CN214255659U - Power tower installation device for power infrastructure - Google Patents

Power tower installation device for power infrastructure Download PDF

Info

Publication number
CN214255659U
CN214255659U CN202120412106.8U CN202120412106U CN214255659U CN 214255659 U CN214255659 U CN 214255659U CN 202120412106 U CN202120412106 U CN 202120412106U CN 214255659 U CN214255659 U CN 214255659U
Authority
CN
China
Prior art keywords
installation
electric power
sides
base
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120412106.8U
Other languages
Chinese (zh)
Inventor
陈华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120412106.8U priority Critical patent/CN214255659U/en
Application granted granted Critical
Publication of CN214255659U publication Critical patent/CN214255659U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an electric power tower installation device is used in electric power capital construction, including base and tower body, four ends of tower body bottom all are provided with the installation piece, the top fixed mounting of base has four mounts bases, four the mounting groove has all been seted up to the inside of mount base, four the mounting groove is open-top structure, four the installation piece is respectively through four the mounting groove inserts four the inside of mount base, and four the installation cavity has all been seted up to the inboard bottom of mount base, two movable chamber, two have been seted up at the top of installation cavity movable chamber are located respectively the both sides of mounting groove, all be provided with the bearing on the lateral wall of the inside both sides of installation cavity, the inside of installation cavity is passed through bearing movable mounting has the bull stick, the intermediate position department of bull stick is provided with the stopper. The utility model discloses a set up a series of structures and make this device have the installation of being convenient for and install the strong characteristics of back stability.

Description

Power tower installation device for power infrastructure
Technical Field
The utility model relates to an electric power facility technical field specifically is an electric power tower installation device for electric power capital construction.
Background
A power tower is a tower-like building for transmitting electricity. The structure features that the various tower types are space truss structure, the rods are mainly composed of single equal angle steel or combined angle steel, the materials are Q235(A3F) and Q345(16Mn), the rods are connected by coarse bolts, the rods are connected by shearing force of bolts, the whole tower is composed of angle steel, connecting steel plates and bolts, and individual parts such as tower legs are welded by several steel plates into an assembly, so the hot galvanizing anticorrosion, transportation and construction erection are very convenient. For the iron tower with the breath height below 60m, a foot nail is arranged on one main material of the iron tower so as to facilitate the climbing operation of construction operators.
At the in-process of installation, the electric power tower that has now carries out mutual fixed connection through fixing bolt for the majority, realizes the stable fixed of electric power tower support column, and the operation process is complicated, and the installation of being not convenient for has prolonged electric power tower construction time, consequently, we provide an electric power tower installation device for electric power infrastructure in order to solve this a series of problems and solve the problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric power tower installation device is used in electric power capital construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: an electric power tower installation device for electric power infrastructure construction comprises a base and a tower body, wherein four ends of the bottom of the tower body are respectively provided with an installation block, the top of the base is fixedly provided with four installation seats, the four installation seats are respectively provided with an installation groove, the four installation grooves are of a top opening structure, the four installation blocks are respectively inserted into the four installation seats through the four installation grooves, the bottom of the inner side of each installation seat is respectively provided with an installation cavity, the top of the installation cavity is provided with two movable cavities, the two movable cavities are respectively positioned at two sides of the installation groove, the side walls at two sides in the installation cavity are respectively provided with a bearing, the inner part of the installation cavity is movably provided with a rotating rod through the bearing, a limit block is arranged at the middle position of the rotating rod, and the surface of the rotating rod is provided with two sections of reverse threads, two sections of reverse screw threads on the surface of the rotating rod are symmetrically distributed with the limiting blocks as symmetrical points, the two sections of reverse screw threads on the surface of the rotating rod are provided with internal thread sleeves in a threaded sleeve mode, two movable plates are fixedly arranged at the tops of the internal thread sleeves respectively and are located in the two movable cavities respectively, and five locking blocks are arranged on the side wall of one side, opposite to the two movable plates, of the two movable plates at equal intervals.
Preferably, five through holes are formed in the side walls of two sides of the mounting groove, five locking grooves are formed in the side walls of two sides of the mounting block, and one end of the locking block extends to the inside of each locking groove through the through holes.
Preferably, one end of the rotating rod is connected with a connecting rod, and one end of the connecting rod is provided with a rotating handle.
Preferably, the bottom of the inner side of the installation cavity is fixedly provided with a limiting rod, the limiting rod is movably sleeved with two limiting sleeves, a connecting block is arranged between the limiting sleeves and the internal thread sleeves, and the limiting sleeves are fixedly connected with the internal thread sleeves through the connecting block.
Preferably, a plurality of inserted bars are installed to the equidistant intensive bottom of base, the both sides of inserted bar all are provided with the barb.
Preferably, the mounting seat is fixed to the base through welding, and the mounting block is fixed to the tower body through welding.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model has the advantages of being scientific and reasonable in structure, convenience safe in utilization, through rotating the turning handle, can make the connecting rod drive the bull stick and rotate, and then make the bull stick pass through the effect of two sections reverse screw threads on its surface, make two internal thread covers simultaneously or reverse movement, and then when needs are installed the tower body, make two internal thread covers simultaneously relative movement, and then make two fly leafs simultaneously relative movement, make the inside in locking groove is gone into to the latch segment card of its one side, and then fix the installation piece in the inside of mounting groove, make this device need not install fixedly through fixing bolt and make the installation loaded down with trivial details, the time of reduction installation that can be great, and the equidistant intensive a plurality of inserted bars of installing in bottom of base, the both sides of inserted bar all are provided with the barb, make the base stability after the installation stronger, it is more firm to install.
Drawings
Fig. 1 is a schematic structural view of the whole of the present invention;
FIG. 2 is a schematic view of the interior of the mounting base of the present invention;
fig. 3 is an enlarged view of a portion a in fig. 1 according to the present invention.
In the figure: 1. a base; 2. a mounting seat; 3. mounting blocks; 4. a tower body; 5. inserting a rod; 6. a barb; 7. mounting grooves; 8. a movable cavity; 9. an internal thread sleeve; 10. a bearing; 11. connecting blocks; 12. a limiting sleeve; 13. a limiting rod; 14. a limiting block; 15. a rotating rod; 16. a connecting rod; 17. a handle is rotated; 18. installing a cavity; 19. a locking block; 20. a locking groove; 21. a through hole; 22. a movable plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a technical scheme of an electric tower installation device for electric power infrastructure construction comprises a base 1 and a tower body 4, wherein four ends of the bottom of the tower body 4 are respectively provided with an installation block 3, the top of the base 1 is fixedly provided with four installation seats 2, the inside of each installation seat 2 is provided with an installation groove 7, each installation groove 7 is of a top opening structure, the four installation blocks 3 are respectively inserted into the inside of each installation seat 2 through the four installation grooves 7, the bottom of the inner side of each installation seat 2 is provided with an installation cavity 18, the top of each installation cavity 18 is provided with two movable cavities 8, the two movable cavities 8 are respectively positioned at two sides of each installation groove 7, the side walls at two sides inside the installation cavity 18 are respectively provided with a bearing 10, a rotating rod 15 is movably installed inside the installation cavity 18 through the bearing 10, a limit block 14 is arranged at the middle position of the rotating rod 15, and the surface of the rotating rod 15 is provided with two reverse threads, two sections of reverse screw threads on the surface of the rotating rod 15 are symmetrically distributed by taking the limiting block 14 as a symmetric point, the internal thread sleeves 9 are sleeved at the two sections of reverse screw threads on the surface of the rotating rod 15, the movable plates 22 are fixedly mounted at the tops of the two internal thread sleeves 9, the two movable plates 22 are respectively positioned inside the two movable cavities 8, and five locking blocks 19 are arranged on the side wall of one side of the two movable plates 22 opposite to each other at equal intervals.
Preferably, five through holes 21 are formed in the side walls of the two sides of the mounting groove 7, five locking grooves 20 are formed in the side walls of the two sides of the mounting block 3, and one end of the locking block 19 extends to the inside of the locking groove 20 through the through holes 21.
Preferably, one end of the rotating rod 15 is connected with a connecting rod 16, and one end of the connecting rod 16 is provided with a rotating handle 17, so as to facilitate the rotation of the rotating rod 15.
Preferably, the bottom of the inner side of the installation cavity 18 is fixedly provided with a limiting rod 13, the limiting rod 13 is movably sleeved with two limiting sleeves 12, a connecting block 11 is arranged between the limiting sleeves 12 and the internal thread sleeve 9, and the limiting sleeves 12 and the internal thread sleeve 9 are fixedly connected through the connecting block 11, so that the rotating rod 15 can not rotate along with the rotation of the rotating rod 15 when the rotating rod 15 rotates.
Preferably, a plurality of inserted bars 5 are installed to the equidistant intensive bottom of base 1, and the both sides of inserted bar 5 all are provided with barb 6 for base 1 is more strong in stability after the installation, and the installation is more firm.
Preferably, through welded fastening between mount pad 2 and the base 1, through welded fastening between installation piece 3 and the tower body 4 for holistic stability is strong, connects closely.
The working principle is as follows: before use, the safety of each structure of the device is checked firstly, the connecting rod 16 can drive the rotating rod 15 to rotate by rotating the rotating handle 17, so that the rotating rod 15 can simultaneously move in opposite directions or opposite directions through the action of two sections of reverse threads on the surface of the rotating rod 15, and when the tower body 4 needs to be installed, the two internal thread sleeves 9 can simultaneously move in opposite directions, so that the two movable plates 22 can simultaneously move in opposite directions, the locking block 19 on one side of the locking rod can be clamped into the locking groove 20, and the installation block 3 can be fixed in the installation groove 7, so that the device is not required to be installed and fixed through fixing bolts, the installation time can be greatly reduced, a plurality of inserting rods 5 are densely installed at equal intervals at the bottom of the base 1, barbs 6 are arranged on two sides of the inserting rods 5, and the stability of the base 1 after installation is stronger, the installation is firmer.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus, and any standard components found in known art that may be commercially available or commercially available and may be readily customized based on the teachings of the specification and the drawings, and that the particular connection between the various components is by conventional means well known in the art, and that the machine, component, or apparatus is by model and circuit connection is by conventional means well known in the art, and will not be described in detail herein.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an electric power tower installation device for electric power infrastructure, includes base (1) and tower body (4), its characterized in that: four ends of the bottom of the tower body (4) are respectively provided with an installation block (3), the top of the base (1) is fixedly provided with four installation seats (2), four installation grooves (7) are formed in the four installation seats (2), the four installation grooves (7) are of a top opening structure, the four installation blocks (3) are respectively inserted into the four installation seats (2) through the four installation grooves (7), the bottom of the inner sides of the four installation seats (2) is respectively provided with an installation cavity (18), the top of the installation cavity (18) is provided with two movable cavities (8), the two movable cavities (8) are respectively positioned at two sides of the installation grooves (7), the side walls at two sides of the inner part of the installation cavity (18) are respectively provided with a bearing (10), the inner part of the installation cavity (18) is movably provided with a rotating rod (15) through the bearing (10), the utility model discloses a locking device for a bicycle, including bull stick (15), runner bar (15), stopper (14) and internal thread sleeve (9), two sets of reverse screw threads in bull stick (15) surface with stopper (14) are the symmetric distribution of symmetry point each other, the equal screw thread of two sets of reverse screw thread departments in bull stick (15) surface cup joints and installs internal thread sleeve (9), two the equal fixed mounting in top of internal thread sleeve (9) has fly leaf (22), two fly leaf (22) are located two respectively the inside in activity chamber (8), two impartial interval is provided with five latch segments (19) on the lateral wall of the relative one side of fly leaf (22).
2. The power tower installation device for electric power infrastructure of claim 1, wherein: all seted up five through-holes (21) on the lateral wall of mounting groove (7) both sides, all seted up five locking grooves (20) on the lateral wall of mounting block (3) both sides, the one end of latch segment (19) is passed through-hole (21) extend to the inside in locking groove (20).
3. The power tower installation device for electric power infrastructure of claim 1, wherein: one end of the rotating rod (15) is connected with a connecting rod (16), and one end of the connecting rod (16) is provided with a rotating handle (17).
4. The power tower installation device for electric power infrastructure of claim 1, wherein: the utility model discloses a mounting cavity, including installation cavity (18), installation cavity, connecting block (9), stop collar (12) and connecting block (11), the inboard bottom fixed mounting of installation cavity (18) has gag lever post (13), movable sleeve joint installs two stop collars (12) on gag lever post (13), stop collar (12) with be provided with between internal thread bush (9) connecting block (11) fixed connection.
5. The power tower installation device for electric power infrastructure of claim 1, wherein: the base is characterized in that a plurality of inserted bars (5) are densely arranged at equal intervals at the bottom of the base (1), and barbs (6) are arranged on two sides of each inserted bar (5).
6. The power tower installation device for electric power infrastructure of claim 1, wherein: the mounting seat (2) and the base (1) are fixed through welding, and the mounting block (3) and the tower body (4) are fixed through welding.
CN202120412106.8U 2021-02-24 2021-02-24 Power tower installation device for power infrastructure Expired - Fee Related CN214255659U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120412106.8U CN214255659U (en) 2021-02-24 2021-02-24 Power tower installation device for power infrastructure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120412106.8U CN214255659U (en) 2021-02-24 2021-02-24 Power tower installation device for power infrastructure

Publications (1)

Publication Number Publication Date
CN214255659U true CN214255659U (en) 2021-09-21

Family

ID=77727144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120412106.8U Expired - Fee Related CN214255659U (en) 2021-02-24 2021-02-24 Power tower installation device for power infrastructure

Country Status (1)

Country Link
CN (1) CN214255659U (en)

Similar Documents

Publication Publication Date Title
CH393504A (en) End winding holder for a stator winding of a dynamo-electric machine
DE2162346A1 (en) Connection for pillar elements with horizontal beams
CN214255659U (en) Power tower installation device for power infrastructure
WO2015007656A1 (en) Method for producing a precast concrete segment of a wind turbine tower, and a precast concrete tower segment formwork
CN210238765U (en) Connection node of assembled concrete frame beam column
CN213299035U (en) Connecting structure of heavy anti-slip assembled comprehensive pipeline support hanger
CN211369016U (en) Assembled light steel building
CN209538041U (en) Support system and its steel corbel component
CN207620504U (en) A kind of Fabricated railing
CN105908855A (en) Modularized assembling-type cross-shaped cold-bending thin-wall profile steel combined wall and connection method thereof
CN216007274U (en) Assembling mechanism of steel structure
CN208997098U (en) A kind of H profile steel convenient for connection
RU2706984C1 (en) Column connection assembly with crossbar
CN209891089U (en) Recess locking device of fixed collet
CN110541558B (en) Building construction scaffold fastener
CN111424809A (en) High regulation type building steel construction of degree of freedom
CN215630651U (en) Connecting device for steel structure nodes
CN220503941U (en) Transmission line iron tower foundation reinforcing apparatus
CN215671091U (en) Connecting and locking device for building template
CN215764024U (en) Foundation bolt fixing device
CN219365025U (en) PCT shear wall structure suitable for assembly type building construction
CN219672059U (en) Water-driven coupling overhauling platform
CN214423579U (en) Novel connection structure for assembly type structure
CN219045211U (en) Steel structure connecting piece
CN213597499U (en) Novel stupefied template of no back of body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210921

CF01 Termination of patent right due to non-payment of annual fee