CN214324721U - Construction project information management device - Google Patents
Construction project information management device Download PDFInfo
- Publication number
- CN214324721U CN214324721U CN202120099989.1U CN202120099989U CN214324721U CN 214324721 U CN214324721 U CN 214324721U CN 202120099989 U CN202120099989 U CN 202120099989U CN 214324721 U CN214324721 U CN 214324721U
- Authority
- CN
- China
- Prior art keywords
- antetheca
- groove
- wall
- set firmly
- fixed plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 239000011521 glass Substances 0.000 claims abstract description 5
- 230000006835 compression Effects 0.000 claims description 9
- 238000007906 compression Methods 0.000 claims description 9
- 238000001125 extrusion Methods 0.000 claims description 6
- 230000019771 cognition Effects 0.000 abstract description 4
- 238000007726 management method Methods 0.000 description 16
- 230000008901 benefit Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Images
Landscapes
- Drawing Aids And Blackboards (AREA)
Abstract
The utility model discloses a construction project information-based management device belongs to construction project management technical field. The utility model provides a construction project information-based management device, the on-line screen storage device comprises a base, base top surface middle part has set firmly the fixed plate, fixed plate antetheca lower part has set firmly the blank, blank antetheca lower extreme has set firmly the backup pad, the fixed plate antetheca is the rectangle arrangement for the position on blank upper portion and has seted up four recesses, the embedded bulletin box that is equipped with of recess, bulletin box bottom surface middle part has set firmly the slider, the recess bottom surface has seted up the spout for the position of slider, the paper slot has been seted up to bulletin box top surface front side, paper slot antetheca middle part inlays and is equipped with the glass board, bulletin box antetheca lower extreme has set firmly the arm-tie, fixed plate antetheca right side is equipped with progress show subassembly. This device had both improved the cognition of staff to the engineering completion, and the enthusiasm that again can effectual pulling staff's construction has greatly made things convenient for the progress management work of manager to the engineering project.
Description
Technical Field
The utility model relates to a construction project management technical field, more specifically say, relate to a construction project information-based management device.
Background
Informatization means that new productivity represented by intelligent tools mainly based on computers is developed and developed, and the new productivity is brought to benefit of the historical process of society, nowadays, informatization is increasingly popular, and the construction engineering project management is also carried out by adopting an informatization method, in the engineering project management process, in order to more conveniently carry out overall management work on the engineering, a manager needs to publish engineering data calculated by a computer or newly issued engineering information so as to be convenient for the checking of working personnel, the computer is a very compact instrument, the dust-proof screen is easy to damage in a dusty environment, the size of the screen is limited, workers need to operate a computer to look up one by one when checking information, this causes a problem that the reading is slow and the information distribution efficiency is reduced, and therefore, a construction project informatization management device is proposed.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
An object of the utility model is to provide a construction project information-based management device to solve the problem that proposes among the above-mentioned background art.
2. Technical scheme
The utility model provides a construction project information-based management device, includes the base, base top surface middle part has set firmly the fixed plate, fixed plate antetheca lower part has set firmly the blank, blank antetheca lower extreme has set firmly the backup pad, the fixed plate antetheca is the rectangle for the position on blank upper portion and arranges and has seted up four recesses, the embedded bulletin box that is equipped with of recess, bulletin box bottom surface middle part has set firmly the slider, the spout has been seted up for the position of slider to the recess bottom surface, the paper slot has been seted up to bulletin box top surface front side, paper slot antetheca middle part is inlayed and is equipped with the glass board, bulletin box antetheca lower extreme has set firmly the arm-tie, fixed plate antetheca right side is equipped with progress show subassembly.
Preferably, the supporting plate is of an inclined structure with a high front part and a low rear part, the outer wall of the bulletin box is in sliding contact with the inner wall of the groove, the sliding block and the sliding groove are of a ladder-shaped column structure, the sliding block is in sliding fit with the sliding groove, and the pulling plate is of an L-shaped structure.
Preferably, progress show subassembly is including removing the seat, it is fillet structure to remove seat antetheca both ends, the spacing groove has been seted up for the position of removing the seat to the fixed plate antetheca, the spacing groove is T type structure, it has set firmly two limiting plates for the symmetry of position of spacing groove antetheca to remove seat both sides, limiting plate antetheca and spacing groove antetheca sliding fit.
Preferably, it is equipped with a plurality of rubber circles to remove seat outer wall to be linear equidistant cover, rubber circle both sides outer wall and the anterior both sides inner wall extrusion fit in spacing groove, it has set firmly directional board to remove seat antetheca middle part, directional board is the rhombus structure, the fixed plate antetheca is linear equidistant a plurality of scale grooves of having seted up for the position on directional board right side.
Preferably, the middle part of the rear wall of the movable seat is fixedly provided with a telescopic rod, the rear end of the telescopic rod is fixedly provided with a T-shaped block, the position of the rear wall of the limiting groove relative to the T-shaped block is provided with a T-shaped groove, the T-shaped block is in sliding fit with the T-shaped groove, and the outer wall of the telescopic rod is sleeved with a compression spring.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
1. the utility model is provided with the bulletin box and the white board, a manager can display the engineering data which is informationized by the computer in a writing or printing mode on paper, and the white board pen can write the data on the white board, thereby being convenient for the staff to check, and if the content is more, the printing is needed, the printed bulletin can be inserted into the bulletin box along the paper slot, the bulletin box can extend or retract along the sliding fit direction of the sliding block and the sliding groove through the pull plate, and after the bulletin is placed in the bulletin box, a worker can see the information and data disclosed on the paper at a glance, so that alright improve the staff to the understanding of engineering progress information, can strengthen the efficiency of engineering information publication, can produce the protection to the paper of publishing information through bulletin box again, effectual help the administrator carry out perfect overall plan and management to the engineering project, the practicality is strong.
2. The utility model is provided with a progress display component, a manager can firstly use a computer to input various data of the project and then calculate, calculate the current completion amount of the project, then publish the data according to the percentage, the manager can press the movable seat towards the rear part along the front side of the movable seat to compress the compression spring and the telescopic rod at the rear side, at the moment, the movable seat can be adjusted to a proper position along the sliding fit direction of the T-shaped block and the T-shaped groove according to the data of the project completion percentage, and the pointing plate corresponds to the corresponding scale position of the scale groove, then under the resilience of the compression spring, the movable seat can be clamped into the front part of the limit groove again, the position of the movable seat can be limited through the extrusion fit of the rubber ring and the front part of the limit groove, so that the project progress data calculated by the computer can be displayed in a most clear mode, thereby, the cognition of a worker to the project completion degree is improved, the enthusiasm of workers in construction can be effectively pulled, and progress management work of managers on engineering projects is greatly facilitated.
3. The utility model discloses a low backup pad in high back before whiteboard antetheca lower extreme sets firmly, and the administrator can place the little article that needs use such as blank pen in its contained angle with the blank when using this device, has made things convenient for administrator's use to take.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a front sectional view of the present invention;
FIG. 3 is a schematic top sectional view of the present invention;
fig. 4 is a schematic structural diagram of the bulletin box of the present invention;
fig. 5 is a schematic view of the exploded structure of the progress display module of the present invention.
The reference numbers in the figures illustrate: 1. a base; 2. a fixing plate; 3. a white board; 4. a support plate; 5. a groove; 6. a bulletin box; 7. a slider; 8. a chute; 9. a paper slot; 10. a glass plate; 11. pulling a plate; 12. a progress display component; 13. a movable seat; 14. a limiting groove; 15. a limiting plate; 16. a rubber ring; 17. a pointing board; 18. a scale groove; 19. a telescopic rod; 20. a T-shaped block; 21. a T-shaped groove; 22. compressing the spring.
Detailed Description
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-5, the present invention provides a technical solution:
the utility model provides a construction project information-based management device, the on-line screen storage device comprises a base 1, 1 top surface middle part of base has set firmly fixed plate 2, 2 antetheca lower parts of fixed plate have set firmly blank 3, 3 antetheca lower extremes of blank have set firmly backup pad 4, 2 antetheca of fixed plate are the rectangle for the position on 3 upper portions of blank and have seted up four recesses 5, the embedded bulletin box 6 that is equipped with of recess 5, 6 bottom surface middle parts of bulletin box have set firmly slider 7, spout 8 has been seted up for the position of slider 7 in the 5 bottom surfaces of recess, paper slot 9 has been seted up to 6 top surfaces front sides of bulletin box, paper slot 9 antetheca middle part is inlayed and is equipped with glass board 10, 6 antetheca lower extreme of bulletin box has set firmly arm- tie 11, 2 antetheca right side of fixed plate is equipped with progress show subassembly 12.
Specifically, the supporting plate 4 is an inclined structure with a high front part and a low rear part, the outer wall of the bulletin box 6 is in sliding contact with the inner wall of the groove 5, the sliding block 7 and the sliding groove 8 are both in a ladder-shaped column structure, the sliding block 7 is in sliding fit with the sliding groove 8, the pull plate 11 is in an L-shaped structure, a manager can display engineering data which is informationized through a computer in a writing or printing mode on paper, a whiteboard pen can be used for writing the data on the whiteboard 3, checking of workers is facilitated, if more contents need to be printed, the printed bulletin can be inserted into the bulletin box 6 along the paper groove 9, the bulletin box 6 can be extended or retracted along the sliding fit direction of the sliding block 7 and the sliding groove 8 through the pull plate 11, the workers can see information and data disclosed on the paper clearly after placing the bulletin, so that the understanding of the workers on the engineering progress information can be improved, and the efficiency of publishing the engineering information can be enhanced, and the bulletin box 6 can protect the paper for publishing information, so that the manager can be effectively helped to carry out more perfect overall planning and management on the engineering project, and the practicability is high.
Further, progress show subassembly 12 is fillet structure including removing seat 13, and remove 13 antetheca both ends of seat, and spacing groove 14 has been seted up for the position that removes seat 13 to 2 antethecas of fixed plate, and spacing groove 14 is T type structure, and the position symmetry that removes seat 13 both sides for the spacing groove 14 antetheca has set firmly two limiting plates 15, limiting plate 15 antetheca and 14 antetheca sliding fit of limiting groove.
Furthermore, remove the seat 13 outer wall and be linear equidistant cover and be equipped with a plurality of rubber circles 16, rubber circle 16 both sides outer wall and the anterior both sides inner wall extrusion fit in spacing groove 14, remove seat 13 antetheca middle part and set firmly directional board 17, directional board 17 is the rhombus structure, and the 2 antethecas of fixed plate is linear equidistant a plurality of scale grooves 18 of having seted up for the position on directional board 17 right side.
Furthermore, an expansion link 19 is fixedly arranged in the middle of the rear wall of the movable seat 13, a T-shaped block 20 is fixedly arranged at the rear end of the expansion link 19, a T-shaped groove 21 is arranged at the position of the rear wall of the limit groove 14 corresponding to the T-shaped block 20, the T-shaped block 20 is in sliding fit with the T-shaped groove 21, a compression spring 22 is sleeved on the outer wall of the expansion link 19, a manager can firstly use a computer to record various project data and then calculate the current project completion amount, and then the project completion amount is published in percentage, the manager can press the movable seat 13 towards the rear part along the front side of the movable seat 13 to compress the compression spring 22 and the expansion link 19 at the rear side, at this time, the movable seat 13 can be adjusted to a proper position along the sliding fit direction of the T-shaped block 20 and the T-shaped groove 21 according to the project completion percentage data, the direction plate 17 corresponds to the corresponding scale position of the scale groove 18, and then under the resilience force of the compression spring 22, the movable seat 13 can be clamped into the front part of the limiting groove 14 again, the position of the movable seat 13 can be limited through the extrusion fit of the rubber ring 16 and the front part of the limiting groove 14, and therefore engineering progress data calculated by a computer can be displayed in a most vivid mode, the cognition of workers on the engineering completion degree is improved, the enthusiasm of the workers in construction can be effectively pulled, and the progress management work of managers on engineering projects is greatly facilitated.
The working principle is as follows: the manager can display the engineering data which is informationized by the computer by writing or printing the engineering data on paper, the whiteboard pen can write the data on the whiteboard 3, so that the data can be conveniently checked by workers, if the content is more and needs to be printed, the printed bulletin can be inserted into the bulletin box 6 along the paper slot 9, the bulletin box 6 can extend or retract along the sliding fit direction of the sliding block 7 and the sliding slot 8 by the pull plate 11, the bulletin can be clearly seen by the workers after the bulletin is placed in the bulletin box, so that the knowledge of the workers on the engineering progress information can be improved, the efficiency of publishing the engineering information can be enhanced, the bulletin box 6 can protect the paper for publishing the information, the manager can be effectively helped to carry out more overall planning and management on the engineering project, the practicability is strong, moreover, the manager can firstly use the computer to record various engineering data and then carry out calculation, the current completion amount of the project is calculated, then the current completion amount of the project is published according to the percentage, a manager can press the movable seat 13 towards the rear part along the front side of the movable seat 13 to compress the compression spring 22 and the telescopic rod 19 at the rear side, at the moment, the movable seat 13 can be adjusted to a proper position along the sliding fit direction of the T-shaped block 20 and the T-shaped groove 21 according to the data of the percentage of the project completion, the pointing plate 17 corresponds to the corresponding scale position of the scale groove 18, then the movable seat 13 can be clamped into the front part of the limit groove 14 again under the action of the resilience force of the compression spring 22, the position of the movable seat 13 can be limited through the extrusion fit of the rubber ring 16 and the front part of the limit groove 14, and therefore the project progress data calculated by the computer can be displayed in a most vivid mode, the cognition of the worker on the project completion degree is improved, and the enthusiasm of the worker construction can be effectively pulled, the progress management work of managers on engineering projects is greatly facilitated.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (5)
1. The utility model provides a construction project information-based management device, includes base (1), its characterized in that: a fixed plate (2) is fixedly arranged in the middle of the top surface of the base (1), a white board (3) is fixedly arranged on the lower portion of the front wall of the fixed plate (2), a supporting plate (4) is fixedly arranged at the lower end of the front wall of the white board (3), four grooves (5) are arranged on the front wall of the fixing plate (2) in a rectangular shape relative to the upper part of the white board (3), a notice box (6) is embedded in the groove (5), a sliding block (7) is fixedly arranged in the middle of the bottom surface of the notice box (6), a sliding groove (8) is arranged at the position of the bottom surface of the groove (5) corresponding to the sliding block (7), a paper groove (9) is arranged on the front side of the top surface of the bulletin box (6), a glass plate (10) is embedded in the middle of the front wall of the paper groove (9), the lower end of the front wall of the bulletin box (6) is fixedly provided with a pull plate (11), and the right side of the front wall of the fixing plate (2) is provided with a progress display assembly (12).
2. The construction project informatization management device according to claim 1, characterized in that: the supporting plate (4) is of an inclined structure with a high front part and a low rear part, the outer wall of the bulletin box (6) is in sliding contact with the inner wall of the groove (5), the sliding block (7) and the sliding groove (8) are of a trapezoidal column structure, the sliding block (7) is in sliding fit with the sliding groove (8), and the pulling plate (11) is of an L-shaped structure.
3. The construction project informatization management device according to claim 1, characterized in that: progress show subassembly (12) is including removing seat (13), it is fillet structure to remove seat (13) antetheca both ends, spacing groove (14) have been seted up for the position of removing seat (13) to fixed plate (2) antetheca, spacing groove (14) are T type structure, it has set firmly two limiting plate (15) to remove seat (13) both sides for the symmetry of position of spacing groove (14) antetheca, limiting plate (15) antetheca and spacing groove (14) antetheca sliding fit.
4. The construction project informatization management device according to claim 3, characterized in that: remove seat (13) outer wall and be linear equidistant cover and be equipped with a plurality of rubber circle (16), rubber circle (16) both sides outer wall and spacing groove (14) front portion both sides inner wall extrusion fit, remove seat (13) antetheca middle part and set firmly directional board (17), directional board (17) are the rhombus structure, fixed plate (2) antetheca is linear equidistant a plurality of scale grooves (18) of having seted up for the position on directional board (17) right side.
5. The construction project informatization management device according to claim 4, characterized in that: remove seat (13) back wall middle part and set firmly telescopic link (19), telescopic link (19) rear end is equipped with T type piece (20) admittedly, T type groove (21) have been seted up for the position of T type piece (20) to spacing groove (14) rear wall, T type piece (20) and T type groove (21) sliding fit, telescopic link (19) outer wall cover is equipped with compression spring (22).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120099989.1U CN214324721U (en) | 2021-01-14 | 2021-01-14 | Construction project information management device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120099989.1U CN214324721U (en) | 2021-01-14 | 2021-01-14 | Construction project information management device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214324721U true CN214324721U (en) | 2021-10-01 |
Family
ID=77909940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120099989.1U Expired - Fee Related CN214324721U (en) | 2021-01-14 | 2021-01-14 | Construction project information management device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214324721U (en) |
-
2021
- 2021-01-14 CN CN202120099989.1U patent/CN214324721U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205028342U (en) | Archives output system | |
CN214324721U (en) | Construction project information management device | |
CN201948205U (en) | Special tool box for accounting | |
CN102998551A (en) | SD (secure digital) card plug in-out detector | |
CN212537293U (en) | Novel touch integrated cash register | |
CN212484213U (en) | High definition touch all-in-one touch correction equipment | |
CN209859128U (en) | Data statistics display device based on electric energy meter checking full-flow management and control school application platform | |
CN216467167U (en) | Horizontal touch all-in-one | |
CN213988191U (en) | Performance table display device for coal mine sales department | |
CN215189932U (en) | Building engineering cost analytical equipment | |
CN210407581U (en) | Contactable conference integrated machine | |
CN219834576U (en) | Information recording management device | |
CN216280414U (en) | Safety warning mechanism for museum | |
CN215501820U (en) | Library resource informatization classification platform | |
CN215398723U (en) | Handcart for chemical industry chemistry sampling inspection | |
CN211297339U (en) | Intelligent book management system | |
CN212194827U (en) | Performance recording device for human resource management | |
CN220821099U (en) | Data storage device | |
CN215954664U (en) | Standby tower number plate with convenient replacement content | |
CN213565127U (en) | Recording device for electric power investigation | |
CN212796300U (en) | Convenient-to-use filing stamp | |
CN214904714U (en) | Drawing table for animation design | |
CN216385473U (en) | Measuring device for deformation of joint of pipe sheet | |
CN219590820U (en) | Calculation amount calculating device | |
CN214312272U (en) | English translation is with comparison legend |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211001 |
|
CF01 | Termination of patent right due to non-payment of annual fee |