CN214246882U - A construction guardrail for town road - Google Patents

A construction guardrail for town road Download PDF

Info

Publication number
CN214246882U
CN214246882U CN202023012482.2U CN202023012482U CN214246882U CN 214246882 U CN214246882 U CN 214246882U CN 202023012482 U CN202023012482 U CN 202023012482U CN 214246882 U CN214246882 U CN 214246882U
Authority
CN
China
Prior art keywords
construction guardrail
connector
support column
seted
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023012482.2U
Other languages
Chinese (zh)
Inventor
安丽亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Hongqiao Traffic Engineering Co ltd
Original Assignee
Sichuan Hongqiao Traffic Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Hongqiao Traffic Engineering Co ltd filed Critical Sichuan Hongqiao Traffic Engineering Co ltd
Priority to CN202023012482.2U priority Critical patent/CN214246882U/en
Application granted granted Critical
Publication of CN214246882U publication Critical patent/CN214246882U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a construction guardrail for town road, which comprises a supporting column, first connecting port has been seted up to the support column upper end, and bottom fixedly connected with base, two sets of mounting grooves have been seted up to support column bilateral symmetry, and adjacent two the support column passes through telescopic machanism and is connected with same coupling mechanism, telescopic machanism includes armed lever, pivot and rotation mouth, the armed lever rotates through the pivot and connects in the mounting groove, fixed connection is respectively on mounting groove inner wall both sides at the pivot both ends, coupling mechanism rotates and installs between two armed levers, coupling mechanism comprises fixed block and link, connecting block fixed connection is between two fixed blocks, and the inside second connector of having seted up, through folding rod through connection between first connecting port and the second connector. The utility model discloses can fold the shrink when not using, very big occupation space that has reduced the construction guardrail has saved individual physical power and construction manpower.

Description

A construction guardrail for town road
Technical Field
The utility model belongs to the technical field of the road construction, especially, relate to a construction guardrail for town road.
Background
The construction guardrail is made of an iron pipe and is manufactured by the processes of bending the seamless iron pipe, welding, polishing, high-pressure paint baking, film pasting and the like layer by layer. The method is widely applied to isolation and warning of construction sites. In the road construction process, the guard rails are often required to be used for separating a construction area from a non-construction area and temporarily enclosing a construction road, the guard rails can not only guarantee the safety of constructors, but also meet the requirements of safe and civilized construction, and the image of a construction site can be effectively improved.
However, the construction guardrail is made of steel pipes directly, so that the construction guardrail is very troublesome to use. When taking the construction guardrail to the construction site, the whole guardrail occupies a large amount of space, and it is very inconvenient to carry, and needs many people to carry together carrying the in-process, has consumed a large amount of physical power of staff, has also wasted a large amount of manpower resources.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem of inconvenient carrying, and providing a construction guardrail for town road.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a construction guardrail for municipal roads comprises support columns, wherein the upper ends of the support columns are provided with first connecting ports, the bottoms of the support columns are fixedly connected with a base, two groups of mounting grooves are symmetrically formed in two sides of each support column, two adjacent support columns are connected with the same connecting mechanism through telescopic mechanisms, each telescopic mechanism comprises an arm rod, a rotating shaft and a rotating port, the arm rods are connected in the mounting grooves through rotating of the rotating shafts, two ends of each rotating shaft are respectively and fixedly connected to two sides of the inner wall of each mounting groove, the rotating ports are formed in one ends, far away from the rotating shafts, of the arm rods, the connecting mechanisms are rotatably installed between the two arm rods and consist of fixing blocks and connecting blocks, each fixing block is a cylinder with an axial lead perpendicular to the direction of the support column and is rotatably connected into the rotating ports through bearings, and the connecting blocks are fixedly connected between the two fixing blocks, and the inside of the connecting rod is provided with a second connecting port, and the first connecting port and the second connecting port are connected through a folding rod.
Preferably, two adjacent support columns opposite to each other are provided with object placing grooves, the space volumes of the two object placing grooves are larger than the volume of the connecting mechanism, and the connecting mechanism is matched with the object placing grooves in size and shape.
Preferably, the inner space of the mounting groove is larger than the volume of the arm rod, and the arm rod can be completely accommodated in the mounting groove.
Preferably, one end of the arm rod close to the rotating shaft is semicircular and is not contacted with the inner wall of the mounting groove.
Preferably, the first connecting port and the second connecting port are the same in size, and the diameters of the round ports are larger than the diameter of the folding rod.
Preferably, the support column lateral wall fixedly connected with bandage in the outside, be provided with the buckle on the bandage.
Compared with the prior art, the beneficial effects of the utility model are that:
when the construction guardrail needs to be folded, two adjacent support columns are folded towards the middle, the arm rod in the telescopic mechanism is installed inside the installation groove, the connecting mechanism is installed inside the object placing groove, and the occupied space of the whole construction guardrail is reduced to the greatest extent. When needs use the construction guardrail, pull open telescopic machanism, pass the second connector on first connector and the connecting block on the support column with the folding rod, expand the construction guardrail, place the place that needs the construction. The utility model discloses can fold the shrink when not using, very big occupation space that has reduced the construction guardrail, folding back makes things convenient for carrying of constructor very, just can carry the transfer to the construction guardrail alone simultaneously, has saved individual physical power and construction manpower.
Drawings
FIG. 1 is a schematic structural view of a construction guardrail for a municipal road provided by the invention when contracted;
FIG. 2 is a schematic structural view of the utility model when the construction guardrail for the municipal road is unfolded;
FIG. 3 is a schematic view of a chute structure of a construction guardrail for a town road according to the present invention;
FIG. 4 is a schematic structural view of a telescopic mechanism of the construction guardrail for the municipal road, provided by the invention;
fig. 5 is the utility model provides a coupling mechanism's for construction guardrail of town road mechanism sketch map.
In the figure: the device comprises a support column 1, a folding rod 2, a base 3, a mounting groove 4, a telescopic mechanism 5, an arm rod 51, a rotating shaft 52, a rotating port 53, a connecting mechanism 6, a fixing block 61, a connecting block 62, a first connecting port 7, a second connecting port 8, an article placing groove 9 and a binding belt 10.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-5, a construction guardrail for a municipal road comprises a support pillar 1, wherein the upper end of the support pillar 1 is provided with a first connecting port 7, the bottom of the support pillar 1 is fixedly connected with a base 3, two sets of mounting grooves 4 are symmetrically arranged on two sides of the support pillar 1, two adjacent support pillars 1 are connected with the same connecting mechanism 6 through a telescopic mechanism 5, the telescopic mechanism 5 comprises an arm rod 51, a rotating shaft 52 and a rotating port 53, the arm rod 51 is rotatably connected in the mounting grooves 4 through the rotating shaft 52, two ends of the rotating shaft 52 are respectively fixedly connected on two sides of the inner wall of the mounting groove 4, the rotating port 53 is arranged at one end of the arm rod 51 far away from the rotating shaft 52, the connecting mechanism 6 is rotatably arranged between the two arm rods 51, the connecting mechanism 6 comprises a fixed block 61 and a connecting block 62, the fixed block 61 is a cylinder with an axial lead vertical to the direction of the support pillar 1 and is rotatably connected in the rotating port 53 through a bearing, connecting block 62 fixed connection is between two fixed blocks 61, and has seted up second connector 8 inside, passes through folding rod 2 through connection between first connector 7 and the second connector 8.
Use above-mentioned technical scheme's embodiment, when constructor will fold the transport to the construction guardrail, fold all support columns 1 to the centre, the effect through telescopic machanism 5 will construct the guardrail shrink, simultaneously the armed lever 51 among the telescopic machanism 5 because the rotation of pivot 52 is inside the effect shrinks to mounting groove 4, the coupling mechanism 6 of connection in the middle of telescopic machanism 5 shrinks inside putting thing groove 9, two adjacent support columns 1 contact, the at utmost has reduced the occupation space of whole construction guardrail. When constructor reachd the job site, when needing to use the construction guardrail, constructor only need with the separation of 1 pulling of support column, telescopic machanism 5 between the support column 1 expandes, passes first connector 7 on the support column 1 and the second connector 8 on the connecting block 62 with folding rod 2, expandes whole construction guardrail with folding rod 2 and supports, places in the place that needs the construction. The utility model discloses it is collapsible, made things convenient for constructor to carrying of construction guardrail, saved personnel's physical power and building site manpower.
According to the preferable technical scheme in the embodiment, the opposite sides of two adjacent support columns 1 are respectively provided with the object placing grooves 9, the space volume of the two object placing grooves 9 is larger than that of the connecting mechanism 6, the connecting mechanism 6 is matched with the object placing grooves 9 in size and shape, more space can be saved when the guardrail is folded and constructed, the guardrail is more convenient to carry, and the occupied space is smaller;
the inner space of the mounting groove 4 is larger than the volume of the arm rod 51, the arm rod 51 can be completely accommodated into the mounting groove 4, and the mounting groove 4 capable of accommodating the arm rod 51 is used for saving space when the guardrail is folded;
one end of the arm rod 51 close to the rotating shaft 52 is semicircular and is not contacted with the inner wall of the mounting groove 4, and the semicircular arrangement can avoid that the arm rod 51 cannot normally rotate in the mounting groove 4;
the first connecting port 7 and the second connecting port 8 are the same in size, and the diameters of the round openings are larger than those of the folding rod 2, so that the folding rod 2 can penetrate through the first connecting port 7 and the second connecting port 8 to support the construction guardrail;
the side wall of the outermost side supporting column 1 is fixedly connected with a binding belt 10, a buckle is arranged on the binding belt 10, and the binding belt 10 is designed to be convenient to fix and carry when the construction guardrail is folded.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a construction guardrail for town road, includes support column (1), its characterized in that, first coupling port (7) have been seted up to support column (1) upper end, and bottom fixedly connected with base (3), two sets of mounting grooves (4) have been seted up to support column (1) bilateral symmetry, adjacent two support column (1) is connected with same coupling mechanism (6) through telescopic machanism (5), telescopic machanism (5) include armed lever (51), pivot (52) and rotation mouth (53), armed lever (51) rotate through pivot (52) and connect in mounting groove (4), pivot (52) both ends are fixed connection respectively on mounting groove (4) inner wall both sides, rotation mouth (53) are seted up in the one end that pivoted lever (52) were kept away from in armed lever (51), coupling mechanism (6) rotate and install between two armed levers (51), coupling mechanism (6) comprise fixed block (61) and connecting block (62), fixed block (61) are the cylinder of vertical support post (1) direction for the axial lead, and rotate through the bearing and connect in rotation mouth (53), connecting block (62) fixed connection is between two fixed blocks (61), and inside second connector (8) of having seted up, through folding rod (2) through connection between first connector (7) and second connector (8).
2. The construction guardrail for the municipal road as claimed in claim 1, wherein two adjacent support columns (1) are provided with a storage groove (9) at the opposite side, the space volume of the two storage grooves (9) is larger than that of the connecting mechanism (6), and the connecting mechanism (6) is matched with the storage groove (9) in size and shape.
3. A construction guardrail for town roads according to claim 1, characterized in that the interior space of the mounting groove (4) is larger than the volume of the arm (51) and can completely accommodate the arm (51) into the mounting groove (4).
4. The construction guardrail for the town road according to claim 1, wherein the end of the arm (51) near the rotating shaft (52) is provided in a semicircular shape without contacting the inner wall of the installation groove (4).
5. A construction guardrail for town roads according to claim 1, wherein the first connector (7) and the second connector (8) are the same size, and the round mouth diameter is larger than the diameter of the folding rod (2).
6. The construction guardrail for the municipal road according to claim 1, characterized in that the side wall of the outermost support post (1) is fixedly connected with a binding band (10), and the binding band (10) is provided with a buckle.
CN202023012482.2U 2020-12-15 2020-12-15 A construction guardrail for town road Active CN214246882U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023012482.2U CN214246882U (en) 2020-12-15 2020-12-15 A construction guardrail for town road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023012482.2U CN214246882U (en) 2020-12-15 2020-12-15 A construction guardrail for town road

Publications (1)

Publication Number Publication Date
CN214246882U true CN214246882U (en) 2021-09-21

Family

ID=77738302

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023012482.2U Active CN214246882U (en) 2020-12-15 2020-12-15 A construction guardrail for town road

Country Status (1)

Country Link
CN (1) CN214246882U (en)

Similar Documents

Publication Publication Date Title
CN207082303U (en) A kind of Multi-functional exhibition board
CN214246882U (en) A construction guardrail for town road
CN111482213B (en) Urban sewage detection platform and use method thereof
CN212335978U (en) Additional strengthening is handled to ground
CN108128671A (en) Fire water pump truck
CN210976681U (en) A rail guard structure for housing construction uses
CN2883471Y (en) Combined signboard
CN212123260U (en) Pipe fitting rack for civil engineering convenient to adjust
CN207098571U (en) A kind of pipe for cable protection pipe is rested the head on
CN212686183U (en) Pipeline rack for civil construction
CN207536941U (en) A kind of small-size retractable cable work vehicle
CN215407795U (en) Foldable net partition
CN206873496U (en) Inspection shaft structure is used in a kind of municipal administration
CN202745474U (en) Tent bracket
CN211736099U (en) Discharging device of wet-laying waterproof coiled material laying machine
CN207317234U (en) A kind of folding portable air conditioner support
CN213136732U (en) Pipeline placing support for civil engineering
CN219807185U (en) Be used for civil engineering pipe fitting rack
CN206128830U (en) Large -span tent frame
CN207003304U (en) A kind of folding type roadblock warning sign
CN206458061U (en) A kind of building scaffold
CN214173353U (en) Measuring device for tunnel engineering convenient to carry
CN219769737U (en) Stainless steel pipe transfer device for hydraulic engineering
CN217269308U (en) Safety enclosure device for construction
CN205388214U (en) Support of display screen

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant