CN214220615U - Improve pulling-on piece structure of atress condition - Google Patents

Improve pulling-on piece structure of atress condition Download PDF

Info

Publication number
CN214220615U
CN214220615U CN202022858301.1U CN202022858301U CN214220615U CN 214220615 U CN214220615 U CN 214220615U CN 202022858301 U CN202022858301 U CN 202022858301U CN 214220615 U CN214220615 U CN 214220615U
Authority
CN
China
Prior art keywords
interior
pulling
wall
piece
insertion portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022858301.1U
Other languages
Chinese (zh)
Inventor
高渭泉
胡燕江
雍杰
李小杰
刘海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Zhite New Material Technology Co ltd
Original Assignee
Hubei Zhite New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Zhite New Material Technology Co ltd filed Critical Hubei Zhite New Material Technology Co ltd
Priority to CN202022858301.1U priority Critical patent/CN214220615U/en
Application granted granted Critical
Publication of CN214220615U publication Critical patent/CN214220615U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides an improve pulling-on piece structure of atress condition belongs to building templates technical field. Including flaky body, the middle part of body has one and arranges the insertion portion in the wall body and two connecting portions that are located the insertion portion both ends in, and connecting portion department has a mounting hole, has an interior cover that props respectively between two connecting portions and the insertion portion, and the interior is propped and is sheathe in and has a perforation, and the body is worn to establish in the perforation, and interior is propped and is sheathe in and has seted up a screw hole, and interior cover that props can pass through the bolt fastening of threaded connection in the screw hole on the body. The utility model has the advantages of can improve the precision that the template was assembled.

Description

Improve pulling-on piece structure of atress condition
Technical Field
The utility model belongs to the technical field of the building templates, a improve pulling-on piece structure of atress condition is related to.
Background
In the aluminum formwork construction process, in order to enable the inner wall panel and the outer wall panel to be firmly connected, the inner wall formwork and the outer wall formwork are usually fixed through wall bolts. Adopt the pulling-on piece to replace the through-wall bolt, make the both ends of pulling-on piece fix respectively on interior outer wallboard, when the pouring concrete, the pulling-on piece mainly receives the pulling force along pulling-on piece length direction, the pulling-on piece of different specifications is selected according to the pulling force condition, in order to ensure that the pulling-on piece maintains effectively in the work progress, if 400 wide pulling-on pieces, 500 wide pulling-on pieces, 600 wide pulling-on pieces etc., nevertheless because the pulling-on piece width is big more, and the dead weight is big more, pass the material for the construction and caused certain difficulty, and the less pulling-on piece of width then can not satisfy the atress demand again, this scheme aims at solving this difficult problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at the above-mentioned problem that exists to current technique, provide a pulling-on piece structure of improving the atress condition, the utility model aims to solve the technical problem that how to improve the atress condition of pulling-on piece, improve the precision of assembling of template.
The purpose of the utility model can be realized by the following technical proposal: the utility model provides an improve pulling-on piece structure of atress condition, its characterized in that, includes flaky body, the middle part of body has one and arranges the insertion portion in the wall body and two connecting portions that are located the insertion portion both ends in, connecting portion department has a mounting hole, has an interior brace cover between two connecting portions and the insertion portion respectively, the interior brace is sheathe in and is had a perforation, the body is worn to establish in the perforation, interior brace sheathes in and has seted up a screw hole, interior brace cover can pass through the bolt fastening of threaded connection in the screw hole on the body.
Two interior braces can pass through the bolt fastening on the body, and its position on the body is adjustable, when the installation pulling-on piece, fix two connecting portion of pulling-on piece on interior outer wallboard respectively earlier, then adjust two interior braces, make it support and lean on the medial surface of wallboard, it is under the exogenic action of concrete that receives between interior outer wall, on the one hand, can increase its ability that receives the extrusion and indeformable, make the interval between interior outer wallboard can be better maintain, the reliability of interior outer wall position is higher, on the other hand, because before the pouring concrete, probably be close to each other because of the effect of bracing structure between the interior outer wallboard template, make the position between interior outer wall template change, the installation accuracy of bracing is influenced, the position between interior outer wall template can effectually be maintained in the setting of interior brace, the precision of template assembly is improved.
Therefore, in comparison, the stress condition of the pull piece is improved, so that the pull piece with a smaller size can have a wider application range, and the problems of difficult material transfer, serious waste and the like of the pull piece with a large size are avoided.
Drawings
Fig. 1 is a perspective view of a tab construction.
In the figure, 1, a body; 11. an insertion portion; 12. a connecting portion; 13. mounting holes; 2. an inner supporting sleeve; 21. perforating; 22. a threaded bore.
Detailed Description
The following are specific embodiments of the present invention and the accompanying drawings are used to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.
As shown in fig. 1, the wall-mounted wall-.
The two inner supporting sleeves 2 can be fixed on the body 1 through bolts, and the positions of the inner supporting sleeves on the body 1 can be adjusted, when the pulling piece is installed, the two connecting parts 12 of the pulling piece are respectively fixed on the inner wall plate and the outer wall plate, then the two inner supporting sleeves 2 are adjusted to be abutted against the inner side surfaces of the wall plates, under the action of the external supporting force of the concrete between the inner wall and the outer wall, on one hand, the capability of the concrete not deformed due to extrusion can be increased, the distance between the inner wall and the outer wall can be better maintained, the reliability of the position of the inner wall and the outer wall is higher, on the other hand, because before the pouring concrete, probably because the effect of bracing structure is close to each other between the interior outer wall panel template, make the position between the interior outer wall template change, influence the installation accuracy of bracing, the position between the interior outer wall template can effectually be maintained in the setting of interior brace cover 2, improves the precision of template assembly.
Therefore, in comparison, the stress condition of the pull piece is improved, so that the pull piece with a smaller size can have a wider application range, and the problems of difficult material transfer, serious waste and the like of the pull piece with a large size are avoided.
The specific embodiments described herein are merely illustrative of the spirit of the invention. Various modifications, additions and substitutions for the specific embodiments described herein may be made by those skilled in the art without departing from the spirit of the invention or exceeding the scope of the invention as defined in the accompanying claims.

Claims (1)

1. The utility model provides an improve pulling-on piece structure of atress condition, its characterized in that, includes flaky body (1), the middle part of body (1) has one and arranges in the internal portion of wall (11) and two connecting portion (12) that are located inserting portion (11) both ends, connecting portion (12) department has a mounting hole (13), has one respectively between two connecting portion (12) and inserting portion (11) and props cover (2), it perforates (21) to have one on interior propping cover (2), body (1) is worn to establish in perforation (21), a screw hole (22) have been seted up on interior propping cover (2), interior propping cover (2) can be through the bolt fastening in screw hole (22) on body (1).
CN202022858301.1U 2020-12-02 2020-12-02 Improve pulling-on piece structure of atress condition Active CN214220615U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022858301.1U CN214220615U (en) 2020-12-02 2020-12-02 Improve pulling-on piece structure of atress condition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022858301.1U CN214220615U (en) 2020-12-02 2020-12-02 Improve pulling-on piece structure of atress condition

Publications (1)

Publication Number Publication Date
CN214220615U true CN214220615U (en) 2021-09-17

Family

ID=77700309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022858301.1U Active CN214220615U (en) 2020-12-02 2020-12-02 Improve pulling-on piece structure of atress condition

Country Status (1)

Country Link
CN (1) CN214220615U (en)

Similar Documents

Publication Publication Date Title
CN211257823U (en) Building engineering construction template fastener
CN214220615U (en) Improve pulling-on piece structure of atress condition
WO2018033054A1 (en) Highly stable building formwork of convenient location
CN112663822B (en) Mounting rack used between masonry structure walls
CN211286645U (en) Fastening device for corner template
CN211114831U (en) Template internal corner capable of freely adjusting angle
CN210552008U (en) Window frame positioning structure applied to prefabricated outer wall
CN112900847A (en) Support assembly, template combination assembling method and template combination
CN210947133U (en) Node structure of steel construction assembled house
CN205605576U (en) Hollow brick wall fixing object special parts
KR200275103Y1 (en) fixing structure of slab support pipe for building
CN211948846U (en) Concrete prefabricated member
CN112049412A (en) External corner aluminum template system
CN214368179U (en) Aluminum alloy anti-seismic support
CN214497415U (en) Novel connection structure of gate
CN219491716U (en) Novel anti-bank reinforcement
CN216041901U (en) Assembled heat preservation wall convenient to installation
CN210151941U (en) Assembled building reinforced concrete member
CN213204972U (en) External corner lock
CN219327406U (en) Assembled building wall component
CN216766392U (en) ALC wallboard connected node
CN220100269U (en) Assembled steel construction wallboard
CN220598348U (en) Red copper sheet installation fixing device
CN211899044U (en) T-shaped wall surface connecting structure
CN211548029U (en) Assembled building connection structure convenient to firm installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant