CN214364819U - Building construction operation platform - Google Patents

Building construction operation platform Download PDF

Info

Publication number
CN214364819U
CN214364819U CN202120105570.2U CN202120105570U CN214364819U CN 214364819 U CN214364819 U CN 214364819U CN 202120105570 U CN202120105570 U CN 202120105570U CN 214364819 U CN214364819 U CN 214364819U
Authority
CN
China
Prior art keywords
moving
bottom plate
operation platform
concrete
transverse plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120105570.2U
Other languages
Chinese (zh)
Inventor
侯龙景
侯龙明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Muchuan Construction Engineering Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120105570.2U priority Critical patent/CN214364819U/en
Application granted granted Critical
Publication of CN214364819U publication Critical patent/CN214364819U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a building construction operation platform, which comprises an operation platform, wherein a collecting device is arranged in the operation platform; the collecting device comprises a transverse plate, two moving grooves and two moving handles are arranged on the upper surface of the transverse plate, the moving handles are movably connected to the inner portions of the moving grooves, the lateral moving grooves are formed in the right side face of the transverse plate, a moving bottom plate is movably connected to the inner portions of the lateral moving grooves, the distance between the moving bottom plate and the wall plate is changed through movement of the moving bottom plate, the moving bottom plate moves to drive the diversion blades to move, the diversion blades move and are attached to the wall face, when the collecting device works, more concrete on the wall face can fall onto the diversion blades, the diversion blades are in the shape of blades, better concrete can flow, the concrete on the surface of the diversion blades enters the collecting groove, concrete collecting groove residues are recycled, and the utilization efficiency of the concrete is improved.

Description

Building construction operation platform
Technical Field
The utility model relates to a construction operation platform technical field specifically is a construction operation platform.
Background
Construction worker must use the operation platform of construction usefulness when building house, and the operation platform who uses all obtains through the equipment on the miniature building site, then accumulates layer upon layer and goes, and the operation platform that uses is gone up on the miniature building site makes son, mother's frame combination together through the mode that cup joints.
When the existing platform is constructed, because concrete can not be directly solidified between bricks, concrete residues fall on the ground, unnecessary concrete loss is caused, and the utilization rate of the concrete greatly reduced is increased.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction operation platform to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a building construction operation platform comprises an operation platform, wherein a collecting device is arranged in the operation platform; the collecting device comprises a transverse plate, two moving grooves are formed in the upper surface of the transverse plate, moving handles are movably connected in the two moving grooves, a lateral moving groove is formed in the right side surface of the transverse plate, a moving bottom plate is movably connected in the lateral moving groove, the two moving handles are fixedly connected to the left side of the upper surface of the moving bottom plate, a flow guide blade is connected to the right side surface of the upper surface of the moving bottom plate, and a collecting groove is formed in the upper surface of the moving bottom plate; a fixed connecting device is arranged in the operating platform; and a clamping device is arranged outside the movable bottom plate.
Preferably, the fixed connection device includes the spliced pole, the even connecting hole of equidistance is seted up to the operation platform inside wall, swing joint has the spliced pole in the connecting hole, connecting hole and spliced pole size looks adaptation, two swing joint has the diaphragm between the spliced pole.
Preferably, the clamping device comprises clamping holes, the upper surface of the movable bottom plate is provided with two clamping holes, each clamping hole is internally and movably connected with a clamping column, and the upper surface of each clamping column is fixedly connected with a collecting tank.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the building construction operation platform has the advantages that the transverse plate is inserted between the two connecting columns by moving the transverse plate, so that a user can adapt to different working heights by inserting the transverse plate between the two connecting columns according to the required height, the practicability of the device is improved, after the transverse plate is inserted at a proper position, the user drives the moving bottom plate to move by moving the moving handle, the moving groove limits and fixes the moving handle, the moving stability of the moving bottom plate is greatly improved, the moving bottom plate moves in the lateral moving groove by moving the moving handle, the distance between the moving bottom plate and the wall plate is changed, the moving of the moving bottom plate drives the guide blade to move, the guide blade moves and is attached to the wall surface, when the building construction operation platform is used for working, more concrete on the wall surface can fall on the guide blade, and the guide blade is in the shape of a blade, can let the better flow of concrete, concrete through water conservancy diversion blade surface gets into the collecting vat, realizes the recovery to the concrete residue, has improved the utilization efficiency of concrete.
(2) This construction operation platform, through removing the collecting vat, the removal of collecting vat drives the removal of joint post, and the removal of joint post lets joint post and joint hole separate, realizes the removal to the collecting vat, and when the user removed the collecting vat, can retrieve the concrete residue in the collecting vat, then will remove the handle and reply the normal position, improved the practicality of this device greatly.
Drawings
Fig. 1 is a schematic structural view of the operation platform of the present invention;
fig. 2 is a schematic structural view of the platform main body of the present invention;
FIG. 3 is a schematic structural view of the cross plate of the present invention;
fig. 4 is an exploded view of the cross plate of the present invention.
In the figure: 1. an operating platform; 11. connecting columns; 12. connecting holes; 21. a transverse plate; 22. a moving groove; 23. a lateral movement slot; 24. moving the handle; 25. moving the base plate; 26. a flow guiding blade; 27. collecting tank; 31. a clamping column; 32. a clamping hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a building construction operation platform comprises an operation platform 1, wherein a collecting device is arranged in the operation platform 1; the collecting device comprises a transverse plate 21, two moving grooves 22 are formed in the upper surface of the transverse plate 21, moving handles 24 are movably connected in the two moving grooves 22, a lateral moving groove 23 is formed in the right side surface of the transverse plate 21, a moving bottom plate 25 is movably connected in the lateral moving groove 23, the two moving handles 24 are fixedly connected to the left side of the upper surface of the moving bottom plate 25, a flow guide blade 26 is connected to the right side surface of the upper surface of the moving bottom plate 25, a collecting groove 27 is formed in the upper surface of the moving bottom plate 25, a fixed connecting device is arranged in the operating platform 1 and comprises connecting columns 11, equidistant connecting holes 12 are formed in the inner side wall of the operating platform 1, connecting columns 11 are movably connected in the connecting holes 12, the connecting holes 12 are matched with the connecting columns 11 in size, the transverse plate 21 is movably connected between the two connecting columns 11, the transverse plate 21 is inserted between the two connecting columns 11 by moving the transverse plate 21, the utility model has the advantages that the transverse plate 21 is inserted between different connecting columns 11 according to the required height by a user to adapt to different working heights, the practicability of the device is improved, after the transverse plate 21 is inserted at a proper position, the user drives the moving bottom plate 25 to move by moving the moving handle 24, the moving groove 22 limits and fixes the moving handle 24, the moving stability of the moving bottom plate 25 is greatly improved, the moving bottom plate 25 moves in the lateral moving groove 23 by the moving of the moving handle 24, the distance between the moving bottom plate 25 and a wall plate is changed by the moving of the moving bottom plate 25, the flow guide blade 26 is driven to move by the moving of the moving bottom plate 25, the flow guide blade 26 moves and is attached to the wall surface, when the device is used for working, more concrete on the wall surface falls on the flow guide blade 26, the flow guide blade 26 is in a blade shape, the concrete can better flow, and the concrete on the surface of the flow guide blade 26 enters the collecting groove 27, realize the recovery to the concrete residue, the utilization efficiency of concrete is improved, it is equipped with latch device to remove bottom plate 25 outward, latch device includes joint hole 32, two joint holes 32 have been seted up to the upper surface of removal bottom plate 25, equal swing joint has joint post 31 in every joint hole 32, higher authority fixedly connected with collecting vat 27 of joint post 31, through removing collecting vat 27, collecting vat 27's removal drive joint post 31's removal, joint post 31's removal lets joint post 31 and joint hole 32 separate, the realization is to collecting vat 27's removal, when the user removed collecting vat 27, can retrieve the concrete residue in the collecting vat 27, then reply the normal position with removal handle 24, the practicality that has improved this device greatly, the utility of this device
Specifically, the utility model discloses during the use:
the first step is as follows: the transverse plate 21 is inserted between the two connecting columns 11 by moving the transverse plate 21, so that a user can insert the transverse plate 21 between different connecting columns 11 according to the required height to adapt to different working heights, the practicability of the device is improved, after the transverse plate 21 is inserted at a proper position, the user drives the moving bottom plate 25 to move by moving the moving handle 24, the moving groove 22 limits and fixes the moving handle 24, the moving stability of the moving bottom plate 25 is greatly improved, the moving of the moving handle 24 enables the moving bottom plate 25 to move in the lateral moving groove 23, the moving of the moving bottom plate 25 changes the distance between the moving bottom plate 25 and a wall plate, the moving of the moving bottom plate 25 drives the diversion blade 26 to move, the diversion blade 26 moves to be attached to the wall surface, when the device is used and works, more concrete on the wall surface falls on the diversion blade 26, and the diversion blade 26 is in a blade shape, the concrete can better flow, and the concrete on the surface of the flow guide blade 26 enters the collecting tank 27, so that the concrete residues are recycled, and the utilization efficiency of the concrete is improved.
The second step is that: through removing collecting vat 27, collecting vat 27's removal drives the removal of joint post 31, and the removal of joint post 31 lets joint post 31 and joint hole 32 separate, realizes the removal to collecting vat 27, and when the user removed collecting vat 27, can retrieve the concrete residue in collecting vat 27, then will remove handle 24 answer normal position, improved the practicality of this device greatly.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "both ends", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Furthermore, the terms "first", "second", "third", "fourth" are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated, whereby the features defined as "first", "second", "third", "fourth" may explicitly or implicitly include at least one such feature.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "disposed," "connected," "fixed," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A building construction operation platform comprises an operation platform (1), wherein a collecting device is arranged in the operation platform (1); the method is characterized in that: the collecting device comprises a transverse plate (21), two moving grooves (22) are formed in the upper surface of the transverse plate (21), moving handles (24) are movably connected into the two moving grooves (22), a lateral moving groove (23) is formed in the right side surface of the transverse plate (21), a moving bottom plate (25) is movably connected into the lateral moving groove (23), the two moving handles (24) are fixedly connected to the left end of the upper surface of the moving bottom plate (25), a flow guide blade (26) is connected to the right side surface of the upper surface of the moving bottom plate (25), and a collecting groove (27) is formed in the upper surface of the moving bottom plate (25);
a fixed connecting device is arranged in the operating platform (1);
and a clamping device is arranged outside the movable bottom plate (25).
2. A construction work platform according to claim 1, wherein: the fixed connection device comprises a connecting column (11), and connecting holes (12) which are uniform in equal distance are formed in the inner side wall of the operating platform (1).
3. A construction work platform according to claim 2, wherein: the connecting holes (12) are movably connected with connecting columns (11), and the connecting holes (12) are matched with the connecting columns (11) in size.
4. A construction work platform according to claim 3, wherein: a transverse plate (21) is movably connected between the two connecting columns (11).
5. A construction work platform according to claim 1, wherein: the clamping device comprises clamping holes (32), and the upper surface of the movable bottom plate (25) is provided with two clamping holes (32).
6. A construction work platform according to claim 5, wherein: every all swing joint has joint post (31) in joint hole (32), the higher authority fixedly connected with collecting vat (27) of joint post (31).
CN202120105570.2U 2021-01-15 2021-01-15 Building construction operation platform Active CN214364819U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120105570.2U CN214364819U (en) 2021-01-15 2021-01-15 Building construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120105570.2U CN214364819U (en) 2021-01-15 2021-01-15 Building construction operation platform

Publications (1)

Publication Number Publication Date
CN214364819U true CN214364819U (en) 2021-10-08

Family

ID=77956064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120105570.2U Active CN214364819U (en) 2021-01-15 2021-01-15 Building construction operation platform

Country Status (1)

Country Link
CN (1) CN214364819U (en)

Similar Documents

Publication Publication Date Title
CN214364819U (en) Building construction operation platform
CN212002406U (en) Building device of safe construction
CN210887603U (en) Steel structure connecting piece
CN210459928U (en) Scaffold frame for house construction with adjustable
CN211143975U (en) Road construction is with removing rail
CN213509476U (en) Construction platform convenient to remove
CN210126316U (en) End block rear mold insert structure for hospital CT machine
CN218373261U (en) Cutting device for repairing roads
CN211229433U (en) Construction platform convenient to remove
CN213234527U (en) Municipal works are with construction protector
CN216239563U (en) Be applicable in circular arc reentrant corner construction tool convenient to dismouting
CN210888303U (en) Safety device for construction
CN215107085U (en) A remove handling frame for building engineering
CN212867075U (en) Telegraph pole upwarping equipment
CN214246073U (en) Assembled house fast assembly structure
CN215482952U (en) Steel plate positioning structure
CN219548825U (en) Bored pile dredging device
CN213450262U (en) Tunnel construction engineering is with chisel wall device
CN218263775U (en) Hydraulic engineering is with fence of decontaminating
CN216866240U (en) Protection frame is used in photovoltaic power generation construction
CN219586668U (en) Multistage sand blocking device for soil and water conservation
CN218624265U (en) Composite geomembrane applied to tunnel engineering
CN213856760U (en) Negative pole mould that has a waste clearance of battery electrode slice processing usefulness
CN215253011U (en) Based on assembled vibration isolation ditch for building field
CN219117131U (en) Novel automatic filling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230626

Address after: No. 456, Chengbei Road, Muxi Town, Muchuan County, Leshan, Sichuan Province 614000

Patentee after: Muchuan Construction Engineering Co.,Ltd.

Address before: 252000 No.15, Lushan South Road, Liaocheng Economic and Technological Development Zone, Shandong Province

Patentee before: Hou Longjing

TR01 Transfer of patent right