CN214361590U - Cooling water tank of steel belt production line for packaging - Google Patents

Cooling water tank of steel belt production line for packaging Download PDF

Info

Publication number
CN214361590U
CN214361590U CN202120565173.3U CN202120565173U CN214361590U CN 214361590 U CN214361590 U CN 214361590U CN 202120565173 U CN202120565173 U CN 202120565173U CN 214361590 U CN214361590 U CN 214361590U
Authority
CN
China
Prior art keywords
water tank
cooling water
production line
tank
steel band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120565173.3U
Other languages
Chinese (zh)
Inventor
李平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Lenaite Steel Strip Co ltd
Original Assignee
Hubei Lenaite Steel Strip Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Lenaite Steel Strip Co ltd filed Critical Hubei Lenaite Steel Strip Co ltd
Priority to CN202120565173.3U priority Critical patent/CN214361590U/en
Application granted granted Critical
Publication of CN214361590U publication Critical patent/CN214361590U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Carbon And Carbon Compounds (AREA)

Abstract

The utility model discloses a cooling water tank of steel band production line for packing relates to steel band production line technical field, for solving and needs cooling water tank to cool off the steel band in the steel band production line production process for current packing, and general cooling water tank water consumption is big, leads to the too high problem of whole cooling process cost. The inside below of steel band cooling water tank body installs recovery tank, install the delivery port on the outer wall of terminal surface before the recovery tank, the conveyer pipe is installed to the one end of delivery port, the condenser pipe subassembly is installed to the one end of conveyer pipe, the condenser pipe subassembly is kept away from the one end of conveyer pipe and is installed the spray tank, and the one end of delivery port is passed through conveyer pipe and condenser pipe subassembly and is connected with the spray tank, recovery tank's internally mounted has the recovery basin, activated carbon adsorption box is installed to the top of recovery basin, activated carbon adsorption box's inside is provided with the active carbon, and the active carbon is provided with a plurality of.

Description

Cooling water tank of steel belt production line for packaging
Technical Field
The utility model discloses steel band production line relates to technical field, specifically is a cooling water tank of steel band production line for packing.
Background
Steel strips (steel-belt) refer to a conveyor belt made of carbon steel as a traction and carrying member of a belt conveyor, and can also be used for binding goods; the steel plate is a narrow and long steel plate produced by various steel rolling enterprises in order to meet the requirements of different industrial departments on industrialized production of various types of metal or mechanical products. The steel band is also called as band steel, the width is within 1300mm, and the length is slightly different according to the size of each roll. The strip steel is generally supplied in a coiled manner, and has the advantages of high dimensional precision, good surface quality, convenience in processing, material saving and the like.
However, the production process of the existing steel strip production line for packaging needs a cooling water tank to cool the steel strip, and the water consumption of the common cooling water tank is large, so that the cost of the whole cooling process is overhigh; therefore, the existing requirements are not met, and a cooling water tank of a steel strip production line for packaging is provided for the cooling water tank.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a cooling water tank of steel band production line for packing to need cooling water tank to cool off the steel band in solving the current steel band production line for packing production process that proposes among the above-mentioned background art, and general cooling water tank water consumption is big, leads to the too high problem of whole cooling process cost.
In order to achieve the above object, the utility model provides a following technical scheme: a cooling water tank of a steel strip production line for packaging comprises a steel strip cooling water tank body, a recovery water tank is arranged below the inside of the steel strip cooling water tank body, a delivery port is arranged on the outer wall of the front end surface of the recovery water tank, one end of the delivery port is provided with a delivery pipe, a condensing pipe component is arranged at one end of the conveying pipe, a spraying box is arranged at one end of the condensing pipe component far away from the conveying pipe, one end of the conveying opening is connected with the spraying box through the conveying pipe and the condensing pipe component, a recovery water tank is arranged in the recovery water tank, an active carbon adsorption tank is arranged above the recovery water tank, active carbon is arranged in the active carbon adsorption tank, and the active carbon is provided with a plurality of, the impurity filter screen is installed to the top of active carbon adsorption case, the connection screw is all installed with four angles of impurity filter screen outer wall to the active carbon adsorption case.
Preferably, the lower extreme of spray box installs the shower, and the shower installs threely, the shower head is installed to the one end of shower.
Preferably, a fan is installed on one side of the spray header.
Preferably, the steel strip cooling water tank body is provided with inlet and outlet cover plates at two ends, the outer wall of the inlet and outlet cover plate is provided with an inlet and outlet at the upper part, and an inlet and outlet at the bottom is arranged below the inlet and outlet at the upper part.
Preferably, electric guide rail sets are installed at both ends of the steel strip cooling water tank body.
Preferably, a water changing port is installed on one side of the conveying port.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model utilizes the recovery water tank to collect and recover the water body in the spraying process, when the steel belt is cooled and sprayed, the water body falls downwards to the impurity filter screen due to gravity, the impurities doped in the water body can be separated by the impurity filter screen, the remaining water body continuously falls into the activated carbon adsorption tank and is adsorbed by a plurality of activated carbon, the impurities in the water body are reduced due to filtration and adsorption, then the water body reaches the recovery water tank for placement, when the water body is needed to be used, the water body can be conveyed to the condenser pipe component through the conveying port and the conveying pipe to be cooled, then the water body enters the spray tank from the condenser pipe component for next cooling water spraying operation, compared with the common cooling water tank for steel belt production, the utility model reduces the required water consumption of the cooling water tank, and can utilize the recovery water body and the condenser pipe component to repeatedly use the water body, and can filter the water body at the in-process that uses, filtering component adopts the screw thread to fix, and the user of being convenient for assembles and dismantles to can ensure that the cost in the steel band production line cooling process obtains reducing.
2. Through the fan of one side installation at the shower head, the fan is close to the exit, utilizes the fan can accelerate the cooling efficiency of cooling water on the one hand, and on the other hand can blow off and weather the water on steel band surface.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of a partial structure of a steel strip cooling water tank body of the present invention;
FIG. 3 is a schematic view of a partial structure of the recovery water tank of the present invention;
in the figure: 1. a steel strip cooling water tank body; 2. an inlet-outlet cover plate; 3. an upper inlet and outlet; 4. an electric guide rail set; 5. a bottom inlet and outlet; 6. a recovery water tank; 7. a spray box; 8. a condenser tube assembly; 9. a delivery pipe; 10. a delivery port; 11. a shower pipe; 12. a shower head; 13. a fan; 14. an impurity filter screen; 15. an activated carbon adsorption tank; 16. activated carbon; 17. a recovery water tank; 18. a connecting screw hole; 19. and (4) changing a water gap.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, the present invention provides an embodiment: a cooling water tank of a steel strip production line for packaging comprises a steel strip cooling water tank body 1, a recovery water tank 6 is arranged below the interior of the steel strip cooling water tank body 1, a conveying port 10 is arranged on the outer wall of the front end face of the recovery water tank 6, a conveying pipe 9 is arranged at one end of the conveying port 10, a condensing pipe assembly 8 is arranged at one end of the conveying pipe 9, a spraying tank 7 is arranged at one end, far away from the conveying pipe 9, of the condensing pipe assembly 8, one end of the conveying port 10 is connected with the spraying tank 7 through the conveying pipe 9 and the condensing pipe assembly 8, a recovery water tank 17 is arranged inside the recovery water tank 6, an active carbon adsorption tank 15 is arranged above the recovery water tank 17, active carbon 16 is arranged inside the active carbon adsorption tank 15, and activated carbon 16 is provided with a plurality of, and impurity filter screen 14 is installed to the top of activated carbon adsorption case 15, and four angles of activated carbon adsorption case 15 and impurity filter screen 14 outer wall all install connection screw 18.
Further, the lower end of the spray box 7 is provided with three spray pipes 11, the spray pipes 11 are provided with three spray heads 12, and one ends of the spray pipes 11 are provided with the spray heads 12, so that the water body can be sprayed and cooled from top to bottom on the steel strip by using the spray pipes 11 and the spray heads 12.
Further, a fan 13 is installed on one side of the spray header 12, the fan 13 can accelerate the cooling efficiency of cooling water on the one hand, and on the other hand can blow off and blow dry the water on the surface of the steel strip.
Further, the inlet and outlet cover plates 2 are installed at two ends of the steel strip cooling water tank body 1, the upper inlet and outlet 3 are installed on the outer wall of the inlet and outlet cover plate 2, the bottom inlet and outlet 5 are installed below the upper inlet and outlet 3, and the upper inlet and outlet 3 and the bottom inlet and outlet 5 can be conveniently designed for a user to carry out double-layer steel strip cooling operation in the mode of an upper layer and a lower layer.
Further, electric guide rail group 4 is all installed at the both ends of steel band cooling water tank body 1, utilizes electric guide rail group 4 can be convenient for the user to remove the steel band, makes whole cooling water tank be fit for using in the steel band production line.
Further, a water changing port 19 is installed on one side of the conveying port 10, and the water changing port 19 is used for facilitating a user to change the water body inside regularly.
The working principle is as follows: when the water cooling device is used, the water body in the spraying process is collected and recycled by utilizing the recycling water tank 6, when the steel belt is cooled and sprayed, the water body falls downwards to the impurity filter screen 14 due to gravity, the impurities doped in the water body can be separated by the impurity filter screen 14, the remaining water body continuously falls into the activated carbon adsorption tank 15 and is adsorbed by a plurality of activated carbon 16, the impurities in the water body are reduced due to filtration and adsorption, then the impurities reach the recycling water tank 17 for placement, when the water cooling device is needed to be used, the water body can be conveyed to the condensation pipe assembly 8 through the conveying opening 10 and the conveying pipe 9 for water cooling, then the water body enters the spraying tank 7 from the condensation pipe assembly 8 for next cooling water spraying operation, compared with the cooling water tank for common steel belt production, the water consumption required by the cooling water tank is reduced, the water body and the condensation pipe assembly 8 can be reused, and can filter the in-process of using to can ensure that the cost in the steel band production line cooling process obtains reducing, through the installation fan 13 in one side of shower head 12, fan 13 is close to the exit, utilizes fan 13 to accelerate the cooling efficiency of cooling water on the one hand, and on the other hand can blow off and weather the water on steel band surface.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a cooling water tank of steel band production line for packing, includes steel band cooling water tank body (1), its characterized in that: the steel band cooling water tank comprises a steel band cooling water tank body (1), wherein a recovery water tank (6) is installed below the interior of the steel band cooling water tank body (1), a conveying port (10) is installed on the outer wall of the front end face of the recovery water tank (6), a conveying pipe (9) is installed at one end of the conveying port (10), a condensing pipe assembly (8) is installed at one end of the conveying pipe (9), a spray tank (7) is installed at one end, away from the conveying pipe (9), of the condensing pipe assembly (8), the spray tank (7) is installed at one end of the conveying port (10), one end of the conveying port (10) is connected with the spray tank (8) through the conveying pipe (9) and the condensing pipe assembly (8), a recovery water tank (17) is installed inside the recovery water tank (6), an active carbon adsorption tank (15) is installed above the recovery water tank (17), active carbon adsorption tank (16) is arranged inside the active carbon adsorption tank (15), a plurality of active carbon (16) are arranged, an impurity filter screen (14) is installed above the active carbon adsorption tank (15), and the four corners of the outer walls of the activated carbon adsorption box (15) and the impurity filter screen (14) are respectively provided with a connecting screw hole (18).
2. The cooling water tank of a production line of a steel strip for packaging as set forth in claim 1, wherein: shower (11) are installed to the lower extreme of spray box (7), and shower (11) install threely, shower head (12) are installed to the one end of shower (11).
3. The cooling water tank of a production line of a steel strip for packaging as set forth in claim 2, wherein: and a fan (13) is arranged on one side of the spray header (12).
4. The cooling water tank of a production line of a steel strip for packaging as set forth in claim 1, wherein: inlet and outlet cover plates (2) are installed at two ends of the steel strip cooling water tank body (1), an upper inlet and outlet (3) is installed on the outer wall of the inlet and outlet cover plates (2), and a bottom inlet and outlet (5) is installed below the upper inlet and outlet (3).
5. The cooling water tank of a production line of a steel strip for packaging as set forth in claim 1, wherein: and electric guide rail sets (4) are arranged at two ends of the steel strip cooling water tank body (1).
6. The cooling water tank of a production line of a steel strip for packaging as set forth in claim 1, wherein: and a water changing port (19) is arranged on one side of the conveying port (10).
CN202120565173.3U 2021-03-19 2021-03-19 Cooling water tank of steel belt production line for packaging Expired - Fee Related CN214361590U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120565173.3U CN214361590U (en) 2021-03-19 2021-03-19 Cooling water tank of steel belt production line for packaging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120565173.3U CN214361590U (en) 2021-03-19 2021-03-19 Cooling water tank of steel belt production line for packaging

Publications (1)

Publication Number Publication Date
CN214361590U true CN214361590U (en) 2021-10-08

Family

ID=77972141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120565173.3U Expired - Fee Related CN214361590U (en) 2021-03-19 2021-03-19 Cooling water tank of steel belt production line for packaging

Country Status (1)

Country Link
CN (1) CN214361590U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114225826A (en) * 2021-11-29 2022-03-25 合肥中科碳微科技有限公司 High-speed dropping pill preparation equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114225826A (en) * 2021-11-29 2022-03-25 合肥中科碳微科技有限公司 High-speed dropping pill preparation equipment
CN114225826B (en) * 2021-11-29 2024-04-02 合肥中科碳微科技有限公司 High-speed dripping pill preparation equipment

Similar Documents

Publication Publication Date Title
CN214361590U (en) Cooling water tank of steel belt production line for packaging
CN212120575U (en) Spraying device is used in processing of color-coated sheet
CN205925360U (en) Drip washing splitter is used in zirconium oxychloride production
CN215032403U (en) High-efficient clearance water tank formula wire drawing machine
CN103010707B (en) Air cushion-belt conveyer device
CN210892354U (en) Cooling equipment for electrolytic copper processing
CN209646921U (en) A kind of coating machine drying unit
CN209577505U (en) A kind of aluminium sheet cleaning device of aluminium sheet paint line
CN212901885U (en) Plasma air purifier
CN214914458U (en) Tail gas absorption and purification device of closed calcium carbide furnace
CN2784070Y (en) Water fog, high voltage and static compositer dust remover for cement vertical kiln
CN113059009A (en) Rolling mill with spray system having anti-splash function
CN207329639U (en) A kind of conveyer belt cleaning equipment
CN202446971U (en) Foam-filler integrated burner gas purification tower
CN218249305U (en) High-efficient collection device of inorganization dust
CN206253239U (en) Wet cottrell
CN220926958U (en) But steel band pickling plant of cyclic utilization acid mist
CN110510373A (en) A kind of aluminium alloy extrusions processing cooling device
CN212237937U (en) Be used for aluminum alloy processing environmental protection spraying device
CN219972811U (en) Water-saving spray equipment
CN219880958U (en) Plate rolling device for 304 stainless steel plate
CN220142945U (en) Printing gas cleaning device
CN220160956U (en) Copper strip winding device
CN102698550A (en) Combined foam and packing furnace gas purification tower
CN220125835U (en) Industrial dust removal filter equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211008

CF01 Termination of patent right due to non-payment of annual fee