CN214311431U - Industrial control equipment operation stability testboard - Google Patents

Industrial control equipment operation stability testboard Download PDF

Info

Publication number
CN214311431U
CN214311431U CN202120180260.7U CN202120180260U CN214311431U CN 214311431 U CN214311431 U CN 214311431U CN 202120180260 U CN202120180260 U CN 202120180260U CN 214311431 U CN214311431 U CN 214311431U
Authority
CN
China
Prior art keywords
electric connection
module
industrial control
equipment
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120180260.7U
Other languages
Chinese (zh)
Inventor
曹景斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Youyi Technology Co.,Ltd.
Original Assignee
Guangzhou Youyi Electromechanical Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Youyi Electromechanical Equipment Co ltd filed Critical Guangzhou Youyi Electromechanical Equipment Co ltd
Priority to CN202120180260.7U priority Critical patent/CN214311431U/en
Application granted granted Critical
Publication of CN214311431U publication Critical patent/CN214311431U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The utility model belongs to the technical field of the robot that delivers food, concretely relates to industry control equipment operating stability testboard, including the equipment support, install electric connection's total accuse switch and power transformer on the equipment support, be provided with multilayer place the platform on the equipment support, place the last a plurality of equipment power supply interface that all is provided with of platform, the equal electric connection power transformer of power supply interface, power supply interface electric connection have timing control module, timing control module electric connection has button module and time display module, timing control module, button module and time display module still electric connection power transformer. The utility model provides a testboard that can once only carry out the operating stability test to a plurality of industrial control equipment, degree of automation is higher, is showing and has reduced the manual operation step, has the practical meaning that is showing.

Description

Industrial control equipment operation stability testboard
Technical Field
The utility model relates to a food delivery robot technical field particularly, relates to industrial control equipment operating stability testboard.
Background
With the advance of modern industrialization process, the proportion of manual operation in industrial production is continuously reduced, and various automatic production equipment is widely applied to industrial production. The automatic production equipment generally needs to be automatically controlled by matching industrial control equipment (such as an embedded industrial personal computer, an industrial computer and the like). After long-time production operation, due to the influence of factors such as equipment aging, industrial control equipment is prone to failure and can be continuously used after being maintained. After the maintenance unit performs maintenance on the industrial control equipment, the stability test is generally required to be performed so as to ensure that the industrial control equipment can stably run for a long time after being delivered back to a workshop. At present, maintenance enterprises on the market generally start the maintained industrial control equipment manually and test the equipment by manually recording time, so that the operation is complicated, recording errors are easy to occur when more equipment is processed for testing, the working effect is influenced, and the quality of maintenance service is difficult to guarantee.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems that the operation stability test is generally carried out by pure manual operation after the maintenance of industrial control equipment on the market at present, the operation is more complicated, errors are easy to occur, and the test efficiency is low, the test bench for the operation stability of the industrial control equipment is provided.
Industrial control equipment operating stability testboard, including the equipment support, install electric connection's total accuse switch and power transformer on the equipment support, be provided with multilayer place the platform on the equipment support, all be provided with a plurality of equipment power supply interfaces on the place the platform, the equal electric connection power transformer of power supply interface, power supply interface electric connection have timing control module, timing control module electric connection has button module and time display module, timing control module, button module and time display module still electric connection power transformer.
Further, the timing control module comprises a PLC controller.
Furthermore, the operation key module comprises a touch display screen.
Furthermore, a protective baffle is arranged at the front end of the placing platform, and a plurality of handwriting whiteboards are arranged on the front surface of the protective baffle corresponding to the power supply interface.
Furthermore, a cooling fan is arranged on the side edge of the placing platform and electrically connected with the power transformer.
The utility model has the advantages that:
1. the operation stability test of a plurality of industrial control equipment can be carried out once only, and work efficiency is high.
2. The manual operation steps are less, and the use is convenient.
3. Simple structure and low equipment cost.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic structural diagram of a test bench for operation stability of industrial control equipment;
FIG. 2 is a right side view of the industrial control equipment operation stability test bench;
fig. 3 is a schematic circuit block diagram of the industrial control equipment operation stability test bench.
The attached drawings are as follows:
the method comprises the following steps of 1-an equipment support, 2-a master control switch, 3-a power transformer, 4-a placement platform, 5-a power supply interface, 6-a timing control module, 7-a touch display screen, 8-a protective baffle, 9-a handwriting white board and 10-a cooling fan.
Detailed Description
In order to solve the problems that the operation stability test is generally carried out by pure manual operation after the maintenance of industrial control equipment on the market at present, the operation is more complicated, errors are easy to occur, and the test efficiency is low, the test bench for the operation stability of the industrial control equipment is provided.
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings in the embodiments of the present invention are combined below to clearly and completely describe the technical solutions in the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, but not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1 to 3, this embodiment provides industrial control equipment operating stability testboard, including equipment support 1, install electric connection's total accuse switch 2 and power transformer 3 on the equipment support 1, be provided with four layers of place the platform 4 on the equipment support 1, all be provided with a plurality of equipment power supply interface 5 on the place the platform 4, the equal electric connection power transformer 3 of power supply interface 5, 5 electric connection of power supply interface have timing control module 6, 6 electric connection of timing control module has button module and time display module, timing control module 6, button module and time display module still electric connection power transformer 3.
The master control switch 2 is connected with the mains supply, and the power transformer 3 is used for converting the mains supply into a power supply which can be used by the industrial control equipment to be tested and each functional module.
During the in-service use, place the industrial control equipment that has maintained on place the platform 4 and dock power supply interface 5, open total accuse switch 2, utilize the power of button module activation power supply interface 5, the industrial control equipment that needs to carry out the operation test circular telegram can move, and time display module can take notes the test operating duration that shows industrial control equipment, need not artifical record, and work efficiency is high.
The timing control module 6 includes a PLC controller. The PLC controller is a common element in the market, and can provide power switch control and operation time recording functions corresponding to each layer of the placing platform 4. Since the structure and application of the PLC controller belong to the known technology in the art, and the related improvements are not involved in the present solution, they will not be described in detail herein.
The key module and the time display module are integrated into a touch display screen 7. The touch display screen 7 has both the control key and the information display function, and facilitates the user to control the on-off of the power supply interface 5 on each layer of the placing platform 4 and check the power-on running time without manually monitoring the industrial control equipment in the test.
The front end of the placing platform 4 is provided with a protective baffle 8, and the front surface of the protective baffle 8 is provided with a plurality of handwriting whiteboards 9 corresponding to the power supply interface 5. The protective baffle 8 can limit the industrial control equipment placed on the placing platform 4, and the industrial control equipment is prevented from accidentally falling. And the handwriting whiteboard 9 facilitates the addition of remark information to the industrial control equipment in the test by the staff, and improves the working efficiency.
And a heat radiation fan 10 is arranged on the side edge of the placing platform 4, and the heat radiation fan 10 is electrically connected with the power transformer 3. The heat dissipation fan 10 can promote the air flow of each layer of the placing platform 4, take away the heat of the equipment in time, and avoid the overheating phenomenon when a plurality of industrial control equipment are operated and tested.
The foregoing is a more detailed description of the present invention, and it is not intended that the present invention be limited to the specific details, since modifications and variations will be apparent to those skilled in the art.

Claims (5)

1. Industrial control equipment operating stability testboard, its characterized in that, including the equipment support, install electric connection's total accuse switch and power transformer on the equipment support, be provided with multilayer place the platform on the equipment support, all be provided with a plurality of equipment power supply interfaces on the place the platform, the equal electric connection power transformer of power supply interface, power supply interface electric connection have timing control module, timing control module electric connection has button module and time display module, timing control module, button module and time display module still electric connection power transformer.
2. The industrial control equipment operation stability test bench of claim 1, wherein the timing control module comprises a PLC controller.
3. The industrial control equipment operation stability test bench of claim 1, wherein the key module and the time display module are integrated into a touch display screen.
4. The industrial control equipment operation stability test bench of claim 1, wherein a protection baffle is arranged at the front end of the placing platform, and a plurality of handwriting white boards are arranged on the front surface of the protection baffle corresponding to the power supply interface.
5. The industrial control equipment operation stability test bench of claim 1, wherein a heat dissipation fan is disposed on a side of the placement platform, and the heat dissipation fan is electrically connected to the power transformer.
CN202120180260.7U 2021-01-22 2021-01-22 Industrial control equipment operation stability testboard Active CN214311431U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120180260.7U CN214311431U (en) 2021-01-22 2021-01-22 Industrial control equipment operation stability testboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120180260.7U CN214311431U (en) 2021-01-22 2021-01-22 Industrial control equipment operation stability testboard

Publications (1)

Publication Number Publication Date
CN214311431U true CN214311431U (en) 2021-09-28

Family

ID=77829073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120180260.7U Active CN214311431U (en) 2021-01-22 2021-01-22 Industrial control equipment operation stability testboard

Country Status (1)

Country Link
CN (1) CN214311431U (en)

Similar Documents

Publication Publication Date Title
CN107632219B (en) Automatic startup and shutdown test system and test method thereof
CN205158348U (en) USB equipment hot plug detecting system
CN102236087A (en) Withstand voltage test device and method of three-phase electric energy meter
CN214311431U (en) Industrial control equipment operation stability testboard
CN100517907C (en) Method for managing electric quantity of electric power source and replacing battery in hot pluggable condition for portable electronic equipments
CN204116573U (en) A kind of power supply automatic aging line
CN208607293U (en) A kind of underwater equipment electric property detection system
CN107355948B (en) Control method and device of photovoltaic air conditioner
CN203243215U (en) Multicircuit output communication power supply capable of hot plugging
CN201345558Y (en) Off-line UPS
CN102221867B (en) Circuit for realizing computer soft off and control method thereof
CN109671785B (en) MWT conductive offset printing method
CN101377753A (en) Accessory test device and method
CN203404060U (en) Automatic detection device of variable frequency compressor
CN201876687U (en) Automatic power-off control system
CN205003580U (en) Embedded industry mainboard
CN101290748A (en) Method and system for displaying status of system by LCD
CN210534039U (en) Heat conduction effect detection device of heat dissipation film
CN106033200A (en) Control method and power supply equipment
CN207630544U (en) A kind of heating joint tool
CN217363074U (en) Extensible power line carrier communication equipment detection device
CN212134878U (en) Independent timer circuit function board system
CN205375366U (en) Desk calculator power with accumulate function
CN210246614U (en) Dual-channel remote programmable power supply device
CN100480956C (en) Connecting method and device for multiple fan

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 9th Floor, Building A2, Liandong U Valley, No. 17 Xicheng Middle Street, Huangpu District, Guangzhou City, Guangdong Province, 510663

Patentee after: Guangdong Youyi Technology Co.,Ltd.

Address before: 510000 Room 401, building B, No. 5, henggangtou, Daguan, Tianhe District, Guangzhou, Guangdong

Patentee before: GUANGZHOU YOUYI ELECTROMECHANICAL EQUIPMENT Co.,Ltd.