CN214388775U - Mountaineering rope with anti-drop subassembly - Google Patents

Mountaineering rope with anti-drop subassembly Download PDF

Info

Publication number
CN214388775U
CN214388775U CN202023314436.8U CN202023314436U CN214388775U CN 214388775 U CN214388775 U CN 214388775U CN 202023314436 U CN202023314436 U CN 202023314436U CN 214388775 U CN214388775 U CN 214388775U
Authority
CN
China
Prior art keywords
fastening
fastening rack
rack
tooth
climbing rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023314436.8U
Other languages
Chinese (zh)
Inventor
刘丽娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou Meifan Rope Mesh Belt Co ltd
Original Assignee
Taizhou Meifan Rope Mesh Belt Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou Meifan Rope Mesh Belt Co ltd filed Critical Taizhou Meifan Rope Mesh Belt Co ltd
Priority to CN202023314436.8U priority Critical patent/CN214388775U/en
Application granted granted Critical
Publication of CN214388775U publication Critical patent/CN214388775U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a climbing rope with anti-drop subassembly, the upper end of climbing rope body is processed respectively with the lower extreme and is had the tightening rope of mutual symmetry, and the surface mounting of climbing rope body has first fastening rack, the inboard surface machining of first fastening rack has first spacing tooth, and the inboard of first fastening rack installs second fastening rack, the inboard surface machining of second fastening rack has the spacing tooth of second, and the right-hand member of first fastening rack and second fastening rack links to each other with the fixed block, the left side lower extreme surface machining of fixed block has first tooth hole and second tooth hole, and the right side machining of fixed block has the anti-drop subassembly, the bottom processing of anti-drop subassembly has spacing pinion rack. The utility model discloses a climbing rope with anti-drop subassembly can reduce the operation degree of difficulty, and can prevent that other fastening structure from droing, reduces mountain-climbing motion's danger.

Description

Mountaineering rope with anti-drop subassembly
Technical Field
The utility model relates to a climbing rope technical field specifically is a climbing rope with anti-drop subassembly.
Background
Mountain climbing ropes are the most important equipment in mountain climbing activities both historically and today. The climbing technologies such as ascending, descending and protection are all unfolded by taking a climbing rope as a center. Numerous climbing articles such as a carabiner, a safety belt and the like can only play a role when being connected with a climbing rope. The early climbing ropes are made of cotton, and then are made of hemp, and after the fifty years, the early climbing ropes are made of nylon fibers with excellent performances in aspects of tension, durability, abrasion resistance and the like, but the existing climbing ropes are relatively complicated to operate in the using process, and easily cause component falling due to improper operation, so that personal risks are caused.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a climbing rope with anti-drop subassembly has the advantage that prevents the rope fastener and drops, has solved the problem among the prior art.
In order to achieve the above object, the utility model provides a following technical scheme: a mountaineering rope with an anti-falling assembly comprises a mountaineering rope body, wherein the upper end and the lower end of the mountaineering rope body are respectively provided with a tightening rope which is symmetrical to each other, the surface of the mountaineering rope body is provided with a first fastening rack, the inner side surface of the first fastening rack is provided with a first limiting tooth, the inner side of the first fastening rack is provided with a second fastening rack, the inner side surface of the second fastening rack is provided with a second limiting tooth, the first fastening rack and the second fastening rack are respectively sleeved on the surface of the mountaineering rope body, the right ends of the first fastening rack and the second fastening rack are connected with a fixed block, the surface of the lower end of the left side of the fixed block is provided with a first tooth hole, the upper end of the first tooth hole is provided with a second tooth hole, the right ends of the first fastening rack and the second fastening rack are connected with the fixed block by inserting the first tooth hole and the second tooth hole, and the right side of the fixed block is provided with the anti-falling assembly, a limiting toothed plate is processed at the bottom of the anti-falling assembly and is positioned at the upper end of the first fastening rack;
the top surface of anti-drop subassembly links to each other with the connecting block, and the bottom processing of connecting block has the inserted bar, and the bottom of inserted bar links to each other rather than inside clamp plate through inserting anti-drop subassembly, and the bottom left and right sides of inserted bar is connected with first gag lever post and second gag lever post respectively, and the other end of first gag lever post and second gag lever post is connected with the movable block, and just first gag lever post and second gag lever post are located the inside of clamp plate, and the bottom surface machining of clamp plate has the third spacing tooth of mutual symmetry.
Preferably, the first tooth hole and the second tooth hole are through hole grooves in the front and back direction, and the right ends of the first fastening rack and the second fastening rack are located outside the right side of the fixing block through the hole grooves.
Preferably, the left ends of the first fastening rack and the second fastening rack are glued with the left side of the fixing block.
Preferably, the left side and the right side of the bottom of the inserted bar are respectively provided with a groove, and the first limiting rod and the second limiting rod are connected with the inserted bar through the insertion grooves.
Preferably, a slotted hole is formed in the left side surface of the anti-falling assembly, and the right end of the second fastening rack is connected with the anti-falling assembly through the slotted hole.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses climbing rope with anti-drop subassembly, tighten the both ends that the rope can tighten up the climbing rope, and first spacing tooth and the spacing tooth of second can tighten up and fix the rope, first fastening rack and second fastening rack can be fixed to the fixed block, and the right side processing of fixed block has the anti-drop subassembly, the anti-drop subassembly can be used for preventing that first fastening rack and second fastening rack from droing with the fixed block easily, the security of use improves, the bottom processing of anti-drop subassembly has spacing pinion rack, spacing pinion rack can be used for controlling the elasticity of first fastening rack, through above-mentioned structural connection, can reduce the operation degree of difficulty, and can prevent that other fastening structure from droing, reduce the danger of climbing motion.
Drawings
FIG. 1 is a three-dimensional structure of the present invention;
FIG. 2 is a schematic view of the connection of the fixed block structure of the present invention;
FIG. 3 is a connection plan view of the fixing block structure of the present invention;
fig. 4 is a connection diagram of the internal structure of the anti-falling off assembly of the present invention.
In the figure: 1. a climbing rope body; 2. tightening the rope; 3. a first fastening rack; 31. a first limit tooth; 4. a second fastening rack; 41. a second limit tooth; 5. a fixed block; 51. a first perforation; 52. a second perforation; 6. an anti-drop assembly; 61. connecting blocks; 62. inserting a rod; 63. a first limit rod; 64. a second limiting rod; 65. a movable block; 66. pressing a plate; 67. a third limit tooth; 7. a limit toothed plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a mountain-climbing rope with an anti-falling assembly includes a mountain-climbing rope body 1, fastening ropes 2 are symmetrically processed at the upper end and the lower end of the mountain-climbing rope body 1, the fastening ropes 2 can fasten both ends of the mountain-climbing rope, a first fastening rack 3 is mounted on the surface of the mountain-climbing rope body 1, a first limiting tooth 31 is processed on the inner side surface of the first fastening rack 3, a second fastening rack 4 is mounted on the inner side of the first fastening rack 3, a second limiting tooth 41 is processed on the inner side surface of the second fastening rack 4, the first limiting tooth 31 and the second limiting tooth 41 can fasten and fix the rope, the first fastening rack 3 and the second fastening rack 4 are respectively sleeved on the surface of the mountain-climbing rope body 1, the right ends of the first fastening rack 3 and the second fastening rack 4 are connected to a fixing block 5, the fixing block 5 can fix the first fastening rack 3 and the second fastening rack 4, a first toothed hole 51 is processed on the surface of the lower end of the left side of the fixed block 5, a second toothed hole 52 is processed on the upper end of the first toothed hole 51, the right ends of the first fastening rack 3 and the second fastening rack 4 are connected with the fixed block 5 by inserting the first toothed hole 51 and the second toothed hole 52, an anti-falling assembly 6 is processed on the right side of the fixed block 5, the anti-falling assembly 6 can be used for preventing the first fastening rack 3 and the second fastening rack 4 from easily falling off from the fixed block 5, the use safety is improved, a limit toothed plate 7 is processed on the bottom of the anti-falling assembly 6, the limit toothed plate 7 can be used for controlling the tightness of the first fastening rack 3, the limit toothed plate 7 is positioned on the upper end of the first fastening rack 3, the top surface of the anti-falling assembly 6 is connected with a connecting block 61, a plug rod 62 is processed on the bottom of the connecting block 61, the bottom of the plug rod 62 is connected with a pressing plate 66 inside the plug-falling assembly 6, and the left and right sides of the bottom of the inserted link 62 are respectively connected with a first limit rod 63 and a second limit rod 64, the other ends of the first limit rod 63 and the second limit rod 64 are connected with a movable block 65, the first limiting rod 63 and the second limiting rod 64 are located inside the pressing plate 66, third limiting teeth 67 which are symmetrical to each other are machined on the surface of the bottom of the pressing plate 66, the first tooth holes 51 and the second tooth holes 52 are through hole grooves which are through from front to back, the right ends of the first fastening rack 3 and the second fastening rack 4 pass through the hole grooves and are located outside the right side of the fixing block 5, the left ends of the first fastening rack 3 and the second fastening rack 4 are glued with the left side of the fixing block 5, grooves are machined on the left side and the right side of the bottom of the inserting rod 62, grooves are machined on the two sides of the bottom of the inserting rod 62, the first limiting rod 63 and the second limiting rod 64 are connected with the inserting rod 62 through the insertion grooves, a groove hole is machined on the surface of the left side of the anti-falling component 6, and the right end of the second fastening rack 4 is connected with the anti-falling component 6 through the groove hole.
In summary, the following steps: the utility model discloses a climbing rope with anti-drop subassembly, the upper end and the lower extreme of climbing rope body 1 are processed respectively and are had the tightening rope 2 of mutual symmetry, and climbing rope body 1's surface mounting has first fastening rack 3, the inboard surface processing of first fastening rack 3 has first spacing tooth 31, and the inboard of first fastening rack 3 is installed second fastening rack 4, the inboard surface processing of second fastening rack 4 has second spacing tooth 41, and the right-hand member of first fastening rack 3 and second fastening rack 4 links to each other with fixed block 5, the left side lower extreme surface processing of fixed block 5 has first perforation 51 and second perforation 52, and the right side processing of fixed block 5 has anti-drop subassembly 6, the bottom processing of anti-drop subassembly 6 has spacing pinion rack 7, the tightening rope 2 can tighten up the both ends of climbing rope, and first spacing tooth 31 and second spacing tooth 41 can tighten up and fix the rope, first fastening rack 3 and second fastening rack 4 can be fixed to fixed block 5, and the right side processing of fixed block 5 has anti-drop subassembly 6, anti-drop subassembly 6 can be used for preventing that first fastening rack 3 and second fastening rack 4 from droing with fixed block 5 easily, the security of use is improved, anti-drop subassembly 6's bottom processing has spacing pinion rack 7, can be used for controlling the elasticity of first fastening rack 3 through spacing pinion rack 7, thereby can reach the effect that prevents the rope fastener and drop.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a climbing rope with anti-drop subassembly, includes climbing rope body (1), its characterized in that: the upper end and the lower end of the mountain climbing rope body (1) are respectively provided with a tightening rope (2) which are symmetrical to each other, the surface of the mountain climbing rope body (1) is provided with a first fastening rack (3), the inner side surface of the first fastening rack (3) is provided with a first limiting tooth (31), the inner side of the first fastening rack (3) is provided with a second fastening rack (4), the inner side surface of the second fastening rack (4) is provided with a second limiting tooth (41), the first fastening rack (3) and the second fastening rack (4) are respectively sleeved on the surface of the mountain climbing rope body (1), the right ends of the first fastening rack (3) and the second fastening rack (4) are connected with a fixing block (5), the left side lower end surface of the fixing block (5) is provided with a first tooth hole (51), the upper end of the first tooth hole (51) is provided with a second tooth hole (52), and the right ends of the first fastening rack (3) and the second fastening rack (4) are inserted into the first tooth hole (51) and the second tooth hole (52) (52) The anti-falling rack is connected with the fixed block (5), the anti-falling assembly (6) is processed on the right side of the fixed block (5), the limiting toothed plate (7) is processed at the bottom of the anti-falling assembly (6), and the limiting toothed plate (7) is located at the upper end of the first fastening rack (3); the top surface of anti-drop subassembly (6) links to each other with connecting block (61), the bottom processing of connecting block (61) has inserted bar (62), the bottom of inserted bar (62) links to each other rather than inside clamp plate (66) through inserting anti-drop subassembly (6), and the bottom left and right sides of inserted bar (62) is connected with first gag lever post (63) and second gag lever post (64) respectively, the other end of first gag lever post (63) and second gag lever post (64) is connected with movable block (65), and first gag lever post (63) and second gag lever post (64) are located the inside of clamp plate (66), the bottom surface machining of clamp plate (66) has third spacing tooth (67) of mutual symmetry.
2. The mountain climbing rope with the anti-drop assembly according to claim 1, wherein the first and second tooth holes (51, 52) are through-going hole slots, and right ends of the first and second fastening racks (3, 4) pass through the hole slots and are located outside the right side of the fixing block (5).
3. The mountain climbing rope with the anti-drop assembly according to claim 1, wherein left ends of the first and second fastening racks (3, 4) are glued to a left side of the fixing block (5).
4. The mountain climbing rope with the anti-falling component as claimed in claim 1, wherein grooves are respectively formed at the left and right sides of the bottom of the insertion rod (62), and the first limiting rod (63) and the second limiting rod (64) are connected with the insertion rod (62) through the insertion grooves.
5. The mountain climbing rope with the anti-falling component as claimed in claim 1, wherein the left side surface of the anti-falling component (6) is provided with a slotted hole, and the right end of the second fastening rack (4) is connected with the anti-falling component (6) through the slotted hole.
CN202023314436.8U 2020-12-31 2020-12-31 Mountaineering rope with anti-drop subassembly Expired - Fee Related CN214388775U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023314436.8U CN214388775U (en) 2020-12-31 2020-12-31 Mountaineering rope with anti-drop subassembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023314436.8U CN214388775U (en) 2020-12-31 2020-12-31 Mountaineering rope with anti-drop subassembly

Publications (1)

Publication Number Publication Date
CN214388775U true CN214388775U (en) 2021-10-15

Family

ID=78043443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023314436.8U Expired - Fee Related CN214388775U (en) 2020-12-31 2020-12-31 Mountaineering rope with anti-drop subassembly

Country Status (1)

Country Link
CN (1) CN214388775U (en)

Similar Documents

Publication Publication Date Title
US6401309B1 (en) Fastening hook for elastic rope
CA2854804C (en) Connecting adjustment assembly
CN214388775U (en) Mountaineering rope with anti-drop subassembly
CN211584974U (en) Anti-falling device for climbing pole tower for high-altitude operation personnel
CN212700388U (en) Effectual board of ascending a height of antiskid
US20050172461A1 (en) Karabiners
CN209917110U (en) Safety belt for construction with function of promptly saving oneself
CN208877843U (en) A kind of climbers for preventing from falling off from electric pole
CN210438278U (en) Adjustable multipurpose guided missile hoist
CN212730757U (en) Portable on-site monitoring is ascended a height, is climbed and is used sampling safety belt
CN210695275U (en) Wooden support frame of trees rejuvenation
CN219154126U (en) Anti-drop's handicraft pendant
CN211323296U (en) Ribbon tightening structure
CN218739928U (en) Anti-falling device
CN218652773U (en) Safety falling protector for steel wire rope
CN218716494U (en) Antiskid device for crawling ladder
CN214743171U (en) Avoid sprocket crank of dislocation
CN211241940U (en) Rope fastener
CN202128858U (en) Self-locking climbing protector and self-locking climbing protection device
CN211298632U (en) Prevent zip fastener subassembly of gliding
CN212465149U (en) Zipper with rubber tooth single-layer explosion-proof structure
CN213418652U (en) Conveniently-climbing electric concrete pole
CN203040912U (en) Draw-type lock catch
CN221788079U (en) Climbing buckle and climbing device for pole tower
CN207001249U (en) A kind of aircraft nose card insertion type band

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211015

CF01 Termination of patent right due to non-payment of annual fee