CN214280706U CN202120418087.XU CN202120418087U CN214280706U CN 214280706 U CN214280706 U CN 214280706U CN 202120418087 U CN202120418087 U CN 202120418087U CN 214280706 U CN214280706 U CN 214280706U
Authority
CN
China
Prior art keywords
power transmission
cylinder
transmission line
ring
circuit construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120418087.XU
Other languages
Chinese (zh)
Inventor
林永照
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Wanlin Construction Management Co ltd
Original Assignee
Fujian Wanlin Construction Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Wanlin Construction Management Co ltd filed Critical Fujian Wanlin Construction Management Co ltd
Priority to CN202120418087.XU priority Critical patent/CN214280706U/en
Application granted granted Critical
Publication of CN214280706U publication Critical patent/CN214280706U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)

Abstract

The application discloses circuit construction circuit installation laying device relates to the technical field of circuit construction, including two vertical and the support frame that is parallel to each other, it is connected with the cylinder that supplies the power transmission line to encircle to rotate between two support frames, the cylinder is cylindric and axis level, sliding connection has the several to separate the fender ring on the cylinder surface, it establishes on the cylinder to separate the fender ring cover, separate the surperficial in opposite directions of fender ring and keep away from one of cylinder and serve the mounting hole of offering the power transmission line head and pass, be provided with the clamping mechanism who is used for pressing from both sides tight power transmission line head in the mounting hole, it is provided with the locking structure who is used for fixed fender ring position to separate on fender ring and the cylinder. The application provides a circuit construction circuit installation laying device, can fix and be difficult for causing because the winding scope of power transmission line or thickness and solid the influence for the power transmission line head that makes the power transmission line.

Description

Circuit construction line installation laying device
Technical Field
The application relates to the technical field of circuit construction, in particular to a circuit construction line installation and laying device.
Background
At present, in the circuit construction process, an electric wire line is generally required to be laid, and power supply in a longer distance or a wider range is realized, so that the line which is generally required to be laid is longer, and the laying process is more complicated and a line laying device is generally used.
Among the correlation technique, the patent document of grant bulletin No. CN208971044U, a power transmission line laying equipment for circuit construction is published, including two vertical support frames that parallel, it supplies the winding cylinder of power transmission line to rotate to be connected with between two support frames, separate for the power transmission line that three region can be used for twining different specifications and pattern through the baffle on the cylinder, lie in the heavy groove that all offers the power transmission line end of a thread of placing in the partition region of difference on the cylinder, sliding connection has two fixture blocks in the heavy groove, the fixture block can pass through the position of bolt and cylinder butt restriction fixture block, thereby it is fixed with the end of a thread of power transmission line clamp tightly to press from both sides through two fixture blocks. One side of the roller is detachably connected with a motor through a bolt and a nut, and the motor can drive the roller to rotate to replace manual power transmission line winding and unwinding.
With respect to the above-described related art, the inventors consider that the following drawbacks exist: because the heavy groove is seted up on the cylinder, cover the heavy groove easily when the power transmission line winding is more for the user is difficult for unscrewing or locking the bolt on the fixture block, and the end of a thread of same power transmission line is also difficult for inserting to the heavy inslot.
SUMMERY OF THE UTILITY MODEL
In order to make the end of a thread of transmission line be difficult for receiving the influence because of the winding scope of transmission line or thickness, this application provides a circuit construction circuit installation laying device.
The application provides a circuit construction line installation laying device adopts following technical scheme:
the utility model provides a circuit construction circuit installation laying device, includes two vertical and the support frame that is parallel to each other, two rotate between the support frame and be connected with the cylinder that supplies the power transmission line to encircle, the cylinder is cylindric and axis level, cylinder sliding connection has the several on the surface to separate and keeps off the ring, separate and keep away from ring looks surface just keep away from one of cylinder is served and is offered the mounting hole that supplies the power transmission line end of a thread to pass, be provided with in the mounting hole and be used for pressing from both sides tightly the clamping mechanism of power transmission line end of a thread, it is used for fixing to be provided with on fender ring and the cylinder to separate the locking structure who keeps off the ring position.
Through adopting above-mentioned technical scheme, separate the fender ring and be provided with the several and fix at the cylinder on the surface through locking structure for the cylinder can divide into a plurality of regions and supply different power transmission lines to encircle, and the mounting hole setting just is located the one end that keeps off the ring and keep away from the cylinder on separating the fender ring, makes the mounting hole difficult to be covered by the power transmission line that encircles, and the mounting hole also can be through opening the position that locking structure removed the fender ring slightly if sheltered from, makes the power transmission line end of a thread can take out.
Optionally, a sliding groove is formed in the side wall of the roller, the sliding groove is parallel to the axis of the roller, and a sliding block which slides in the sliding groove and is matched with the sliding groove is arranged on the blocking ring.
Through adopting above-mentioned technical scheme, the slider that separates the fender ring slides and makes to separate the fender ring and can slide along cylinder axis direction in the spout, and the slider with separate the fender ring adaptation and make to separate and keep off the ring and be difficult for rotating.
Optionally, the locking structure includes a plurality of first threaded holes that are formed in the bottom of the sliding groove and distributed along the length direction of the sliding groove, a plurality of first through holes are formed in the surface of the sliding block facing the axis of the roller, and the locking structure further includes a first bolt that is inserted into the first through hole and is in threaded connection with the first threaded holes.
Through adopting above-mentioned technical scheme, rotate first bolt and make behind the first through-hole with first screw hole threaded connection, thereby the fixed position that keeps off the ring that keeps off, and connect the size that can adjust different regions through first bolt and the first screw hole of difference, when the power transmission line head was sheltered from inconvenient taking out, can adjust and keep off the position of ring.
Optionally, the sliding grooves are formed in the surface of the drum, the two sliding grooves are symmetrically arranged along the axis of the drum, and the two sliding blocks are arranged on the baffle ring and are opposite to each other.
Through adopting above-mentioned technical scheme, the spout is provided with two, and the cylinder makes two slider atresss even at the rotation in-process, increases and keeps off the life of ring, and need unscrew two first bolts simultaneously just can remove and keep off the position of ring, reduces the maloperation.
Optionally, the clamping mechanism includes a sliding block sliding in the mounting hole, and a fastening assembly for pushing the sliding block and enabling the sliding block and the side wall of the mounting hole to clamp the power transmission line head is arranged on the blocking ring.
Through adopting above-mentioned technical scheme, promote the slider and remove through supporting tight subassembly, the slider is under the effect of supporting tight subassembly and the mounting hole lateral wall presss from both sides tightly the power transmission line end of a thread to pack up the power transmission line end of a thread.
Optionally, a second through hole communicated with the mounting hole is formed in the surface, away from the roller, of the blocking ring, the fastening assembly comprises a sliding rod which penetrates through the second through hole and is in threaded connection with the sliding block, one end, away from the sliding block, of the sliding rod is located on the outer side of the blocking ring and is connected with a handle, and the fastening assembly further comprises a spring which is sleeved on the sliding rod and is respectively abutted to the side wall of the mounting hole and the sliding block.
Through adopting above-mentioned technical scheme, the pulling handle for the slider can remove, and the spring shrink, the power transmission line end of a thread can be pegged graft to the mounting hole in, when the release handle, makes under the spring force effect, slider and mounting hole lateral wall can support the power transmission line end of a thread tight, thereby the position of fixed power transmission line end of a thread.
Optionally, the mounting holes and the clamping mechanism are provided with multiple groups on the barrier ring at equal intervals.
By adopting the technical scheme, after the power transmission line is used, the line head can be connected into the nearest mounting hole, so that the power transmission line is not easy to be in a loose state or extend out of a overlong state.
Optionally, one end of the sliding block, which is far away from the handle, is fixedly connected with an elastic pad.
Through adopting above-mentioned technical scheme, the cushion supports tightly with the power transmission line end of a thread under the effect of spring force, because the cushion has elasticity for the power transmission line is difficult by extrusion deformation.
In summary, the present application includes at least one of the following benefits:
1. the blocking rings are provided with a plurality of blocking rings and fixed on the surface of the roller through the locking structures, so that the roller can be divided into a plurality of areas for different power transmission lines to surround, the mounting holes are formed in the blocking rings and located at one ends, far away from the roller, of the blocking rings, the mounting holes are not easily covered by the surrounding power transmission lines, and if the mounting holes are covered, the positions of the blocking rings can be slightly moved by opening the locking structures, so that the line ends of the power transmission lines can be taken out;
2. the mounting holes and the clamping mechanisms are arranged in the baffle rings at equal intervals, and after the power transmission line is used, the line head can be connected into the nearest mounting hole, so that the power transmission line is not easy to be in a loose state or a state that the line head extends out too long;
3. the slider is kept away from the one end fixedly connected with cushion of handle, the cushion supports tightly with the power transmission line end of a thread under the effect of spring force for the power transmission line is difficult by extrusion deformation.
Drawings
FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present application;
FIG. 2 is a partial schematic view showing the structure of the drum;
fig. 3 is a schematic structural diagram of a baffle disc according to an embodiment of the present application.
Description of reference numerals: 1. a support frame; 11. a universal wheel; 12. inserting holes; 2. a drum; 21. a chute; 22. a first threaded hole; 23. rotating the rod; 24. mounting a disc; 3. a baffle ring; 31. a slider; 32. a first through hole; 33. mounting holes; 34. a second through hole; 35. a slide bar; 36. a slide bar; 361. an elastic pad; 37. a spring; 38. a handle; 4. a power transmission line; 41. a power transmission line head; 5. a motor; 6. placing a rack; 7. a reinforcing bar; 8. a first bolt.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses circuit construction line installation laying device. Referring to fig. 1, the circuit construction line installation and laying device comprises two support frames 1 with two parallel sides, wherein the two support frames 1 are rotatably connected with a roller 2 for winding a power transmission line 4, and two sides of the roller 2 are connected with an installation disc 24 through bolts. Coaxial jack 12 has been seted up between two support frames 1 surface in opposite directions, and mounting disc 24 both sides fixedly connected with inserts the rotary rod 23 in jack 12 for cylinder 2 can rotate round rotary rod 23, and cylinder 2 is whole to become cylindricly and axis level after fixed. The two support frames 1 are connected with a reinforcing rod 7 through bolts, so that the support frames 1 are kept vertical, and the rotating rods 23 are not easy to leave the plug holes 12. The bottom of each of the two support frames 1 is connected with two universal wheels 11, so that the power transmission line 4 wound on the roller 2 can move to a construction site along with the support frames 1. One rotating rod 23 is connected with a motor 5 through a bolt and a nut, and the lower end of the motor 5 is fixedly connected with a placing rack 6. The drum 2 can be wound and unwound by manually rotating the rotating rod 23 or by the motor 5.
Referring to fig. 1 and 2, two chutes 21 have been seted up along length direction on the surface of cylinder 2, and two chutes 21 symmetry set up in cylinder 2 axis both sides, and sliding connection has the several to separate on cylinder 2 keeps off ring 3, and separates to keep off ring 3 cover and establish on cylinder 2, and the preferred two of this embodiment to divide into three region with cylinder 2 outer wall, can supply the transmission line 4 winding of different specifications in order to adapt to the different needs of laying wire.
Referring to fig. 2 and 3, two sliding blocks 31 for sliding in the sliding grooves 21 are integrally connected to the inner wall of the blocking ring 3, and the sliding blocks 31 and the sliding grooves 21 are adapted to make the blocking ring 3 and the drum 2 not easy to rotate relatively. The surface of the sliding block 31 facing the roller 2 is provided with a first through hole 32 penetrating through the baffle ring 3, a first bolt 8 is inserted in the first through hole 32, the sliding groove 21 is internally provided with a plurality of first threaded holes 22 along the length direction, the first bolt 8 can be in threaded connection with the first threaded holes 22 so as to fix the position of the baffle ring 3, and the first bolt 8 can be in threaded connection with different first threaded holes 22 so as to adjust the length of the winding area of different power transmission lines 4. The two ends of the sliding groove 21 penetrate through the two end surfaces of the roller 2, and the blocking ring 3 can be taken down when the supporting frame 1 is dismounted.
Referring to fig. 1 and 3, the power transmission line 4 includes a power transmission line head 41, the two baffle rings 3 have mounting holes 33 opened on their facing surfaces, the mounting holes 33 are located on the side of the baffle rings 3 away from the drum 2, and the mounting holes 33 are uniformly opened on the baffle rings 3 around the axis of the drum 2, preferably six. A clamping mechanism for clamping the power transmission line head 41 is provided in the mounting hole 33 so that the power transmission line head 41 can be retracted when not in use. The clamping mechanism comprises a second through hole 34 formed in the side wall of the mounting hole 33 far away from the roller 2, and the second through hole 34 penetrates through the baffle ring 3 and the mounting hole 33. A sliding rod 35 is slidably connected in the second through hole 34, a sliding bar 36 is connected to one end of the sliding rod 35 located in the mounting hole 33 through a thread, the other end of the sliding rod 35 is located outside the barrier ring 3 and is fixedly connected with a handle 38, a spring 37 is fixedly connected between the sliding bar 36 and the side wall of the mounting hole 33 in an abutting mode, the spring 37 is sleeved on the sliding rod 35, and an elastic pad 361 is fixedly bonded to one end, far away from the sliding rod 35, of the sliding bar 36. When not in use, the spring 37 is in a slightly contracted state so that the elastic pad 361 can abut on the side wall of the mounting hole 33, and when the handle 38 is pulled and the power transmission cord 41 is inserted into the mounting hole 33, the handle 38 is released so that the elastic pad 361 and the side wall of the mounting hole 33 abut on the power transmission cord 41. The elastic pad 361 can be compressed and deformed so that the power transmission line head 41 is not easily pressed and deformed by the elastic force of the spring 37; the mounting holes 33 are provided in plural on the baffle ring 3 so that the power transmission line head 41 can be inserted into the mounting hole 33 nearby, so that the power transmission line 4 is not easy to be loosened or the power transmission line head 41 is too long. The mounting hole 33 is opened on the barrier ring 3 so that the mounting hole 33 is not easily covered by the power transmission line 4, and the first bolt 8 can be unscrewed so that the barrier ring 3 can be slid to facilitate removal of the power transmission line head 41.
The implementation principle of the circuit construction line installation and laying device in the embodiment of the application is as follows: according to the demand, a plurality of baffle rings 3 are sleeved on a roller 2, the first bolt 8 is rotated to enable the first bolt 8 to be in threaded connection with a first threaded hole 22, the baffle rings 3 divide the roller 2 into different regions for winding power transmission lines 4 of different specifications, power transmission line heads 41 are pulled, a nearby handle 38 is pulled, a sliding strip 36 slides, the power transmission line heads 41 are plugged into mounting holes 33, the handle 38 is released, under the action of elastic force of a spring 37, the elastic pads 361 and the side walls of the mounting holes 33 tightly support the power transmission line heads 41, and when the roller 2 is driven to rotate manually or by a motor 5, the unused power transmission lines 4 are not easily released.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a circuit construction circuit installation laying device, includes two vertical and support frame (1) that are parallel to each other, two rotate between support frame (1) and be connected with cylinder (2) that supply power transmission line (4) to encircle, cylinder (2) are cylindric and axis level, its characterized in that: cylinder (2) sliding connection has several to separate and keeps off ring (3) on the surface, it establishes to separate fender ring (3) on cylinder (2), separate keep off ring (3) surface in opposite directions and keep away from one of cylinder (2) is served and is offered mounting hole (33) that supply power transmission line head (41) passed, be provided with in mounting hole (33) and be used for pressing from both sides tightly the clamping mechanism of power transmission line head (41), it is used for fixing to separate to be provided with on fender ring (3) and cylinder (2) separate the locking structure who keeps off ring (3) position.
2. The circuit construction line installation and laying device according to claim 1, wherein: the side wall of the roller (2) is provided with a sliding groove (21), the sliding groove (21) is parallel to the axis of the roller (2), and the baffle ring (3) is provided with a sliding block (31) which slides in the sliding groove (21) and is matched with the sliding groove (21).
3. The circuit construction line installation and laying device according to claim 2, wherein: the locking structure comprises a plurality of first threaded holes (22) which are formed in the bottom of the sliding groove (21) and distributed along the length direction of the sliding groove, a plurality of first through holes (32) are formed in the surface, facing the axis of the roller (2), of the sliding block (31), and the locking structure further comprises first bolts (8) which are inserted into the first through holes (32) and used for being in threaded connection with the first threaded holes (22).
4. The circuit construction line installation and laying device according to claim 3, wherein: the surface of the roller (2) is provided with two sliding grooves (21), the two sliding grooves (21) are symmetrically arranged along the axis of the roller (2), and the two sliding blocks (31) are also arranged on the baffle ring (3) oppositely.
5. The circuit construction line installation and laying device according to claim 1, wherein: the clamping mechanism comprises a sliding block (31) sliding in the mounting hole (33), and a clamping component used for pushing the sliding block (31) to enable the sliding block (31) and the side wall of the mounting hole (33) to clamp the power transmission line head (41) is arranged on the blocking ring (3).
6. The circuit construction line installation and laying device according to claim 5, wherein: keep away from on the surface of cylinder (2) keeping away from in spacer ring (3) seted up with second through-hole (34) of mounting hole (33) intercommunication, support tight subassembly including wear to establish in second through-hole (34) and with slider (31) threaded connection's slide bar (35), slide bar (35) keep away from the one end of slider (31) and be located spacer ring (3) outside is connected with handle (38), support tight subassembly still including the cover establish on slide bar (35) and respectively with spring (37) of mounting hole (33) lateral wall and slider (31) butt.
7. The circuit construction line installation and laying device according to claim 6, wherein: and a plurality of groups of the mounting holes (33) and the clamping mechanisms are arranged on the baffle ring (3) at equal intervals.
8. The circuit construction line installation and laying device according to claim 7, wherein: one end of the sliding block (31) far away from the handle (38) is fixedly connected with an elastic pad (361).
CN202120418087.XU 2021-02-25 2021-02-25 Circuit construction line installation laying device Active CN214280706U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120418087.XU CN214280706U (en) 2021-02-25 2021-02-25 Circuit construction line installation laying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120418087.XU CN214280706U (en) 2021-02-25 2021-02-25 Circuit construction line installation laying device

Publications (1)

Publication Number Publication Date
CN214280706U true CN214280706U (en) 2021-09-24

Family

ID=77792711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120418087.XU Active CN214280706U (en) 2021-02-25 2021-02-25 Circuit construction line installation laying device

Country Status (1)

Country Link
CN (1) CN214280706U (en)

Similar Documents

Publication Publication Date Title
CN214280706U (en) Circuit construction line installation laying device
CN214827939U (en) Cable winding and unwinding devices for construction
CN213186890U (en) Building electrical construction fixing device convenient to installation
CN219716515U (en) Protective structure of machine-mounted wire
CN218959308U (en) Communication cabinet with built-in wire harness arranging structure
CN218434301U (en) Wire harness device for electrical engineering cable
CN216672462U (en) Adjustable cable testing bridge of being convenient for comb cable of length
CN215934302U (en) Electric wire cable support for temporary construction
CN214828115U (en) Convenient-to-adjust winder for wires and cables
CN213484435U (en) Cable fixing frame for installing communication equipment
CN212953547U (en) Blanking carding device for ground wire production
CN218569566U (en) Novel transformer cabinet of distribution network
CN218867799U (en) Communication cable laying device
CN218275853U (en) Convenient to use's wire stripping equipment
CN217769314U (en) Novel wire harness fixing device
CN220107731U (en) Servo motor termination convenient to use
CN110912011A (en) Transformer substation large-scale equipment base and chain block connector
CN217291759U (en) Sheet metal shell polishing device for machine tool machining
CN216501572U (en) Take-up machine with cable locking function
CN220544594U (en) Novel low-voltage cable laying device
CN107978435A (en) A kind of transformer pulling plate
CN217708103U (en) High-speed rewinding machine for producing environment-friendly paper
CN217376782U (en) Steel wire drawing drum
CN218734666U (en) Communication equipment platform convenient to installation is dismantled
CN218888056U (en) Multifunctional wire box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant