CN214219797U - Drainage device for river course construction - Google Patents

Drainage device for river course construction Download PDF

Info

Publication number
CN214219797U
CN214219797U CN202023289291.0U CN202023289291U CN214219797U CN 214219797 U CN214219797 U CN 214219797U CN 202023289291 U CN202023289291 U CN 202023289291U CN 214219797 U CN214219797 U CN 214219797U
Authority
CN
China
Prior art keywords
fixedly connected
hull
drainage device
connecting rod
waterproof box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023289291.0U
Other languages
Chinese (zh)
Inventor
王广州
霍倩倩
吕佳明
邱喜宏
李昭
张卫东
熊理清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Third Highway Engineering Co Ltd
Original Assignee
CCCC Third Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Third Highway Engineering Co Ltd filed Critical CCCC Third Highway Engineering Co Ltd
Priority to CN202023289291.0U priority Critical patent/CN214219797U/en
Application granted granted Critical
Publication of CN214219797U publication Critical patent/CN214219797U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a hydrophobic means technical field just discloses a hydrophobic means is used in river course construction, which comprises a ship body, the interior diapire fixedly connected with waterproof case of hull, the top fixed mounting of waterproof case has motor power, the right side inner wall fixed mounting of hull has antifriction bearing, antifriction bearing's inside fixedly connected with and motor power's output shaft fixed connection's connecting rod, the outside fixedly connected with blade of connecting rod, the equal fixedly connected with skeleton of both sides inner wall around the hull. This drainage device is used in river course construction through installing waterproof box, motor power, antifriction bearing, connecting rod and blade on the hull, is convenient for utilize waterproof box to support installation motor power, and motor power output power drives the connecting rod and is rotatory in antifriction bearing's inside to drive the blade and rotate, for the hull provides the power of motion, guaranteed that whole desilting device can incessant carry out desilting work.

Description

Drainage device for river course construction
Technical Field
The utility model relates to a hydrophobic means technical field specifically is a hydrophobic means is used in river course construction.
Background
River regulation is also called 'riverbed regulation', and engineering measures for controlling and modifying river frequently cause scouring and silting phenomena in natural rivers, water damage easily occurs, water conservancy development is hindered, and in order to meet the requirements of removing troubles and benefiting, proper measures are required to regulate the river, including engineering of dredging, bank protection and the like.
The requirement for the environment is higher and higher, and the mediation is key engineering to the river course is administered, but current drainage device for river course construction has the mediation effect poor, and degree of mechanization is low, consumes a large amount of manpowers, causes the fund waste of certain degree, and the mediation effect is poor to lead to needing to clear up repeatedly, and the repeated operation has increased during operation, so provides a drainage device for river course construction and solves the above-mentioned problem of proposing.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a drainage device for river course construction possesses advantages such as river course mediation effect is good, has solved current drainage device for river course construction and has had the mediation effect poor, and degree of mechanization is low, consumes a large amount of manpowers, causes the fund waste of certain degree, and the mediation effect is poor to lead to needing to clear up repeatedly, and the operation has increased the problem of operating duration repeatedly.
(II) technical scheme
For realizing the effectual purpose of above-mentioned river course mediation, the utility model provides a following technical scheme: a drainage device for river channel construction comprises a ship body, wherein a waterproof box is fixedly connected to the inner bottom wall of the ship body, a power motor is fixedly installed at the top of the waterproof box, a rolling bearing is fixedly installed on the inner wall of the right side of the ship body, a connecting rod fixedly connected with an output shaft of the power motor is fixedly connected to the inner portion of the rolling bearing, blades are fixedly connected to the outer portion of the connecting rod, fixed frameworks are fixedly connected to the inner walls of the front side and the rear side of the ship body, an installation block is fixedly connected to the bottom of each fixed framework, a telescopic rod is hinged to the front face of each installation block, a dredging plough is fixedly connected to the bottom of each telescopic rod, a sewage pumping pump is fixedly installed at the top of each fixed framework, a sewage inlet pipe is fixedly connected to the input end of the sewage pumping pump, a control valve is fixedly connected to the outer portion of each sewage inlet pipe, and a sewage discharge pipe is fixedly connected to the output end of the sewage pumping pump, interior diapire fixedly connected with of hull deposits the silt case, deposit the inside fixedly connected with of silt case and cross the water board, deposit the bottom fixedly connected with drain pipe of silt case.
Preferably, the right side of the ship body is provided with a mounting hole, and the connecting rod penetrates through the mounting hole, extends to the inside of the ship body and is fixedly connected with an output shaft of the power motor
Preferably, an operation opening is formed in the bottom of the ship body, and the telescopic rod and the sewage inlet pipe penetrate through the operation opening and extend to the bottom of the ship body.
Preferably, the installation block is hinged with the telescopic rod through a movable pin, and water outlets which are uniformly distributed and nine in number are formed in the water passing plate.
Preferably, the bottom of depositing silt case and hull all has seted up the wash port, the drain pipe passes through and extends to the bottom of hull through the wash port.
Preferably, the top of waterproof box has seted up into dirty mouthful, the sewage inlet tube runs through and extends to the inside of waterproof box through into dirty mouthful.
(III) advantageous effects
Compared with the prior art, the utility model provides a drainage device is used in river course construction possesses following beneficial effect:
the drainage device for river channel construction is characterized in that a waterproof box, a power motor, a rolling bearing, a connecting rod and blades are arranged on a ship body, the power motor is conveniently supported and installed by the waterproof box, the power motor outputs power to drive the connecting rod to rotate inside the rolling bearing, so that the blades are driven to rotate, moving power is provided for the ship body, the integral dredging device is guaranteed to uninterruptedly conduct dredging work, the working efficiency is improved, the labor intensity is reduced, the fixed framework, the installation block, the telescopic rod and the fixed framework of the dredging plough are arranged on the waterproof box to play a role of a fixed supporting dredging tool, the installation block plays a role of adjusting the angle of the telescopic rod, the sludge in different directions is guaranteed to be cleaned, the telescopic rod plays a role of adjusting the integral length to adapt to different water depths, the utilization rate is improved, the dredging plough plays a role of excavating and smashing the sludge at the bottom of a river, through install on waterproof box and take out the dirty pump, the sewage inlet tube, control valve and blow off pipe, the suction of being convenient for utilize taking out dirty pump output passes through the sewage inlet tube, the silt that the desilting plough was beaten is inhaled and is being discharged through the blow off pipe, the control valve plays and adjusts entering silt flow size, deposit the silt case through installing on the hull, water passing plate and drain pipe, be convenient for utilize and deposit silt case and deposit the silt through blow off pipe exhaust, water passing plate is with the row's of going into the drain pipe in the silt, the river course is discharged into at last, overall structure is simple, the operation is simple, need not too much personnel's operation, basic full mechanized operation, it is effectual to dredge, the degree of mechanization is high, the manpower is saved, do not need to clear up repeatedly, it is long when having reduced the construction.
Drawings
FIG. 1 is a sectional view of the present invention;
fig. 2 is a front view of the structure of the present invention.
In the figure: the device comprises a ship body 1, a waterproof box 2, a power motor 3, a rolling bearing 4, a connecting rod 5, a blade 6, a fixed framework 7, an installation block 8, a telescopic rod 9, a dredging plough 10, a sewage pump 11, a sewage inlet pipe 12, a control valve 13, a sewage discharge pipe 14, a sludge storage box 15, a water passing plate 16 and a water discharge pipe 17.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, a drainage device for river channel construction comprises a hull 1, a waterproof box 2 is fixedly connected to the inner bottom wall of the hull 1, a power motor 3 is fixedly installed on the top of the waterproof box 2, a rolling bearing 4 is fixedly installed on the inner wall of the right side of the hull 1, a connecting rod 5 fixedly connected to the output shaft of the power motor 3 is fixedly connected to the inside of the rolling bearing 4, a mounting hole is formed on the right side of the hull 1, the connecting rod 5 penetrates through the mounting hole and extends to the inside of the hull 1 and is fixedly connected to the output shaft of the power motor 3, a blade 6 is fixedly connected to the outside of the connecting rod 5, a fixed framework 7 is fixedly connected to the inner walls of the front and back sides of the hull 1, a mounting block 8 is fixedly connected to the bottom of the fixed framework 7, a telescopic rod 9 is hinged to the front surface of the mounting block 8, a dredging plow 10 is fixedly connected to the bottom of the telescopic rod 9, and a sewage pump 11 is fixedly installed on the top of the fixed framework 7, the input fixedly connected with sewage inlet pipe 12 of sewage pump 11, dirty mouthful has been seted up at the top of waterproof box 2, sewage inlet pipe 12 runs through and extends to the inside of waterproof box 2 through dirty mouthful of advancing, the operation mouth has been seted up to the bottom of hull 1, telescopic link 9 and sewage inlet pipe 12 run through and extend to the bottom of hull 1 through the operation mouth, the outside fixedly connected with control valve 13 of sewage inlet pipe 12, the output fixed connection blowdown pipe 14 of sewage pump 11, interior diapire fixedly connected with of hull 1 deposits silt case 15, deposit the inside fixedly connected with water board 16 that passes through of silt case 15, installation piece 8 is articulated through the movable pin with telescopic link 9, the inside of passing through water board 16 is seted up evenly distributed quantity and is nine outlet, deposit the bottom fixedly connected with drain pipe 17 of silt case 15, deposit silt case 15 and hull wash port 1's bottom and have all seted up, drain pipe 17 runs through and extends to hull 1's bottom through the wash port.
To sum up, the drainage device for river construction is convenient for supporting and installing the power motor 3 by the waterproof box 2 through installing the waterproof box 2, the power motor 3, the rolling bearing 4, the connecting rod 5 and the blade 6 on the ship body 1, the power motor 3 outputs power to drive the connecting rod 5 to rotate in the rolling bearing 4, so as to drive the blade 6 to rotate, thereby providing motion power for the ship body 1, ensuring that the integral dredging device can continuously carry out dredging work, improving the working efficiency, reducing the labor intensity, playing a role of a fixed dredging tool supporting by installing the fixed framework 7, the installation block 8, the telescopic rod 9 and the fixed framework 7 of the dredging plow 10 on the waterproof box 2, the installation block 8 playing a role of adjusting the angle of the telescopic rod 9, ensuring that silt in different directions is cleaned, and the telescopic rod 9 plays a role of adjusting the overall length, the dredging device is suitable for different water depths, the utilization rate is improved, the dredging plough 10 plays a role of excavating and smashing silt at the bottom of a river, the silt pumped by the dredging plough 10 is sucked through the sewage inlet pipe 12 by installing the sewage pumping pump 11, the sewage inlet pipe 12, the control valve 13 and the sewage discharge pipe 14 on the waterproof box 2, the silt pumped by the dredging plough 10 is sucked and discharged through the sewage discharge pipe 14, the control valve 13 plays a role of adjusting the flow of the entering silt, the silt storage box 15, the water passing plate 16 and the water discharge pipe 17 are installed on the ship body 1, the silt stored in the silt storage box 15 is conveniently stored by using the silt discharged through the sewage discharge pipe 14, the water in the silt is discharged into the water discharge pipe 17 through the water passing plate 16 and finally discharged into the river channel, the whole structure is simple, the operation is not required to be performed by too many personnel, the basic fully mechanical operation is realized, the dredging effect is good, the problem that the dredging effect of the existing drainage device for river channel construction is poor in dredging effect and the low mechanical degree is solved, consume a large amount of manpowers, cause the fund waste of certain degree, the mediation effect is poor leads to needing to clear up repeatedly, and the long problem of working duration has been increased in the repeated operation.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a drainage device for river course construction, includes hull (1), its characterized in that: the boat comprises a boat body (1), a waterproof box (2) is fixedly connected to the inner bottom wall of the boat body (1), a power motor (3) is fixedly mounted at the top of the waterproof box (2), a rolling bearing (4) is fixedly mounted on the inner wall of the right side of the boat body (1), a connecting rod (5) fixedly connected with an output shaft of the power motor (3) is fixedly connected to the inner portion of the rolling bearing (4), blades (6) are fixedly connected to the outer portion of the connecting rod (5), fixed frameworks (7) are fixedly connected to the inner walls of the front side and the rear side of the boat body (1), an installation block (8) is fixedly connected to the bottom of each fixed framework (7), a telescopic rod (9) is hinged to the front side of each installation block (8), a dredging plow (10) is fixedly connected to the bottom of each telescopic rod (9), a sewage pumping pump (11) is fixedly mounted at the top of each fixed framework (7), and a sewage inlet pipe (12) is fixedly connected to the input end of each sewage pumping pump (11), the outside fixedly connected with control valve (13) of sewage inlet tube (12), take out output fixed connection blow off pipe (14) of dirty pump (11), interior diapire fixedly connected with of hull (1) deposits silt case (15), deposit the inside fixedly connected with of silt case (15) and cross water board (16), deposit bottom fixedly connected with drain pipe (17) of silt case (15).
2. The drainage device for river channel construction according to claim 1, wherein: the right side of the ship body (1) is provided with a mounting hole, and the connecting rod (5) penetrates through the mounting hole, extends to the inside of the ship body (1) and is fixedly connected with an output shaft of the power motor (3).
3. The drainage device for river channel construction according to claim 1, wherein: the bottom of hull (1) has been seted up the operation mouth, telescopic link (9) and sewage inlet tube (12) run through and extend to the bottom of hull (1) through the operation mouth.
4. The drainage device for river channel construction according to claim 1, wherein: the mounting block (8) is hinged with the telescopic rod (9) through a movable pin, and water outlets which are uniformly distributed and nine in number are formed in the water passing plate (16).
5. The drainage device for river channel construction according to claim 1, wherein: the bottom of depositing silt case (15) and hull (1) has all seted up the wash port, drain pipe (17) run through and extend to the bottom of hull (1) through the wash port.
6. The drainage device for river channel construction according to claim 1, wherein: the top of waterproof box (2) has been seted up into dirty mouthful, sewage inlet tube (12) run through and extend to the inside of waterproof box (2) through into dirty mouthful.
CN202023289291.0U 2020-12-31 2020-12-31 Drainage device for river course construction Expired - Fee Related CN214219797U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023289291.0U CN214219797U (en) 2020-12-31 2020-12-31 Drainage device for river course construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023289291.0U CN214219797U (en) 2020-12-31 2020-12-31 Drainage device for river course construction

Publications (1)

Publication Number Publication Date
CN214219797U true CN214219797U (en) 2021-09-17

Family

ID=77707784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023289291.0U Expired - Fee Related CN214219797U (en) 2020-12-31 2020-12-31 Drainage device for river course construction

Country Status (1)

Country Link
CN (1) CN214219797U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114243579A (en) * 2022-02-21 2022-03-25 国网山东省电力公司乳山市供电公司 Submarine cable buries plough underground
CN114987699A (en) * 2022-06-23 2022-09-02 中交广州航道局有限公司 Plow hook remote control ship and control system thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114243579A (en) * 2022-02-21 2022-03-25 国网山东省电力公司乳山市供电公司 Submarine cable buries plough underground
CN114987699A (en) * 2022-06-23 2022-09-02 中交广州航道局有限公司 Plow hook remote control ship and control system thereof

Similar Documents

Publication Publication Date Title
CN214219797U (en) Drainage device for river course construction
CN211816543U (en) Hydraulic engineering desilting device
CN110512675B (en) Environment-friendly dredging dredger and use method thereof
CN211849689U (en) Dredging device for hydraulic and hydroelectric engineering
CN209669964U (en) A kind of hydraulic engineering Accrete clearing device
CN213014130U (en) Be applied to composite set of drainage pump station forebay desilting
CN215053831U (en) A stifled desilting device is prevented to sewer for hydraulic engineering
CN211816541U (en) Dredging device for hydraulic engineering
CN211773380U (en) Water conservancy culvert gate sediment removal device
CN219491128U (en) Canal river dredging device
CN213682034U (en) Irrigation area high-efficiency water-saving canal bottom structure
CN220318620U (en) River channel dredging mechanism
CN213741299U (en) River silt cleaning device for hydraulic engineering construction
CN219060159U (en) Dredger river channel cleaning device
CN214460769U (en) Automatic desilting system of desilting pond water conservancy
CN213508633U (en) Hydraulic engineering mechanized high-efficient desilting equipment
CN211172154U (en) Silt clearance economizer of small-size reservoir
CN211920912U (en) Water conservancy project gate purifier
CN214464384U (en) Hydraulic tunnel drainage device with sealing effect
CN218492585U (en) Channel dredging and channel filling equipment for river channel
CN219450884U (en) Silt processor for water conservancy
CN211523333U (en) Water conservancy device for clearing river silt
CN217175006U (en) River channel branch inlet sludge cleaning device
CN211646685U (en) Municipal administration pipeline is with portable maintenance of equipment
CN214530856U (en) Channel dredging sludge cleaning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210917

CF01 Termination of patent right due to non-payment of annual fee