CN214400384U - Upper structure for single-nozzle water-coal-slurry water-cooled wall gasification furnace - Google Patents

Upper structure for single-nozzle water-coal-slurry water-cooled wall gasification furnace Download PDF

Info

Publication number
CN214400384U
CN214400384U CN202023295658.XU CN202023295658U CN214400384U CN 214400384 U CN214400384 U CN 214400384U CN 202023295658 U CN202023295658 U CN 202023295658U CN 214400384 U CN214400384 U CN 214400384U
Authority
CN
China
Prior art keywords
water
combustion chamber
gasifier
gasification furnace
burner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023295658.XU
Other languages
Chinese (zh)
Inventor
郭文龙
闫晓泽
景明华
荆云峰
闫永兵
王杰
裴双
申静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangmei Fengxi Fertilizer Industry Group Co ltd
Original Assignee
Yangmei Fengxi Fertilizer Industry Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangmei Fengxi Fertilizer Industry Group Co ltd filed Critical Yangmei Fengxi Fertilizer Industry Group Co ltd
Priority to CN202023295658.XU priority Critical patent/CN214400384U/en
Application granted granted Critical
Publication of CN214400384U publication Critical patent/CN214400384U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an upper structure for a single-nozzle water-coal-slurry water-cooled wall gasifier, which comprises a gasifier body, wherein a combustion chamber is arranged in the gasifier body, an annular cavity is arranged between the outer wall of the combustion chamber and the gasifier body, and nitrogen is filled in the annular cavity; an upper coil pipe and a refractory castable are arranged at an upper opening of the combustion chamber in the gasification furnace body, the upper coil pipe is coated in the refractory castable, and the refractory castable is hermetically connected with the upper opening of the combustion chamber; the upper part of the gasification furnace body is provided with a flange structure; the gasification furnace body is provided with a burner which penetrates through the flange structure and the refractory castable, the outer end of the burner is communicated with the outside of the gasification furnace, and the inner end of the burner is communicated with the combustion chamber; and a cooling jacket is arranged on the burner, and the burner is cooled by the cooling jacket water circulation. The scheme cancels the water inlet and outlet pipes of the upper coil pipe, simplifies the structure of the furnace top, improves the continuous operation time of the gasification furnace, reduces the maintenance frequency, eliminates the potential safety hazard caused by frequent furnace opening and shutting, and improves the production benefit.

Description

Upper structure for single-nozzle water-coal-slurry water-cooled wall gasification furnace
Technical Field
The utility model relates to a single nozzle coal slurry water-cooling wall gasifier field of making design, concretely relates to superstructure that is used for single nozzle coal slurry water-cooling wall gasifier.
Background
The top and the hanging wall pipe of the single-nozzle coal water slurry gasification furnace of the original system are frequently leaked and need to be replaced every year, the furnace needs to be forcibly shut down and maintained after replacement, complex processes such as pressure relief, replacement, cooling, top cover screw removal, top coil replacement, upper coil positioning, refractory material pouring, sealing surface repair, top cover screw fastening, air tightness experiment, long-time furnace drying and feeding are needed after each shutdown, the maintenance time is about 6 days, the furnace drying time is more than 2 days and more than 8 days in total, and the production, the technology and the maintenance personnel in the mobile workshop, the castable manufacturers, the materials, the equipment suppliers and the like can be firmly maintained day and night, a large amount of manpower, material resources and financial resources are consumed, the whole-year production task is influenced, the production cost is increased, and the enterprise benefit loss is serious.
In addition, because the water inlet and outlet pipes are reserved on the two large flanges at the top of the furnace, the assembly and the installation are very difficult, and the assembly time of the gasification furnace is seriously influenced; there are also many potential safety hazards during the blow-out period and the risk of the rear system stopping due to loss of air supply is increased.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an superstructure that is used for single nozzle coal slurry water-cooling wall gasifier.
In order to achieve the above object, the utility model provides a following technical scheme: an upper structure for a single-nozzle water-coal-slurry water-cooled wall gasifier comprises a gasifier body, wherein a combustion chamber is arranged in the gasifier body, an annular cavity is arranged between the outer wall of the combustion chamber and the gasifier body, and nitrogen is filled in the annular cavity; an upper coil pipe and a refractory castable are arranged at an upper opening of the combustion chamber in the gasification furnace body, the upper coil pipe is coated in the refractory castable, and the refractory castable is hermetically connected with the upper opening of the combustion chamber; the upper part of the gasification furnace body is provided with a flange structure; the gasification furnace body is provided with a burner which penetrates through the flange structure and the refractory castable, the outer end of the burner is communicated with the outside of the gasification furnace, and the inner end of the burner is communicated with the combustion chamber; and a cooling jacket is arranged on the burner, and circulating cooling liquid is arranged in the cooling jacket.
Further, the flange structure comprises an outer flange and an inner flange which are connected in an up-and-down stacking mode.
Further, the inner flange is fixedly connected with the gasification furnace body.
Further, the circulating cooling liquid is circulating cooling water.
Furthermore, a sealing plate is arranged in the gasification furnace body to separate the annular cavity from the combustion chamber; the shrouding is through full welding mode and combustion chamber upper portion opening outer wall and gasification stove body sealing connection.
Furthermore, the surface of the sealing plate is coated with a refractory castable.
Furthermore, the upper coil is of an empty pipe structure which does not store cooling liquid.
Furthermore, the material of the upper coil pipe is Incoloy825 material or 12Cr1MoVG material.
The technical effects of the utility model are as follows: the top coil and the slag hole coil of the gasification furnace of the original design scheme are leaked every year, the furnace shutdown maintenance and replacement are required, the material cost for replacing the coil of each gasification furnace is 8 ten thousand yuan, and the other maintenance and management costs are about 15 ten thousand yuan, which is 23 ten thousand yuan in total. The total time from the shutdown to the startup of the furnace is at least 8 days, the urea yield of the end product is about 11032.9 tons, the sale price is 1820 ten thousand yuan calculated by 1650 yuan/ton, and the total capital loss is 1843 ten thousand yuan per year. Meanwhile, various potential safety hazards can be caused in the process of starting and stopping the automobile, and the continuous production operation of the rear body system is threatened. The scheme improves the continuous operation time of the single-nozzle coal water slurry gasification furnace, reduces the maintenance frequency, eliminates the potential safety hazard caused by frequent furnace opening and shutting, reduces the capital loss and greatly improves the production benefit. The water inlet and outlet pipe of the upper coil pipe is eliminated, the design of the furnace top is simpler, and the installation is more convenient; effectively completely cut off combustion chamber and gasification furnace body, factor of safety is bigger, and the operation is more stable.
Drawings
FIG. 1 is a schematic view of the top structure of a gasification furnace in the example.
Reference numerals: 1. a gasifier body; 2. a combustion chamber; 3. an annular cavity; 4. burning a nozzle; 5. feeding a coil pipe; 6. closing the plate; 7. an outer flange; 71. an inner flange; 8. a refractory castable.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
As shown in figure 1, the upper structure for the single-nozzle water-coal-slurry water-cooled wall gasifier comprises a gasifier body 1, wherein a combustion chamber 2 is arranged in the gasifier body 1, an annular cavity 3 is arranged between the outer wall of the combustion chamber 2 and the gasifier body 1, and nitrogen is filled in the annular cavity 3 and has temperature and pressure indications; an upper coil pipe 5 and a refractory castable 8 are arranged at an upper opening of the combustion chamber 2 in the gasification furnace body 1, the upper coil pipe 5 is coated in the refractory castable 8, and the refractory castable 8 is hermetically connected with the upper opening of the combustion chamber 2; the upper part of the gasification furnace body 1 is provided with a flange structure; the gasification furnace body 1 is provided with a burner 4, the burner 4 penetrates through the flange structure and the refractory castable 8, the outer end of the burner 4 is communicated with the outside of the gasification furnace, and the inner end of the burner 4 is communicated with the combustion chamber 2; and a cooling jacket is arranged on the burner 4, and circulating cooling liquid is arranged in the cooling jacket and can be circulating cooling water. The burner 4 is cooled by self cooling jacket water circulation. The upper coil 5 is an empty tube structure in which the coolant is not stored. The winding pipe in the upper coil pipe 5 is not communicated with water, and only serves as a framework to lay refractory castable 8 to surround the periphery of the burner 4.
The flange structure comprises an outer flange 7 and an inner flange 71 which are connected in an up-and-down stacking manner.
The inner flange 71 is fixedly connected with the gasification furnace body 1.
A sealing plate 6 is arranged in the gasification furnace body 1 to separate the annular cavity 3 from the refractory castable 8; the closing plate 6 is hermetically connected with the outer wall of the upper opening of the combustion chamber 2 and the gasification furnace body 1 in a full-welding mode.
The surface of the closing plate 6 is coated with a refractory castable material 8.
The material of the upper coil 5 is Incoloy825 material or 12Cr1MoVG material. The 12Cr1MoVG is mainly used for boilers, and has low corrosion resistance requirement and the highest working temperature of 580 ℃; incoloy825 has good corrosion resistance in various complex environments, and the maximum working temperature is 900 ℃.
The improvement of the scheme is that the device comprises a shell,
1. water inlet and outlet pipelines on two large flanges at the top of the gasification furnace are eliminated, a metal winding pipe in an upper coil pipe 5 is used as a framework to lay refractory castable to wrap the periphery of a burner 4, and the body of the burner 4 is cooled by water of a jacket boiler of the burner;
2. the material of a metal winding pipe in the upper coil pipe 5 which runs under the severe working condition is adjusted to Incoloy825 from original 12Cr1MoVG, wherein the former is mainly used for boilers and has low corrosion resistance requirement and the highest working temperature of 580 ℃; incoloy825 has good corrosion resistance in various complex environments, and has the highest working temperature of 900 ℃;
3. the sealing plate 6 is fully welded and coated with the refractory castable 8, while the original design is spot-welded and the castable is not coated inside and outside.
Through the improvement, the furnace top structure is simplified, the continuous operation time of the single-nozzle coal water slurry gasification furnace is improved, the maintenance frequency is reduced, the potential safety hazard caused by frequent furnace opening and shutting is eliminated, the capital loss is reduced, and the production benefit is greatly improved.
The upper coil pipe 5 has the following functions: isolating the combustion chamber 2 and the gasification furnace body 1, wherein the temperature of the combustion chamber 2 is over 1700 ℃, and the temperature of the shell is controlled within 150 ℃; the protection burner 4 works for a long time in a high-temperature, high-humidity and high-corrosion environment.
The design method is as follows: by analyzing the design action and the working principle of the burner 4 and the upper coil 5, the corrosion condition of ions in gasified raw material coal on alloy materials in a dew point region and other factors, the water inlet and outlet pipelines of the upper coil 5 are closed, the coil in the furnace is used as a framework to lay refractory castable 8 to surround the periphery of the burner 4, and the body of the burner 4 is cooled by cooling jacket water in a circulating way; aiming at the problem of material corrosion under the severe working condition of the top coil pipe, the original 12Cr1MoVG material is adjusted to be an Inconel825 material. By adopting the scheme, the temperature of the vault of the gasification furnace, the temperature of the burner 4 flow meter and the temperature of the annular cavity 3 are normal, no abnormality or fluctuation is found, and other process indexes are normal. The coil pipe does not leak any more, the temperature of the vault of the gasification furnace and the temperature of the annular cavity 3 are normal, and no rising trend occurs; the cooling water flow of the burner 4 is normal, and no flow rising trend is found. The replacement frequency of the coil pipe and the frequency of furnace shutdown and maintenance are reduced, and the continuous operation time of the single-nozzle coal water slurry gasification furnace is prolonged; the yield of the synthesis gas is improved, the physical yield of an enterprise is improved, the consumption of vulnerable parts is reduced, and the enterprise benefit is improved; the start-up and shutdown time and the oven drying time are reduced, and the gas consumption is reduced; the generation of pollutants is reduced, and the environment is protected; the number of times of starting and stopping is reduced, potential safety hazards are avoided, and the risk that the system stops without an air source is reduced; the design of the furnace top is simpler and the installation is more convenient; effectively isolate combustion chamber 2 and gasification furnace body 1, factor of safety is bigger, and the operation is more stable.
The above description has been made in detail only for the preferred embodiment of the present invention, but the present invention is not limited to the above embodiment, and various changes can be made without departing from the spirit of the present invention within the knowledge scope of those skilled in the art, and all such changes are intended to be encompassed by the present invention.

Claims (8)

1. An upper structure for a single-nozzle water-coal-slurry water-cooled wall gasifier is characterized by comprising a gasifier body, wherein a combustion chamber is arranged in the gasifier body, an annular cavity is arranged between the outer wall of the combustion chamber and the gasifier body, and nitrogen is filled in the annular cavity; an upper coil pipe and a refractory castable are arranged at an upper opening of the combustion chamber in the gasification furnace body, the upper coil pipe is coated in the refractory castable, and the refractory castable is hermetically connected with the upper opening of the combustion chamber; the upper part of the gasification furnace body is provided with a flange structure; the gasification furnace body is provided with a burner which penetrates through the flange structure and the refractory castable, the outer end of the burner is communicated with the outside of the gasification furnace, and the inner end of the burner is communicated with the combustion chamber; and a cooling jacket is arranged on the burner, and circulating cooling liquid is arranged in the cooling jacket.
2. The superstructure of single nozzle water-coal-slurry water-cooled wall gasifier according to claim 1, wherein the flange structure comprises an outer flange and an inner flange which are connected in an up-and-down stacking manner.
3. The superstructure for single nozzle coal water slurry water-cooled wall gasifier of claim 2, wherein the inner flange is fixedly connected with the gasifier body.
4. The superstructure for single nozzle coal-water slurry water-cooled wall gasifier according to claim 1, characterized in that the circulating cooling liquid is circulating cooling water.
5. The superstructure of the single nozzle water-coal-slurry water-cooled wall gasifier of claim 1, wherein a sealing plate is arranged in the gasifier body to separate the annular cavity from the combustion chamber; the shrouding is through full welding mode and combustion chamber upper portion opening outer wall and gasification stove body sealing connection.
6. The superstructure of single nozzle water-coal-slurry water-cooled wall gasifier of claim 5, wherein the surface of the closing plate is coated with refractory castable.
7. The superstructure of claim 1, wherein the upper coil is an empty pipe structure without coolant.
8. The superstructure of claim 1, wherein the upper coil is made of Incoloy825 material or 12Cr1MoVG material.
CN202023295658.XU 2020-12-31 2020-12-31 Upper structure for single-nozzle water-coal-slurry water-cooled wall gasification furnace Expired - Fee Related CN214400384U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023295658.XU CN214400384U (en) 2020-12-31 2020-12-31 Upper structure for single-nozzle water-coal-slurry water-cooled wall gasification furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023295658.XU CN214400384U (en) 2020-12-31 2020-12-31 Upper structure for single-nozzle water-coal-slurry water-cooled wall gasification furnace

Publications (1)

Publication Number Publication Date
CN214400384U true CN214400384U (en) 2021-10-15

Family

ID=78044700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023295658.XU Expired - Fee Related CN214400384U (en) 2020-12-31 2020-12-31 Upper structure for single-nozzle water-coal-slurry water-cooled wall gasification furnace

Country Status (1)

Country Link
CN (1) CN214400384U (en)

Similar Documents

Publication Publication Date Title
CN214400384U (en) Upper structure for single-nozzle water-coal-slurry water-cooled wall gasification furnace
CN102925218A (en) In-line gasifier having a cooling jacket with pipework passing through the side of the pressure cladding
CN212619379U (en) Electric heater for sealing sulfur-containing gas
JP2023543051A (en) Blast furnace with shaft supply of hot process gas
CN112812851A (en) Upper structure for single-nozzle water-coal-slurry water-cooled wall gasification furnace
CN102041104A (en) Flame detection probe protector
CN201825987U (en) Novel sealing device for high-temperature resistant protective gas
CN210127251U (en) Blast furnace roof water-cooling chute inspection hole sealing structure
CN108473895A (en) Gasification system and technique
CA3000899C (en) Cooling device for a burner of a gasification reactor
WO2018150991A1 (en) Burner, gasification furnace provided with burner, and burner attaching method
CN201873652U (en) Protective device for flame detection probe
CN212931093U (en) Heat exchanger capable of preventing shell side gas phase thermal resistance
CN203878119U (en) Heat unit with heat transmitter
US6024028A (en) Protection of the air ports of a recovery boiler
CN218763424U (en) Boiler tuyere sealing structure
CN216923600U (en) Wear-resistant air pipe elbow for steel mill blast furnace
CN205740914U (en) For producing the entrained-flow reactor of forming gas
CN212206404U (en) Hot air temperature thermocouple protection device
CN214088418U (en) Reactor and reaction system
CN2580374Y (en) Water cooling cupola
CN221397823U (en) Novel chilling chamber
CN212293455U (en) Annular cavity structure of pressurized gasification furnace and annular cavity pressure control loop
CN104328236A (en) Method for replacing cooling equipment under blast furnace feeding situation
CN213542461U (en) Combustion oil gun

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211015