CN214401383U - Operation passageway and pipeline bridge structure supported by electrolytic cell body - Google Patents

Operation passageway and pipeline bridge structure supported by electrolytic cell body Download PDF

Info

Publication number
CN214401383U
CN214401383U CN202022058953.7U CN202022058953U CN214401383U CN 214401383 U CN214401383 U CN 214401383U CN 202022058953 U CN202022058953 U CN 202022058953U CN 214401383 U CN214401383 U CN 214401383U
Authority
CN
China
Prior art keywords
electrolytic cell
pipeline bridge
fixedly connected
cell body
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022058953.7U
Other languages
Chinese (zh)
Inventor
唐世棚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoji Dechen Industry and Trade Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022058953.7U priority Critical patent/CN214401383U/en
Application granted granted Critical
Publication of CN214401383U publication Critical patent/CN214401383U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electrolytic Production Of Non-Metals, Compounds, Apparatuses Therefor (AREA)

Abstract

The utility model relates to a pipeline bridge structure technical field specifically is an operation passageway and pipeline bridge structure by electrolysis trough cell body supporting, including the electrolysis trough, the last fixed surface of electrolysis trough is connected with pipeline bridge main part, the operation mouth has all been seted up to pipeline bridge main part's both sides, the quantity of operation mouth is eight, the first mount pad of the equal fixedly connected with in top and the bottom of pipeline bridge main part inner wall and second mount pad. The utility model has the advantages that: this operation passageway and pipeline bridge structure by electrolysis trough cell body supporting sets up the pipeline bridge main part through the upper surface at the electrolysis trough to operation mouth has been seted up at the both sides of pipeline bridge main part, can the person of facilitating the use operate the use, set up the retaining ring at the surface of connecting rod and install fixedly to connecting the rope, and the one end of keeping away from solid fixed ring at the connecting rope sets up the bandage, the user binds bandage and health when operating the use, has reached convenient to use's purpose.

Description

Operation passageway and pipeline bridge structure supported by electrolytic cell body
Technical Field
The utility model relates to a pipeline bridge structure technical field, especially an operation passageway and pipeline bridge structure by electrolysis trough cell body supporting.
Background
The electrolytic cell consists of a cell body, an anode and a cathode, and an anode chamber and a cathode chamber are mostly separated by a diaphragm. The electrolytic bath is divided into three types, namely an aqueous solution electrolytic bath, a molten salt electrolytic bath and a non-aqueous solution electrolytic bath according to the difference of the electrolyte. When direct current passes through the electrolytic cell, an oxidation reaction occurs at the interface of the anode and the solution, and a reduction reaction occurs at the interface of the cathode and the solution, so as to prepare the required product. The optimized design of the electrolytic cell structure and the reasonable selection of the electrode and diaphragm materials are the keys of improving the current efficiency, reducing the cell voltage and saving the energy consumption. At present, the electrolytic cell is developing towards high capacity and low energy consumption. The bipolar type electrolytic cell is suitable for large-scale production and is adopted in the electrolytic water and chlor-alkali industries in sequence. At present, often set up the pipeline bridge at the upper surface of electrolysis trough cell body in order to facilitate the user to operate and use, but current pipeline bridge has following shortcoming:
the operation passageway and the pipeline bridge structure of the cell body support of most of the existing electrolytic cells are inconvenient for users to use, and the users are inconvenient for installing and using the operation passageway and the pipeline bridge structure.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the defects of the prior art and provide an operation passageway and a pipeline bridge structure supported by an electrolytic bath body.
The purpose of the utility model is realized through the following technical scheme: an operation passageway and pipeline bridge structure supported by an electrolytic cell body comprises an electrolytic cell, wherein a pipeline bridge main body is fixedly connected to the upper surface of the electrolytic cell, operation ports are formed in two sides of the pipeline bridge main body, the number of the operation ports is eight, a first mounting seat and a second mounting seat are fixedly connected to the top and the bottom of the inner wall of the pipeline bridge main body, the number of the first mounting seats is three, a first mounting groove and a second mounting groove are formed in the three first mounting seats and the three second mounting seats, and the number of the first mounting groove and the number of the second mounting groove are four and eight respectively;
four the equal swing joint in inside of first mounting groove has the connecting rod, eight the equal swing joint in inside of second mounting groove has the gag lever post, the quantity of gag lever post is two, solid fixed ring has been cup jointed to the surface of connecting rod, gu fixed ring's quantity is four, four gu the equal fixedly connected with in one side of fixed ring connects the rope, four connect the rope and keep away from the equal fixedly connected with bandage of solid fixed ring's the one end.
Optionally, two limiting holes are formed in one end, close to the second mounting seat, of the inner portion of each limiting rod, and the number of the limiting holes is two.
Optionally, the inner parts of the two limiting holes are in threaded connection with limiting bolts.
Optionally, the connecting rod and the limiting rod are fixedly connected with a connecting plate at one end far away from the second mounting seat.
Optionally, the bottom of the inner wall of the pipeline bridge main body is fixedly connected with a limiting strip.
Optionally, the limiting strip and the connecting plate are in lap joint with each other.
Optionally, the two sides of the electrolytic cell are fixedly connected with escalators, and one ends of the escalators, which are far away from the electrolytic cell, are lapped with the ground.
The utility model has the advantages of it is following:
1. this operation passageway and pipeline bridge structure by electrolysis trough cell body supporting, set up the pipeline bridge main part through the upper surface at the electrolysis trough, and operation mouth has been seted up at the both sides of pipeline bridge main part, can the person of facilitating the use operates the use, set up the retaining ring at the surface of connecting rod again and install fixedly to connecting the rope, and the one end of keeping away from solid fixed ring at the connecting rope sets up the bandage, the user binds bandage and health when operating the use, can avoid unexpected emergence, the purpose convenient to use has been reached.
2. This operation passageway and pipeline bridge structures by electrolysis trough cell body supporting, top and bottom through at pipeline bridge main part inner wall set up first mount pad and second mount pad, and set up first mounting groove and second mounting groove in the inside of first mount pad and second mount pad and install connecting rod and gag lever post, can the person of facilitating the use carry out the dismouting construction to it, again set up spacing pore pair spacing bolt and install near the one end of second mount pad in the gag lever post inside, thereby carry out spacing reinforcement to it, fixed effectual purpose has been reached, the rationality of design has been embodied.
Drawings
Fig. 1 is a schematic structural view of a first viewing angle of the present invention;
fig. 2 is a schematic structural view of a second viewing angle of the present invention;
fig. 3 is a schematic structural view of the mounting base of the present invention;
FIG. 4 is a schematic structural view of the main body of the pipeline bridge of the present invention;
fig. 5 is a schematic structural view of the fixing ring of the present invention.
In the figure: 1-an electrolytic cell, 2-a pipeline bridge main body, 3-an operation opening, 4-a first mounting seat, 5-a second mounting seat, 6-a first mounting groove, 7-a second mounting groove, 8-a connecting rod, 9-a limiting rod, 10-a fixing ring, 11-a connecting rope, 12-a binding band, 13-a limiting hole, 14-a limiting bolt, 15-a connecting plate, 16-a limiting strip and 17-a staircase.
Detailed Description
The invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following description.
As shown in fig. 1-5, an operation passageway and pipeline bridge structure supported by an electrolytic cell body comprises an electrolytic cell 1, a pipeline bridge main body 2 is fixedly connected to the upper surface of the electrolytic cell 1, operation ports 3 are respectively arranged on two sides of the pipeline bridge main body 2, the number of the operation ports 3 is eight, a first installation seat 4 and a second installation seat 5 are respectively and fixedly connected to the top and the bottom of the inner wall of the pipeline bridge main body 2, the number of the first installation seats 4 is three, a first installation groove 6 and a second installation groove 7 are respectively arranged inside the three first installation seats 4 and the three second installation seats 5, a connecting rod 8 and a limiting rod 9 are installed by arranging the first installation seat 4 and the second installation seat 5 at the top and the bottom of the inner wall of the pipeline bridge main body 2 and arranging the first installation groove 6 and the second installation groove 7 inside the first installation seat 4 and the second installation seat 5, the mounting and dismounting construction can be conveniently carried out by a user, a limiting hole 13 is formed in one end, close to the second mounting seat 5, of the limiting rod 9 to mount a limiting bolt 14, so that the limiting and reinforcing are carried out on the limiting bolt, and the purpose of good fixing effect is achieved, wherein the number of the first mounting grooves 6 and the number of the second mounting grooves 7 are four and eight respectively; the connecting rods 8 are movably connected inside the four first mounting grooves 6, the limiting rods 9 are movably connected inside the eight second mounting grooves 7, the number of the limiting rods 9 is two, the fixing rings 10 are sleeved on the outer surfaces of the connecting rods 8, the number of the fixing rings 10 is four, the connecting ropes 11 are fixedly connected to one sides of the four fixing rings 10, the binding bands 12 are fixedly connected to one ends, away from the fixing rings 10, of the four connecting ropes 11, the pipeline bridge main body 2 is arranged on the upper surface of the electrolytic bath 1, the operation ports 3 are formed in the two sides of the pipeline bridge main body 2, operation and use of a user can be facilitated, the fixing rings 10 are arranged on the outer surfaces of the connecting rods 8 to fixedly mount the connecting ropes 11, the binding bands 12 are arranged at the ends, away from the fixing rings 10, of the connecting ropes 11, the binding bands 12 are bound with a body when the user operates and uses, and accidents can be avoided, the purpose of convenient to use has been reached, spacing hole 13 has been seted up to the inside one end that is close to second mount pad 5 of two gag lever post 9, the quantity in spacing hole 13 is two, the equal threaded connection in inside of two spacing holes 13 has spacing bolt 14, the equal fixedly connected with connecting plate 15 of one end that second mount pad 5 was kept away from to connecting rod 8 and gag lever post 9, the spacing strip 16 of bottom fixedly connected with of 2 inner walls of pipeline bridge main part, spacing strip 16 and connecting plate 15 overlap joint each other, the equal fixedly connected with staircase 17 in both sides of electrolysis trough 1, the one end that electrolysis trough 1 was kept away from to two staircases 17 overlaps joint each other with ground.
The working process of the utility model is as follows: the pipeline bridge main body 2 is arranged on the upper surface of the electrolytic bath 1, the operation ports 3 are formed in the two sides of the pipeline bridge main body 2, operation and use of a user can be facilitated, the fixing ring 10 is arranged on the outer surface of the connecting rod 8 to install and fix the connecting rope 11, the binding band 12 is arranged at one end, far away from the fixing ring 10, of the connecting rope 11, and the binding band 12 is bound with a body of the user when the user operates and uses the pipeline bridge main body, so that accidents can be avoided, and the purpose of convenience in use is achieved; set up first mount pad 4 and second mount pad 5 through top and bottom at 2 inner walls of pipeline bridge main part, and set up first mounting groove 6 and second mounting groove 7 in the inside of first mount pad 4 and second mount pad 5 and install connecting rod 8 and gag lever post 9, can the person of facilitating the use carry out the dismouting construction to it, set up spacing hole 13 in the inside one end that is close to second mount pad 5 of gag lever post 9 again and install spacing bolt 14, thereby carry out spacing reinforcement to it, the purpose that fixed effectual has been reached, the rationality of design has been embodied.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. An operating aisle and pipeline bridge structure supported by an electrolyzer cell body, comprising an electrolyzer (1), characterized in that: the upper surface of the electrolytic cell (1) is fixedly connected with a pipeline bridge main body (2), the two sides of the pipeline bridge main body (2) are respectively provided with an operation port (3), the number of the operation ports (3) is eight, the top and the bottom of the inner wall of the pipeline bridge main body (2) are respectively fixedly connected with a first installation seat (4) and a second installation seat (5), the number of the first installation seats (4) is three, the interiors of the three first installation seats (4) and the three second installation seats (5) are respectively provided with a first installation groove (6) and a second installation groove (7), and the number of the first installation grooves (6) and the number of the second installation grooves (7) are respectively four and eight;
four the equal swing joint in inside of first mounting groove (6) has connecting rod (8), eight the equal swing joint in inside of second mounting groove (7) has gag lever post (9), the quantity of gag lever post (9) is two, solid fixed ring (10) have been cup jointed to the surface of connecting rod (8), the quantity of solid fixed ring (10) is four, four the equal fixedly connected with in one side of solid fixed ring (10) connects rope (11), four connect rope (11) and keep away from the equal fixedly connected with bandage (12) of one end of solid fixed ring (10).
2. An operating aisle and piping bridge construction supported by an electrolytic cell body according to claim 1, characterised in that: two spacing holes (13) have been seted up to the inside one end that is close to second mount pad (5) of gag lever post (9), the quantity of spacing hole (13) is two.
3. An operating aisle and piping bridge construction supported by an electrolytic cell body according to claim 2, characterised in that: the inner parts of the two limiting holes (13) are in threaded connection with limiting bolts (14).
4. An operating aisle and piping bridge construction supported by an electrolytic cell body according to claim 1, characterised in that: the connecting rod (8) and the limiting rod (9) are far away from the connecting plate (15) which is fixedly connected with the end of the second mounting seat (5).
5. An operating aisle and piping bridge construction supported by an electrolytic cell body according to claim 1, characterised in that: the bottom of the inner wall of the pipeline bridge main body (2) is fixedly connected with a limiting strip (16).
6. An operating aisle and piping bridge construction supported by an electrolytic cell body according to claim 5, characterised in that: the limiting strips (16) are mutually overlapped with the connecting plates (15).
7. An operating aisle and piping bridge construction supported by an electrolytic cell body according to claim 1, characterised in that: both sides of the electrolytic cell (1) are fixedly connected with escalators (17), and one ends, far away from the electrolytic cell (1), of the escalators (17) are in lap joint with the ground.
CN202022058953.7U 2020-09-18 2020-09-18 Operation passageway and pipeline bridge structure supported by electrolytic cell body Active CN214401383U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022058953.7U CN214401383U (en) 2020-09-18 2020-09-18 Operation passageway and pipeline bridge structure supported by electrolytic cell body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022058953.7U CN214401383U (en) 2020-09-18 2020-09-18 Operation passageway and pipeline bridge structure supported by electrolytic cell body

Publications (1)

Publication Number Publication Date
CN214401383U true CN214401383U (en) 2021-10-15

Family

ID=78018984

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022058953.7U Active CN214401383U (en) 2020-09-18 2020-09-18 Operation passageway and pipeline bridge structure supported by electrolytic cell body

Country Status (1)

Country Link
CN (1) CN214401383U (en)

Similar Documents

Publication Publication Date Title
CN210215563U (en) High-pressure water electrolytic tank
CN108550754A (en) A kind of chemical cell being conveniently replaceable electrolyte
JP2020022955A5 (en)
CN214401383U (en) Operation passageway and pipeline bridge structure supported by electrolytic cell body
WO2009070938A1 (en) Multielectrodes-type ion-membrane electrolytic cell with oxygen-cathodes
CN213866441U (en) Plastic polar frame of electrolytic cell
CN203653720U (en) Large combined rare-earth molten salt electrolytic cell system
CN201626990U (en) Energy-saving prebaked anode carbon block for aluminum electrolysis
CN104213152A (en) Aluminum electrolysis cell with center joint material blocking partition plate
CN217127558U (en) Lower structure of electrolytic cell
CN202415696U (en) Large-size full-flooded titanium manganese alloy coating layer anode plate for electrolyzing manganese dioxide
CN208690326U (en) A kind of chemical cell being conveniently replaceable electrolyte
CN104928721B (en) A kind of preparation of low-valence titanium chloride molten salt electrolyte and purifier
CN101736359B (en) Solid polymer electrolyte electrolytic bath
CN108588747A (en) A kind of constant gradient spaced electrodes electrolysis unit
CN211595806U (en) Hydrogen machine for breathing
CN207818754U (en) A kind of metal-air battery system
CN217026099U (en) Chemical electrolytic bath for metal scrap
CN205474033U (en) Ionic exchange membrane electrolyser
CN205474019U (en) Novel ion membrane electrolytic cell
CN205474020U (en) Novel ion membrane electrolytic cell
CN2931500Y (en) Magnesium electrolysis bath side cathode configuration structure
CN207828420U (en) A kind of electrochemistry electrolytic cell
CN206666655U (en) tungsten cathode device and electrolytic cell
CN219315102U (en) Novel water electrolysis polar plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221020

Address after: No. 1, Yingda Road, High tech Development Zone, Baoji, Shaanxi, 721000 (Room 107, Zhonghuan Hotel)

Patentee after: Baoji Dechen Industry and Trade Co.,Ltd.

Address before: 234000 Anhui city in Suzhou province near the River Road No. 215

Patentee before: Tang Shipeng

TR01 Transfer of patent right