CN214323097U - Pipeline auxiliary maintenance device for building construction - Google Patents
Pipeline auxiliary maintenance device for building construction Download PDFInfo
- Publication number
- CN214323097U CN214323097U CN202022789357.6U CN202022789357U CN214323097U CN 214323097 U CN214323097 U CN 214323097U CN 202022789357 U CN202022789357 U CN 202022789357U CN 214323097 U CN214323097 U CN 214323097U
- Authority
- CN
- China
- Prior art keywords
- adjusting
- adjusting hole
- moving rod
- sides
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 24
- 238000009435 building construction Methods 0.000 title claims abstract description 11
- 238000010276 construction Methods 0.000 claims description 7
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
Images
Landscapes
- Pipe Accessories (AREA)
Abstract
The utility model relates to the technical field of pipeline maintenance devices, in particular to an auxiliary pipeline maintenance device for building construction, which comprises a vehicle body, wherein a push rod is arranged on one side of the vehicle body, a fixed frame is arranged on both sides of the top of the vehicle body, the fixed frame is a U-shaped frame, the two opposite sides of the fixed frame are both provided with a clamping groove, a plurality of first adjusting holes are uniformly arranged on both sides of the fixed frame along the extending direction, a first moving rod is arranged between the two opposite clamping grooves, a sliding groove is arranged on one opposite side of the first moving rod, a second moving rod is arranged on both opposite sides of the sliding groove, an adjusting mechanism is arranged between the second moving rod and the sliding groove, supporting columns are arranged at both ends of the top of the second moving rod, a clamping plate is arranged between the supporting columns, the adjusting mechanism comprises a second adjusting bolt, a second adjusting hole and a third adjusting hole, the third adjusting hole is arranged at both ends of the second moving rod, and the third adjusting hole is positioned inside the sliding groove, the utility model discloses simple structure is convenient for adjust.
Description
Technical Field
The utility model relates to a pipeline maintenance technical field especially relates to a supplementary maintenance device of pipeline for construction.
Background
In the building construction process, the use amount of the pipeline is large, an auxiliary device is often lacked in the pipeline maintenance process, the pipeline maintenance difficulty is large, the maintenance speed of the pipeline is influenced, and the consumed manual labor intensity is increased.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists the supplementary maintenance device that lacks among the prior art, and the supplementary maintenance device of pipeline for construction that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a supplementary maintenance device of pipeline for construction, includes the automobile body, the push rod is installed to automobile body one side, the mount is all installed to automobile body top both sides, the mount is U type frame, just the draw-in groove has all been opened to the both sides that the mount is relative, the mount both sides are evenly opened along extending direction has a plurality of first regulation holes, and are relative install first carriage release lever between the draw-in groove is inside, the spout has all been opened to the one side that first carriage release lever is relative, the second carriage release lever is all installed to the both sides that the spout is relative, the second carriage release lever with install adjustment mechanism between the spout, the pillar is all installed at second carriage release lever top both ends, install splint between the pillar, splint are the arc.
Preferably, the adjusting mechanism comprises a second adjusting bolt, a second adjusting hole and a third adjusting hole, the third adjusting hole is formed in two ends of the second moving rod, the third adjusting hole is located inside the sliding groove, the second adjusting hole is uniformly formed in the length direction of the first moving rod, and the second adjusting bolt is inserted into the second adjusting hole.
Preferably, the sizes of the second adjusting bolt, the second adjusting hole and the third adjusting hole are matched.
Preferably, gaskets are arranged on two sides of one end, connected with the sliding groove, of the second moving rod, and the gaskets are elastic sheets.
Preferably, both opposite sides of the first moving rod are provided with limiting holes, and the size of each limiting hole is matched with that of the first adjusting hole.
The utility model provides a pair of pipeline auxiliary maintenance device for construction, beneficial effect lies in: the position of the second moving rod is adjusted by utilizing a fixed frame arranged at the top of the vehicle body, so that the positions of the supporting column and the clamping plate are adjusted, and the position of the clamping plate is conveniently adjusted by utilizing an adjusting mechanism.
Drawings
Fig. 1 is a schematic perspective view of a pipe auxiliary maintenance device for building construction according to the present invention;
fig. 2 is a schematic structural view of an adjusting mechanism of the auxiliary maintenance device for a pipeline for building construction provided by the utility model;
fig. 3 is the utility model provides a pipeline maintenance device's for construction third regulation pore structure sketch map for construction.
In the figure: the device comprises a vehicle body 1, a push rod 2, a fixing frame 3, a clamping groove 4, a first moving rod 5, a first adjusting hole 6, a first adjusting bolt 7, a second adjusting bolt 8, a second moving rod 9, a support column 10, a clamping plate 11, a second adjusting hole 12, a sliding groove 13, a third adjusting hole 14, a gasket 15 and a limiting hole 16.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a pipeline auxiliary maintenance device for building construction comprises a vehicle body 1, a push rod 2 is installed on one side of the vehicle body 1, a fixed frame 3 is installed on both sides of the top of the vehicle body 1, the fixed frame 3 is a U-shaped frame, clamping grooves 4 are formed on both opposite sides of the fixed frame 3, a plurality of first adjusting holes 6 are uniformly formed on both sides of the fixed frame 3 along the extending direction, a first moving rod 5 is installed between the opposite clamping grooves 4, limiting holes 16 are formed on both opposite sides of the first moving rod 5, the size of the limiting holes 16 is matched with that of the first adjusting holes 6, so that the installation and fixation of the first moving rod 5 are conveniently completed, the socket operation difficulty of the device is reduced, a sliding groove 13 is formed on both opposite sides of the first moving rod 5, a second moving rod 9 is installed on both opposite sides of the sliding groove 13, an adjusting mechanism is installed between the second moving rod 9 and the sliding groove 13, and supporting columns 10 are installed at both ends of the top of the second moving rod 9, install splint 11 between the pillar 10, splint 11 are the arc, and gasket 15 is all installed to the one end both sides that second carriage release lever 9 and spout 13 meet, and gasket 15 is the flexure strip, conveniently accomplishes the centre gripping to the pipeline to reduce the damage of striking to second carriage release lever 9.
Example 2
Referring to fig. 1-3, as the utility model discloses a further preferred embodiment, the difference with embodiment 1 lies in, adjustment mechanism includes second adjusting bolt 8, second regulation hole 12 and third regulation hole 14, third regulation hole 14 is seted up at second carriage release lever 9 both ends, and third regulation hole 14 all is located inside spout 13, second regulation hole 12 is evenly seted up along 5 length direction of first carriage release lever, second adjusting bolt 8 is pegged graft inside second regulation hole 12, second adjusting bolt 8, size homogeneous phase between second regulation hole 12 and the third regulation hole 14 matches, conveniently accomplish the regulation and the fixing to splint 11 positions, thereby conveniently accomplish the centre gripping and the fixed to the pipeline, thereby conveniently accomplish the auxiliary stay effect to the pipeline maintenance, reduce the maintenance degree of difficulty.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (5)
1. The utility model provides a supplementary maintenance device of pipeline for construction, includes automobile body (1), push rod (2) are installed to automobile body (1) one side, its characterized in that, mount (3) are all installed to automobile body (1) top both sides, mount (3) are U type frame, and draw-in groove (4) have all been opened to the relative both sides of mount (3), mount (3) both sides are evenly opened along extending direction has a plurality of first regulation holes (6), and relative install first carriage release lever (5) between draw-in groove (4) inside, spout (13) have all been opened to the relative one side of first carriage release lever (5), second carriage release lever (9) are all installed to the relative both sides of spout (13), install adjustment mechanism between second carriage release lever (9) and spout (13), pillar (10) are all installed at second carriage release lever (9) top both ends, install splint (11) between pillar (10), splint (11) are the arc.
2. The auxiliary maintenance device for the pipeline for building construction according to claim 1, wherein the adjusting mechanism comprises a second adjusting bolt (8), a second adjusting hole (12) and a third adjusting hole (14), the third adjusting hole (14) is formed in two ends of the second moving rod (9), the third adjusting hole (14) is located inside the sliding groove (13), the second adjusting hole (12) is formed uniformly along the length direction of the first moving rod (5), and the second adjusting bolt (8) is inserted into the second adjusting hole (12).
3. The auxiliary maintenance device for the pipeline for building construction as claimed in claim 2, wherein the sizes of the second adjusting bolt (8), the second adjusting hole (12) and the third adjusting hole (14) are matched.
4. The auxiliary maintenance device for the pipeline for building construction according to claim 1, wherein gaskets (15) are mounted on two sides of one end of the second moving rod (9) connected with the sliding chute (13), and the gaskets (15) are elastic sheets.
5. The auxiliary maintenance device for the pipeline for building construction as claimed in claim 1, wherein the first movable rod (5) is provided with limiting holes (16) at two opposite sides, and the size of the limiting holes (16) is matched with the size of the first adjusting holes (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022789357.6U CN214323097U (en) | 2020-11-26 | 2020-11-26 | Pipeline auxiliary maintenance device for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022789357.6U CN214323097U (en) | 2020-11-26 | 2020-11-26 | Pipeline auxiliary maintenance device for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214323097U true CN214323097U (en) | 2021-10-01 |
Family
ID=77896636
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022789357.6U Expired - Fee Related CN214323097U (en) | 2020-11-26 | 2020-11-26 | Pipeline auxiliary maintenance device for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214323097U (en) |
-
2020
- 2020-11-26 CN CN202022789357.6U patent/CN214323097U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214323097U (en) | Pipeline auxiliary maintenance device for building construction | |
CN219061014U (en) | Steel construction consolidates roof device for architectural design | |
CN211779393U (en) | Indoor warm pipeline fixing device that leads to | |
CN210344228U (en) | Reduction gearbox convenient for periodic maintenance | |
CN209190559U (en) | A kind of engine case of motorcycle frock clamp | |
CN219611288U (en) | Bus duct mounting system | |
CN213103788U (en) | Protective structure for steel rolling production | |
CN209190320U (en) | A kind of shuttle body clamp for machining | |
CN220428167U (en) | Adjustable clamp for chain machining | |
CN213946169U (en) | Paper cup processing shifts anchor clamps | |
CN214643097U (en) | Auxiliary supporting device for mounting water pipe in hydropower station | |
CN218940987U (en) | Quick installing support of fixed photovoltaic module | |
CN218668558U (en) | Template design mounting fixture | |
CN219458956U (en) | Various steel roof photovoltaic support with adjustable | |
CN221095855U (en) | A fixing device is dismantled in installation for reinforced concrete construction template | |
CN219735355U (en) | Hanging installation device of building smoke exhaust system | |
CN221755397U (en) | Quick preassembling clamp device for metal parts | |
CN221501657U (en) | Simple device for assisting in supporting formwork and connecting formwork | |
CN220645340U (en) | Building frame roof beam reinforced structure | |
CN221612361U (en) | Ripple compensator detects auxiliary device | |
CN210713875U (en) | Tool for improving installation quality of hyperboloid special-shaped curtain wall | |
CN203999718U (en) | Electrically heated guide rails assembling adjusting pole under a kind of annealing furnace plate | |
CN214989620U (en) | Bridge building hoist for steel mould convenient to adjust | |
CN217224353U (en) | Positioning fixture for welding heating and ventilation pipe | |
CN219394228U (en) | Fast-assembling formula auxiliary material support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211001 |