CN214221200U - Quick installation device of interim plank road in tunnel - Google Patents

Quick installation device of interim plank road in tunnel Download PDF

Info

Publication number
CN214221200U
CN214221200U CN202023182167.4U CN202023182167U CN214221200U CN 214221200 U CN214221200 U CN 214221200U CN 202023182167 U CN202023182167 U CN 202023182167U CN 214221200 U CN214221200 U CN 214221200U
Authority
CN
China
Prior art keywords
angle steel
sleeve
plank road
base
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023182167.4U
Other languages
Chinese (zh)
Inventor
黄文宝
唐王龙
林春旭
蒋浩
蒋洪
叶辽羽
莫海钊
杨成
李罡烨
林悦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202023182167.4U priority Critical patent/CN214221200U/en
Application granted granted Critical
Publication of CN214221200U publication Critical patent/CN214221200U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a quick installation device of interim plank road in tunnel, including pole setting and cover in pole setting upper portion and with pole setting fixed connection's sleeve, be provided with on the sleeve with the sleeve even base as an organic whole, through bolt fixedly connected with left side support bar and right side support bar symmetrically on the base. The utility model discloses a fix left side bracing piece and right side bracing piece at the base through the bolt, form firm supporting platform, the footboard install on this supporting platform can, can accelerate interim plank road horizon bar and montant installation like this and demolish efficiency, improve cyclic utilization efficiency and reduce the potential safety hazard, the device batch production of being convenient for simultaneously. Therefore, the utility model discloses the installation reduces the staff in a large number with demolising the in-process, has reduced intensity of labour, and the equal recyclable of each component after the plank road is demolishd reduces unnecessary extravagant, improves interim plank road safety in utilization performance simultaneously.

Description

Quick installation device of interim plank road in tunnel
Technical Field
The utility model relates to a quick installation device of interim plank road in tunnel belongs to the interim plank road technical field of tunnel engineering.
Background
When the shield tunneling machine is adopted to construct a subway tunnel, a storage battery car is required to transport prefabricated tunnel pipe pieces and excavated soil bodies, so that field operation personnel can safely shuttle in the tunnel under construction, and temporary trestle roads are required to be lapped on the tunnel pipe pieces. The temporary plank road is composed of a pedal, a transverse horizontal rod, a longitudinal horizontal rod and a vertical rod, wherein the pedal is an independent component and is placed on a platform which is well installed and is lapped by the longitudinal and transverse horizontal rods. The horizontal pole with great ease that uses in the engineering passes through welded connection in the pole setting at present, and the installation needs expend a large amount of manpower and materials with demolising, but the large cyclic utilization ratio of member loss after demolising is low moreover, and the welding process requires highly and welding defect causes the incident easily simultaneously.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an ann tears quick installation device of convenient, the cost-effective, repeatedly usable's interim plank road in tunnel open to compensate not enough among the prior art.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a quick installation device of interim plank road in tunnel, includes pole setting and the sleeve of cover in pole setting upper portion and with pole setting fixed connection, is provided with the base even as an organic whole with the sleeve on the sleeve, through bolt fixedly connected with left side bracing piece and right side bracing piece symmetrically on the base.
Further, two right angle grooves have been seted up symmetrically on the base, left side bracing piece and right side bracing piece be right angle shape angle steel construction, and left side bracing piece and right side bracing piece pass through the bolt to be fixed respectively at two right angle inslot.
Further, the right-angle-shaped angle steel structure comprises transverse angle steel and longitudinal angle steel, butt joints matched with each other are arranged at the end parts of the transverse angle steel and the longitudinal angle steel, and the transverse angle steel and the longitudinal angle steel are combined together through the butt joints to form the right-angle-shaped angle steel structure.
Further, the sleeve is fixed on the vertical rod through a screw.
Since the technical scheme is used, the utility model discloses an advantage has below: the utility model discloses a fix left side bracing piece and right side bracing piece at the base through the bolt, form firm supporting platform, the footboard install on this supporting platform can, can accelerate interim plank road horizon bar and montant installation like this and demolish efficiency, improve cyclic utilization efficiency and reduce the potential safety hazard, the device batch production of being convenient for simultaneously. Therefore, the utility model discloses the installation reduces the staff in a large number with demolising the in-process, has reduced intensity of labour, and the equal recyclable of each component after the plank road is demolishd reduces unnecessary extravagant, improves interim plank road safety in utilization performance simultaneously.
Drawings
Fig. 1 is a perspective view of a schematic structural view of the present invention;
fig. 2 is a top view of the structural schematic diagram of the present invention.
Description of reference numerals: 1-vertical rod, 2-sleeve, 3-base, 4-left side support rod, 5-right side support rod, 6-bolt, 7-tunnel segment, 8-transverse angle steel, 9-longitudinal angle steel and 10-butt joint.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The embodiment of the utility model provides a: referring to fig. 1 and 2, a fast installation device for temporary tunnels comprises an upright rod 1 and a sleeve 2 sleeved on the upper part of the upright rod 1 and fixedly connected with the upright rod 1, wherein a base 3 connected with the sleeve 2 into a whole is arranged on the sleeve 2, and a left support rod 4 and a right support rod 5 are symmetrically and fixedly connected to the base 3 through bolts 6. Two right angle grooves have been seted up symmetrically on base 3, left side bracing piece 4 and right side bracing piece 5 be right angle shape angle steel structure, and left side bracing piece 4 and right side bracing piece 5 pass through bolt 6 to be fixed respectively at two right angle inslot. The right-angle-shaped angle steel structure comprises transverse angle steel 8 and longitudinal angle steel 9, the end parts of the transverse angle steel 8 and the longitudinal angle steel 9 are provided with butt joints 10 which are matched with each other, the transverse angle steel 8 and the longitudinal angle steel 9 are combined together through the butt joints 10 to form a right-angle-shaped angle steel structure, and therefore the left side support rod 4 and the right side support rod 5 can be split into the transverse angle steel 8 and the longitudinal angle steel 9, so that the storage and the transportation are facilitated. The sleeve 2 is fixed on the upright 1 by screws.
The utility model discloses a bolt 6 is fixed left side support bar 4 and right side support bar 5 at base 3, forms firm supporting platform, the footboard install on this supporting platform can for interim plank road horizon bar and montant installation and demolish efficiency like this, improve cyclic utilization efficiency and reduce the potential safety hazard, the device batch production of being convenient for simultaneously. Therefore, the utility model discloses the installation reduces the staff in a large number with demolising the in-process, has reduced intensity of labour, and the equal recyclable of each component after the plank road is demolishd reduces unnecessary extravagant, improves interim plank road safety in utilization performance simultaneously.

Claims (4)

1. The utility model provides a quick installation device of interim plank road in tunnel, includes pole setting (1) and cover in pole setting (1) upper portion and with pole setting (1) fixed connection's sleeve (2), its characterized in that: the sleeve (2) is provided with a base (3) which is connected with the sleeve (2) into a whole, and the base (3) is symmetrically and fixedly connected with a left side supporting rod (4) and a right side supporting rod (5) through bolts (6).
2. The quick installation device of a tunnel temporary stack of claim 1, characterized in that: two right angle grooves have been seted up on base (3) symmetrically, left side support pole (4) and right side support pole (5) be right angle shape angle steel structure, and left side support pole (4) and right side support pole (5) are fixed respectively at two right angle inslot through bolt (6).
3. The quick installation device of a tunnel temporary stack according to claim 2, characterized in that: the right-angle-shaped angle steel structure comprises transverse angle steel (8) and longitudinal angle steel (9), the end parts of the transverse angle steel (8) and the longitudinal angle steel (9) are provided with butt joints (10) matched with each other, and the transverse angle steel (8) and the longitudinal angle steel (9) are combined together through the butt joints (10) to form the right-angle-shaped angle steel structure.
4. The quick installation device of a tunnel temporary stack of claim 1, characterized in that: the sleeve (2) is fixed on the upright rod (1) through a screw.
CN202023182167.4U 2020-12-25 2020-12-25 Quick installation device of interim plank road in tunnel Active CN214221200U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023182167.4U CN214221200U (en) 2020-12-25 2020-12-25 Quick installation device of interim plank road in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023182167.4U CN214221200U (en) 2020-12-25 2020-12-25 Quick installation device of interim plank road in tunnel

Publications (1)

Publication Number Publication Date
CN214221200U true CN214221200U (en) 2021-09-17

Family

ID=77705382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023182167.4U Active CN214221200U (en) 2020-12-25 2020-12-25 Quick installation device of interim plank road in tunnel

Country Status (1)

Country Link
CN (1) CN214221200U (en)

Similar Documents

Publication Publication Date Title
CN203334730U (en) Split mounting type steel-structure movable workshop in construction site
CN202370253U (en) Assembly type single-row vertical rod machining shed for building construction site
CN110552709A (en) self-propelled integral station-crossing method and device suitable for large-diameter shield machine
CN201685036U (en) Large steel pipe assembled welding trolley
CN105952133A (en) Suspended large-span reinforced concrete structure construction steel platform and construction method
CN112627862A (en) Combined type arch protection trolley and method for tunnel primary support reinforcement
CN214221200U (en) Quick installation device of interim plank road in tunnel
CN108756902A (en) It is a kind of to be used for the auxiliary device and shield machine steering method that shield machine transition is missed the stop
CN205369229U (en) But walking hoisting frame suitable for manual hole digging pile steel reinforcement cage is laid
CN102817617B (en) Novel inhaul cable type shield originating backrest substrate system
CN201908665U (en) Movable variable-cross section lining trolley
CN204552255U (en) Integral movable type rain-proof shelter
CN215441927U (en) Steel pipe and fish-belly sill combination formula underground structure
CN213737101U (en) Support reinforcing device for belt conveyor support
CN214456325U (en) Gantry crane beam lifting machine with high legs and low legs
CN214464175U (en) Assembled shield constructs empty counterforce device that pushes away of TBM complete machine
CN210027398U (en) Be applied to safety isolation protection shed structure in subway station rail line area
CN205205680U (en) Cast -in -place arched bridge member formula support steel arc distribution beam construction
CN113463656A (en) Steel pipe and fish-belly sill combination formula underground structure
CN210395394U (en) Steel structure foundation for long-distance construction of large modular structure
CN208280636U (en) A kind of elevator well safety device
CN203377226U (en) Counterweight type solar frame
CN209443577U (en) A kind of steel structure member
CN206667466U (en) Steel construction operating platform
CN205778884U (en) Base apparatus for shield export & import

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant