CN214365393U - Building engineering construction rail guard - Google Patents

Building engineering construction rail guard Download PDF

Info

Publication number
CN214365393U
CN214365393U CN202120079981.9U CN202120079981U CN214365393U CN 214365393 U CN214365393 U CN 214365393U CN 202120079981 U CN202120079981 U CN 202120079981U CN 214365393 U CN214365393 U CN 214365393U
Authority
CN
China
Prior art keywords
pulley
telescopic pipe
sliding groove
scissor type
type guardrail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120079981.9U
Other languages
Chinese (zh)
Inventor
马军伟
乔晓光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Real Estate Construction Group Co ltd
Original Assignee
Shandong Real Estate Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Real Estate Construction Group Co ltd filed Critical Shandong Real Estate Construction Group Co ltd
Priority to CN202120079981.9U priority Critical patent/CN214365393U/en
Application granted granted Critical
Publication of CN214365393U publication Critical patent/CN214365393U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a building engineering construction rail guard, including main part, first protector and second protector, first protector is flexible to be located in the main part, the second protector is flexible to be located in the main part. The utility model belongs to the technical field of construction protection of constructional engineering, in particular to a construction protective guard of constructional engineering; in the use, protect the danger area through first protector and second protector, effectively solved present rail guard form fixed on the existing market, some use the railing to keep apart the gap great, can not play fine effectual isolation protective effect, the rail guard junction needs to use a plurality of bolt fixings for the inconvenience of ten minutes when ann of rail guard is torn open, the inconvenient problem of ten minutes when some integrative fixed rail guard makes the transportation.

Description

Building engineering construction rail guard
Technical Field
The utility model belongs to the technical field of the building engineering construction protection, specifically indicate a building engineering construction rail guard.
Background
At present, in the building construction process, the guard rail can play the effect of keeping apart warning and reminding, is an indispensable equipment in the building construction.
The prior protective fence has the following defects:
firstly, the existing guard railings are fixed in form, and some used railings have large isolation gaps, so that a good and effective isolation protection effect cannot be achieved;
secondly, the joints of the existing guard rails need to be fixed by a plurality of bolts, so that the guard rails are inconvenient to mount and dismount, and the guard rails fixed integrally are inconvenient to transport.
SUMMERY OF THE UTILITY MODEL
To the above situation, for overcoming prior art's defect, the utility model provides a building engineering construction rail guard protects hazardous area through first protector and second protector, it is fixed to have effectively solved present rail guard form on the existing market, some use the railing to keep apart the gap great, can not play fine effectual isolation protective effect, the rail guard junction needs to use a plurality of bolt fastening for very inconvenient when the ann of rail guard is torn open, inconvenient problem very when some integrative fixed rail guard makes the transportation.
The utility model adopts the following technical scheme: the utility model relates to a building engineering construction protective guard, which comprises a main body, a first protective device and a second protective device, wherein the first protective device is telescopically arranged on the main body, and the second protective device is telescopically arranged on the main body; the main body comprises a first square pillar, a second square pillar, a first base and a second base, the first square pillar is arranged on the left side of the main body, the second square pillar is arranged on the right side of the main body, the first base is arranged on the lower side of the first square pillar, and the second square pillar is arranged on the lower side of the second base; the first protection device comprises a first sliding groove, a second sliding groove, a third sliding groove, a fourth sliding groove, a first pulley, a second pulley, a third pulley, a fourth pulley, a fifth pulley, a sixth pulley, a seventh pulley, an eighth pulley, a first scissor type guardrail and a second scissor type guardrail, wherein the first sliding groove is arranged in the first square pillar, the second sliding groove is arranged in the first square pillar, the third sliding groove is arranged in the second square pillar, the fourth sliding groove is arranged in the second square pillar, one end of the first pulley is arranged in the first sliding groove in a sliding manner, the upside of one end of the first scissor type guardrail is arranged at the other end of the first pulley, one end of the second pulley is arranged in the first sliding groove in a sliding manner, the other end of the second pulley is arranged at the lower side of one end of the first scissor type guardrail, one end of the fifth pulley is arranged in the third sliding groove in a sliding manner, the other end upside of first scissor type guardrail is located to the other end of fifth pulley, the one end of sixth pulley slides and locates in the third spout, the other end downside of first scissor type guardrail is located to the other end of sixth pulley, the one end of third pulley slides and locates in the second spout, the other end of third pulley is located to the one end upside of second scissor type guardrail, the one end of fourth pulley slides and locates in the second spout, the one end downside of second scissor type guardrail is located to the other end of fourth pulley, the one end of seventh pulley slides and locates in the fourth spout, the other end upside of second scissor type guardrail is located to the other end of seventh pulley, the one end of eighth pulley slides and locates in the fourth spout, the other end downside of second scissor type guardrail is located to the other end of eighth pulley.
Furthermore, the second protection device comprises a first telescopic pipe, a second telescopic pipe, a third telescopic pipe, a fourth telescopic pipe, a fifth telescopic pipe and a sixth telescopic pipe, wherein the second telescopic pipe is arranged on a first square support, the first telescopic pipe is arranged on a second square support, one end of the second telescopic pipe is arranged in the first telescopic pipe in a sliding manner, the fourth telescopic pipe is arranged on the first square support, the third telescopic pipe is arranged on the second square support, one end of the fourth telescopic pipe is arranged in the third telescopic pipe in a sliding manner, the fifth telescopic pipe is arranged on the first square support, the sixth telescopic pipe is arranged on the second square support, and one end of the fifth telescopic pipe is arranged in the sixth telescopic pipe in a sliding manner.
Adopt above-mentioned structure the utility model discloses the beneficial effect who gains as follows: the utility model provides a building engineering construction rail guard, utilize first protector and second protector, stimulate the square pillar of second, first pulley and second pulley are in the first spout relative slip, fifth pulley and sixth pulley are in the third spout relative slip, first scissor type guardrail is elongated, third pulley and fourth pulley are in the second spout relative slip, seventh pulley and eighth pulley are in the fourth spout relative slip, the second scissor type guardrail is elongated, the flexible pipe of second slides in first flexible pipe, the flexible pipe of fourth slides in the flexible pipe of third, the flexible pipe of fifth slides in the flexible pipe of sixth, first protector and second protector overall length are elongated, installation effectiveness has been improved greatly, and convenient to use.
Drawings
Fig. 1 is the utility model relates to a building engineering construction rail guard main section view.
The telescopic device comprises a main body 1, a main body 2, a first protection device 3, a second protection device 4, a first square support, 5, a second square support, 6, a first base 7, a second base 8, a first sliding groove 9, a second sliding groove 10, a third sliding groove 11, a fourth sliding groove 12, a first pulley 13, a second pulley 14, a third pulley 15, a fourth pulley 16, a fifth pulley 17, a sixth pulley 18, a seventh pulley 19, an eighth pulley 20, a first scissor type guardrail 21, a second scissor type guardrail 22, a first telescopic pipe 23, a second telescopic pipe 24, a third telescopic pipe 25, a fourth telescopic pipe 26, a fifth telescopic pipe 27 and a sixth telescopic pipe.
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments; based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1, the utility model relates to a building engineering construction protective guard, which comprises a main body 1, a first protection device 2 and a second protection device 3, wherein the first protection device 2 is telescopically arranged on the main body 1, and the second protection device 3 is telescopically arranged on the main body 1; the main body 1 comprises a first square pillar 4, a second square pillar 5, a first base 6 and a second base 7, the first square pillar 4 is arranged on the left side of the main body 1, the second square pillar 5 is arranged on the right side of the main body 1, the first base 6 is arranged on the lower side of the first square pillar 4, and the second square pillar 5 is arranged on the lower side of the second base 7; the first protection device 2 comprises a first sliding groove 8, a second sliding groove 9, a third sliding groove 10, a fourth sliding groove 11, a first pulley 12, a second pulley 13, a third pulley 14, a fourth pulley 15, a fifth pulley 16, a sixth pulley 17, a seventh pulley 18, an eighth pulley 19, a first scissor type guardrail 20 and a second scissor type guardrail 21, wherein the first sliding groove 8 is arranged in the first square pillar 4, the second sliding groove 9 is arranged in the first square pillar 4, the third sliding groove 10 is arranged in the second square pillar 5, the fourth sliding groove 11 is arranged in the second square pillar 5, one end of the first pulley 12 is arranged in the first sliding groove 8 in a sliding manner, the upside of one end of the first scissor type guardrail 20 is arranged at the other end of the first pulley 12, one end of the second pulley 13 is arranged in the first sliding groove 8 in a sliding manner, the other end of the second pulley 13 is arranged at the lower side of one end of the first scissor type guardrail 20, one end of the fifth pulley 16 is slidably disposed in the third sliding groove 10, the other end of the fifth pulley 16 is disposed on the upper side of the other end of the first scissor type guardrail 20, one end of the sixth pulley 17 is slidably disposed in the third sliding groove 10, the other end of the sixth pulley 17 is disposed on the lower side of the other end of the first scissor type guardrail 20, one end of the third pulley 14 is slidably disposed in the second sliding groove 9, the upper side of one end of the second scissor type guardrail 21 is disposed on the other end of the third pulley 14, one end of the fourth pulley 15 is slidably disposed in the second sliding groove 9, the other end of the fourth pulley 15 is disposed on the lower side of one end of the second scissor type guardrail 21, one end of the seventh pulley 18 is slidably disposed in the fourth sliding groove 11, the other end of the seventh pulley 18 is disposed on the upper side of the other end of the second scissor type guardrail 21, and one end of the eighth pulley 19 is slidably disposed in the fourth sliding groove 11, the other end of the eighth pulley 19 is arranged at the lower side of the other end of the second scissor type guardrail 21.
The second protection device 3 includes a first extension tube 22, a second extension tube 23, a third extension tube 24, a fourth extension tube 25, a fifth extension tube 26 and a sixth extension tube 27, the second extension tube 23 is disposed on the first square support 4, the first extension tube 22 is disposed on the second square support 5, one end of the second extension tube 23 is slidably disposed in the first extension tube 22, the fourth extension tube 25 is disposed on the first square support 4, the third extension tube 24 is disposed on the second square support 5, one end of the fourth extension tube 25 is slidably disposed in the third extension tube 24, the fifth extension tube 26 is disposed on the first square support 4, the sixth extension tube 27 is disposed on the second square support 5, and one end of the fifth extension tube 26 is slidably disposed in the sixth extension tube 27.
When the device is used, a user firstly puts the main body 1 at a place needing protection, pulls the second square support post 5 by using the first protection device 2 and the second protection device 3, the first pulley 12 and the second pulley 13 slide in the first sliding groove 8 in an opposite direction, the fifth pulley 16 and the sixth pulley 17 slide in the third sliding groove 10 in an opposite direction, the first scissor-type guardrail 20 is lengthened, the third pulley 14 and the fourth pulley 15 slide in an opposite direction in the second sliding groove 9, the seventh pulley 18 and the eighth pulley 19 slide in an opposite direction in the fourth sliding groove 11, the second scissor-type guardrail 21 is lengthened, the second extension tube 23 slides in the first extension tube 22, the fourth extension tube 25 slides in the third extension tube 24, the fifth extension tube 26 slides in the sixth extension tube 27, and the first protection device 2 and the second protection device 3 are lengthened as a whole, it is above that the utility model discloses holistic work flow, when using next time repeat this step can.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (2)

1. The utility model provides a building engineering construction rail guard which characterized in that: the device comprises a main body, a first protection device and a second protection device, wherein the first protection device is arranged on the main body in a telescopic mode, and the second protection device is arranged on the main body in a telescopic mode; the main body comprises a first square pillar, a second square pillar, a first base and a second base, the first square pillar is arranged on the left side of the main body, the second square pillar is arranged on the right side of the main body, the first base is arranged on the lower side of the first square pillar, and the second square pillar is arranged on the lower side of the second base; the first protection device comprises a first sliding groove, a second sliding groove, a third sliding groove, a fourth sliding groove, a first pulley, a second pulley, a third pulley, a fourth pulley, a fifth pulley, a sixth pulley, a seventh pulley, an eighth pulley, a first scissor type guardrail and a second scissor type guardrail, wherein the first sliding groove is arranged in the first square pillar, the second sliding groove is arranged in the first square pillar, the third sliding groove is arranged in the second square pillar, the fourth sliding groove is arranged in the second square pillar, one end of the first pulley is arranged in the first sliding groove in a sliding manner, the upside of one end of the first scissor type guardrail is arranged at the other end of the first pulley, one end of the second pulley is arranged in the first sliding groove in a sliding manner, the other end of the second pulley is arranged at the lower side of one end of the first scissor type guardrail, one end of the fifth pulley is arranged in the third sliding groove in a sliding manner, the other end upside of first scissor type guardrail is located to the other end of fifth pulley, the one end of sixth pulley slides and locates in the third spout, the other end downside of first scissor type guardrail is located to the other end of sixth pulley, the one end of third pulley slides and locates in the second spout, the other end of third pulley is located to the one end upside of second scissor type guardrail, the one end of fourth pulley slides and locates in the second spout, the one end downside of second scissor type guardrail is located to the other end of fourth pulley, the one end of seventh pulley slides and locates in the fourth spout, the other end upside of second scissor type guardrail is located to the other end of seventh pulley, the one end of eighth pulley slides and locates in the fourth spout, the other end downside of second scissor type guardrail is located to the other end of eighth pulley.
2. A construction guard rail according to claim 1, wherein: the second protection device comprises a first telescopic pipe, a second telescopic pipe, a third telescopic pipe, a fourth telescopic pipe, a fifth telescopic pipe and a sixth telescopic pipe, wherein the second telescopic pipe is arranged on a first square support, the first telescopic pipe is arranged on a second square support, one end of the second telescopic pipe is arranged in the first telescopic pipe in a sliding manner, the fourth telescopic pipe is arranged on the first square support, the third telescopic pipe is arranged on the second square support, one end of the fourth telescopic pipe is arranged in the third telescopic pipe in a sliding manner, the fifth telescopic pipe is arranged on the first square support, the sixth telescopic pipe is arranged on the second square support, and one end of the fifth telescopic pipe is arranged in the sixth telescopic pipe in a sliding manner.
CN202120079981.9U 2021-01-12 2021-01-12 Building engineering construction rail guard Active CN214365393U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120079981.9U CN214365393U (en) 2021-01-12 2021-01-12 Building engineering construction rail guard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120079981.9U CN214365393U (en) 2021-01-12 2021-01-12 Building engineering construction rail guard

Publications (1)

Publication Number Publication Date
CN214365393U true CN214365393U (en) 2021-10-08

Family

ID=77954858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120079981.9U Active CN214365393U (en) 2021-01-12 2021-01-12 Building engineering construction rail guard

Country Status (1)

Country Link
CN (1) CN214365393U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115341775A (en) * 2022-09-23 2022-11-15 中国十七冶集团有限公司 Telescopic guardrail for protecting wellhead of rainwater and sewage inspection well and use method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115341775A (en) * 2022-09-23 2022-11-15 中国十七冶集团有限公司 Telescopic guardrail for protecting wellhead of rainwater and sewage inspection well and use method

Similar Documents

Publication Publication Date Title
CN214365393U (en) Building engineering construction rail guard
CA2634710A1 (en) Impact slider assembly for a guardrail
CN202831589U (en) Movable type security operating platform
EP1428938A3 (en) Protector for safety rails
US3428183A (en) Gutter guard
ES2369124T3 (en) MODULAR ROOF LADDER.
US6932194B1 (en) Safety rail for scaffolding
US20110120030A1 (en) Skylight screen
CN205577834U (en) Roofing overhauls cat ladder protector
CN212053862U (en) Adjustable entrance to a cave protector is used in elevator installation
DE502005004991D1 (en) crash barrier
CN204728227U (en) The special snow hurdle of a kind of railway
CN210264002U (en) Building high altitude rail guard
CN211470608U (en) A protector for tower crane driver climbing
CN206969430U (en) A kind of building waste pond
CN213683303U (en) Sleeve type protective rail fastener for floor edge opening
CN213391308U (en) Construction site safety passage device with buffer structure
CN205591576U (en) Protector with adjustable face limit entrance to a cave
CN206941481U (en) A kind of protector of municipal administration
CN205740192U (en) A kind of guardrail for hydraulic lifter
CN205804203U (en) Novel road snow guard
CN218206051U (en) Anti-climbing device for electric power tower
CN212105711U (en) Slide rail formula roofing cat ladder
CN205840375U (en) Assembled stairs safe protective railing
CN218406148U (en) Self-return type stair opening protection mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A protective fence for Construction Engineering

Effective date of registration: 20220325

Granted publication date: 20211008

Pledgee: Weifang Bank Co.,Ltd. Heping Road sub branch

Pledgor: Shandong Real Estate Construction Group Co.,Ltd.

Registration number: Y2022980003231

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230323

Granted publication date: 20211008

Pledgee: Weifang Bank Co.,Ltd. Heping Road sub branch

Pledgor: Shandong Real Estate Construction Group Co.,Ltd.

Registration number: Y2022980003231

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A type of protective fence for construction engineering

Effective date of registration: 20230331

Granted publication date: 20211008

Pledgee: Weifang Bank Co.,Ltd. Heping Road sub branch

Pledgor: Shandong Real Estate Construction Group Co.,Ltd.

Registration number: Y2023980036870

PE01 Entry into force of the registration of the contract for pledge of patent right