CN214246586U - Integral prefabricated template structure - Google Patents
Integral prefabricated template structure Download PDFInfo
- Publication number
- CN214246586U CN214246586U CN202023303466.9U CN202023303466U CN214246586U CN 214246586 U CN214246586 U CN 214246586U CN 202023303466 U CN202023303466 U CN 202023303466U CN 214246586 U CN214246586 U CN 214246586U
- Authority
- CN
- China
- Prior art keywords
- template
- connecting pipe
- pipe
- piece
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model provides an integral prefabricated template structure, include: template and connecting pipe, the template is a square flat board, the connecting pipe sets up a plurality of, and is a plurality of the connecting pipe sets up side by side on the first side of template, wear to be equipped with the connecting piece in the template, the connecting piece by the second side of template is worn to establish in the template, just the connecting piece passes expose behind the template the first side of template, and with the connecting pipe is connected, in order to incite somebody to action template and connecting pipe are connected as an organic whole. Through setting up template and connecting pipe, link together both and form prefabricated construction, need not to fix the template once more when using, can use, can greatly improve the efficiency of construction.
Description
Technical Field
The utility model relates to a construction technical field particularly, relates to an integral prefabricated template structure.
Background
At present, in the fields of bridge engineering, municipal engineering and civil engineering, when a concrete structure is poured, a template needs to be erected for pouring, and the existing wood board erecting mode needs to be used for fixing the template repeatedly for many times, so that the erected and reinforced template cannot be reused, and the construction efficiency is low.
Disclosure of Invention
In view of this, the utility model provides an integral prefabricated template structure aims at solving the unable used repeatedly of template that sets up when current template sets up, the lower problem of efficiency of construction.
In one aspect, the utility model provides an integral prefabricated template structure, include: template and connecting pipe, the template is a square flat board, the connecting pipe sets up a plurality of, and is a plurality of the connecting pipe sets up side by side on the first side of template, wear to be equipped with the connecting piece in the template, the connecting piece by the second side of template is worn to establish in the template, just the connecting piece passes expose behind the template the first side of template, and with the connecting pipe is connected, in order to incite somebody to action template and connecting pipe are connected as an organic whole.
Furthermore, a plurality of through holes are uniformly formed in the template, and the through holes are used for enabling the connecting pieces to penetrate through the template.
Furthermore, the connecting piece is a bolt with a T-shaped structure, and the bolt penetrates through the through hole and then is clamped on the template and is connected with a threaded hole formed in the connecting pipe.
Furthermore, the connecting pipe is evenly provided with a plurality of threaded holes, and the threaded holes are opposite to the through holes.
Furthermore, a groove is formed in the through hole in the second side face of the template and used for enabling the end portion of the bolt to be clamped in the groove.
Further, the integral prefabricated formwork structure further comprises: the connecting plate, seted up a plurality of arcs on the connecting plate, the connecting pipe card is established in the arc, the connecting plate is used for right the connecting pipe is fixed a position.
Further, the connecting plate is perpendicularly intersected with the connecting pipe.
Furthermore, the connecting plates are two, and the two connecting plates are respectively arranged at two end parts of the connecting pipe.
Furthermore, pipe clamps are arranged on the connecting pipes, one pipe clamp is arranged on each connecting pipe on two sides of each connecting plate, and the pipe clamps are used for positioning the connecting plates.
Further, the connecting pipe is a steel pipe.
Compared with the prior art, the beneficial effects of the utility model reside in that, through setting up template and connecting pipe, form prefabricated construction after linking together both, need not to fix the template once more again when using, can use, can greatly improve the efficiency of construction.
Further, above-mentioned prefabricated template is integrated into whole to ordinary common template to the size at concrete position that can go on as required is tailor-made, has solved that traditional template construction speed is slow, the recruitment is many, overall stability is poor etc. drawback, and this structure can be better more quick is under construction concrete template engineering, improves construction quality, and it is more convenient to use, and the engineering time of having also greatly saved simultaneously has saved the cost of labor for more efficient construction operation.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to refer to like parts throughout the drawings. In the drawings:
fig. 1 is a bottom view of an integral prefabricated form structure provided by an embodiment of the present invention;
fig. 2 is a front view of an integral prefabricated form structure provided by an embodiment of the present invention;
fig. 3 is a schematic diagram of a template structure provided in an embodiment of the present invention;
fig. 4 is a schematic structural view of a connection plate provided in an embodiment of the present invention.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art. It should be noted that, in the present invention, the embodiments and features of the embodiments may be combined with each other without conflict. The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
Referring to fig. 1-4, the present embodiment provides an integrated prefabricated formwork structure, including: template 1 and connecting pipe 2, template 1 is a square flat board, connecting pipe 2 sets up a plurality of, and is a plurality of connecting pipe 2 sets up side by side on the first side of template 1, wear to be equipped with the connecting piece on the template 1, the connecting piece by the second side of template 1 wears to establish in the template 1, just the connecting piece passes expose behind the template 1 the first side of template 1, and with connecting pipe 2 connects, in order to incite somebody to action template 1 and connecting pipe 2 connect as an organic wholely.
Specifically, a plurality of through holes 11 are uniformly formed in the template 1, and the through holes 11 are used for enabling the connecting pieces to penetrate through the template 1.
Specifically, the connecting piece is a bolt 4 with a T-shaped structure, and the bolt 4 penetrates through the through hole 11 and then is clamped on the template 1 and is connected with a threaded hole formed in the connecting pipe 2.
Particularly, the connecting pipe 2 is evenly provided with a plurality of threaded holes, and the threaded holes are opposite to the through holes 11.
Specifically, a groove is formed in the through hole 11 on the second side surface of the template 1, and the groove is used for clamping the end of the bolt 4.
Particularly, integral prefabricated template structure still include connecting plate 3, a plurality of arcs 31 have been seted up on the connecting plate 3, 2 card of connecting pipe are established in the arc 31, connecting plate 3 is used for right connecting pipe 2 is fixed a position. The connection plate 3 is preferably a metal plate.
Specifically, the connection plate 3 perpendicularly intersects the connection pipe 2.
Specifically, two connection plates 3 are provided, and the two connection plates 3 are provided at both ends of the connection pipe 2.
Specifically, the connecting pipes 2 are provided with pipe clamps, each of the connecting pipes 2 on two sides of the connecting plate 3 is provided with one pipe clamp, and the pipe clamps are used for positioning the connecting plates 3.
Specifically, the connection pipe 2 is a steel pipe.
When the prefabricated formwork is used, the whole formwork can be preprocessed according to the position to be constructed, the connected integral prefabricated formwork 1 is installed to the preset position, concrete pouring is carried out, the integral prefabricated formwork is dismantled after the pouring is finished, and the concrete pouring is carried out next time.
It can be seen that this embodiment is through setting up template and connecting pipe, links together both and forms prefabricated construction, need not to fix the template once more when using, can use, can greatly improve the efficiency of construction.
Further, above-mentioned prefabricated template is integrated into whole to ordinary common template to the size at concrete position that can go on as required is tailor-made, has solved that traditional template construction speed is slow, the recruitment is many, overall stability is poor etc. drawback, and this structure can be better more quick is under construction concrete template engineering, improves construction quality, and it is more convenient to use, and the engineering time of having also greatly saved simultaneously has saved the cost of labor for more efficient construction operation.
It will be apparent to those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims and their equivalents, the present invention is also intended to include such modifications and variations.
Claims (10)
1. An integral prefabricated formwork structure, comprising: template and connecting pipe, the template is a square flat board, the connecting pipe sets up a plurality of, and is a plurality of the connecting pipe sets up side by side on the first side of template, wear to be equipped with the connecting piece in the template, the connecting piece by the second side of template is worn to establish in the template, just the connecting piece passes expose behind the template the first side of template, and with the connecting pipe is connected, in order to incite somebody to action template and connecting pipe are connected as an organic whole.
2. The integral prefabricated formwork structure of claim 1, wherein a plurality of through holes are uniformly formed in the formwork, and the through holes are used for enabling the connecting piece to penetrate through the formwork.
3. The integral prefabricated formwork structure of claim 2, wherein the connecting member is a T-shaped bolt, and the bolt passes through the through hole and is clamped on the formwork and connected with a threaded hole formed in the connecting pipe.
4. The integral prefabricated formwork structure of claim 3, wherein a plurality of threaded holes are uniformly formed on the connecting pipe, and the threaded holes are opposite to the through holes.
5. The one-piece prefabricated formwork structure of claim 3, wherein said through hole of said second side of said formwork is provided with a groove for the end of said bolt to be engaged therein.
6. The unitary prefabricated formwork structure of any one of claims 1-5, further comprising: the connecting plate, seted up a plurality of arcs on the connecting plate, the connecting pipe card is established in the arc, the connecting plate is used for right the connecting pipe is fixed a position.
7. The one-piece prefabricated panel structure of claim 6, wherein said connecting plate perpendicularly intersects said connecting tube.
8. The integrated prefabricated formwork structure of claim 7, wherein there are two connecting plates, and the two connecting plates are respectively disposed at two ends of the connecting pipe.
9. The integral prefabricated formwork structure of claim 6, wherein the connecting pipes are provided with pipe clamps, and each connecting pipe on two sides of the connecting plate is provided with one pipe clamp for positioning the connecting plate.
10. The integrated prefabricated panel structure of claim 1, wherein the connecting pipe is a steel pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023303466.9U CN214246586U (en) | 2020-12-31 | 2020-12-31 | Integral prefabricated template structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023303466.9U CN214246586U (en) | 2020-12-31 | 2020-12-31 | Integral prefabricated template structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214246586U true CN214246586U (en) | 2021-09-21 |
Family
ID=77722715
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023303466.9U Active CN214246586U (en) | 2020-12-31 | 2020-12-31 | Integral prefabricated template structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214246586U (en) |
-
2020
- 2020-12-31 CN CN202023303466.9U patent/CN214246586U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211499799U (en) | Shear force wall reinforcement | |
CN214246586U (en) | Integral prefabricated template structure | |
CN213539740U (en) | A bolt formula connecting device for aluminum alloy template is connected | |
CN219825702U (en) | Prefabricated building unit module | |
CN211257816U (en) | Beam-free floor column cap tool type adjustable template | |
CN211114806U (en) | Reverse ridge formwork reinforcing steel bar fixture | |
CN210917962U (en) | Steel bar truss floor support plate framework | |
CN201850700U (en) | Secondary beam of corrugated web H-shaped steel floor and supporting support rod | |
CN210105293U (en) | Novel flitch is as reinforcement system of template main joist | |
CN212295641U (en) | Adjustable column template device | |
CN220725770U (en) | Novel shear wall reinforcing device | |
CN220767687U (en) | Assembled steel trestle connection system structure | |
CN218715115U (en) | Keel structure made of novel material | |
CN217439558U (en) | Be used for variable cross section to consolidate pull rod support composite set of assembling fast | |
CN215291491U (en) | Quick mounting fixture of both sides wood | |
CN216181461U (en) | Box girder template unit | |
CN115434510B (en) | Building template supporting structure and supporting method thereof | |
CN217998917U (en) | Big wall template connection structure who uses installs fast | |
CN112554556B (en) | Split steel template reinforcing device | |
CN215105464U (en) | Shaped steel post rag crab-bolt and integrated positioner of preventing off normal of post reinforcing bar | |
CN215888983U (en) | Upper reinforcing mesh supporting and positioning device | |
CN203514776U (en) | L-shaped formwork for combined aluminum alloy formwork | |
CN220166711U (en) | Box culvert connected through steel plate socket joint | |
CN215168014U (en) | Shear wall template support piece and strutting arrangement | |
CN215630100U (en) | Template bayonet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |