Prior art keywords
column
motor
roller
construction engineering
heating machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120179623.5U
Other languages
Chinese (zh)
Inventor
刘彦伶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jianqi Power Technology Engineering Co Ltd
Original Assignee
Beijing Jianqi Power Technology Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jianqi Power Technology Engineering Co Ltd filed Critical Beijing Jianqi Power Technology Engineering Co Ltd
Priority to CN202120179623.5U priority Critical patent/CN214217798U/en
Application granted granted Critical
Publication of CN214217798U publication Critical patent/CN214217798U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model discloses a pay-off for construction engineering, including base and second column spinner, the lower extreme of base is provided with the wheel, the left end of base is connected with the baffle, the skin of first column spinner is connected with first cylinder, the upper end of first motor is provided with the drive belt, the second column spinner is located the upper end of second support column, the outer arrangement of second cylinder has the elasticity overcoat, the left end of casing is provided with the pipeline, the water layer has been installed to the left end of gauze wiping layer, the upper end of pipeline is provided with the third support column, the right-hand member of heating machine is provided with the steam outlet, it has the fan to cross the upper end arrangement in wind gap, the upper end of second motor is connected with the spliced pole. This pay-off for construction engineering compares this pay-off with current ordinary pay-off and has the function that reduces the wearing and tearing of line, still has abluent function when receiving the line, can wash the line of receiving.

Description

Pay-off for construction engineering
Technical Field
The utility model relates to a construction technical field specifically is a pay-off for construction engineering.
Background
Pay-off is paying out machine promptly, when installing the cable conductor in the building engineering construction, because the whole overlength of cable, can fix the cable reel in the pivot of paying out machine before the installation cable, emit the cable through the paying out machine, can emit the cable while installing to can avoid the chaotic winding of cable in the installation condition emergence together, pay-off is comparatively troublesome when receiving the line simultaneously.
Ordinary pay-off can not receive the line automatically, can not wash the line of packing up, and wearing and tearing appear easily when the unwrapping wire reduces the life that the line can not be fine satisfies people's user demand, to above-mentioned condition, carries out technical innovation on current pay-off basis.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pay-off for construction engineering to propose general ordinary pay-off in solving above-mentioned background art and can not carry out the automation and receive the line, can not rinse the line of packing up, wear and tear appears easily when the unwrapping wire, the life that reduces the line can not be fine satisfies people's user demand problem.
In order to achieve the above object, the utility model provides a following technical scheme: a paying-off device for building construction engineering comprises a base and a second rotary column, wherein wheels are arranged at the lower end of the base, a baffle is connected to the left end of the base, a handle is installed at the left end of the baffle, a first supporting column, a first motor, a second supporting column and a shell are sequentially arranged at the upper end of the base from left to right, the first rotary column is arranged between the first supporting columns, a first roller is connected to the outer layer of the first rotary column, a baffle is installed on the outer layer of the first roller, a transmission belt is arranged at the upper end of the first motor, the second rotary column is located at the upper end of the second supporting column, a second roller is connected to the outer layer of the second rotary column, an elastic outer sleeve is arranged on the outer layer of the second roller, a gauze pipeline is arranged at the left end of the shell, a gauze wiping layer is connected to the left end of the pipeline, a water passing layer is installed at the left end of the gauze wiping layer, the upper end of pipeline is provided with the third support column, and the right-hand member of third support column is connected with the heating machine, the right-hand member of heating machine is provided with the steam outlet, and the right-hand member of steam outlet is provided with the wind gap, settle the upper end in wind gap has the fan, and the upper end of fan is provided with the second motor, the upper end of second motor is connected with the spliced pole.
Preferably, the fan forms a rotating structure through the second motor and the connecting column, and the second motor and the connecting column are welded.
Preferably, the second drum and the second rotary column form an integrated structure, and the second rotary column and the second drum are bonded to each other.
Preferably, the heating machines are symmetrically distributed about the central axis of the connecting column, and the heating machines are fixedly connected with the third supporting column.
Preferably, an integrated structure is formed between the heating machine and the hot gas outlet, and the heating machine and the hot gas outlet are bonded.
Preferably, the number of the second rollers is two, and the second rollers are fixedly connected with the elastic outer sleeve.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses through the setting of first column spinner, first motor and drive belt, can make take-up become electric control by manpower control through first motor, can drive the first cylinder through the first column spinner and rotate to realize the effect of receiving the line, can transmit the rotation of first motor through the drive belt, can make take-up become electric power by the manpower like this, can reduce the manpower, alleviate workman's physical demands;
2. the utility model discloses a gauze wiping layer, the layer of crossing water, fan and the setting of heating machine, can be at the earth on the line of wiping of receiving the line through the gauze wiping layer, can further wash the line when receiving the line through the layer of crossing water, can make the hot-blast that the heating machine produced blow to the line through the fan, can produce steam through the heating machine, like this can be when receiving the line, wash the outward appearance of line;
3. the utility model discloses a setting of second support column, second column spinner, second cylinder and can provide the support for the cylinder through the second support column, can drive the second cylinder through the second column spinner and rotate, can alleviate the friction of line through the second cylinder, can make the second cylinder prevent that the surface has elasticity through the elasticity overcoat, can reduce the friction at the unwrapping wire in-process like this, make the line can not receive the damage at the unwrapping wire in-process.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a left side view of the structure of the present invention;
FIG. 3 is a schematic view of the structure at A in FIG. 1 according to the present invention;
fig. 4 is a schematic structural diagram of the point B in fig. 1 according to the present invention.
In the figure: 1. a base; 2. a wheel; 3. a baffle plate; 4. a handle; 5. a first support column; 6. a first spin column; 7. a first drum; 8. a partition plate; 9. a first motor; 10. a transmission belt; 11. a second support column; 12. a second spin column; 13. a second drum; 14. a housing; 15. a pipeline; 16. a gauze wiping layer; 17. a water passing layer; 18. connecting columns; 19. a second motor; 20. a fan; 21. a third support column; 22. a heating machine; 23. a hot gas outlet; 24. an elastic outer sleeve; 25. and (4) air passing through the air inlet.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a paying-off device for building construction engineering comprises a base 1 and a second rotary column 12, wherein the lower end of the base 1 is provided with wheels 2, the left end of the base 1 is connected with a baffle 3, the left end of the baffle 3 is provided with a handle 4, the upper end of the base 1 is sequentially provided with a first support column 5, a first motor 9, a second support column 11 and a shell 14 from left to right, a first rotary column 6 is arranged between the first support columns 5, the outer layer of the first rotary column 6 is connected with a first roller 7, the outer layer of the first roller 7 is provided with a baffle 8, the upper end of the first motor 9 is provided with a transmission belt 10, the paying-off device can be changed from manual control to electric control through the first motor 9, the first roller 7 can be driven to rotate through the first rotary column 6, and the effect of paying-off is realized, the rotation of the first motor 9 can be transmitted through the transmission belt 10, so that the winding device can be changed from manpower to electric power, the manpower can be reduced, and the physical consumption of workers can be reduced;
the second rotary column 12 is positioned at the upper end of the second support column 11, the outer layer of the second rotary column 12 is connected with a second roller 13, the second roller 13 and the second rotary column 12 form an integrated structure, and the second rotary column 12 and the second roller 13 are bonded, through the arrangement of the second support column 11, the second rotary column 12, the second roller 13 and the second support column 11, the rollers can be supported, the second rotary column 12 can drive the second roller 13 to rotate, the friction of the wire can be reduced through the second roller 13, the surface of the second roller 13 can be prevented from having elasticity through the elastic outer sleeve 24, so that the friction in the paying-off process can be reduced, and the wire cannot be damaged in the paying-off process;
the outer arrangement of second cylinder 13 has elasticity overcoat 24, second cylinder 13 is provided with two, and be fixed connection between second cylinder 13 and the elasticity overcoat 24, the left end of casing 14 is provided with pipeline 15, and the left end of pipeline 15 is connected with gauze wiping layer 16, water layer 17 is installed to the left end of gauze wiping layer 16, the upper end of pipeline 15 is provided with third support column 21, and the right-hand member of third support column 21 is connected with heating machine 22, heating machine 22 is the symmetric distribution about the axis of spliced pole 18, and be fixed connection between heating machine 22 and the third support column 21, the right-hand member of heating machine 22 is provided with hot gas outlet 23, and the right-hand member of hot gas outlet 23 is provided with air outlet 25, constitute the integrated structure between heating machine 22 and the hot gas outlet 23, and be the bonding between heating machine 22 and the hot gas outlet 23, the utility model discloses a gauze wiping layer 16, water layer 17, The setting of fan 20 and heater 22, can wipe the earth on the line at the wiping of receipts line through gauze wiping layer 16, can make the line further wash when receiving the line through water layer 17, the steam that can make heater 22 produce through fan 20 blows to the line, can produce steam through heater 22, can wash the outward appearance of line when receiving the line like this, it has fan 20 to settle the upper end of wind gap 25, and the upper end of fan 20 is provided with second motor 19, the upper end of second motor 19 is connected with spliced pole 18, fan 20 constitutes revolution mechanic through between second motor 19 and the spliced pole 18, and be the welding between second motor 19 and the spliced pole 18.
The working principle is as follows: when the pay-off device for the building construction engineering is used, firstly, a wire passes between the two second rollers 13 during pay-off, then the first motor 9 is started to work, the first motor 9 transmits power to the first rotary column 6 through the transmission belt 10 after working, then the first roller 7 and the first motor 9 rotate, then the pay-off effect is realized, when the wire is taken up, the wire firstly passes through the pipeline 15 and then passes through the two second rollers 13, and finally is connected with the first roller 7, then the first motor 9 is started, the first roller 7 is rotated by using the first motor 9, then the wire is pulled to be wound on the first roller 7, then when the wire passes through the gauze wiping layer 16 and the water passing layer 17, the wire is cleaned, meanwhile, the second motor 19 connected with the connecting post 18 works, then the second motor 19 drives the fan 20 to rotate, the fan 20 blows air downward, and then the operation of the heater 22 is started, and the operation of the heater 22 produces hot air, and then the line passing through the water layer 17 is dried by the fan 20.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a pay-off for construction engineering, includes base (1) and second column spinner (12), its characterized in that: the lower end of the base (1) is provided with wheels (2), the left end of the base (1) is connected with a baffle (3), the left end of the baffle (3) is provided with a handle (4), the upper end of the base (1) is sequentially provided with a first supporting column (5), a first motor (9), a second supporting column (11) and a shell (14) from left to right, a first rotary column (6) is arranged between the first supporting columns (5), the outer layer of the first rotary column (6) is connected with a first roller (7), the outer layer of the first roller (7) is provided with a partition plate (8), the upper end of the first motor (9) is provided with a driving belt (10), the second rotary column (12) is positioned at the upper end of the second supporting column (11), the outer layer of the second rotary column (12) is connected with a second roller (13), the outer layer of the second roller (13) is provided with an elastic jacket (24), the left end of casing (14) is provided with pipeline (15), and the left end of pipeline (15) is connected with gauze and cleans layer (16), water layer (17) are installed to the left end of gauze and clean layer (16), the upper end of pipeline (15) is provided with third support column (21), and the right-hand member of third support column (21) is connected with heating machine (22), the right-hand member of heating machine (22) is provided with steam outlet (23), and the right-hand member of steam outlet (23) is provided with wind gap (25), settle the upper end in wind gap (25) has fan (20), and the upper end of fan (20) is provided with second motor (19), the upper end of second motor (19) is connected with spliced pole (18).
2. The paying-off device for building construction engineering according to claim 1, wherein: the fan (20) forms a rotating structure through the second motor (19) and the connecting column (18), and the second motor (19) and the connecting column (18) are welded.
3. The paying-off device for building construction engineering according to claim 1, wherein: the second roller (13) and the second rotating column (12) form an integrated structure, and the second rotating column (12) is bonded with the second roller (13).
4. The paying-off device for building construction engineering according to claim 1, wherein: the heating machine (22) is symmetrically distributed about the central axis of the connecting column (18), and the heating machine (22) is fixedly connected with the third supporting column (21).
5. The paying-off device for building construction engineering according to claim 1, wherein: an integrated structure is formed between the heating machine (22) and the hot gas outlet (23), and the heating machine (22) and the hot gas outlet (23) are bonded.
6. The paying-off device for building construction engineering according to claim 1, wherein: the number of the second rollers (13) is two, and the second rollers (13) are fixedly connected with the elastic outer sleeve (24).
CN202120179623.5U 2021-01-22 2021-01-22 Pay-off for construction engineering Expired - Fee Related CN214217798U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120179623.5U CN214217798U (en) 2021-01-22 2021-01-22 Pay-off for construction engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120179623.5U CN214217798U (en) 2021-01-22 2021-01-22 Pay-off for construction engineering

Publications (1)

Publication Number Publication Date
CN214217798U true CN214217798U (en) 2021-09-17

Family

ID=77690554

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120179623.5U Expired - Fee Related CN214217798U (en) 2021-01-22 2021-01-22 Pay-off for construction engineering

Country Status (1)

Country Link
CN (1) CN214217798U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114261847A (en) * 2021-12-27 2022-04-01 江西应用技术职业学院 Pay-off is used in engineering survey and drawing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114261847A (en) * 2021-12-27 2022-04-01 江西应用技术职业学院 Pay-off is used in engineering survey and drawing

Similar Documents

Publication Publication Date Title
CN214217798U (en) Pay-off for construction engineering
CN209199685U (en) Cable recycling and processing device
CN212257048U (en) Cable surface cleaning device
CN210529138U (en) Spinning dust treatment device for grey-colored spun yarns
CN211366616U (en) Colliery is supply cable winding and unwinding devices in pit
CN105013740A (en) Cable cleaning and baking equipment
CN112591546A (en) Cable straightening equipment for municipal engineering
CN114572769A (en) Cable pay-off and take-up device for building engineering with clean effect
CN209036957U (en) Cable extruding machine
CN111485341A (en) Textile cloth coloring production line and printing and dyeing method thereof
CN114592289A (en) Dyeing device for textile yarns
CN208309154U (en) Humidification mechanism is used in a kind of processing of yarn
CN212494262U (en) Belt cleaning device is used in wire and cable production
CN210450031U (en) Cable surface's belt cleaning device
CN107724055A (en) A kind of glass fabric segmenting device
CN114803715B (en) Filament processing is with coiling mechanism that has continuous equipment of winding up for superfine denier socks
CN215402306U (en) Clean type cable winding device
CN212168407U (en) Building steel pipe surface cement cleaning device
CN209633483U (en) A kind of building construction cutter device
CN210784191U (en) Wall surface cleaning device
CN207633086U (en) A kind of glass fabric segmenting device
CN217534997U (en) Cable processing wind
CN213543104U (en) Cleaning and drying device for cables
CN210730337U (en) Copper alloy wire washing device
CN204769665U (en) Cable conductor washs drying equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210917