CN214253741U - Construction project construction progress management device - Google Patents

Construction project construction progress management device Download PDF

Info

Publication number
CN214253741U
CN214253741U CN202120533615.6U CN202120533615U CN214253741U CN 214253741 U CN214253741 U CN 214253741U CN 202120533615 U CN202120533615 U CN 202120533615U CN 214253741 U CN214253741 U CN 214253741U
Authority
CN
China
Prior art keywords
wall
progress
lamp
management
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120533615.6U
Other languages
Chinese (zh)
Inventor
孙伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120533615.6U priority Critical patent/CN214253741U/en
Application granted granted Critical
Publication of CN214253741U publication Critical patent/CN214253741U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

The utility model discloses a building project construction progress management device, which comprises a base, the bottom four corners department of base all is equipped with the area universal wheel of stopping, the perpendicular fixedly connected with stand in top outer wall middle part of base, and the top inner wall of stand pegs graft and have the regulation pole, the top outer wall fixedly connected with solar cell panel of regulation pole, four side outer walls of stand all are equipped with the sliding tray, and the inner wall sliding connection of sliding tray has the sliding seat. The utility model discloses a four sides all are equipped with the management panel, can correspond the engineering progress in different districts, changeable districts and whole engineering management progress when looking over are equipped with the roll display screen on the management panel, can be used to report progress data in real time, and the upset light board of bottom can be with project progress control's more clear, the management and the renovation of the pertinence of being convenient for through switching fine then progress in different regional project and the project.

Description

Construction project construction progress management device
Technical Field
The utility model relates to a construction technical field especially relates to a building project construction progress management device.
Background
The construction project progress control is the control work throughout the whole construction process of the construction project, and the progress control is one of the main works of construction unit project constructors and supervision unit project supervisors. The quality of the progress control directly affects the construction period, workload, resource consumption and the like of the project. Therefore, the progress control work in the building construction process must be done well.
The existing progress management and display are all through structures similar to blackboard walls, many contents need to be manually replaced, the problems of data errors and untimely progress updating can be caused, the project progress among many different areas is not detailed, the progress of different detailed items in a project cannot be well pursued, and the management is not facilitated to be carried out in cooperation with the whole project.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the building project construction progress management device who proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a construction project construction progress management device comprises a base, universal wheels with brakes are arranged at four corners of the bottom end of the base, a stand column is vertically and fixedly connected to the middle of the outer wall of the top of the base, an adjusting rod is inserted into the inner wall of the top of the stand column, a solar cell panel is fixedly connected to the outer wall of the top of the adjusting rod, sliding grooves are formed in the outer walls of the four sides of the stand column, sliding seats are slidably connected to the inner wall of each sliding groove, a connecting support is fixedly connected to the outer wall of each sliding seat, a management panel is fixedly connected to the end portion of each connecting support, a rolling display screen, a turning lamp plate and a progress indicator are arranged on the outer wall of each management panel, the rolling display screens are located on the two sides of the bottom of the outer wall of each management panel and located above the turning lamp plates and the progress indicator, each turning lamp plate is of a triangular prism structure, and display screens are arranged on the three sides of the outer wall of each turning lamp plate, the both ends of upset light tablet all are equipped with the switching circular telegram axle, and switch through electric connection between the tip and the progress indicator of circular telegram axle.
As a further scheme of the utility model, one side that the outer wall of upset lamp tablet is close to linking bridge is equipped with the controller, and passes through electric connection between controller and upset lamp tablet, the progress indicator lamp.
As a further scheme of the utility model, the bottom outer wall both sides of sliding seat all are through hinge fixedly connected with vaulting pole, and the top inner wall of sliding seat passes through screw thread fixedly connected with positioning screw, positioning screw's bottom outer wall joint is on the outer wall of vaulting pole.
As a further aspect of the present invention, the bottom inner wall of the base is provided with a battery pack and an inverter, and between the battery pack and the inverter and between the solar cell panel through an electric connection.
As a further scheme of the utility model, the progress indicator comprises LED lamp pearl and the base plate that ten equidistance were arranged, and the tip of base plate is equipped with the label groove.
As a further aspect of the present invention, the management panel is connected to a switch, and the switch is connected to a PLC controller through a wire.
The utility model has the advantages that:
1. the construction progress management device is provided with the management panels on four sides, can correspond to the engineering progress of different areas, can switch the areas and all the engineering management progress during checking, improves the engineering progress control of different areas, and effectively controls the construction efficiency while improving the quality;
2. the management panel in the construction progress management device is provided with a rolling display screen which can be used for reporting progress data in real time, and the turnover lamp board at the bottom can control the responsibility and progress in a project more clearly by switching different regional projects and the progress of detailed rules in the project, so that the management and the treatment in a targeted manner are facilitated;
3. the solar cell panel is arranged at the top of the construction progress management device, so that the endurance of the equipment on a construction site can be prolonged.
Drawings
Fig. 1 is a schematic perspective view of a construction progress management device for a construction project according to the present invention;
fig. 2 is a schematic view of a project turnover board structure of a construction progress management device for a construction project according to the present invention;
fig. 3 is a back structural diagram of a management panel of the construction progress management device for a construction project according to the present invention;
fig. 4 is the utility model provides a slip seat structural schematic of construction project construction progress management device.
In the figure: 1. a base; 2. universal wheels with brakes; 3. a column; 4. a sliding groove; 5. a sliding seat; 6. connecting a bracket; 7. a progress indicator light; 8. a project turnover board; 9. a management panel; 10. a solar panel; 11. a display screen; 12. switching the electrifying shaft; 13. a controller; 14. positioning a screw rod; 15. a stay bar.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, a construction project construction progress management device comprises a base 1, universal wheels 2 with brakes are arranged at four corners of the bottom end of the base 1, a vertical column 3 is vertically and fixedly connected to the middle of the outer wall of the top of the base 1, an adjusting rod is inserted into the inner wall of the top of the vertical column 3, a solar cell panel 10 is fixedly connected to the outer wall of the top of the adjusting rod, sliding grooves 4 are arranged on the outer walls of four sides of the vertical column 3, sliding seats 5 are slidably connected to the inner walls of the sliding grooves 4, connecting brackets 6 are fixedly connected to the outer walls of the sliding seats 5, management panels 9 are fixedly connected to the ends of the connecting brackets 6, a rolling display screen, turning lamp boards 8 and progress indication lamps 7 are arranged on the outer wall of the management panels 9, the rolling display screen is positioned on two sides of the bottom of the outer wall of the management panels 9 between the turning lamp boards 8 and the progress indication lamps 7, and is positioned above the turning lamp boards 8 and the progress indication lamps 7, the turnover lamp plate 8 is of a triangular prism structure, three sides of the outer wall of the turnover lamp plate are respectively provided with a display screen 11, two ends of the turnover lamp plate 8 are respectively provided with a switching power-on shaft 12, the end part of the switching power-on shaft 12 is electrically connected with the progress indicator lamp 7, responsibility and progress control in a project can be clearer by switching different regional projects and the progress of detailed rules in the project, and the pertinence management and treatment are convenient, one side, close to the connecting bracket 6, of the outer wall of the turnover lamp plate 8 is provided with a controller 13, the turnover lamp plate 8 and the progress indicator lamp 7 are electrically connected, two sides of the outer wall of the bottom end of the sliding seat 5 are fixedly connected with supporting rods 15 through hinges, the inner wall of the top end of the sliding seat 5 is fixedly connected with positioning screw rods 14 through threads, the outer wall of the bottom end of the positioning screw rods 14 is clamped on the outer wall of the supporting rods 15, the inner wall of the bottom end of the base 1 is provided with a battery pack and an inverter, and through electric connection between group battery and the dc-to-ac converter and between the solar cell panel 10, can prolong the continuation of journey of equipment on the construction ground, progress indicator 7 comprises LED lamp pearl and the base plate of ten equidistance arrangements, and the tip of base plate is equipped with the label groove, and management panel 9 is connected with the switch, and the switch is connected with the PLC controller through the wire, and the model of PLC controller is S7-200.
The working principle is as follows: 1. when the device is used, the device is pushed to an information management area through the universal wheel 2 with the brake for displaying the construction progress and detailed rules of a building project, wherein the management panels 9 on four sides correspond to project progresses of different areas on four sides, and the construction project progress of the building project can be visually and effectively viewed;
2. the detailed rules of the project continuously switch the project names by turning over the project turning plate 8 and utilizing the switching power-on shafts 12 at the two ends, at the moment, the corresponding progress indicator lamps 7 are changed, the controller 13 is connected with the information end, the progress information can be synchronized in real time, and a better information updating state is achieved;
3. holistic management panel 9 height-adjustable withdraws vaulting pole 15 through not hard up positioning screw 14, recycles positioning screw 14 after sliding in sliding tray 4 and props up vaulting pole 15 joint on the both sides inner wall of sliding tray 4, realizes management panel 9 location.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "both ends", "first", "second", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
In the description of this patent, it is noted that unless otherwise specifically stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can include, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a construction project construction progress management device, includes base (1), its characterized in that, the bottom four corners department of base (1) all is equipped with the area and stops universal wheel (2), the perpendicular fixedly connected with stand (3) in top outer wall middle part of base (1), and the top inner wall of stand (3) pegs graft and have the regulation pole, the top outer wall fixedly connected with solar cell panel (10) of regulation pole, four side outer walls of stand (3) all are equipped with sliding tray (4), and the inner wall sliding connection of sliding tray (4) has sliding seat (5), the outer wall fixedly connected with linking bridge (6) of sliding seat (5), and the tip fixedly connected with management panel (9) of linking bridge (6), the outer wall of management panel (9) is equipped with roll display screen, upset lamp board (8) and progress pilot lamp (7), lie in the outer wall bottom of management panel (9) between upset lamp (8) and progress pilot lamp (7), the upset lamp board (8) and progress pilot lamp (7) are located the management panel (9) Both sides, and roll the display screen and be located the top of upset lamp tablet (8) and progress indicator (7), upset lamp tablet (8) are the triangular prism structure, and the outer wall three sides of upset lamp tablet all are equipped with display screen (11), the both ends of upset lamp tablet (8) all are equipped with switch circular telegram axle (12), and switch through electric connection between the tip of circular telegram axle (12) and progress indicator (7).
2. The construction progress management device for the building project according to claim 1, wherein a controller (13) is arranged on one side, close to the connecting bracket (6), of the outer wall of the turnover lamp board (8), and the controller (13), the turnover lamp board (8) and the progress indicator lamp (7) are electrically connected.
3. The construction progress management device for the building project according to claim 1, wherein the two sides of the outer wall of the bottom end of the sliding seat (5) are fixedly connected with support rods (15) through hinges, the inner wall of the top end of the sliding seat (5) is fixedly connected with positioning screws (14) through threads, and the outer wall of the bottom end of each positioning screw (14) is clamped on the outer wall of each support rod (15).
4. A construction progress management device for a building project according to claim 1, characterized in that the inner wall of the bottom end of the base (1) is provided with a battery pack and an inverter, and the battery pack and the inverter are electrically connected with each other and the solar panel (10).
5. The construction progress management device for the building project according to claim 1, wherein the progress indicator lamp (7) is composed of ten LED lamp beads arranged at equal intervals and a substrate, and a label slot is arranged at the end of the substrate.
6. The construction progress management device for the building project according to claim 1, wherein the management panel (9) is connected with a switch, and the switch is connected with a PLC controller through a lead.
CN202120533615.6U 2021-03-15 2021-03-15 Construction project construction progress management device Active CN214253741U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120533615.6U CN214253741U (en) 2021-03-15 2021-03-15 Construction project construction progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120533615.6U CN214253741U (en) 2021-03-15 2021-03-15 Construction project construction progress management device

Publications (1)

Publication Number Publication Date
CN214253741U true CN214253741U (en) 2021-09-21

Family

ID=77727869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120533615.6U Active CN214253741U (en) 2021-03-15 2021-03-15 Construction project construction progress management device

Country Status (1)

Country Link
CN (1) CN214253741U (en)

Similar Documents

Publication Publication Date Title
CN214253741U (en) Construction project construction progress management device
CN206271383U (en) A kind of educational propaganda column
CN206774021U (en) A kind of lifting type mathematical education shows panel assembly
CN212105434U (en) Building construction safety device
CN205508308U (en) Art design works show shelf
CN211340504U (en) Vehicle speed reduction device for road and bridge
CN214576266U (en) Road and bridge construction safety device
CN219666414U (en) Positioning device for photovoltaic panel installation
CN218880632U (en) Guide board capable of independently generating power based on constructional engineering
CN218373484U (en) Road indicating device for city planning
CN214312422U (en) Construction signboard
CN209560768U (en) Teaching demonstration device is used in a kind of operation of intelligent Building System
CN213691222U (en) Road traffic sign tablet of conveniently disassembling
CN206110632U (en) Shockproof scaffold support frame of building
CN110701548A (en) Municipal administration street lamp convenient to installation
CN214890149U (en) Safety education indicating device
CN210783590U (en) Building engineering management statistics display device
CN215891815U (en) Construction site information display rack
CN211622538U (en) Lifting scaffold convenient to equipment
CN214433295U (en) Large-scale exhibition is with exhibition frame convenient to show different showpiece
CN213809555U (en) Comprehensive information notification device for people going in and out of school
CN219591065U (en) Display board
CN217678710U (en) Sign is used in highway engineering construction
CN215988039U (en) Wisdom campus information display device
CN213018681U (en) Building electrical construction erection equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant