CN214275248U - Wisdom building site intelligence linkage raise dust supervisory equipment - Google Patents

Wisdom building site intelligence linkage raise dust supervisory equipment Download PDF

Info

Publication number
CN214275248U
CN214275248U CN202022918502.6U CN202022918502U CN214275248U CN 214275248 U CN214275248 U CN 214275248U CN 202022918502 U CN202022918502 U CN 202022918502U CN 214275248 U CN214275248 U CN 214275248U
Authority
CN
China
Prior art keywords
raise dust
fixedly connected
supervisory equipment
groove
building site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022918502.6U
Other languages
Chinese (zh)
Inventor
赵哲文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Tongtong Hanwang Technology Co ltd
Original Assignee
Shenzhen Tongtong Hanwang Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Tongtong Hanwang Technology Co ltd filed Critical Shenzhen Tongtong Hanwang Technology Co ltd
Priority to CN202022918502.6U priority Critical patent/CN214275248U/en
Application granted granted Critical
Publication of CN214275248U publication Critical patent/CN214275248U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a wisdom building site intelligence linkage raise dust supervisory equipment relates to raise dust control field. This wisdom building site intelligence linkage raise dust supervisory equipment, including the pole setting, the top overlap joint of pole setting has the kicking block, the last fixed surface of kicking block is connected with the raise dust monitor, the sleeve has been cup jointed on the surface of kicking block, the spout has been seted up to the surface of kicking block, the inside sliding connection of spout has the slider, the surface and the telescopic inner wall fixed connection of slider, the fluting has been seted up to telescopic left side inner wall. This wisdom building site intelligence linkage raise dust supervisory equipment, through mutually supporting of slider, spout, sleeve, fluting, first spring, runner, pivot, kelly and draw-in groove, reach and be convenient for install raise dust control appearance in the pole setting, to a great extent has accelerated the installation effectiveness, has solved present wisdom building site intelligence linkage raise dust supervisory equipment and is taking time very to the installation of each part for the problem of installation effectiveness has been reduced.

Description

Wisdom building site intelligence linkage raise dust supervisory equipment
Technical Field
The utility model relates to a raise dust control technical field specifically is a wisdom building site intelligence linkage raise dust supervisory equipment.
Background
Wisdom building site is wisdom earth theory and has appeared in the trade in engineering field, be a brand-new engineering full life cycle management theory, it also needs raise dust supervisory equipment to monitor in the construction of wisdom building site, the raise dust is because subaerial dust is at wind-force, the artificial drive and other drive fly upward and get into atmospheric open pollution source, be the important component part of total suspended particles thing in the ambient air, the raise dust control is in order to carry out real-time online monitoring's measure to the raise dust, wisdom building site intelligence linkage raise dust supervisory equipment is very taking time to the installation of each part at present, make installation effectiveness reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a wisdom building site intelligence linkage raise dust supervisory equipment has solved present wisdom building site intelligence linkage raise dust supervisory equipment and is very taking time in the installation to each part for the problem of installation effectiveness has been reduced.
Technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: an intelligent linkage dust-raising monitoring device for an intelligent construction site comprises a vertical rod, wherein a top block is lapped at the top end of the vertical rod, a dust-raising monitor is fixedly connected to the upper surface of the top block, a sleeve is sleeved on the surface of the top block, a sliding groove is formed in the outer surface of the top block, a sliding block is connected to the inner portion of the sliding groove in a sliding mode, the surface of the sliding block is fixedly connected with the inner wall of the sleeve, a groove is formed in the inner wall of the left side of the sleeve, a rotating shaft is fixedly connected to the inner wall of the groove, a rotating wheel is sleeved on the surface of the rotating shaft, a clamping rod is fixedly connected to the surface of the right side of the rotating wheel, a first spring is fixedly connected to the upper surface of the clamping rod, one end, away from the clamping rod, of the first spring is fixedly connected with the inner wall of the left side of the groove, a clamping groove is formed in the surface of the vertical rod, one end, away from the rotating wheel, is clamped with the inner portion of the clamping groove, an installation cylinder is sleeved on the surface of the vertical rod, the right side surface of the installation cylinder is fixedly connected with a control box.
Furthermore, the locating slot has been seted up on the top of pole setting, the inside grafting of locating slot has the locating lever, the top of locating lever is connected with the lower fixed surface of kicking block.
Furthermore, the surface of the vertical rod is fixedly connected with a supporting ring, and the upper surface of the supporting ring is fixedly connected with a second spring.
Furthermore, the surface of the vertical rod is sleeved with a movable ring, and the upper surface of the movable ring is fixedly connected with the bottom end of the second spring.
Furthermore, the upper surface of the movable ring is provided with a groove, a clamping block is clamped in the groove, and the upper surface of the clamping block is fixedly connected with the bottom of the mounting cylinder.
Furthermore, the quantity of kelly is two, and two kellies use the axis symmetry setting of pole setting.
The utility model provides a wisdom building site intelligence linkage raise dust supervisory equipment. The method has the following beneficial effects:
1. this wisdom building site intelligence linkage raise dust supervisory equipment, through mutually supporting of slider, spout, sleeve, fluting, first spring, runner, pivot, kelly and draw-in groove, reach and be convenient for install raise dust control appearance in the pole setting, to a great extent has accelerated the installation effectiveness, has solved present wisdom building site intelligence linkage raise dust supervisory equipment and is taking time very to the installation of each part for the problem of installation effectiveness has been reduced.
2. This wisdom building site intelligence linkage raise dust supervisory equipment through the cooperation of locating lever and constant head tank, reaches the raise dust control appearance increase steadiness after for the installation, also can carry out the preinstallation of raise dust control appearance simultaneously, through the cooperation of filler ring, second spring, activity ring, fixture block, recess and installation section of thick bamboo, reaches to be convenient for install the control box, and the striking that the buffering produced because of the gravity of control box downstream simultaneously.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of a portion A of FIG. 1;
fig. 3 is an enlarged view of a portion B of fig. 1 according to the present invention.
Wherein, 1 pole setting, 2 installation section of thick bamboo, 3 control box, 4 raise dust monitors, 5 kicking blocks, 6 sleeves, 7 flutings, 8 first springs, 9 runners, 10 pivot, 11 kellies, 12 draw-in grooves, 13 locating levers, 14 constant head tanks, 15 sliders, 16 spout, 17 fixture blocks, 18 recesses, 19 second springs, 20 backing rings, 21 loose rings.
Detailed Description
As shown in fig. 1-3, an embodiment of the present invention provides an intelligent linked dust monitoring device for a smart construction site, which includes a vertical rod 1, a supporting ring 20 fixedly connected to the surface of the vertical rod 1, a second spring 19 fixedly connected to the upper surface of the supporting ring 20, a movable ring 21 sleeved on the surface of the vertical rod 1, a top block 5 connected to the top end of the vertical rod 1, a positioning groove 14 formed on the top end of the vertical rod 1, a positioning rod 13 inserted into the positioning groove 14, a positioning rod 13 fixedly connected to the top end of the positioning rod 13 and the lower surface of the top block 5, a dust monitor 4 fixedly connected to the upper surface of the top block 5, a sleeve 6 sleeved on the surface of the top block 5, a sliding groove 16 formed on the outer surface of the top block 5, a sliding block 15 slidably connected to the inside of the sliding groove 16, a surface of the sliding block 15 fixedly connected to the inner wall of the sleeve 6, a slot 7 formed on the inner wall of the left side of the sleeve 6, inner wall fixedly connected with pivot 10 of fluting 7, runner 9 has been cup jointed on the surface of pivot 10, the right side fixed surface of runner 9 is connected with kelly 11, the quantity of kelly 11 is two, two kellies 11 set up with the axis symmetry of pole setting 1, the first spring 8 of last fixed surface of kelly 11, the one end that kelly 11 was kept away from to first spring 8 and the left side inner wall fixed connection of fluting 7, draw-in groove 12 has been seted up on the left side surface of pole setting 1, the one end that runner 9 was kept away from to kelly 11 and the inside joint of draw-in groove 12, installation section of thick bamboo 2 has been cup jointed on the surface of pole setting 1, the right side fixed surface of installation section of thick bamboo 2 is connected with control box 3, movable ring 21's upper surface is seted up flutedly 18, the inside joint of recess 18 has fixture block 17, fixture block 17's upper surface and installation section of thick bamboo 2's bottom fixed connection.
The working principle is as follows: the installation barrel 2 is sleeved on the surface of the upright stanchion 1, and the installation barrel 2 is released, at this time, the gravity of the control box 3 can drive the installation barrel 2 to move downwards on the surface of the upright stanchion 1, the installation barrel 2 can finally drive the clamping block 17 to be clamped in the groove 18, the impact force generated when the mounting tube 2 contacts the surface of the movable ring 21 presses the second spring 19 to be buffered, the positioning rod 13 is inserted downwards in alignment with the inside of the positioning slot 14, the lower surface of the top block 5 contacts the top end of the vertical rod 1, then, the sleeve 6 is moved downwards, the sleeve 6 drives the sliding block 15 to slide downwards in the sliding groove 16, meanwhile, the sleeve 6 drives the rotating shaft 9, the first spring 8, the rotating shaft 10 and the clamping rod 11 to move downwards, because first spring 8 is in compression state, after card pole 11 and kicking block 5 separation, first spring 8 can promote card pole 11 and expand, can accomplish the installation of raise dust control appearance 4 after card pole 11 card is gone into inside draw-in groove 12.

Claims (6)

1. The utility model provides a wisdom building site intelligence linkage raise dust supervisory equipment, includes pole setting (1), its characterized in that: the dust monitoring device is characterized in that a top block (5) is lapped at the top end of the vertical rod (1), a dust monitor (4) is fixedly connected to the upper surface of the top block (5), a sleeve (6) is sleeved on the surface of the top block (5), a sliding groove (16) is formed in the outer surface of the top block (5), a sliding block (15) is slidably connected inside the sliding groove (16), the surface of the sliding block (15) is fixedly connected with the inner wall of the sleeve (6), a slot (7) is formed in the inner wall of the left side of the sleeve (6), a rotating shaft (10) is fixedly connected to the inner wall of the slot (7), a rotating wheel (9) is sleeved on the surface of the rotating shaft (10), a clamping rod (11) is fixedly connected to the surface of the right side of the rotating wheel (9), a first spring (8) is fixedly connected to the upper surface of the clamping rod (11), one end, far away from the clamping rod (11), of the first spring (8) is fixedly connected with the inner wall of the left side of the slot (7), draw-in groove (12) have been seted up to the left side surface of pole setting (1), the one end of runner (9) and the inside joint of draw-in groove (12) are kept away from in kelly (11), installation section of thick bamboo (2) has been cup jointed on the surface of pole setting (1), the right side fixed surface of installation section of thick bamboo (2) is connected with control box (3).
2. The intelligent linked raise dust supervisory equipment of claim 1, characterized in that: the top end of the vertical rod (1) is provided with a positioning groove (14), a positioning rod (13) is inserted into the positioning groove (14), and the top end of the positioning rod (13) is fixedly connected with the lower surface of the top block (5).
3. The intelligent linked raise dust supervisory equipment of claim 1, characterized in that: the surface of the vertical rod (1) is fixedly connected with a supporting ring (20), and the upper surface of the supporting ring (20) is fixedly connected with a second spring (19).
4. The intelligent linked raise dust supervisory equipment of claim 3, characterized in that: the surface of the vertical rod (1) is sleeved with a movable ring (21), and the upper surface of the movable ring (21) is fixedly connected with the bottom end of the second spring (19).
5. The intelligent linked raise dust supervisory equipment of claim 4, characterized in that: the upper surface of the movable ring (21) is provided with a groove (18), a clamping block (17) is clamped inside the groove (18), and the upper surface of the clamping block (17) is fixedly connected with the bottom of the mounting barrel (2).
6. The intelligent linked raise dust supervisory equipment of claim 1, characterized in that: the quantity of kelly (11) is two, and two kellies (11) use the axis symmetry setting of pole setting (1).
CN202022918502.6U 2020-12-08 2020-12-08 Wisdom building site intelligence linkage raise dust supervisory equipment Active CN214275248U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022918502.6U CN214275248U (en) 2020-12-08 2020-12-08 Wisdom building site intelligence linkage raise dust supervisory equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022918502.6U CN214275248U (en) 2020-12-08 2020-12-08 Wisdom building site intelligence linkage raise dust supervisory equipment

Publications (1)

Publication Number Publication Date
CN214275248U true CN214275248U (en) 2021-09-24

Family

ID=77780314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022918502.6U Active CN214275248U (en) 2020-12-08 2020-12-08 Wisdom building site intelligence linkage raise dust supervisory equipment

Country Status (1)

Country Link
CN (1) CN214275248U (en)

Similar Documents

Publication Publication Date Title
CN208724538U (en) A kind of municipal works ornamental trees and shrubs protective frame
CN204322092U (en) A kind of soup stick mechanism drawing mobile phone acoustics grenadine
CN204397813U (en) Portablely get cylinder device
CN211469400U (en) Environmental monitoring sampling box
CN214275248U (en) Wisdom building site intelligence linkage raise dust supervisory equipment
CN202527650U (en) Manipulator of full-automatic riveting equipment
CN212317952U (en) Protection device for oil extraction pumping unit
CN108078502B (en) Domestic intelligent cleaning robot
CN213274954U (en) Agricultural soil sampling device
CN207864524U (en) A kind of antidetonation suspension and support type variable diagonal brace
CN110076900A (en) A kind of automatic drill drawing machine structure of production air-entrained concrete building block
CN206691496U (en) A kind of binding machine being easily installed
CN206683911U (en) A kind of rock soil test piece compaction apparatus
CN211773548U (en) Hand-held automatic unhooking dynamic compactor
CN210450849U (en) Automatic adjusting balance mechanism of large manual core setting clamp
CN207802805U (en) Electromagnetic shear mechanism based on fruit picking
CN209143635U (en) A kind of constructing tunnel suspension device based on lever principle climbing
CN201217001Y (en) Weight type cleaner for sintering elastic slide track plate of trolley
CN220650193U (en) Air sampling device
CN213046143U (en) Architectural design outward appearance effect display device
CN216822058U (en) Puller capable of hiding pulling piece
CN213479669U (en) Steering wheel for indoor temperature acquisition based on LORA
CN211573706U (en) Hand-operated well water pump
CN110513108A (en) A kind of oil field well sampler
CN214454947U (en) Grabbing mechanism of automatic detection device for element production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant