CN214383888U - Automatic maintenance device for bridge pier column - Google Patents

Automatic maintenance device for bridge pier column Download PDF

Info

Publication number
CN214383888U
CN214383888U CN202023125200.XU CN202023125200U CN214383888U CN 214383888 U CN214383888 U CN 214383888U CN 202023125200 U CN202023125200 U CN 202023125200U CN 214383888 U CN214383888 U CN 214383888U
Authority
CN
China
Prior art keywords
horizontal part
water storage
pier stud
water
adjusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023125200.XU
Other languages
Chinese (zh)
Inventor
岑杰
蒋珊敏
林靖涵
娄柳东
胡鑫杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo City Urban Ecological Construction Group Co ltd
Original Assignee
Ningbo City Urban Ecological Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo City Urban Ecological Construction Group Co ltd filed Critical Ningbo City Urban Ecological Construction Group Co ltd
Priority to CN202023125200.XU priority Critical patent/CN214383888U/en
Application granted granted Critical
Publication of CN214383888U publication Critical patent/CN214383888U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to an automatic curing means of bridge pier stud relates to the field of bridge maintenance, it includes the pier stud, still include the water storage fill, the equal butt of first horizontal part and second horizontal part is on the circumference lateral wall of pier stud, first horizontal part butt in the upside of second horizontal part, first vertical part butt is close to one side of pier stud in the vertical portion of second, fixedly connected with outlet pipe on the water storage fill, the one end fixed connection that the water storage was fought is kept away from to the outlet pipe is in the feed tank, still be equipped with on the water storage fill and carry out the adjusting part who adjusts the relative position between first L template and the second L template. Improved from first L type pipe and second L type intraductal spun water because the velocity of flow is too fast not absorbed by the pier stud and flow down along the circumference lateral wall of pier stud, caused the problem of the waste of water resource, this application has along the lateral wall of pier stud the water storage that flows down flow back to in the supply tank in the water bucket for the water resource can reuse, is difficult for extravagant, has improved the effect of the utilization ratio of water resource.

Description

Automatic maintenance device for bridge pier column
Technical Field
The application relates to the field of bridge maintenance, in particular to an automatic maintenance device for bridge pier columns.
Background
The cast-in-place concrete structure needs to be maintained after cement is solidified so as to keep the surface of the concrete moist, thereby ensuring that the hydration and hardening of the cement can be smoothly carried out. If the curing is not carried out in time, after the surface of the concrete loses water, the hydration reaction of the cement is stopped, and simultaneously, the surface shrinks due to drying, and under the action of shrinkage stress, a concrete structure can generate cracks, so that the safety and the normal use of the structure are influenced.
In the related art, chinese patent with publication number CN211171635U discloses an automatic maintenance device for bridge pier stud, including supply tank, water pump, mount and nozzle group, the nozzle group includes two first L type pipes and two second L type pipes, the both ends of second L type pipe are worn to establish the one end of different first L type pipes respectively in a sliding manner, a plurality of hole for water spraying have all been seted up on the inside wall of first L type pipe and the second L type pipe, be provided with the mounting on the outer wall of first L type pipe, be provided with lifting unit on the mount, the output fixedly connected with one end of water pump and the water pipe of first L type pipe intercommunication. Through the position of the intraductal second L type pipe of adjustment first L type, rethread mounting makes both fixed, including the nozzle group that makes two first L type pipes and two second L type pipes constitute can surround the bridge pier stud for this humidification curing means can be applicable to the humidification maintenance work of the square bridge pier stud of not unidimensional, improves the suitability.
In view of the above-mentioned related art, the inventor believes that water sprayed from the first L-shaped pipe and the second L-shaped pipe flows down along the circumferential side wall of the pier column due to the over-high flow velocity and is not absorbed by the pier column, which causes waste of water resources.
SUMMERY OF THE UTILITY MODEL
In order to improve from first L type pipe and the interior spun water of second L type pipe because the velocity of flow is too fast not absorbed by the pier stud and flow down along the circumference lateral wall of pier stud, cause the problem of the waste of water resource, this application provides a bridge pier stud automatic maintenance device.
The application provides a pair of automatic curing means of bridge pier column adopts following technical scheme:
the utility model provides a bridge pier stud automatic maintenance device, includes the pier stud, still includes the water storage fill, the water storage fill includes first L template and second L template, the quantity of first L template and second L template is two, first L template includes first horizontal part and first vertical portion, second L template includes second horizontal part and the vertical portion of second, the equal butt of first horizontal part and second horizontal part is on the circumference lateral wall of pier stud, first horizontal part butt in the upside of second horizontal part, one side that first vertical portion butt is close to the pier stud in the vertical portion of second, fixedly connected with outlet pipe on the water storage fill, the one end fixed connection that the water storage was fought was kept away from to the outlet pipe is in the supply tank, still be equipped with the adjusting part who adjusts the relative position between first L template and the second L template on the water storage fill.
Through adopting above-mentioned technical scheme, first L template cooperation second L template forms the water storage fill of laminating pier stud, and the water storage that flows down along the lateral wall of pier stud flows back to the supply tank in the water storage fill for the water resource can reuse, and be difficult for extravagant, has improved the utilization ratio of water resource.
Optionally, the adjusting part includes adjusting pole and stopper, one side that the second horizontal part is close to first horizontal part is equipped with the hole of wearing to establish that supplies the adjusting pole to wear to establish, be equipped with two at least regulation holes on the first horizontal part, the length direction setting along first horizontal part of regulation hole, the quantity of stopper is two, two the equal threaded connection of stopper is in adjusting the pole, two the stopper butt respectively in one side that the second horizontal part was kept away from to first horizontal part and one side that first horizontal part was kept away from to the second horizontal part.
Through adopting above-mentioned technical scheme, adjust the pole and wear to locate different regulation downtheholely for the cavity that first horizontal part and second horizontal part cooperation formed is different, is applicable to different pier stud, has improved the application scope of water storage fill.
Optionally, the adjusting hole is a long waist hole.
Through adopting above-mentioned technical scheme, the setting in long waist hole for adjust the pole in the adjustment hole can finely tune, make the laminating more firm between pier stud and the water storage hopper, improved adjusting part's control range.
Optionally, the adjusting assembly further comprises a sealing gasket covering one of the adjusting holes, the sealing gasket is sleeved on the adjusting rod, one side of the sealing gasket abuts against the limiting block, and the other side of the sealing gasket abuts against one side, far away from the second horizontal portion, of the first horizontal portion.
By adopting the technical scheme and the arrangement of the sealing gasket, on one hand, the friction force between the limiting block and the first horizontal part is increased, so that the connection between the limiting block and the first horizontal part is firmer, the adjusting rod is not easy to slide in the adjusting hole, and the stability of the adjusting assembly is improved; on the other hand, the sealing gasket covers the adjusting hole, so that water in the water storage bucket is not easy to enter the adjusting hole and flow out, and the sealing property of the water storage bucket is improved.
Optionally, one end fixedly connected with closing plate that first L template is close to the second L template, the closing plate butt is in second horizontal part and the vertical portion of second, still inlay in the regulation hole and be equipped with the sealing plug, the sealing plug is laminated with the lateral wall of regulation hole.
Through adopting above-mentioned technical scheme, the setting of closing plate and sealing plug for there is the gap difficult for first horizontal part and second horizontal part junction, makes to seal between first L template and the second L template, has improved the leakproofness of water storage fill.
Optionally, a pull ring is fixed on the sealing plug.
Through adopting above-mentioned technical scheme, the area of gripping of sealing plug has been increased in the setting of pull ring, and convenience of customers dismantles and installs the sealing plug through gripping the pull ring, has improved the dismantlement and the installation effectiveness of sealing plug.
Optionally, a connecting rope is fixedly connected to the pull ring, and one end, far away from the pull ring, of the connecting rope is fixedly connected to the first vertical portion.
Through adopting above-mentioned technical scheme, connect the setting of rope for the pull ring is difficult for losing when not using, has improved the life of pull ring.
Optionally, the first horizontal part and the second horizontal part are arranged obliquely with the ground, and one side of the first horizontal part and one side of the second horizontal part close to the pier column are arranged obliquely downwards to the side far away from the pier column.
Through adopting above-mentioned technical scheme, first horizontal part and second horizontal part are the slope setting for rivers flow to the outlet pipe along the inclined plane, have improved the water efficiency of outlet pipe.
Optionally, the lower side of the water storage hopper is fixedly connected with a supporting column.
Through adopting above-mentioned technical scheme, the setting of support column, on the one hand, supports the water storage fill for the water storage fill is difficult for the slope when rivers are too much, and on the other hand, parallel arrangement between water storage fill and the ground makes the water storage fill laminate with the pier stud all the time, has improved the water receiving efficiency of water storage fill.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the water flowing down along the side wall of the pier stud is stored in the water storage hopper and flows back to the water supply tank, so that water resources can be reused, waste is not easy to occur, and the utilization rate of the water resources is improved;
2. the adjusting rod is arranged in different adjusting holes in a penetrating mode, so that cavities formed by matching the first horizontal part and the second horizontal part are different, the water storage bucket is suitable for different pier columns, and the application range of the water storage bucket is widened;
3. the setting of support post, on the one hand, supports the water storage fill for the water storage fill is difficult for the slope when rivers are too much, and on the other hand, parallel arrangement between water storage fill and the ground makes the water storage fill laminate with the pier stud all the time, has improved the water receiving efficiency of water storage fill.
Drawings
Fig. 1 is a schematic structural view of an automatic pier stud maintenance device in an embodiment of the present application.
Fig. 2 is a schematic structural view of a water storage hopper and a water supply tank in an embodiment of the present application.
Fig. 3 is an exploded view of the water bucket in the embodiment of the present application.
Description of reference numerals: 1. pier studs; 2. a water supply tank; 21. a water pump; 3. a jet pipe group; 31. a fixed mount; 4. a water storage hopper; 41. a first L-shaped plate; 411. a first horizontal portion; 4111. an adjustment hole; 412. a first vertical portion; 42. a second L-shaped plate; 421. a second horizontal portion; 4211. perforating holes; 422. a second vertical portion; 43. a water outlet pipe; 44. a support pillar; 5. an adjustment assembly; 51. adjusting a rod; 52. a limiting block; 53. a gasket; 54. a sealing plug; 55. a pull ring; 56. connecting ropes; 57. and (7) sealing the plate.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses automatic curing means of bridge pier stud. Referring to fig. 1, the automatic maintenance device for bridge pier comprises a pier 1, a water supply tank 2, a water pump 21, a fixing frame 31, a spray pipe group 3 and a water storage hopper 4.
Mount 31 fixed connection is on pier stud 1, and spout group 3 passes through the rope to be connected on mount 31 and set up towards pier stud 1 to spout rivers to pier stud 1, 2 fixed connection of supply tank are subaerial, and water pump 21 installs on supply tank 2 in order to provide the water in the supply tank 2 to spout group 3, and water storage bucket 4 installs in subaerial and along the setting of the circumference lateral wall of pier stud 1, in order to store the water that flows down from pier stud 1.
Referring to fig. 2, the water storage bucket 4 includes a first L-shaped plate 41 and a second L-shaped plate 42, the number of the first L-shaped plate 41 and the second L-shaped plate 42 is two, the first L-shaped plate 41 includes a first horizontal portion 411 and a first vertical portion 412, and the first horizontal portion 411 and the first vertical portion 412 are disposed at a certain angle to form the first L-shaped plate 41. The second L-shaped plate 42 includes a second horizontal portion 421 and a second vertical portion 422, the second horizontal portion 421 and the second vertical portion 422 are disposed at a certain angle to form the second L-shaped plate 42, the first horizontal portion 411 abuts and slides on the upper side of the second horizontal portion 421, and the first vertical portion 412 abuts on one side of the second vertical portion 422 close to the pier stud 1. A water outlet pipe 43 is fixedly connected to the water storage bucket 4, one end of the water outlet pipe 43 is communicated with the inner side of the water storage bucket 4, and the other end of the water outlet pipe 43 is communicated with the inner side of the water supply tank 2, so that water in the water storage bucket 4 flows into the water supply tank 2 to be recovered.
The first horizontal portion 411 and the second horizontal portion 421 are disposed to be inclined, and the first horizontal portion 411 and the second horizontal portion 421 are disposed to be inclined downward from a side close to the pier stud 1 to a side far from the pier stud 1, so that water falling into the first horizontal portion 411 and the second horizontal portion 421 flows to a side of the water outlet pipe 43.
The downside fixedly connected with support column 44 of water storage bucket 4, the quantity of support column 44 is four, four support columns 44 respectively fixed connection in the downside of two first L templates 41 and second L template 42, and four support columns 44 all butt in subaerially, provide water storage bucket 4 with the support.
Referring to fig. 3, an adjusting assembly 5 is further installed on the water storage tank 4.
The adjusting assembly 5 comprises an adjusting rod 51, a limiting block 52 and a sealing gasket 53, a through hole 4211 is formed in one side of the second horizontal portion 421 close to the first horizontal portion 411, the adjusting rod 51 is arranged in the through hole 4211 in a penetrating manner and is arranged towards the first horizontal portion 411, at least two adjusting holes 4111 are formed in the first horizontal portion 411, the adjusting holes 4111 are uniformly arranged along the length direction of the first horizontal portion 411, and the adjusting rod 51 is arranged in the adjusting holes 4111 in a penetrating manner to enable the relative distance between the first horizontal portion 411 and the second horizontal portion 421 to be fixed.
The adjustment hole 4111 is a long waist hole, so that the adjustment rod 51 can be finely adjusted in the adjustment hole 4111.
The number of the limiting blocks 52 is two, the limiting blocks 52 are connected to the adjusting rod 51 by screw threads, one of the limiting blocks 52 abuts against one side of the first horizontal portion 411 away from the second horizontal portion 421, the other limiting block 52 abuts against one side of the second horizontal portion 421 away from the first horizontal portion 411, and the two limiting blocks 52 are matched to fix the position of the adjusting rod 51 in the adjusting hole 4111.
Here, for example, the sealing gasket 53 is made of a rubber material, the sealing gasket 53 is sleeved on the adjusting rod 51, the sealing gasket 53 covers the adjusting hole 4111 formed through the adjusting rod 51, so that the adjusting hole 4111 is sealed, the sealing gasket 53 is provided in a long sheet shape, one end of the sealing gasket 53 abuts against the limiting block 52, and the other end of the sealing gasket 53 abuts against one side of the first horizontal portion 411 away from the second horizontal portion 421, so that the sealing gasket 53 covers along with the pressing of the limiting block 52.
A sealing plate 57 is bonded to an end surface of the first L-shaped plate 41 close to the second L-shaped plate 42, the sealing plate 57 is made of rubber, the sealing plate 57 is L-shaped, and the sealing plate 57 abuts against the second horizontal portion 421 and the second vertical portion 422, so that a contact portion between the second horizontal portion 421 and the first horizontal portion 411 and a contact portion between the second vertical portion 422 and the second horizontal portion 421 are sealed.
A sealing plug 54 is further embedded in the adjusting hole 4111, where the sealing plug 54 is made of rubber, the sealing plug 54 is disposed in conformity with the adjusting hole 4111, and the sealing plug 54 is embedded in the adjusting hole 4111 and attached to a sidewall of the adjusting hole 4111, so that water flow is not easy to flow into the second horizontal portion 421 from the adjusting hole 4111.
A pull ring 55 is fixedly connected to a side of the sealing plug 54 away from the second horizontal portion 421, so that a user can conveniently pull the pull ring 55 to operate the sealing plug 54.
A connecting rope 56 is bound on the sealing plug 54, and the other end of the connecting rope 56 is bound on the first vertical part 412, so that the sealing plug 54 is not easy to fall off and lose.
The implementation principle of the automatic maintenance device for the bridge pier column in the embodiment of the application is as follows: the first horizontal portion 411 slides to the position where the second horizontal portion 421 corresponds to the adjusting hole 4111, the first horizontal portion 411 and the second horizontal portion 421 are attached to the pier stud 1, the pull ring 55 corresponding to the adjusting hole 4111 is held, the sealing plug 54 is pulled out, the adjusting rod 51 is inserted into the corresponding adjusting hole 4111 and is finely adjusted, the sealing gasket 53 is sleeved on the adjusting rod 51 and abuts against one side of the adjusting hole 4111, which is far away from the second horizontal portion 421, the two limit blocks 52 are sequentially connected to the adjusting rod 51 through threads, the first horizontal portion 411 and the second horizontal portion 421 are locked, and the whole water storage bucket 4 slides downwards until the support column 44 abuts against the ground.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. The utility model provides an automatic curing means of bridge pier stud, includes pier stud (1), its characterized in that: the water storage device is characterized by further comprising a water storage hopper (4), wherein the water storage hopper (4) comprises a first L-shaped plate (41) and a second L-shaped plate (42), the number of the first L-shaped plate (41) and the number of the second L-shaped plate (42) are both two, the first L-shaped plate (41) comprises a first horizontal part (411) and a first vertical part (412), the second L-shaped plate (42) comprises a second horizontal part (421) and a second vertical part (422), the first horizontal part (411) and the second horizontal part (421) are abutted to the circumferential side wall of the pier column (1), the first horizontal part (411) is abutted to the upper side of the second horizontal part (421), the first vertical part (412) is abutted to one side of the second vertical part (422) close to the pier column (1), a water outlet pipe (43) is fixedly connected to the water storage hopper (4), and one end, far away from the water storage hopper (4), of the water outlet pipe (43) is fixedly connected to the water supply tank (2), the water storage hopper (4) is also provided with an adjusting component (5) for adjusting the relative position between the first L-shaped plate (41) and the second L-shaped plate (42).
2. The automatic maintenance device of a bridge pier column according to claim 1, wherein: adjusting part (5) is including adjusting pole (51) and stopper (52), one side that second horizontal part (421) are close to first horizontal part (411) is equipped with and supplies to adjust wear to establish hole (4211) that pole (51) wore to establish, be equipped with two at least regulation holes (4111) on first horizontal part (411), adjust the length direction setting of hole (4111) along first horizontal part (411), the quantity of stopper (52) is two, two equal threaded connection in regulation pole (51) stopper (52), two stopper (52) butt respectively in one side that second horizontal part (421) were kept away from in first horizontal part (411) and one side that first horizontal part (411) was kept away from in second horizontal part (421).
3. The automatic maintenance device of a bridge pier column according to claim 2, wherein: the adjusting hole (4111) is a long waist hole.
4. The automatic maintenance device of a bridge pier according to claim 3, wherein: the adjusting component (5) further comprises a sealing gasket (53) covering one of the adjusting holes (4111), the sealing gasket (53) is sleeved on the adjusting rod (51), one side of the sealing gasket (53) abuts against the limiting block (52), and the other side of the sealing gasket (53) abuts against one side, away from the second horizontal part (421), of the first horizontal part (411.
5. The automatic maintenance device of a bridge pier according to claim 3, wherein: first L template (41) are close to one end fixedly connected with closing plate (57) of second L template (42), closing plate (57) butt is on second horizontal part (421) and the vertical portion of second (422), still inlay in regulation hole (4111) and be equipped with sealing plug (54), sealing plug (54) and the lateral wall laminating of regulation hole (4111).
6. The automatic maintenance device of a bridge pier according to claim 5, wherein: and a pull ring (55) is fixed on the sealing plug (54).
7. The automatic maintenance device of a bridge pier according to claim 6, wherein: and a connecting rope (56) is fixedly connected to the pull ring (55), and one end, far away from the pull ring (55), of the connecting rope (56) is fixedly connected to the first vertical part (412).
8. The automatic maintenance device of a bridge pier column according to claim 1, wherein: first horizontal part (411) and second horizontal part (421) are with the slope setting of ground, one side that first horizontal part (411) and second horizontal part (421) are close to pier stud (1) is to keeping away from the downward setting of the slope of one side of pier stud (1).
9. The automatic maintenance device of a bridge pier column of claim 8, wherein: the lower side of the water storage hopper (4) is fixedly connected with a supporting column (44).
CN202023125200.XU 2020-12-22 2020-12-22 Automatic maintenance device for bridge pier column Active CN214383888U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023125200.XU CN214383888U (en) 2020-12-22 2020-12-22 Automatic maintenance device for bridge pier column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023125200.XU CN214383888U (en) 2020-12-22 2020-12-22 Automatic maintenance device for bridge pier column

Publications (1)

Publication Number Publication Date
CN214383888U true CN214383888U (en) 2021-10-12

Family

ID=77990842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023125200.XU Active CN214383888U (en) 2020-12-22 2020-12-22 Automatic maintenance device for bridge pier column

Country Status (1)

Country Link
CN (1) CN214383888U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114370168A (en) * 2022-01-08 2022-04-19 中建二局第二建筑工程有限公司山东分公司 Intelligent maintenance device for concrete building body
CN114837443A (en) * 2022-05-28 2022-08-02 安阳建工(集团)有限责任公司 Quick-mounting type automatic concrete curing method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114370168A (en) * 2022-01-08 2022-04-19 中建二局第二建筑工程有限公司山东分公司 Intelligent maintenance device for concrete building body
CN114837443A (en) * 2022-05-28 2022-08-02 安阳建工(集团)有限责任公司 Quick-mounting type automatic concrete curing method
CN114837443B (en) * 2022-05-28 2023-11-10 安阳建工(集团)有限责任公司 Quick-mounting automatic concrete curing method

Similar Documents

Publication Publication Date Title
CN214383888U (en) Automatic maintenance device for bridge pier column
CN104264995A (en) Automatic spraying conservation system for high-rise building shear wall structure
CN210858069U (en) Concrete curing device for ultrahigh independent structure column
CN204435693U (en) Multipurpose roof drainage roof drain
CN210834584U (en) Automatic pressurization concrete impermeability instrument
CN216383062U (en) Hydraulic engineering is installation device for pipeline
CN205348920U (en) Anticorrosive water tank
CN209129372U (en) A kind of reserved opening tool-type hangs mold device
CN208996450U (en) A kind of civil construction reserving hole template
CN209603050U (en) A kind of self-priming flood control plugging bag
CN203403445U (en) Steel sleeve used for plugging basement tube well
CN214143310U (en) Automatic curing means of bridge cantilever end concrete
CN204126276U (en) Wall of High-building structure automatic spray curing system
CN209931112U (en) Irrigation equipment for hydraulic engineering
CN211549056U (en) Air film building water bag anchor
CN212404982U (en) Construction road dust device
CN214196347U (en) Lining maintenance device
CN215482328U (en) Simple pier stud maintenance control circulation system
CN219352642U (en) Water conservation equipment for hydraulic engineering
CN220538586U (en) Irrigation canal
CN212131520U (en) Water conservancy pipe laying fixes protection device
CN211312408U (en) Flood prevention box for hydraulic engineering
CN210235940U (en) Storage device convenient to cement is taken
CN217759947U (en) Plugging device that exempts from of fixed built-in fitting of girder steel encorbelments
CN215410584U (en) Wear floor pipeline waterproof construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant