CN214272885U - Building scaffold installs fast and tears wall spare open - Google Patents

Building scaffold installs fast and tears wall spare open Download PDF

Info

Publication number
CN214272885U
CN214272885U CN202023263723.0U CN202023263723U CN214272885U CN 214272885 U CN214272885 U CN 214272885U CN 202023263723 U CN202023263723 U CN 202023263723U CN 214272885 U CN214272885 U CN 214272885U
Authority
CN
China
Prior art keywords
scaffold
fixing
connecting plate
arc
fixing bolts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023263723.0U
Other languages
Chinese (zh)
Inventor
母坤
贺增林
翟文深
赵越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Xinrui Construction Co ltd
Original Assignee
China State Construction Xinjiang Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Xinjiang Construction Engineering Group Co ltd filed Critical China State Construction Xinjiang Construction Engineering Group Co ltd
Priority to CN202023263723.0U priority Critical patent/CN214272885U/en
Application granted granted Critical
Publication of CN214272885U publication Critical patent/CN214272885U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a building scaffold fast mounting and dismounting wall connecting piece, which relates to the technical field of wall connecting pieces, and comprises an embedded piece, a connecting piece, a scaffold, a first fixing bolt, a second fixing bolt and two fixing nuts, wherein the embedded piece is arranged in a wall body; the utility model can finely adjust the scaffold in the connection process through the connection matching, prevent the position from being adjusted again when the position is deviated, and also prevent the problem of potential danger after the scaffold is continuously installed when the position is deviated; the utility model provides the high practicality to the installation risk has been reduced.

Description

Building scaffold installs fast and tears wall spare open
Technical Field
The utility model belongs to the technical field of even wall spare technique and specifically relates to a building scaffold puts up quick ann and tears wall spare open.
Background
In building engineering, the wall spare is connected scaffold frame body and building subject commonly used to strengthen scaffold's overall stability, improve its and stabilize bearing capacity, avoid appearing empting or collapse etc. and heavily maked accident.
The wall connecting piece in the prior art is mostly of a fixed structure, the main function of the wall connecting piece is that the scaffold is fixed on a wall body, a certain distance deviation exists during installation, the position of the scaffold cannot be finely adjusted by the wall connecting piece in the prior art, the scaffold cannot be continuously installed when the deviation occurs, the working efficiency is influenced, the problem that the scaffold cannot be stably installed or slightly shakes during installation is continuously selected, and great potential danger is caused to constructors.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building scaffold puts up fast ann and tears wall spare open to link the position that wall spare can't finely tune the scaffold frame in solving the background art, influence work efficiency, have the technical problem of potential risk.
The utility model provides a building scaffold puts up fast ann and tears wall spare open, including built-in fitting, connecting piece, scaffold frame, first fixing bolt, second fixing bolt and fixation nut, the built-in fitting sets up in the wall body, first fixing bolt, second fixing bolt and fixation nut are equipped with two, two first fixing bolt symmetry sets up inside the connecting piece, through two one side that first fixing bolt made the connecting piece is connected with the built-in fitting, two on the second fixing bolt sets up the scaffold frame, make scaffold frame and connecting piece's opposite side be connected, two through two second fixing bolt fixation nut difference spiro union on a second fixing bolt, through two the spiro union of second fixing nut and two fixing bolt makes scaffold frame and connecting piece fixed connection.
Furthermore, the connecting piece comprises a U-shaped connecting plate and a horizontal connecting plate, the U-shaped connecting plate is fixedly connected with the embedded part through two first fixing bolts, and the horizontal connecting plate is fixedly connected with the scaffold through the threaded connection of two fixing nuts and two second fixing bolts.
Furthermore, two first arc-shaped holes are formed in the U-shaped connecting plate, the two first arc-shaped holes are vertically and symmetrically located on the U-shaped connecting plate, the two first arc-shaped holes correspond to the embedded parts, and each first fixing bolt is located in one first arc-shaped hole.
Furthermore, two second arc holes are formed in the horizontal connecting plate, the two second arc holes are horizontally symmetrically located on the horizontal connecting plate, the two second arc holes correspond to the scaffold, each second fixing bolt penetrates through one second arc hole and is connected with the horizontal connecting plate, and each fixing nut is attached to one second arc hole when in threaded connection with one second fixing bolt.
Compared with the prior art, the beneficial effects of the utility model reside in that:
in the utility model, firstly, two first fixing bolts are positioned in the connecting piece, and the two first fixing bolts are positioned on the U-shaped connecting plate, each first fixing bolt can move up and down in a first arc-shaped hole, when the connection of the two first fixing bolts and the embedded part is completed, the connecting piece can be finely adjusted up and down, the first fixing bolts are screwed when an ideal position is reached, so that the U-shaped connecting plate is fixed on the wall body, then the scaffold is attached to the horizontal connecting plate in the connecting piece, then the scaffold is connected with the horizontal connecting plate through the second fixing bolts, each second fixing nut is screwed to one second fixing bolt, at the moment, the scaffold can be finely adjusted left and right on the horizontal connecting plate, the two second fixing bolts are screwed after the ideal position is reached, so that the second nuts are attached to the horizontal connecting plate; the connection matching can enable the scaffold to be finely adjusted in the connection process, so that the problem that the scaffold needs to be readjusted to be installed when the position is deviated is prevented, and the problem that the scaffold is potential danger after being continuously installed when the position is deviated is also prevented; the utility model provides the high practicality to the installation risk has been reduced.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of a first angle of the present invention;
fig. 2 is a schematic structural view of a second angle of the present invention;
fig. 3 is a schematic structural view of the middle connection member of the present invention.
Reference numerals: the embedded part comprises an embedded part 1, a scaffold 2, a first fixing bolt 31, a second fixing bolt 21, a fixing nut 22, a connecting piece 3, a U-shaped connecting plate 32, a horizontal connecting plate 33, a first arc-shaped hole 34 and a second arc-shaped hole 35.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention.
The components of the embodiments of the present invention, as generally described and illustrated in the figures herein, may be arranged and designed in a wide variety of different configurations. Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention.
Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1 to 3, the embodiment of the present invention provides a quick assembly and disassembly wall connecting member for a building scaffold, which comprises an embedded part 1, a connecting member 3, a scaffold frame 2, a first fixing bolt 31, a second fixing bolt 21 and a fixing nut 22, the embedded part 1 is arranged in a wall body, two first fixing bolts 31, two second fixing bolts 21 and two fixing nuts 22 are arranged, the two first fixing bolts 31 are symmetrically arranged in the connecting part 3, one side of the connecting piece 3 is connected with the embedded part 1 through two first fixing bolts 31, two second fixing bolts 21 are arranged on the scaffold frame 2, the scaffold 2 is connected with the other side of the connecting piece 3 through two second fixing bolts 21, two fixing nuts 22 are respectively screwed on one second fixing bolt 21, the scaffold 2 is fixedly connected with the connecting piece 3 through the screw connection of the two second fixing nuts 22 and the two fixing bolts.
Specifically, the connecting piece 3 comprises a U-shaped connecting plate 32 and a horizontal connecting plate 33, the U-shaped connecting plate 32 is fixedly connected with the embedded part 1 through two first fixing bolts 31, and the horizontal connecting plate is fixedly connected with the scaffold 2 through the bolt connection of 33 two fixing nuts 22 and two second fixing bolts 21.
Specifically, two first arc-shaped holes 34 are formed in the U-shaped connecting plate 32, the two first arc-shaped holes 34 are vertically and symmetrically located on the U-shaped connecting plate 32, the two first arc-shaped holes 34 correspond to the embedded part 1, and each first fixing bolt 31 is located in one first arc-shaped hole 34.
Specifically, two second arc holes 35 have been seted up on the horizontal connecting plate 33, two second arc holes 35 are the horizontal symmetry and are located horizontal connecting plate 33, and two second arc holes 35 all correspond with scaffold 2, every second fixing bolt 21 all runs through a second arc hole 35 and is connected with horizontal connecting plate 33, every all laminate on a second arc hole 35 during fixation nut 22 and a second fixing bolt 21 spiro union.
The utility model discloses an installation principle: first, two first fixing bolts 31 are located in the connecting member 3, and two first fixing bolts 31 are located on the U-shaped connecting plate 32, each first fixing bolt 31 can move up and down in one first arc-shaped hole 34, when the connection of the two first fixing bolts 31 and the embedded part 1 is completed, the connecting piece 3 can be finely adjusted up and down, when the ideal position is reached, the first fixing bolt 31 is tightened, so that the U-shaped connecting plate 32 is fixed on the wall body, then the scaffold 2 is jointed with the horizontal connecting plate 33 in the connecting piece 3, then the scaffold 2 is connected with the horizontal connecting plate 33 through the second fixing bolts 21, each second fixing nut 22 is screwed on one second fixing bolt 21, at the moment, the scaffold 2 can be finely adjusted left and right on the horizontal connecting plate 33, after reaching the ideal position, the two second fixing bolts 21 are screwed down to enable the second nuts to be attached to the horizontal connecting plate 33; the scaffold frame 2 can be finely adjusted in the connection process through the connection matching, the situation that the position needs to be adjusted again when the position is deviated is prevented, and the problem that the scaffold frame is potential danger after being continuously installed when the position is deviated is also prevented.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.

Claims (4)

1. The building scaffold rapid mounting and dismounting wall connecting part is characterized by comprising an embedded part (1), a connecting part (3), a scaffold (2), first fixing bolts (31), second fixing bolts (21) and fixing nuts (22), wherein the embedded part (1) is arranged in a wall body, the number of the first fixing bolts (31), the number of the second fixing bolts (21) and the number of the fixing nuts (22) are two, the two first fixing bolts (31) are symmetrically arranged in the connecting part (3), one side of the connecting part (3) is connected with the embedded part (1) through the two first fixing bolts (31), the two second fixing bolts (21) are arranged on the scaffold (2), the scaffold (2) is connected with the other side of the connecting part (3) through the two second fixing bolts (21), the two fixing nuts (22) are respectively screwed on the second fixing bolts (21), the scaffold (2) is fixedly connected with the connecting piece (3) through the screw connection of the two fixing nuts (22) and the two second fixing bolts (21).
2. The quick mounting and dismounting wall connecting piece for the building scaffold as recited in claim 1, wherein the connecting piece (3) comprises a U-shaped connecting plate (32) and a horizontal connecting plate (33), the U-shaped connecting plate (32) and the horizontal connecting plate (33) are fixedly connected, the U-shaped connecting plate (32) is fixedly connected with the embedded part (1) through two first fixing bolts (31), and the horizontal connecting plate (33) is fixedly connected with the scaffold frame (2) through the threaded connection of two fixing nuts (22) and two second fixing bolts (21).
3. The quick mounting and demounting wall connecting piece for the building scaffold according to claim 2, wherein two first arc-shaped holes (34) are formed in the U-shaped connecting plate (32), the two first arc-shaped holes (34) are vertically and symmetrically located on the U-shaped connecting plate (32), the two first arc-shaped holes (34) correspond to the embedded part (1), and each first fixing bolt (31) is located in one first arc-shaped hole (34).
4. The building scaffold quick mounting and dismounting wall connecting piece according to claim 2, wherein two second arc-shaped holes (35) are formed in the horizontal connecting plate (33), the two second arc-shaped holes (35) are horizontally and symmetrically located on the horizontal connecting plate (33), the two second arc-shaped holes (35) correspond to the scaffold (2), each second fixing bolt (21) penetrates through one second arc-shaped hole (35) to be connected with the horizontal connecting plate (33), and each fixing nut (22) is attached to one second arc-shaped hole (35) when being in threaded connection with one second fixing bolt (21).
CN202023263723.0U 2020-12-30 2020-12-30 Building scaffold installs fast and tears wall spare open Active CN214272885U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023263723.0U CN214272885U (en) 2020-12-30 2020-12-30 Building scaffold installs fast and tears wall spare open

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023263723.0U CN214272885U (en) 2020-12-30 2020-12-30 Building scaffold installs fast and tears wall spare open

Publications (1)

Publication Number Publication Date
CN214272885U true CN214272885U (en) 2021-09-24

Family

ID=77785394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023263723.0U Active CN214272885U (en) 2020-12-30 2020-12-30 Building scaffold installs fast and tears wall spare open

Country Status (1)

Country Link
CN (1) CN214272885U (en)

Similar Documents

Publication Publication Date Title
CN214272885U (en) Building scaffold installs fast and tears wall spare open
CN111022839A (en) Supporting leg height-adjusting mechanism of ship containment system mounting platform
CN211178914U (en) Laminate polymer battery impact test anchor clamps
CN215367501U (en) Special lower frame convenient to maintain for excavator
CN211480681U (en) Combined plate-type power distribution cabinet
CN210342340U (en) Steel construction house wall body and post roof beam connection structure
CN215056947U (en) Rolling slats door installation combination steady rest
CN215107537U (en) Fixing device and construction equipment
CN213539680U (en) Scaffold connecting piece latch fitting convenient to installation
CN212107798U (en) Instrument support and aircraft
CN212305211U (en) Bracing device for mounting solar panel
CN216196527U (en) Novel climb a bottom bracket
CN219732066U (en) Foundation bolt installation and leveling device for waste heat boiler foundation
CN213653990U (en) Supporting beam for prefabricated house
CN214513158U (en) Filter installation fixing device
CN217537987U (en) Protection pole setting and modularization box
CN215762726U (en) Novel corrosion-resistant bolt
CN211769605U (en) Fixed mounting structure of elevator buffer base
CN214192350U (en) Tower crane frame structure
CN218311741U (en) Welding auxiliary tool for new energy battery box
CN212573242U (en) Main body frame for cabinet control console
CN216972567U (en) Blast furnace top oil cylinder support and blast furnace
CN217873671U (en) Locking bolt with butt structure
CN220896964U (en) Portable multifunctional alarm for civil air defense
CN220395154U (en) Steel scaffold board suitable for outer frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230727

Address after: No. 370, 3rd Floor, No. 89 Xiaojia Village Second Lane, Jinniu District, Chengdu City, Sichuan Province, 610000

Patentee after: China Construction Xinrui Construction Co.,Ltd.

Address before: 830001 239 Qingnian Road, Tianshan District, Urumqi, Xinjiang Uygur Autonomous Region

Patentee before: China State Construction Xinjiang Construction Engineering(Group) Co.,Ltd.

TR01 Transfer of patent right