CN214219669U - Concrete pouring device of steel structure box type column insertion type column base - Google Patents

Concrete pouring device of steel structure box type column insertion type column base Download PDF

Info

Publication number
CN214219669U
CN214219669U CN202022133947.3U CN202022133947U CN214219669U CN 214219669 U CN214219669 U CN 214219669U CN 202022133947 U CN202022133947 U CN 202022133947U CN 214219669 U CN214219669 U CN 214219669U
Authority
CN
China
Prior art keywords
concrete
type column
piece
steel structure
adjusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022133947.3U
Other languages
Chinese (zh)
Inventor
郭明志
韩红波
何风蕊
张文嘉
赵欣然
韩宇
赵恕
张文超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN202022133947.3U priority Critical patent/CN214219669U/en
Application granted granted Critical
Publication of CN214219669U publication Critical patent/CN214219669U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model provides a concrete filling device of steel construction box column insertion formula column base, include: a support member; for supporting the entire device; the feeding piece is used for conveying concrete and arranged on the supporting piece; the filter element for filtering the concrete is arranged at the top of the feeding element; and the adjusting piece is used for adjusting the height of the supporting piece and is arranged on the supporting piece. The beneficial effects of the utility model are that effectual solution is box steel construction column foot in the past and is filled the efficiency of construction low, speed slow, uneconomic, and high altitude mixture control is inconvenient, and the concrete is longer at the time of tank car, and mobility, cohesiveness and guarantor's water retention variation need add additives such as retarder, and the concrete that has coarse aggregate and cubic not conform to the requirement is poured into, can not guarantee to pour the problem of quality.

Description

Concrete pouring device of steel structure box type column insertion type column base
Technical Field
The utility model belongs to building engineering structure construction field especially relates to a concrete filling device of steel construction box column plug-in column base.
Background
In the concrete pouring process of the prior box-type column-inserted column base, the pouring construction quality of concrete is very critical, and particularly in the pouring construction of the box-type steel structure column base of an industrial factory building, the concrete at the cup opening is divided into two parts by a steel column, and the pouring needs to be carried out twice outside the box-type column and inside the box-type column. The pouring sequence is to pour the concrete in the box column first and then between the outside of the column and the cup rim. Concrete in the box-type column is usually through the filling hole of phi 100 that reserves on the post, because the atress of box-type column can be influenced to the hole reservation too big, and the design unit generally does not agree with the reaming, so need add additives such as retarder in the concrete usually, increased concrete material cost, economic benefits is relatively poor. Because the pouring hole of design is very little, and the post grout hole height of different box is different, pours inconveniently, and the concrete pouring efficiency in the box post is low, the speed is slow, and the concrete is longer at the tank car, makes its mobility, cohesiveness and water retentivity worsen, and it also has certain degree of difficulty to insert the vibrting spear through phi 100's pouring hole and vibrate the concrete, and the concrete that has coarse aggregate and cubic nonconforming to the requirements is poured into, can not guarantee to pour the quality.
SUMMERY OF THE UTILITY MODEL
The to-be-solved problem of the utility model is to provide a concrete filling device of steel construction box column plug-in column base, effectual solution box steel construction column base is filled the efficiency of construction in the past and is low, slow, uneconomic, high altitude mixture control is inconvenient, the concrete is longer at the time of tank car, the mobility, cohesiveness and water retention variation need add additives such as retarder, the concrete that has coarse aggregate and cubic not conform to the requirement is poured into, can not guarantee the problem of pouring the quality.
In order to solve the technical problem, the utility model discloses a following technical scheme: the utility model provides a concrete perfusion device of steel construction box column plug-in column base, includes: a support member; for supporting the entire device; the feeding piece is used for conveying concrete and arranged on the supporting piece; the filter element for filtering the concrete is arranged at the top of the feeding element; and the adjusting piece is used for adjusting the height of the supporting piece and is arranged on the supporting piece.
Preferably, the support comprises a bracket for supporting the entire device.
Preferably, the support is a telescopic support.
Preferably, the bracket further comprises a fixing rod for fixing the bracket, and the fixing rod is arranged at the bottom of the bracket.
Preferably, the bracket is further provided with a through hole for placing the adjusting piece.
Preferably, the feeder comprises a hopper for feeding the concrete, arranged on top of the support.
Preferably, the filter element comprises a mesh for filtering the concrete, arranged on top of the feed element.
Preferably, the adjusting member includes an adjusting bolt for adjusting the height of the supporting member, and is provided on the supporting member.
Due to the design of the grate net, the materials which do not meet the requirements, such as coarse aggregates with large particle size or blocks in concrete, and the like in the unloading process are filtered on the grate net, so that the pouring quality is ensured; the bracket is provided with an adjusting piece which can be adjusted according to different heights to meet different height requirements, so that the waiting time of the concrete tank truck and the use of additives such as retarder and the like are reduced; the whole design can ensure that the concrete pouring is high in efficiency, high in speed and cost-saving.
Drawings
FIG. 1 is the embodiment of the utility model provides a concrete perfusion device of steel construction box column plug-in column base
FIG. 2 is the utility model discloses a steel construction box column insert formula column base's concrete filling device uses the sketch map
In the figure:
1. grate 2, funnel 3 and support
4. Adjusting bolt 5 and fixing rod
Detailed Description
The invention will be further described with reference to the following examples and drawings:
in the description of the embodiments of the present invention, it should be understood that the terms "top," "bottom," and the like refer to orientations or positional relationships based on those shown in the drawings, which are used for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present invention. In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "disposed" and "connected" are to be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
As shown in fig. 1, a schematic structural diagram of a concrete pouring device for a steel structure box column insertion column base, the concrete pouring device for the steel structure box column insertion column base comprises: a support member; for supporting the entire device; the feeding piece is used for conveying concrete and arranged on the supporting piece; the filtering piece for filtering concrete is arranged at the top of the feeding piece; the adjusting part of adjusting support piece height sets up on support piece, and whole device height is 1500mm, and the width is 600 mm.
Concretely, support piece is including the support 3 that is used for supporting whole device, and support 3 is telescopic bracket, and height 1100mm, wide 600mm, four supporting legs of support 3 adopt phi 25's round steel preparation, and the round steel is inserted in DN 32's galvanized steel pipe, and galvanized steel pipe's height is less than the round steel height, reaches to locate to set up the through-hole apart from both ends 200mm in the middle of the galvanized steel pipe, and the through-hole number is 12, and the through-hole size matches adjusting bolt. A fixing rod 5 is further welded between two adjacent support legs at the bottom of the support 3, and the fixing rod 5 is made of round steel with the diameter of 14 mm, so that the stability of the support 3 is guaranteed.
The feeding piece comprises a funnel 2 for conveying concrete, the height of the funnel 2 is 1000mm, the width of the funnel is 600mm, the funnel 2 is made of a Q235B steel plate, the thickness of the funnel 2 is 4mm, the funnel is placed at the top of the support 3, the bottom discharge spout part directly extends into a reserved concrete filling hole, the concrete can be directly conveyed into the steel structure box column,
the filtering piece comprises a grate net 1 for filtering concrete, the grate net 1 is made of round steel with the diameter of phi 10, the distance between the round steel is 45mm, the grate net 1 is lapped at the top of the funnel 2, and in the unloading process of the concrete tank truck, materials which are not in accordance with requirements, such as coarse aggregate with large particle size or concrete blocks, are isolated outside by the grate net 1, so that the material quality of pouring concrete is ensured.
The adjusting part comprises an adjusting bolt 4 for adjusting the height of the support, the adjusting bolt 4 is arranged in the middle of the support and at a distance of 200mm from the two ends, the adjusting bolt 4 adopts phi 12 bolts, the number of the adjusting bolts is the same as that of the through holes, height adjustment can be carried out according to filling holes with different heights, the time of concrete in a concrete tank truck is saved, and therefore the invariability of the fluidity, the cohesiveness and the water retention of the concrete can be guaranteed without adding additives.
In the pouring construction of the steel structure box column, a concrete tank truck commands backing to approach the device through field operation personnel, the height of a discharge port of the concrete tank truck is 150mm-200mm higher than that of a grate net 1 at the top end of the device, then concrete is stirred and discharged, and the concrete enters the steel structure box column through a funnel 2. In the discharging process, the materials which are not in accordance with the requirements, such as coarse aggregates with large particle size or concrete blocks, and the like are isolated outside by the grate 1, so that the quality of the poured concrete materials is ensured, and the poured concrete can be vibrated in time. The support 3 is provided with an adjusting bolt 4 which can be adjusted according to different heights to meet different height requirements. The method not only saves the pouring time and the cost of concrete materials, but also ensures the pouring quality.
While one embodiment of the present invention has been described in detail, the description is only a preferred embodiment of the present invention, and should not be considered as limiting the scope of the present invention. All the equivalent changes and improvements made according to the application scope of the present invention should still fall within the patent coverage of the present invention.

Claims (8)

1. The utility model provides a concrete perfusion device of steel construction box column plug-in column base which characterized in that includes:
a support member; for supporting the entire device;
the feeding piece is used for conveying concrete and arranged on the supporting piece;
the filter element for filtering the concrete is arranged at the top of the feeding element;
and the adjusting piece is used for adjusting the height of the supporting piece and is arranged on the supporting piece.
2. The concrete pouring device for the steel structure box type column insertion type column base according to claim 1, is characterized in that: the support comprises a bracket for supporting the entire device.
3. The concrete pouring device for the steel structure box type column insertion type column base as claimed in claim 2, wherein: the support is a telescopic support.
4. The concrete pouring device for the steel structure box type column insertion type column base as claimed in claim 2, wherein: the bracket is also provided with a through hole for placing the adjusting piece.
5. The concrete pouring device for the steel structure box type column insertion type column base as claimed in claim 2, wherein: the bracket also comprises a fixed rod for fixing the bracket, and the fixed rod is arranged at the bottom of the bracket.
6. The concrete pouring device for the steel structure box type column insertion type column base according to claim 1, is characterized in that: the feeding piece comprises a funnel for conveying the concrete and is arranged on the top of the support piece.
7. The concrete pouring device for the steel structure box type column insertion type column base according to claim 1, is characterized in that: the filter element comprises a grate net for filtering the concrete and is arranged at the top of the feeding element.
8. The concrete pouring device for the steel structure box type column insertion type column base according to claim 1, is characterized in that: the adjusting piece comprises an adjusting bolt for adjusting the height of the supporting piece and is arranged on the supporting piece.
CN202022133947.3U 2020-09-25 2020-09-25 Concrete pouring device of steel structure box type column insertion type column base Active CN214219669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022133947.3U CN214219669U (en) 2020-09-25 2020-09-25 Concrete pouring device of steel structure box type column insertion type column base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022133947.3U CN214219669U (en) 2020-09-25 2020-09-25 Concrete pouring device of steel structure box type column insertion type column base

Publications (1)

Publication Number Publication Date
CN214219669U true CN214219669U (en) 2021-09-17

Family

ID=77673724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022133947.3U Active CN214219669U (en) 2020-09-25 2020-09-25 Concrete pouring device of steel structure box type column insertion type column base

Country Status (1)

Country Link
CN (1) CN214219669U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215361A (en) * 2021-12-02 2022-03-22 中冶天工集团有限公司 Movable assembly type box column grouting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114215361A (en) * 2021-12-02 2022-03-22 中冶天工集团有限公司 Movable assembly type box column grouting device

Similar Documents

Publication Publication Date Title
CN214219669U (en) Concrete pouring device of steel structure box type column insertion type column base
US20030202869A1 (en) Mobile storage container, transport vehicle for such container, and method for installing such container
CN209323990U (en) Concrete blanking device
CN105398707A (en) Novel building material storage device
CN218618298U (en) Polycarboxylate water reducing agent's rack
CN210850804U (en) Intelligent control batching system for cement raw materials
CN209257213U (en) A kind of filling concrete machine for municipal bridge construction
CN214696921U (en) Concrete switching device for construction
CN215506587U (en) Aluminium ash processing is with thick liquids preparation device
CN206797951U (en) A kind of raw material recovery device and charging device
CN214531956U (en) A concrete placement equipment for box column
CN209533841U (en) A kind of building stirring blanking device
CN211440609U (en) Dry-mixed mortar equipment for construction site
CN213110791U (en) Horizontal cement tank
CN208265177U (en) A kind of quantitative oscillatory spin batcher
CN211389389U (en) Vibration unloading mechanism of concrete automatic pouring machine
CN209427430U (en) A kind of small-sized integrated storage and metering system of feeding intake
CN209758550U (en) Movable dry-mixed mortar storage tank
CN208932131U (en) A kind of cement storage tank
CN215517196U (en) Energy-saving and environment-friendly masonry dry-mixed mortar production line
CN219913781U (en) Bentonite stoving agitated vessel
CN220418032U (en) Stoving feeder hopper on calcium sulfate production line
CN207511470U (en) A kind of cement bin feeding device
CN209855245U (en) Mortar discharge hopper
CN214365016U (en) Tertiary buffering vibration feeder suitable for roller compacted concrete

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant