CN214252441U - Power equipment operation fault early warning monitoring devices - Google Patents

Power equipment operation fault early warning monitoring devices Download PDF

Info

Publication number
CN214252441U
CN214252441U CN202021348724.2U CN202021348724U CN214252441U CN 214252441 U CN214252441 U CN 214252441U CN 202021348724 U CN202021348724 U CN 202021348724U CN 214252441 U CN214252441 U CN 214252441U
Authority
CN
China
Prior art keywords
limiting
screw
detection box
plate
early warning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021348724.2U
Other languages
Chinese (zh)
Inventor
莫毓昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaqiao University
Original Assignee
Huaqiao University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaqiao University filed Critical Huaqiao University
Priority to CN202021348724.2U priority Critical patent/CN214252441U/en
Application granted granted Critical
Publication of CN214252441U publication Critical patent/CN214252441U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a power equipment operation failure early warning monitoring device, which comprises a bearing plate, wherein one end of the bearing plate is vertically provided with a fixed plate, the upper end of the fixed plate is symmetrically provided with a connecting rod, the connecting rod is rotatably connected with a protective cover, one side of the fixed plate is symmetrically provided with a limiting plate, the inner side of the limiting plate is provided with a slide rail, one side of the limiting plate is vertically provided with a limiting post, the limiting post is sleeved with a limiting rod, when the detection box is installed and fixed, the protective cover is covered, the detection box can be effectively prevented from being exposed in the air to accelerate the aging of the detection box, the long-time dust accumulation is also prevented, the service life of the detection box is shortened, the detection box is slid onto the bearing plate, the detection box can not slide horizontally, the detection box is more stable in work, and the detection box can be moved upwards along the slide rail when being damaged or needing to be cleaned, the test chamber is removed for replacement or cleaning.

Description

Power equipment operation fault early warning monitoring devices
Technical Field
The utility model relates to an electric power engineering technical field specifically is a power equipment operation trouble early warning monitoring devices.
Background
With the development of power systems and the opening of power markets and the deepening of power system reform, electric energy between the interior of a power grid and the power grid starts to be produced and exchanged on a large scale, the quality problem of the electric energy is more and more concerned, the electric measurement and electric energy measurement device is also developed, the electric energy quality detection device can be divided into a plurality of forms such as a portable type, a handheld type and a centralized type, and in recent years, electric energy quality researchers provide distributed electric energy quality detection devices.
Most electric energy early warning detection device is longer because of the time of using now, often appear detecting inaccurate or can not correctly reflect the place of problem, it is more troublesome to change the device when electric energy monitoring devices's anomaly or damage, through expose in the air for a long time, electric energy monitoring devices's surface or inside can be ageing very fast, or the thick dust of one deck of pile up, the normal operating is equipped in very big influence, for this we propose a power equipment operation trouble early warning monitoring devices and be used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electrical equipment operation trouble early warning monitoring devices to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the early warning and monitoring device for the operation faults of the power equipment comprises a bearing plate, wherein a fixed plate is vertically arranged at one end of the bearing plate, a connecting rod is symmetrically arranged at the upper end of the fixed plate, a protective cover is rotatably connected onto the connecting rod, a limiting plate is symmetrically arranged at one side of the fixed plate, a sliding rail is arranged at the inner side of the limiting plate, a limiting column is vertically arranged at one side of the limiting plate, a limiting rod is sleeved on the limiting column, a first screw hole is arranged at one side of the other limiting plate, and a first limiting screw rod is inserted into an internal thread of the first screw hole; be equipped with the detection case between the limiting plate, the surface of detection case is equipped with the pilot lamp, the detection case is located the upper surface of loading board, when the detection case is fixed in the installation, covers the visor, can effectually prevent that the detection case from exposing in the air and accelerating the detection case ageing, has also prevented piling up of long-time dust and has subtracted the life of short detection case, and the pilot lamp is green under the normal conditions, and the pilot lamp becomes red when electric power system appears unusually to reach and remind the staff to overhaul electric power system as early as possible.
As a preferred technical scheme of the utility model, the arc track has been seted up to the both sides that the visor paralleled, the lower extreme symmetry of limiting plate is equipped with second limit screw, second limit screw can the activity card establish in the arc track.
As a preferred technical scheme of the utility model, the upper end of limiting plate one side is equipped with the card cell body, first stop screw thread is pegged graft in the one end of card cell body, the gag lever post can block at the draw-in groove internal, when monitoring case installs the upper surface to the loading board, with the one end card of gag lever post internal at the draw-in groove, can fix the position of detection case with first stop screw precession first screw.
As a preferred technical scheme of the utility model, the second screw has been seted up to the lower extreme of limiting plate, second stop screw thread is pegged graft in the second screw, and precession second screw with second stop screw makes the surface that the visor is being hugged closely tightly to second stop screw, and frictional force between increase visor and second stop screw, visor and the limiting plate is fixed the visor.
As an optimal technical scheme of the utility model, the one end symmetry of detection case is equipped with the slider, the slider can be at the inside activity of slide rail, one side of detection case is equipped with the display, the below array of display is equipped with the button, goes into the slide rail with the slider card in, slides the detection case to the loading board on, makes the detection case can not the horizontal slip, makes the detection case at the during operation more stable, can make the detection case upwards along the slide rail if the detection case is impaired or need clear up, takes out the detection case so that change or clearance.
As an optimal technical scheme of the utility model, the one end of visor is equipped with the connecting block perpendicularly, the connecting block cup joints on the connecting rod.
As an optimized technical scheme of the utility model, a power equipment operation trouble early warning monitoring devices's application method, including following step:
firstly, fixing a fixing plate, then opening a protective cover, screwing a first limiting screw out of a first screw hole, and screwing out one end of a limiting rod clamped in a clamping groove body;
secondly, clamping the sliding block on the detection box into the sliding rail, sliding the detection box to the upper surface of the bearing plate, and clamping one end of the limiting rod into the clamping groove body;
thirdly, screwing the first limit screw into the first screw hole to fix the position of the detection box, and then connecting the detection box into the power system, wherein the indicator light is green, if the indicator light turns red, the circuit system is abnormal, and the display normally displays related data in the power system, so that the abnormal position in the circuit system can be known more clearly;
rotating the protective cover to a position where the connecting block is parallel to the bearing plate, wherein the second limiting screw is positioned in the arc-shaped track;
and fifthly, the second limiting screw is screwed to one end of the second limiting screw to be tightly attached to the surface of the protective cover, and the friction force between the protective cover and the second limiting screw and between the protective cover and the limiting plate is increased to fix the protective cover.
Compared with the prior art, the beneficial effects of the utility model are that:
1. when the detection box is installed and fixed, the protective cover is covered, so that the detection box can be effectively prevented from being exposed in the air to accelerate the aging of the detection box, and the long-time dust accumulation is prevented, and the service life of the detection box is shortened;
2. the detection box is slid onto the bearing plate, so that the detection box cannot horizontally slide, the detection box is more stable in working, and can be upwards moved along the sliding rail if the detection box is damaged or needs to be cleaned, and the detection box is taken out for replacement or cleaning;
3. and screwing the second limit screw into the second screw hole to enable the second limit screw to be tightly attached to the outer surface of the protective cover, so that the friction force between the protective cover and the second limit screw and between the protective cover and the limit plate is increased to fix the protective cover.
4. The utility model provides a detection case is more stable at the during operation, can make progress the detection case along the slide rail when the detection case is impaired or need clear up, takes out the detection case so that change or clearance.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the present invention;
FIG. 3 is a schematic top view of the present invention;
FIG. 4 is an enlarged schematic view of the structure at A of FIG. 1 according to the present invention;
in the figure: the detection device comprises a bearing plate 1, a fixing plate 2, a connecting rod 21, a protective cover 3, a connecting block 31, an arc-shaped track 32, a limiting plate 4, a sliding rail 41, a limiting column 42, a clamping groove body 43, a first limiting screw 44, a first screw hole 45, a second screw hole 46, a second limiting screw 47, a limiting rod 48, a detection box 5, an indicator lamp 51, a display 52, a button 53 and a sliding block 54.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a power equipment operation fault early warning monitoring device comprises a bearing plate 1, wherein one end of the bearing plate 1 is vertically provided with a fixing plate 2, the upper end of the fixing plate 2 is symmetrically provided with a connecting rod 21, the connecting rod 21 is rotatably connected with a protective cover 3, one side of the fixing plate 2 is symmetrically provided with a limiting plate 4, the inner side of the limiting plate 4 is provided with a sliding rail 41, one side of the limiting plate 4 is vertically provided with a limiting column 42, the limiting column 42 is sleeved with a limiting rod 48, one side of the other limiting plate 4 is provided with a first screw hole 45, and a first limiting screw 44 is inserted into an internal thread of the first screw hole 45; be equipped with detection case 5 between limiting plate 4, the surface of detection case 5 is equipped with pilot lamp 51, detection case 5 is located the upper surface of loading board 1, when the fixed detection case 5 of installation, cover visor 3, can effectually prevent that detection case 5 from exposing and accelerate detection case 5 ageing aloft, the life of piling up of long-time dust and subtracting short detection case 5 has also been prevented, pilot lamp 51 is green under the normal conditions, pilot lamp 51 becomes red when electric power system appears unusually, in order to reach and remind the staff to overhaul electric power system as early as possible.
Arc track 32 has been seted up to the both sides that the visor 3 paralleled, and the lower extreme symmetry of limiting plate 4 is equipped with second stop screw 47, and second stop screw 47 can the activity card establish in arc track 32, rotatory the tip of visor 3 to with the same horizontal position of loading board 1, second stop screw 47 is in arc track 32 this moment.
The upper end of limiting plate 4 one side is equipped with card groove body 43, and first stop screw 44 screw thread is pegged graft in the one end of card groove body 43, and gag lever post 48 can block in the card groove body 43, when monitoring case 5 is installed to the upper surface of loading board 1, blocks the one end of gag lever post 48 in card groove body 43, and the position of detection case 5 can be fixed with first stop screw 44 precession first screw 45.
The lower end of the limiting plate 4 is provided with a second screw hole 46, the second limiting screw 47 is inserted into the second screw hole 46 in a threaded manner, the second limiting screw 47 is screwed into the second screw hole 46, so that the second limiting screw 47 is tightly attached to the outer surface of the protective cover 3, and the friction between the protective cover 3 and the second limiting screw 47, and between the protective cover 3 and the limiting plate 4 is increased to fix the protective cover 3.
One end symmetry of detection case 5 is equipped with slider 54, slider 54 can be at the inside activity of slide rail 41, one side of detection case 5 is equipped with display 52, the below array of display 52 is equipped with button 53, go into slide rail 41 with slider 54 card, slide detection case 5 to loading board 1 on, make detection case 5 can not the horizontal slip, it is more stable at the during operation to make detection case 5, can be upwards with detection case 5 along the slide rail when detection case 5 is impaired or need clear up, take out detection case 5 so that change or clearance.
One end of the protective cover 3 is vertically provided with a connecting block 31, and the connecting block 31 is sleeved on the connecting rod 21.
A use method of an early warning and monitoring device for operation faults of power equipment comprises the following steps:
firstly, fixing the fixing plate 2, then opening the protective cover 3, screwing the first limit screw 44 out of the first screw hole 45, and screwing out one end of the limit rod 48 clamped in the clamping groove body 43;
secondly, clamping the sliding block 54 on the detection box 5 into the sliding rail 41, sliding the detection box 5 to the upper surface of the bearing plate 1, and clamping one end of the limiting rod 48 into the clamping groove body 43;
thirdly, screwing the first limit screw 44 into the first screw hole 45 to fix the position of the detection box 5, and then connecting the detection box 5 into the power system, wherein the indicator light 51 is green, if the indicator light 51 turns red, the circuit system is abnormal, and the display 52 normally displays related data in the power system, so that the abnormal position in the circuit system can be more clearly known;
step four, rotating the protective cover 3 to a position where the connecting block 31 is parallel to the bearing plate 1, wherein the second limiting screw 47 is positioned in the arc-shaped track 32;
and step five, the second limiting screw 47 is screwed to one end of the second limiting screw 47 to be tightly attached to the surface of the protective cover 3, and the friction force between the protective cover 3 and the second limiting screw 47, and between the protective cover 3 and the limiting plate 4 is increased to fix the protective cover 3.
The working principle is as follows: the use method comprises the steps of fixing the fixing plate 2, opening the protective cover 3, screwing out the first limit screw 44 from the first screw hole 45, screwing out one end of the limit rod 48 clamped in the clamping groove body 43, clamping the slide block 54 on the detection box 5 into the slide rail 41, sliding the detection box 5 to the upper surface of the bearing plate 1, clamping one end of the limit rod 48 into the clamping groove body 43, screwing the first limit screw 44 into the first screw hole 45 to fix the position of the detection box 5, connecting the detection box 5 into the electric power system, enabling the indicator lamp 51 to be green at the moment, displaying relevant data in the electric power system normally if the indicator lamp 51 turns red if the electric circuit system is abnormal, rotating the protective cover 3 to the parallel position of the connecting block 31 and the bearing plate 1, enabling the second limit screw 47 to be located in the arc-shaped track 32, screwing the second limit screw 47 to one end of the second limit screw 47 to be tightly attached to the surface of the protective cover 3, the friction force between the protective cover 3 and the second limit screw 47 and between the protective cover 3 and the limit plate 4 is increased to fix the protective cover 3.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an electrical equipment operation trouble early warning monitoring devices, includes loading board (1), its characterized in that: a fixing plate (2) is vertically arranged at one end of the bearing plate (1), connecting rods (21) are symmetrically arranged at the upper end of the fixing plate (2), a protective cover (3) is rotatably connected onto the connecting rods (21), limiting plates (4) are symmetrically arranged on one side of the fixing plate (2), sliding rails (41) are arranged on the inner sides of the limiting plates (4), limiting columns (42) are vertically arranged on one sides of the limiting plates (4), limiting rods (48) are sleeved on the limiting columns (42), first screw holes (45) are formed in one side of the other limiting plate (4), and first limiting screw rods (44) are inserted into internal threads of the first screw holes (45); be equipped with detection case (5) between limiting plate (4), the surface of detection case (5) is equipped with pilot lamp (51), detection case (5) are located the upper surface of loading board (1).
2. The power equipment operation fault early warning and monitoring device according to claim 1, characterized in that: arc track (32) have been seted up to both sides that visor (3) paralleled, the lower extreme symmetry of limiting plate (4) is equipped with second stop screw (47), second stop screw (47) can move about the card and establish in arc track (32).
3. The power equipment operation fault early warning and monitoring device according to claim 1, characterized in that: the upper end of one side of the limiting plate (4) is provided with a clamping groove body (43), the first limiting screw (44) is inserted into one end of the clamping groove body (43) in a threaded mode, and the limiting rod (48) can be clamped in the clamping groove body (43).
4. The power equipment operation fault early warning and monitoring device according to claim 2, characterized in that: the lower end of the limiting plate (4) is provided with a second screw hole (46), and the second limiting screw rod (47) is inserted in the second screw hole (46) in a threaded mode.
5. The power equipment operation fault early warning and monitoring device according to claim 1, characterized in that: one end of the detection box (5) is symmetrically provided with a sliding block (54), the sliding block (54) can move in the sliding rail (41), one side of the detection box (5) is provided with a display (52), and buttons (53) are arranged below the display (52) in an array mode.
6. The power equipment operation fault early warning and monitoring device according to claim 1, characterized in that: one end of the protective cover (3) is vertically provided with a connecting block (31), and the connecting block (31) is sleeved on the connecting rod (21).
CN202021348724.2U 2020-07-10 2020-07-10 Power equipment operation fault early warning monitoring devices Active CN214252441U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021348724.2U CN214252441U (en) 2020-07-10 2020-07-10 Power equipment operation fault early warning monitoring devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021348724.2U CN214252441U (en) 2020-07-10 2020-07-10 Power equipment operation fault early warning monitoring devices

Publications (1)

Publication Number Publication Date
CN214252441U true CN214252441U (en) 2021-09-21

Family

ID=77714293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021348724.2U Active CN214252441U (en) 2020-07-10 2020-07-10 Power equipment operation fault early warning monitoring devices

Country Status (1)

Country Link
CN (1) CN214252441U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114364173A (en) * 2021-12-14 2022-04-15 海南电网有限责任公司 Big data fault detection of distribution network and positioning device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114364173A (en) * 2021-12-14 2022-04-15 海南电网有限责任公司 Big data fault detection of distribution network and positioning device
CN114364173B (en) * 2021-12-14 2024-02-20 海南电网有限责任公司 Big data fault detection of distribution network and positioning equipment

Similar Documents

Publication Publication Date Title
CN214252441U (en) Power equipment operation fault early warning monitoring devices
KR102135388B1 (en) High voltage line monitoring system of power plant
CN110658470A (en) Jig for testing probe
CN214251315U (en) Novel subway electrical equipment detects device
CN116381549A (en) Electric energy meter connector lug detection device
CN212872587U (en) Quick detection device of low pressure three-phase unbalance degree
CN211528631U (en) Power battery electric leakage detection equipment
CN112543562B (en) Intelligent digital display type power control instrument based on PLC platform
CN115372788A (en) Circuit artificial intelligence assists maintenance system
CN208224458U (en) A kind of rectangular aluminum hull ferric phosphate lithium cell OCV detection device
CN214310842U (en) Photovoltaic terminal box comprehensive testing device for positioning data line
CN209471190U (en) BMS plate test fixture
CN111596185A (en) Detection device for detecting partial discharge of power transformation equipment
CN216132582U (en) Cable surface temperature measuring device
CN219245590U (en) Protection machanism and be used for wind-powered electricity generation test instrument that opens circuit and test
CN216927035U (en) Automatic testing arrangement of power strip
CN215833570U (en) Detection apparatus with motor residual life judging function
JPH08203567A (en) Deteriorated state detection device for lead-acid battery
CN215768730U (en) Fireproof and heat-insulation three-phase electric energy meter
CN213125372U (en) Electric power overhauls device
CN218070559U (en) Transparent terminal row baffle suitable for infrared temperature measurement
CN215256658U (en) Compressor interlocking device
CN214375180U (en) Remote control power supply tester
CN216013551U (en) Optical cable line fault point positioning and detecting device
CN215833490U (en) Dry-type reactor live detector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant