CN214246243U - Dry-method artificial lump dry-hanging curtain wall system - Google Patents

Dry-method artificial lump dry-hanging curtain wall system Download PDF

Info

Publication number
CN214246243U
CN214246243U CN202022279812.8U CN202022279812U CN214246243U CN 214246243 U CN214246243 U CN 214246243U CN 202022279812 U CN202022279812 U CN 202022279812U CN 214246243 U CN214246243 U CN 214246243U
Authority
CN
China
Prior art keywords
plate
dry
supporting
waterproof
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022279812.8U
Other languages
Chinese (zh)
Inventor
刘备
朱燕明
华建新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hengshang Energy Conservation Technology Co Ltd
Original Assignee
Jiangsu Hengshang Energy Conservation Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Hengshang Energy Conservation Technology Co Ltd filed Critical Jiangsu Hengshang Energy Conservation Technology Co Ltd
Priority to CN202022279812.8U priority Critical patent/CN214246243U/en
Application granted granted Critical
Publication of CN214246243U publication Critical patent/CN214246243U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a curtain system is hung futilely to artificial lump of dry process, belong to the technical field of curtain system, its technical scheme main points are, including supporting layer and decorative layer, supporting layer and decorative layer set gradually to the direction of keeping away from the wall body along being close to the wall body, are provided with waterproof backplate between supporting layer and the decorative layer, and the decorative layer includes top end dysmorphism lump material and standard lump material, and standard lump material piles up a plurality of from top to bottom along one side of waterproof backplate, and standard lump material fissure of displacement piles up, and the screw-thread steel is vertically worn to be equipped with to a plurality of standard lump material, installs waterproof component on the screw-thread steel, and waterproof component is located between the upper and lower two-layer standard lump material. The utility model discloses, the size of the area that can decorate as required makes up the lump material into not equidimension curtain system, does the lump material into the fissure of displacement moreover, in the same direction as the seam outward appearance, and this kind of composition mode is more convenient to later maintenance change, can effectual solution decorate the building block and change the problem of difficulty.

Description

Dry-method artificial lump dry-hanging curtain wall system
Technical Field
The utility model relates to a technical field of curtain system, in particular to artificial lump material of dry process hangs curtain system futilely.
Background
The artificial block comprises: bricks, anticorrosive wood, etc.; traditionally, various clay bricks and non-clay bricks are used as structural walls and veneers for building bricks by adopting concrete. The masonry process is a traditional craftsman manual construction method, needs to adopt a certain technology accumulation and is a labor-intensive process; in recent years, various artificial blocks are used for decorating external walls in large quantity, but most of the artificial blocks adopt the original traditional masonry process.
The prior traditional masonry process has the defects that the decorative masonry engineering quantity is large, a large number of masonry workers are needed, and later maintenance and replacement need to be considered when the decorative masonry block is used as a decorative outer wall, and the masonry block is extremely difficult to maintain, so that the subsequent maintenance is also difficult.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a curtain system is hung futilely to artificial lump material of dry process, the size of the area that can decorate as required makes up the lump material into not equidimension curtain system, does the butt joint with the lump material moreover, in the same direction as seam outward appearance, and this kind of mode of composition is more convenient to later maintenance change, can effectual solution decorate the problem that the building block changed the difficulty.
The above technical purpose of the present invention can be achieved by the following technical solutions:
the utility model provides a curtain system is hung futilely to artificial lump of dry process, includes supporting layer and decorative layer, supporting layer and decorative layer set gradually along being close to the wall body to the direction of keeping away from the wall body, be provided with waterproof backplate between supporting layer and the decorative layer, the decorative layer includes top end lump material and standard lump material, standard lump material has piled up a plurality of from top to bottom along one side of waterproof backplate, standard lump material fissure of displacement piles up, a plurality of standard lump material is vertical to be worn to be equipped with the screw-thread steel, install waterproof component on the screw-thread steel, waterproof component is located between two-layer upper and lower standard lump material, top end lump material sets up the upper and lower both sides at the standard lump material after piling up respectively.
Furthermore, the supporting layer comprises steel stand columns and steel cross beams which are vertically crossed, flat plate embedded parts penetrate through the wall body, steel connecting pieces are welded on the flat plate embedded parts, and the steel stand columns are vertically welded with the steel connecting pieces.
Further, be connected with the link plate of U type on the steel beam, the link plate is including the slab one and the slab two that are parallel to each other, be provided with the slab three between slab one and the slab two perpendicularly, slab one is connected with the steel beam through the connecting piece, hang the mounting that is equipped with the L type on the slab two, the mounting including mutually perpendicular's trip one and trip two, the card is two to be inserted and is equipped with the support and pick the board, the support is picked the board and is supported the below at the bottom of the top lump material.
Furthermore, a connecting bolt vertically penetrates through the second clamping hook and the supporting cantilever plate.
Further, the second plate is sleeved with an anti-slip rubber sheet, and the anti-slip rubber sheet is extruded between the fixing piece and the second plate.
Further, still install the support piece of U type on the steel crossbeam, support piece is including backup pad one and backup pad two that are parallel to each other, install the mounting on the backup pad one, the mounting panel has been alternate in the backup pad two, there is the support through bolted connection on the mounting panel and picks the board.
Furthermore, two supporting and picking plates are symmetrically arranged between the two top and bottom block materials, and a water batching plate is connected between the two supporting and picking plates.
Furthermore, the waterproof assembly comprises a positioning profile clamping piece on the mounting thread steel and a molding adhesive tape inserted on the positioning profile clamping piece.
Furthermore, a side waterproof section bar is arranged between the left side seam and the right side seam of the two standard lump materials, and a side waterproof adhesive tape is embedded on the side waterproof section bar.
To sum up, the utility model discloses following beneficial effect has:
1. through the arrangement of the supporting layer and the decorative layer, a worker firstly installs the supporting layer on the wall body, then installs the waterproof backboard on one side of the supporting layer far away from the wall body, then stacks standard blocks and top-bottom blocks on one side of the waterproof backboard far away from the supporting layer, according to the size of a required project, firstly installs the top-bottom blocks on the bottom, then stacks a plurality of standard blocks on the top-bottom blocks in a staggered way, and then stacks top-bottom blocks on the standard blocks, the assembly mode is more convenient for later maintenance and replacement, and the problem of difficult block replacement can be effectively solved;
2. through the arrangement of the water batching plate and the waterproof assembly, the water batching plate can be arranged between the top bottom block materials, so that water between two adjacent combined block materials can be discharged, meanwhile, a small amount of water flows to the upper part of the water batching plate through the side waterproof adhesive tape and is discharged, and the layered water discharging effect is achieved;
3. through the setting of steel stand and steel crossbeam, can play the effect of support to the decorative layer in one side of wall body, the phenomenon that standard lump material and top bottom lump material after having avoided the combination take place to collapse.
Drawings
FIG. 1 is a schematic longitudinal cross-sectional view of an embodiment for embodying the present invention;
FIG. 2 is an enlarged schematic structural view of a portion A of FIG. 1;
FIG. 3 is an enlarged schematic structural view of a portion B in FIG. 1 according to an exemplary embodiment;
FIG. 4 is an enlarged schematic structural view of a portion C in FIG. 1 according to an exemplary embodiment;
FIG. 5 is a schematic transverse cross-section of an embodiment for embodying the invention;
FIG. 6 is an enlarged schematic view of a portion D in FIG. 5;
FIG. 7 is a front block layout view of an embodiment for embodying the present invention;
in the figure, 1, a support layer; 101. a steel upright post; 102. a steel beam; 2. a decorative layer; 201. top and bottom block materials; 202. standard lump materials; 3. a waterproof backing sheet; 4. a flat plate embedded part; 5. a steel connector; 6. deformed steel bar; 7. a waterproof assembly; 701. positioning the profile clamping piece; 702. molding an adhesive tape; 8. hanging the plate; 801. a first plate sheet; 802. a second plate sheet; 803. a third plate sheet; 9. a fixing member; 901. a first clamping hook; 902. a second clamping hook; 10. supporting the cantilever plate; 11. A connecting bolt; 12. an anti-skid rubber sheet; 13. a support member; 1301. a first support plate; 1302. a second support plate; 14. Mounting a plate; 15. a water-batching plate; 16. side waterproof section bar; 17. side waterproof rubber strip.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
In which like parts are designated by like reference numerals. It should be noted that the terms "front," "back," "left," "right," "upper" and "lower" used in the following description refer to directions in the drawings, and the terms "bottom" and "top," "inner" and "outer" refer to directions toward and away from, respectively, the geometric center of a particular component.
Example (b):
a dry-method artificial block dry-hanging curtain wall system is shown in figure 1 and comprises a supporting layer 1 and a decorative layer 2, wherein the supporting layer 1 and the decorative layer 2 are sequentially arranged along the direction close to a wall body and far away from the wall body, and a waterproof back plate 3 is arranged between the supporting layer 1 and the decorative layer 2.
As shown in fig. 1, the supporting layer 1 includes a steel upright column 101 and a steel cross beam 102 which are arranged in a vertical cross manner, a slab embedded part 4 is arranged in the wall body in a penetrating manner, a steel connecting part 5 is welded on the slab embedded part 4, and the steel upright column 101 is vertically welded with the steel connecting part 5. Through the arrangement of the steel upright columns 101 and the steel cross beams 102, a supporting framework is arranged outside the wall body, and the structural stability of the whole project is facilitated.
As shown in fig. 1 and 2, the decorative layer 2 includes a top bottom block 201 and a plurality of standard blocks 202, the standard blocks 202 are stacked up and down along one side of the waterproof backboard 3, and a plurality of standard blocks 202 are stacked in staggered manner from layer to layer (as shown in fig. 7). Meanwhile, the deformed steel bars 6 vertically penetrate through the standard blocks 202, the waterproof assemblies 7 are mounted on the deformed steel bars 6, the waterproof assemblies 7 are located between the upper layer of standard blocks 202 and the lower layer of standard blocks 202, and the top-bottom block 201 is respectively arranged on the upper side and the lower side of the stacked standard blocks 202. The waterproof assembly 7 comprises a positioning profile clamping piece 701 arranged on the mounting screw-thread steel 6 and a molding adhesive tape 702 inserted on the positioning profile clamping piece 701.
As shown in fig. 1 and 2, workers can combine different numbers of standard blocks 202 and top and bottom blocks 201 into decorative layers 2 of different specifications according to the size of the required project, and the combined mode is convenient for later maintenance and replacement, and can effectively solve the problem of difficulty in replacing decorative blocks. Through the setting of waterproof component 7, when being favorable to rainwater weather, each constitutes the discharge of the rainwater between decorative layer 2.
As shown in fig. 1 and 3, in order to stably connect decorative layer 2 with supporting layer 1, U-shaped hanging plate 8 is connected to steel beam 102, hanging plate 8 includes a first plate 801 and a second plate 802 which are parallel to each other, a third plate 803 is vertically arranged between first plate 801 and second plate 802, and first plate 801 is connected with steel beam 102 through a connecting piece. The L-shaped fixing piece 9 is hung on the second plate 802, the fixing piece 9 comprises a first clamping hook 901 and a second clamping hook 902 which are perpendicular to each other, a supporting pick-up plate 10 is inserted into the second clamping hook 902, the supporting pick-up plate 10 is supported below the top bottom block 201, a connecting bolt 11 vertically penetrates through the second clamping hook 902 and the supporting pick-up plate 10, and the connecting bolt 11 penetrates through the second clamping hook 902 and the supporting pick-up plate 10.
As shown in fig. 1 and 3, the supporting cantilever plate 10 is inserted into the second hook 902, so that the top and bottom blocks 201 and the steel beam 102 are connected, and a stable supporting function is provided for the stacking of the standard blocks 202.
As shown in fig. 3, the second plate 802 is sleeved with the anti-slip rubber 12, the anti-slip rubber 12 is extruded between the fixing member 9 and the second plate 802, and the anti-slip rubber 12 can increase the friction force between the fixing member 9 and the second plate 802, so as to improve the connection stability between the second plate 802 and the fixing member 9. Meanwhile, a connecting bolt 11 vertically penetrates through the second hook 902, and the connecting bolt 11 penetrates through the second hook 902 and the supporting cantilever plate 10 and is sleeved with a nut.
As shown in fig. 1 and 4, a U-shaped supporting member 13 is further mounted on the steel beam 102, the supporting member 13 includes a first supporting plate 1301 and a second supporting plate 1302 which are parallel to each other, a fixing member 9 is mounted on the first supporting plate 1301, a mounting plate 14 is inserted into the second supporting plate 1302, and a supporting cantilever plate 10 is connected to the mounting plate 14 through a bolt. Two supporting and picking plates 10 are symmetrically arranged between the two top bottom block materials 201, a water batching plate 15 is connected between the two supporting and picking plates 10, water between the two top bottom block materials 201 is discharged along the water batching plate 15, and the phenomenon that rainwater enters between the decorative layer 2 and the supporting layer 1 in rainy days is reduced.
As shown in fig. 1 and 5, in order to further enhance the waterproof effect of the decorative layer 2, a side waterproof profile 16 (shown in fig. 6) is installed between the left and right side seams of the two standard blocks 202. The side waterproof section bar 16 is embedded with a side waterproof adhesive tape 17, and a small part of water flows downwards to the upper part of the water batching plate 15 through the side waterproof adhesive tape 17 and is discharged, so that the layered water discharging effect is achieved.
The specific implementation process comprises the following steps: when a worker installs the secondary curtain wall system, firstly the flat embedded parts 4 are inserted on the wall body, then the steel connecting parts 5 are welded on the flat embedded parts 4, and then the steel upright posts 101 and the steel cross beams are crossed and welded with the steel connecting parts 5. The hanging plate 8 is then mounted in the steel beam 102 by bolts, and the supporting pick-up plate 10 is mounted below the top bottom block 201 by the fixing member 9. Meanwhile, the support piece 13 is also mounted on the steel beam 102 through bolts, so that two supporting and cantilever plates 10 are symmetrically mounted between the two top and bottom blocks 201, and the water batch plate 15 is arranged between the two supporting and cantilever plates 10. And a waterproof back plate 3 is arranged on one side of the steel beam 102 far away from the wall body. Standard blocks 202 are then stacked and installed on one side of the waterproof backing 3, and combined into blocks of different areas according to the size of the desired curtain wall system.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications to the present embodiment without inventive contribution as required after reading the present specification, but all of them are protected by patent laws within the scope of the claims of the present invention.

Claims (9)

1. The utility model provides a curtain system is hung futilely to artificial lump of dry process which characterized in that: the waterproof backing plate comprises a supporting layer (1) and a decoration layer (2), wherein the supporting layer (1) and the decoration layer (2) are sequentially arranged along a direction close to a wall body and far away from the wall body, a waterproof backing plate (3) is arranged between the supporting layer (1) and the decoration layer (2), the decoration layer (2) comprises top bottom block materials (201) and standard block materials (202), the standard block materials (202) are vertically stacked along one side of the waterproof backing plate (3), the standard block materials (202) are staggered and stacked, threaded steel (6) vertically penetrate through the standard block materials (202), waterproof assemblies (7) are installed on the threaded steel (6), the waterproof assemblies (7) are located between the upper layer of standard block materials (202) and the lower layer of standard block materials (202), and the top bottom block materials (201) are respectively arranged on the upper side and the lower side of the stacked standard block materials (202).
2. The dry-process artificial block dry-hanging curtain wall system according to claim 1, wherein: the supporting layer (1) comprises steel upright columns (101) and steel cross beams (102) which are vertically crossed, a flat plate embedded part (4) penetrates through the wall body, a steel connecting piece (5) is welded on the flat plate embedded part (4), and the steel upright columns (101) are vertically welded with the steel connecting piece (5).
3. The dry-process artificial block dry-hanging curtain wall system according to claim 2, wherein: the steel beam (102) is connected with a U-shaped hanging plate (8), the hanging plate (8) comprises a first plate (801) and a second plate (802) which are parallel to each other, a third plate (803) is vertically arranged between the first plate (801) and the second plate (802), the first plate (801) is connected with the steel beam (102) through a connecting piece, an L-shaped fixing piece (9) is hung on the second plate (802), the fixing piece (9) comprises a first mutually perpendicular clamping hook (901) and a second clamping hook (902), a supporting cantilever plate (10) is inserted into the second clamping hook (902), and the supporting cantilever plate (10) is supported below the top bottom block material (201).
4. The dry-process artificial block dry-hanging curtain wall system according to claim 3, wherein: and a connecting bolt (11) vertically penetrates through the second clamping hook (902), and the connecting bolt (11) penetrates through the second clamping hook (902) and the supporting cantilever plate (10).
5. The dry-process artificial block dry-hanging curtain wall system according to claim 3, wherein: and an anti-slip rubber sheet (12) is sleeved on the second plate sheet (802), and the anti-slip rubber sheet (12) is extruded between the fixing piece (9) and the second plate sheet (802).
6. The dry-process artificial block dry-hanging curtain wall system according to claim 2, wherein: the steel beam (102) is further provided with a U-shaped supporting piece (13), the supporting piece (13) comprises a first supporting plate (1301) and a second supporting plate (1302) which are parallel to each other, a fixing piece (9) is installed on the first supporting plate (1301), an installing plate (14) is inserted into the second supporting plate (1302), and the installing plate (14) is connected with a supporting and picking plate (10) through bolts.
7. The dry-process artificial block dry-hanging curtain wall system according to claim 6, wherein: two supporting and picking plates (10) are symmetrically arranged between the two top and bottom block materials (201), and a water batching plate (15) is connected between the two supporting and picking plates (10).
8. The dry-process artificial block dry-hanging curtain wall system according to claim 1, wherein: the waterproof assembly (7) comprises a positioning profile clamping piece (701) arranged on the mounting thread steel (6) and a molding adhesive tape (702) inserted on the positioning profile clamping piece (701).
9. The dry-process artificial block dry-hanging curtain wall system according to claim 1, wherein: a side waterproof section bar (16) is arranged between the left side seam and the right side seam of the two standard block materials (202), and a side waterproof rubber strip (17) is embedded on the side waterproof section bar (16).
CN202022279812.8U 2020-10-13 2020-10-13 Dry-method artificial lump dry-hanging curtain wall system Active CN214246243U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022279812.8U CN214246243U (en) 2020-10-13 2020-10-13 Dry-method artificial lump dry-hanging curtain wall system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022279812.8U CN214246243U (en) 2020-10-13 2020-10-13 Dry-method artificial lump dry-hanging curtain wall system

Publications (1)

Publication Number Publication Date
CN214246243U true CN214246243U (en) 2021-09-21

Family

ID=77729362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022279812.8U Active CN214246243U (en) 2020-10-13 2020-10-13 Dry-method artificial lump dry-hanging curtain wall system

Country Status (1)

Country Link
CN (1) CN214246243U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114991365A (en) * 2022-08-01 2022-09-02 江苏恒尚节能科技股份有限公司 Dry-method artificial lump dry-hanging curtain wall system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114991365A (en) * 2022-08-01 2022-09-02 江苏恒尚节能科技股份有限公司 Dry-method artificial lump dry-hanging curtain wall system

Similar Documents

Publication Publication Date Title
CN109736504B (en) Detachable suspended ceiling edge keel system and construction method thereof
CN201649623U (en) Large basement shearing wall truss type steel tube unilateral formwork supporting structure
CN110409811B (en) Non-dismantling forming column template containing reinforcement cage, template structure and building process
CN109811938B (en) Assembled filling wall and frame system connected in rail clamping groove mode and construction method thereof
CN110409813B (en) Non-dismantling forming beam template containing reinforcement cage, template structure and building process
CN103806647A (en) Assembly and disassembly process for large-span concrete bidirectional dense rib beam formwork case
CN214246243U (en) Dry-method artificial lump dry-hanging curtain wall system
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN108625485A (en) A kind of steel bar girder plate end connecting joint structure and construction method
CN113958138A (en) Green formwork system construction method
CN206581577U (en) Using housing construction builder's jack
CN107882244A (en) A kind of construction method of steel bar truss floor support plate
CN105155836A (en) Aluminum alloy formwork for buildings and method for applying aluminum alloy formwork
CN103993683A (en) Industrial factory building outer wall and mounting process thereof
CN111852063A (en) Construction method for renovating and reforming large building roof
CN109914792B (en) Underground garage beam formwork construction method
CN216840143U (en) Steel bar truss floor bearing plate with detachable aluminum bottom mold
CN212428077U (en) Stair step template construction structures
CN201687199U (en) Corridor gutter formed molding board
CN211899408U (en) Building outer wall dry-hanging stone structure
CN111997345B (en) Lifting scaffold hangs hoist system upside down
CN211369529U (en) A template for expansion joint department
CN210013362U (en) Assembled oblique roofing construction structures
CN106150080A (en) Early tear assembly type plastic form construction technology open
CN208830725U (en) A kind of wall single side formwork bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant