CN214235221U - Underground middle section mining mechanism for mining of non-ferrous metals in mine engineering - Google Patents

Underground middle section mining mechanism for mining of non-ferrous metals in mine engineering Download PDF

Info

Publication number
CN214235221U
CN214235221U CN202022399264.2U CN202022399264U CN214235221U CN 214235221 U CN214235221 U CN 214235221U CN 202022399264 U CN202022399264 U CN 202022399264U CN 214235221 U CN214235221 U CN 214235221U
Authority
CN
China
Prior art keywords
mining
fixedly connected
motor
mounting frame
baffle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022399264.2U
Other languages
Chinese (zh)
Inventor
董金松
丁军明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Boze Mining Engineering Co ltd
Original Assignee
Yunnan Boze Mining Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Boze Mining Engineering Co ltd filed Critical Yunnan Boze Mining Engineering Co ltd
Priority to CN202022399264.2U priority Critical patent/CN214235221U/en
Application granted granted Critical
Publication of CN214235221U publication Critical patent/CN214235221U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cleaning By Liquid Or Steam (AREA)

Abstract

The utility model discloses an underground middle section mining mechanism for mining engineering nonferrous metal in the technical field of mineral production, which comprises a mining mechanism body, a heating pipe, a first motor, a water pump and a second motor, wherein the mining mechanism body is arranged on a mounting seat, and the surface of the mounting seat is fixedly connected with a mounting frame, a heating pipe is arranged in the mounting frame, the surface of the mounting frame is fixedly connected with a first motor, a first rotating shaft is arranged in the first motor, one end of the first rotating shaft is fixedly connected with fan blades, the surface of the mounting rack is fixedly connected with a dust guard, the top end of the mounting rack is fixedly connected with a baffle plate, and the surface cover of baffle has the film that catchments, the utility model provides a current mining mechanism receives the wet influence to make a large amount of steam of surface adhesion influence part life easily and the problem of a large amount of dusts of a large amount of steam adhesion behind the equipment surface easily in underground mining in-process.

Description

Underground middle section mining mechanism for mining of non-ferrous metals in mine engineering
Technical Field
The utility model relates to a mineral products production technical field specifically is an underground middle section mining mechanism for mining engineering non ferrous metal exploitation.
Background
Mineral resources are products of earth crust in the long-term forming, developing and evolving processes, natural minerals are formed by gathering under certain geological conditions through certain geological action, different types of mineral products can be formed under different geological actions, most of the mineral resources are distributed underground, so that an open-time mechanism is required to be installed underground for underground mining in the mining process, but the underground environment has high moisture due to high water vapor, the mining mechanism is easy to damp in underground operation for a long time, the service life of parts is low, and the mining mechanism is affected by moisture due to long-time low moisture, a large amount of water vapor is adhered to the surface, a large amount of dust is easy to adhere to the surface and is difficult to clean.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an underground middle section mining mechanism for mining engineering non ferrous metal exploitation to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: an underground middle section mining mechanism for mining of nonferrous metals in mine engineering comprises a mining mechanism body, a heating pipe, a first motor, a water pump and a second motor, wherein the mining mechanism body is installed on an installation seat, the surface of the installation seat is fixedly connected with an installation frame, the heating pipe is installed inside the installation frame, the surface of the installation frame is fixedly connected with the first motor, a first rotating shaft is installed inside the first motor, one end of the first rotating shaft is fixedly connected with a fan blade, the surface of the installation frame is fixedly connected with a dust guard, the top end of the installation frame is fixedly connected with a baffle, the surface of the baffle is sleeved with a water collecting film, the top end surface of the installation frame is fixedly connected with an inserted rod, the top end surface of the installation frame is fixedly connected with the water pump, the water pump is internally provided with a contraction water pipe, and the inner wall of the installation frame is fixedly connected with the second motor, and the internally mounted of second motor has the second axis of rotation, the one end fixedly connected with lead screw of second axis of rotation, and the lead screw is installed in the installation piece, the surface cover of lead screw has the slider, and the surface mounting of slider has the sprinkler bead, the inner wall fixedly connected with gag lever post of mounting bracket, the fixed surface of mount pad is connected with the support frame.
Preferably, the surface of the mounting seat is provided with uniformly distributed water flowing grooves.
Preferably, the baffle is mounted on the top end surface of the mounting frame to form a sealed space, the water collecting film covers the surface of the baffle, the inserted link is mounted inside the baffle, and the water pump is mounted inside the baffle.
Preferably, the two groups of mounting blocks are symmetrically arranged on the inner wall of the mounting frame.
Preferably, the surface of the sliding block is provided with three groups of holes, the inner wall of the hole in the middle of the sliding block is provided with threads, and the two groups of limiting rods are inserted into the holes formed in the sliding block.
Preferably, the sprinkler bead sets up to five and is equidistance distribution, and sprinkler bead and shrink water piping swing joint.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model is installed and installed in the installation seat when the mining mechanism body is not used, and the water collecting film covers the surface of the baffle plate to collect water vapor, so that the water vapor is adhered on the surface of the water collecting film to form water drops, the water flows into the baffle plate through the inserted link and is stored, the collected water vapor is sprayed out from the water spray head through the operation of the water pump, the dust on the surface of the mining mechanism body is cleaned, the position of the sliding block can be adjusted through the operation of the second motor in the cleaning process, after the cleaning is finished, the heating pipe is started to generate heat, the first motor operates to drive the fan blades to rotate to generate wind power, the heat generated by the heating pipe is blown to the surface of the mining mechanism body, to mining mechanism body surface drying, the utility model provides a current mining mechanism receives the wet influence to make a large amount of steam of surface adhesion influence part life easily and the problem of a large amount of dusts of a large amount of steam adhesion behind the equipment surface easily by the wet influence of underground mining in-process.
Drawings
FIG. 1 is a schematic sectional view of the structure of the present invention;
FIG. 2 is a schematic side view of the structure of the present invention;
fig. 3 is a schematic side view of the structure of the present invention.
In the figure: 1. a mining mechanism body; 2. a mounting seat; 3. a mounting frame; 4. heating a tube; 5. a first motor; 6. a first rotating shaft; 7. a fan blade; 8. a dust-proof plate; 9. a baffle plate; 10. a water-collecting film; 11. inserting a rod; 12. a water pump; 13. shrinking the water pipe; 14. a second motor; 15. a second rotating shaft; 16. a screw rod; 17. a mounting seat; 18. a slider; 19. a sprinkler head; 20. a limiting rod; 21. a support frame.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: an underground middle section mining mechanism for mining nonferrous metals in mine engineering comprises a mining mechanism body 1, a heating pipe 4, a first motor 5, a water pump 12 and a second motor 14, wherein the mining mechanism body 1 is installed on an installation seat 2, the surface of the installation seat 2 is fixedly connected with an installation frame 3, the heating pipe 4 is installed inside the installation frame 3, the surface of the installation frame 3 is fixedly connected with the first motor 5, the first motor 5 is installed inside the first motor 5, one end of the first motor 6 is fixedly connected with a fan blade 7, the surface of the installation frame 3 is fixedly connected with a dust-proof plate 8, the top end of the installation frame 3 is fixedly connected with a baffle plate 9, the surface of the baffle plate 9 is sleeved with a water collecting film 10, the surface of the top end of the installation frame 3 is fixedly connected with an inserted link 11, the surface of the top end of the installation frame 3 is fixedly connected with the water pump 12, and the inside of the water pump 12 is provided with a contraction water pipe 13, the inner wall fixedly connected with second motor 14 of mounting bracket 3, and the internally mounted of second motor 14 has second axis of rotation 15, the one end fixedly connected with lead screw 16 of second axis of rotation 15, and lead screw 16 installs in installation piece 17, and the surface cover of lead screw 16 has slider 18, and the surface mounting of slider 18 has sprinkler bead 19, the inner wall fixedly connected with gag lever post 20 of mounting bracket 3, the fixed surface of mount pad 2 is connected with support frame 21.
The surface of the mounting seat 2 is provided with evenly distributed water flowing grooves, and the water flowing grooves on the surface of the mounting seat 2 enable the water spraying head 19 to flow out of the cleaned sewage along the water flowing grooves after cleaning the mining mechanism body 1;
the baffle 9 is arranged on the top end surface of the mounting frame 3 to form a sealed space, the water collecting film 10 covers the surface of the baffle 9, the inserted link 11 is arranged inside the baffle 9, the water pump 12 is arranged inside the baffle 9, a closed space is formed by the baffle 9, so that after the water collecting film 10 covers the surface of the baffle 9 and stands for a long time, water vapor can be condensed into water drops on the surface of the water collecting film 10, the water drops flow into the baffle 9 through the inserted link 11 to be collected, the collected water drops can be sprayed out from the water spray head 19 through the operation of the water pump 12, and the mining mechanism body 1 is cleaned;
the two groups of mounting blocks 17 are symmetrically arranged on the inner wall of the mounting frame 3, and the installation of the mounting blocks 17 improves the sliding stability of the sliding block 18 on the surface of the screw rod 16, so that the sprinkler head 19 can clean the whole mining mechanism body 1;
three groups of holes are formed in the surface of the sliding block 18, threads are formed in the inner wall of the hole in the middle of the sliding block 18, and two groups of limiting rods 20 are inserted into the holes formed in the sliding block 18, so that the rotation of the screw rod 16 in the threaded hole in the sliding block 18 is improved, the sliding block 18 can slide on the screw rod 16, and the whole mining mechanism body 1 is cleaned above the mining mechanism body 1;
the sprinkler bead 19 sets up to five groups and is the equidistance and distributes, and sprinkler bead 19 and shrinkage pool 13 swing joint improve five groups of sprinkler bead 19 parallel distribution for the sprinkler bead 19 is more thorough to mining mechanism body 1 abluent.
The working principle is as follows: according to the attached drawings 1-3, a sealed space is formed on the surface of the mounting frame 3 through the baffle 9, the water-collecting film 10 covers the surface of the baffle 9 for a long time, as a result, after standing for a while, underground water vapor can be condensed into water drops on the surface of the water-collecting film 10, the water drops can flow into the baffle 9 along the inserted link 11 after being much, the water drops in the baffle 9 are pumped out through the operation of the water pump 12, so that water is input from the shrinkage water pipe 13 to the water spray head 19 to be sprayed out, the surface of the mining mechanism body 1 is cleaned, meanwhile, the second motor 14 is started to be connected with the second rotating shaft 15 to rotate, the second rotating shaft 15 drives the screw rod 16 to rotate in the slide block 18, the screw rod 16 is meshed with a threaded hole arranged in the slide block 18 to rotate, the slide block 18 horizontally on the screw rod 16, and the whole mining mechanism body 1 is cleaned above the mining mechanism body 1, after the mining mechanism body 1 is cleaned, the heating pipe 4 is started to operate to generate heat, the first motor 5 is started to operate, the first motor 5 is connected with the first rotating shaft 6 to drive the fan blades 7 to rotate to generate wind power, the heat generated by the heating pipe 4 is blown to the surface of the mining mechanism body 1, and the surface of the mining mechanism body 1 is dried.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an underground middle section mining mechanism for mining engineering non ferrous metal mining, includes mining mechanism body (1), heating pipe (4), first motor (5), water pump (12) and second motor (14), its characterized in that: the mining mechanism comprises a mining mechanism body (1), a mounting frame (3) and a mounting frame (3), wherein the mounting frame (2) is fixedly connected with the surface of the mining mechanism body, a heating pipe (4) is arranged inside the mounting frame (3), a first motor (5) is fixedly connected with the surface of the mounting frame (3), a first rotating shaft (6) is arranged inside the first motor (5), a fan blade (7) is fixedly connected with one end of the first rotating shaft (6), a dust guard (8) is fixedly connected with the surface of the mounting frame (3), a baffle (9) is fixedly connected with the top end of the mounting frame (3), a water collecting film (10) is sleeved on the surface of the baffle (9), an inserting rod (11) is fixedly connected with the surface of the top end of the mounting frame (3), a water pump (12) is fixedly connected with the surface of the top end of the mounting frame (3), and a shrinkage water pipe (13) is arranged inside the water pump (12), the utility model discloses a water spraying installation structure, including mounting bracket (3), inner wall fixedly connected with second motor (14) of mounting bracket (3), and the internally mounted of second motor (14) has second axis of rotation (15), the one end fixedly connected with lead screw (16) of second axis of rotation (15), and lead screw (16) install in installation piece (17), the surface cover of lead screw (16) has slider (18), and the surface mounting of slider (18) has sprinkler bead (19), the inner wall fixedly connected with gag lever post (20) of mounting bracket (3), the fixed surface of mount pad (2) is connected with support frame (21).
2. The underground middle section mining mechanism for mining engineering nonferrous metal mining of claim 1, wherein: and the surface of the mounting seat (2) is provided with water flowing grooves which are uniformly distributed.
3. The underground middle section mining mechanism for mining engineering nonferrous metal mining of claim 1, wherein: the water collecting device is characterized in that the baffle (9) is installed on the top end surface of the installation frame (3) to form a sealed space, the water collecting film (10) covers the surface of the baffle (9), the inserted rod (11) is installed inside the baffle (9), and the water pump (12) is installed inside the baffle (9).
4. The underground middle section mining mechanism for mining engineering nonferrous metal mining of claim 1, wherein: two sets of installation piece (17) are the symmetric distribution and install on the inner wall of mounting bracket (3).
5. The underground middle section mining mechanism for mining engineering nonferrous metal mining of claim 1, wherein: the surface of the sliding block (18) is provided with three groups of holes, the inner wall of the hole in the middle of the sliding block (18) is provided with threads, and the two groups of limiting rods (20) are inserted into the holes formed in the sliding block (18).
6. The underground middle section mining mechanism for mining engineering nonferrous metal mining of claim 1, wherein: the sprinkler heads (19) are arranged into five groups and distributed equidistantly, and the sprinkler heads (19) are movably connected with the shrinkage water pipe (13).
CN202022399264.2U 2020-10-26 2020-10-26 Underground middle section mining mechanism for mining of non-ferrous metals in mine engineering Active CN214235221U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022399264.2U CN214235221U (en) 2020-10-26 2020-10-26 Underground middle section mining mechanism for mining of non-ferrous metals in mine engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022399264.2U CN214235221U (en) 2020-10-26 2020-10-26 Underground middle section mining mechanism for mining of non-ferrous metals in mine engineering

Publications (1)

Publication Number Publication Date
CN214235221U true CN214235221U (en) 2021-09-21

Family

ID=77730375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022399264.2U Active CN214235221U (en) 2020-10-26 2020-10-26 Underground middle section mining mechanism for mining of non-ferrous metals in mine engineering

Country Status (1)

Country Link
CN (1) CN214235221U (en)

Similar Documents

Publication Publication Date Title
JP2016030255A (en) Wiper for performing cleaning and snow removal of solar panel
CN208141725U (en) A kind of outdoor LED display screen convenient for removing surface dirt
CN214235221U (en) Underground middle section mining mechanism for mining of non-ferrous metals in mine engineering
CN116624406A (en) Axial-flow type energy-saving ventilator
CN204126931U (en) Wind Volume durable type blower fan
CN205501963U (en) Be applied to trash rack of medium and small river waterfall water treatment engineering
CN207954357U (en) A kind of dustproof construction of inner circle cutting machine
CN114979431B (en) Road bridge construction supervision system based on BIM technology
CN111384892A (en) Solar photovoltaic panel assembly
CN204928728U (en) Two motor drive solar photovoltaic board self -cleaning devices
CN213783951U (en) Dampproofing treatment facility of hydraulic and hydroelectric engineering equipment
CN211119225U (en) Ceiling lamp groove for architectural decoration
CN210599503U (en) Coal mine operation ventilation unit
CN210469218U (en) Solar photovoltaic support with clean function
CN207766202U (en) Photovoltaic cell supporting rack
CN208537534U (en) A kind of underground water pollution detection device
CN214094410U (en) Forced-exhaust environment-friendly energy-saving steam generator
CN220568207U (en) Flowmeter protector
CN204906304U (en) Single motor drive solar photovoltaic board self -cleaning device
CN220938821U (en) Automatic dehumidifier for civil air defense ventilation tunnel
CN218493715U (en) Large-scale water type power generation device
CN110653787A (en) Automobile part five-work-department integrated intelligent manufacturing production line
CN210780193U (en) Solar power supply device of monitoring system
CN207749189U (en) A kind of steel pipe internal-surface acid dip pickle
CN219139146U (en) Steam turbine with reduce oil blanket carbon deposit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant