CN214217088U - Underground coal mine transportation system and rapid tunneling system - Google Patents

Underground coal mine transportation system and rapid tunneling system Download PDF

Info

Publication number
CN214217088U
CN214217088U CN202022870167.7U CN202022870167U CN214217088U CN 214217088 U CN214217088 U CN 214217088U CN 202022870167 U CN202022870167 U CN 202022870167U CN 214217088 U CN214217088 U CN 214217088U
Authority
CN
China
Prior art keywords
tail
machine
anchor
belt conveyor
transportation system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022870167.7U
Other languages
Chinese (zh)
Inventor
耿海涛
陈建华
张毅
曲高飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Daosike Mining Equipment Technology Co ltd
Original Assignee
Beijing Daosike Mining Equipment Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Daosike Mining Equipment Technology Co ltd filed Critical Beijing Daosike Mining Equipment Technology Co ltd
Priority to CN202022870167.7U priority Critical patent/CN214217088U/en
Application granted granted Critical
Publication of CN214217088U publication Critical patent/CN214217088U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a colliery is transportation system and rapid excavation system in pit, it includes bridge type elevating conveyor, transition belt conveyor and telescopic belt conveyor, bridge type elevating conveyor includes first elevating conveyor body and first aircraft nose that connect gradually, transition belt conveyor includes first aircraft tail, second elevating conveyor body and second aircraft nose that connect gradually, telescopic belt conveyor includes the second aircraft tail, first aircraft nose can overlap joint and can move along the first aircraft tail with first aircraft tail rotatablely, the second aircraft nose can overlap joint and can move along the second aircraft tail with the second aircraft tail rotatablely; the rapid tunneling system comprises a tunneling and anchoring machine, an anchoring and transporting integrated machine and a coal mine underground transportation system, wherein a first transshipment machine body of the coal mine underground transportation system is connected with the anchoring and transporting integrated machine. The utility model discloses prolonged the displacement of bridge type elevating conveyor, reduced the frequency of extension telescopic belt conveyor, increased the continuous operation time of entry driving machine, improved tunnelling efficiency, alleviateed workman's intensity of labour.

Description

Underground coal mine transportation system and rapid tunneling system
Technical Field
The utility model belongs to the technical field of mining equipment technique and specifically relates to a colliery is transportation system in pit and quick tunnelling system.
Background
The existing coal mine underground roadway tunneling process comprises the following steps: and when the tunneling machine is pushed forward, the bridge type reversed loader moves along the tail of the belt conveyor along with the tunneling machine. Because the tail length of the belt conveyor is limited, the moving distance of the bridge type reversed loader on the tail of the belt conveyor is limited, after the heading machine digs a certain distance, the belt conveyor needs to be manually extended, so that the bridge type reversed loader can continuously move along the tail of the belt conveyor, the whole system needs to be stopped when the belt conveyor is extended, the heading efficiency is seriously influenced by frequent stopping, and the labor intensity of workers is high.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a colliery is transportation system in pit and quick tunnelling system to solve prior art and need frequently prolong belt conveyor, tunnelling inefficiency problem.
In order to achieve the above object, the utility model provides a colliery is conveyor system in pit, it includes bridge type elevating conveyor, transition belt conveyor and telescopic belt conveyor, bridge type elevating conveyor is including the first elevating conveyor body and the first aircraft nose that connect gradually, transition belt conveyor is including the first aircraft tail, second elevating conveyor body and the second aircraft nose that connect gradually, telescopic belt conveyor includes the second aircraft tail, first aircraft nose can rotate ground with first aircraft tail overlap joint can be followed first aircraft tail removes, second aircraft nose can rotate ground with second aircraft tail overlap joint can be followed the second aircraft tail removes.
The underground coal mine transportation system comprises a first machine head, a first tail, a second machine head, a second tail, a three-degree-of-freedom lapping mechanism, a lapping trolley, a middle turntable and a top turntable, wherein the first machine head and the first tail and the second machine head and the second tail are lapped through the three-degree-of-freedom lapping mechanism, the three-degree-of-freedom lapping mechanism comprises a lapping trolley, the middle turntable and the top turntable, the lapping trolley can be movably connected with the first machine tail or the second machine tail, the middle turntable is rotatably connected with the lapping trolley through a first connecting shaft, the top turntable is rotatably connected with the middle turntable through a second connecting shaft, the top turntable is rotatably connected with the first machine head or the second machine head through a third connecting shaft, and the first connecting shaft, the second connecting shaft and the third connecting shaft are perpendicular to each other.
The underground coal mine transportation system is characterized in that the first machine tail and the second machine tail are respectively provided with two parallel machine tail rails arranged side by side and a buffering material receiving part positioned between the two machine tail rails, the lapping trolley is provided with two groups of rail clamping wheels and two groups of wheels, the two groups of rail clamping wheels are respectively in rolling fit with the outer side surfaces of the two machine tail rails, and the two groups of wheels are respectively in rolling fit with the top surfaces of the two machine tail rails.
The underground coal mine transportation system comprises a first transfer machine body, a first sliding shoe rack and a second sliding shoe rack, wherein the first sliding shoe rack can slide along the ground; the tail part of the second transshipping machine body is provided with a second skid shoe rack capable of sliding along the ground, and the second skid shoe rack supports the tail part of the second transshipping machine body.
The underground coal mine transportation system comprises a first machine tail, a second machine tail and a third machine tail, wherein the first machine tail comprises a plurality of first bottom plate sliding shoe assemblies which are arranged at intervals along the length direction of the first machine tail, and each first bottom plate sliding shoe assembly comprises two first bottom plate sliding shoes which are arranged at intervals along the width direction of the first machine tail and can slide along the ground; the second tail comprises a plurality of second bottom plate sliding shoe assemblies which are arranged along the length direction of the second tail at intervals, and each second bottom plate sliding shoe assembly comprises two second bottom plate sliding shoes which are arranged along the width direction of the second tail at intervals and can slide along the ground.
The underground coal mine transportation system comprises a bridge type reversed loader body, a tail receiving groove and a first belt, wherein the tail receiving groove is connected with the tail of the first reversed loader body, the first belt is used for supporting and conveying materials, the first reversed loader body comprises a first bridge type reversed loading truss and a first carrier roller mechanism arranged on the first bridge type reversed loading truss, the first machine head comprises a first head roller and a first driving device connected with the first head roller, the first belt is sleeved on the tail receiving groove, the first carrier roller mechanism and the first head roller, and the first driving device drives the first belt to rotate through the first head roller.
The underground coal mine transportation system comprises a transition belt conveyor and a second belt, wherein the second belt is used for supporting and conveying materials, the first tail is provided with a first buffering material receiving part, the second transshipping machine body comprises a second bridge type transshipping truss and a second carrier roller mechanism arranged on the second bridge type transshipping truss, the second head comprises a second head roller and a second driving device connected with the second head roller, the second belt is sleeved on the first buffering material receiving part, the second carrier roller mechanism and the second head roller, and the second driving device drives the second belt to rotate through the second head roller.
The underground coal mine transportation system comprises a first belt, a second belt, a telescopic belt, a belt storage bin and a material conveying platform car, wherein the telescopic belt is used for supporting and conveying materials, the belt storage bin is used for storing the telescopic belt, the material conveying platform car is movably arranged on a machine body section of the telescopic belt conveyor, the second machine tail is provided with a second buffering material receiving part, and the telescopic belt penetrates through the machine body section of the telescopic belt conveyor and is sleeved on the second buffering material receiving part.
The utility model also provides a quick excavation system, it is including driving anchor machine, the broken all-in-one of anchor fortune and foretell colliery underground transportation system, colliery underground transportation system's first transshipping fuselage with the broken all-in-one of anchor fortune is connected.
The rapid tunneling system as described above, wherein the tunneling and anchoring machine comprises a first transfer device, the anchor transporting and breaking integrated machine comprises a frame, a second transfer device, a crushing device, a top anchor supporting device and a side anchor supporting device, the second transfer device is arranged on the frame, a material receiving box corresponding to the discharge hole of the first transfer device is arranged at the head end of the second transfer device, the bridge type reversed loader also comprises a tail receiving groove connected with the tail part of the first reversed loader body, a discharge opening at the tail end of the second transfer device faces the tail receiving groove, the crushing device is fixed on the outer side of the material receiving box and is positioned above the chute of the second transfer device, the top anchor supporting device comprises a plurality of top anchor rod drilling machines arranged on the rack, and the side anchor supporting device comprises a plurality of side anchor rod drilling machines arranged on the rack.
The utility model discloses a colliery is transport system in pit and quick excavation system's characteristics and advantage are:
1. the utility model has the advantages that the transition belt conveyor is arranged, so that the bridge type reversed loader needs to be extended once after two sections of sliding, compared with the prior art, the moving distance of the bridge type reversed loader is extended, the frequency of extending the telescopic belt conveyor is reduced, the continuous working time of the development machine is increased, the development efficiency is improved, and the labor intensity of workers is reduced; in addition, the first machine head part of the utility model can be rotationally lapped with the first machine tail, and the second machine head part can be rotationally lapped with the second machine tail, thereby increasing the degree of freedom of the first machine head part and the second machine head part and improving the maneuverability and flexibility of the system;
2. the utility model has the advantages that the three-freedom-degree lap joint mechanism is arranged, so that the first machine head part has the freedom degrees of pitching, tilting and horizontal rotation when moving on the first machine tail, and the second machine head part has the freedom degrees of pitching, tilting and horizontal rotation when moving on the second machine tail;
3. the utility model discloses a set up the skid shoe frame at the afterbody of first elevating conveyor body, make the afterbody of bridge type elevating conveyor sit on ground and support by ground, thus make the bridge type elevating conveyor remove and the fortune material is more steady, and in the prior art, the afterbody of bridge type elevating conveyor is unsettled state and is connected with anchor fortune brokenly all-in-one, the stationarity that the bridge type elevating conveyor removed and the fortune material is relatively poor, and the afterbody weight of bridge type elevating conveyor presses on anchor fortune brokenly all-in-one, easily damages anchor fortune brokenly all-in-one, the dismouting between anchor fortune brokenly all-in-one and the bridge type elevating conveyor is also inconvenient;
4. the utility model provides an anchor driving machine carries out necessary anchor net when the tunnel is opened up and struts, and the broken all-in-one of anchor fortune is used with anchor driving machine is supporting, and the broken all-in-one of anchor fortune carries out the strutting of surplus stock and anchor rope, plays the reinforcement, mends the effect of anchor and transportation, has realized digging, a balance, guarantees to become the tunnel quality, is favorable to improving the work efficiency of anchor driving machine, is favorable to accelerating tunnelling speed.
Drawings
The drawings are only intended to illustrate and explain the present invention and do not limit the scope of the invention. Wherein:
FIG. 1 is a schematic view of the coal mine underground transportation system of the present invention in an initial state;
FIG. 2 is an enlarged view of a portion of FIG. 1 at A;
FIG. 3 is a cross-sectional view taken along line B-B of FIG. 1;
FIG. 4 is a cross-sectional view taken along line C-C of FIG. 2;
FIG. 5 is a schematic diagram of the coal mine underground transportation system of the present invention at a first working stage;
FIG. 6 is a schematic diagram of the coal mine underground transportation system of the present invention in a second working stage;
FIG. 7 is a schematic diagram of the underground transportation system of the coal mine of the present invention at a third working stage;
fig. 8 is a schematic structural view of the transition belt conveyor of the present invention;
FIG. 9 is an enlarged view of a portion of FIG. 8 at D;
fig. 10 is a partial enlarged view at E in fig. 8;
FIG. 11 is an enlarged view of a portion of FIG. 8 at F;
fig. 12 is a schematic structural view of the rapid tunneling system of the present invention;
FIG. 13 is a schematic diagram of the anchor handling and breaking all-in-one machine of FIG. 12;
FIG. 14 is a schematic illustration of the mating of the material handling platform cart and the fuselage sections of the telescopic belt conveyor of FIG. 12;
fig. 15 is a schematic structural view of the tape magazine of fig. 12.
Main element number description:
1. a bridge type reversed loader;
11. a machine tail receiving groove; 111. a frame body; 112. a carrier roller assembly; 113. an anti-overflow apron board;
12. a first transfer body; 121. A first bridge type transshipment truss; 122. A first carrier roller mechanism;
13. a first head section; 131. A first head drum; 132. A first head frame;
14. a first bootie frame; 141. a support; 142. a base plate; 15. a first belt;
2. a transition belt conveyor;
21. a first tail; 211. a tail rail; 212. a buffer receiving part; 213. a first baseplate shoe assembly;
22. a second transfer body; 221. a second bridge type transshipment truss; 222. a second carrier roller mechanism;
23. a second nosepiece; 231. a second head roller; 232. a second header frame body;
24. a second bootie frame; 25. a first traction winch; 26. a second belt;
3. a telescopic belt conveyor;
31. a second tail; 311. a second baseplate slipper assembly; 32. a second traction winch; 33. a retractable belt;
34. a fuselage section;
4. an anchoring and transporting integrated machine;
41. a frame; 42. a second transfer device; 43. a crushing device; 44. a top jumbolter;
45. assisting an anchor rod drilling machine; 46. a material receiving box; 47. an automatic lapping mechanism; 48. a lifting platform;
5. digging and anchoring machine; 51. a first transfer device;
6. a three-degree-of-freedom lapping mechanism;
61. lapping the trolleys; 611. clamping a rail wheel; 612. a wheel; 62. a middle turntable; 63. a top turntable;
64. a first connecting shaft; 65. a second connecting shaft; 66. a third connecting shaft;
7. a tape storage bin;
71. a belt storage bin frame body; 72. an adjustable head; 721. a head direction-changing drum; 722. an upper telescopic rod;
723. a lower telescopic rod; 73. tensioning a winch; 74. tensioning the vehicle; 75. a tape storage bin track;
8. fortune material platform truck.
Detailed Description
In order to clearly understand the technical features, objects, and effects of the present invention, embodiments of the present invention will be described with reference to the accompanying drawings. Where adjective or adverbial modifiers "upper" and "lower", "top" and "bottom", "inner" and "outer", "leading" and "trailing" are used merely to facilitate relative reference between groups of terms, and do not describe any particular directional limitation on the modified terms. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated, whereby a feature defined as "first", "second", etc. may explicitly or implicitly include one or more of such features. In the description of the present invention, "a plurality" means two or more unless otherwise specified. In the description of the present invention, unless otherwise specified, the term "connected" is to be understood broadly, for example, it may be a fixed connection, a detachable connection, a direct connection, or an indirect connection via an intermediate medium, and those skilled in the art can understand the specific meaning of the above terms in this patent according to specific situations.
Implementation mode one
As shown in fig. 1, the utility model provides a coal mine underground transportation system, which comprises a bridge type reversed loader 1, a transition belt conveyor 2 and a telescopic belt conveyor 3, wherein the bridge type reversed loader 1 comprises a first reversed loader body 12 and a first head part 13 which are connected in sequence, the transition belt conveyor 2 comprises a first tail 21, a second reversed loader body 22 and a second head part 23 which are connected in sequence, the telescopic belt conveyor 3 comprises a second tail 31, the length of the first tail 21 and the length of the second tail 31 can be set according to requirements, the first head part 13 can be rotatably overlapped with the first tail 21 and can move along the first tail 21, the second head part 23 can be rotatably overlapped with the second tail 31 and can move along the second tail 31, namely, the first tail 21 is used as a sliding track of the bridge type reversed loader 1, the second tail 31 is used as a sliding track of the belt conveyor 2, the bridge type reversed loader 1 is used for being connected with the anchor conveying and breaking all-in-one machine 4, and materials mined by the tunneling and anchoring machine 5 are conveyed to the outside of a roadway sequentially through the anchor conveying and breaking all-in-one machine 4, the bridge type reversed loader 1, the transition belt conveyor 2 and the telescopic belt conveyor 3.
The utility model provides a bridge type elevating conveyor 1, transition belt conveyor 2 and telescopic belt conveyor 3 constitute the telescopic part of conveying system jointly, and this telescopic part's concrete working process is:
(1) initial state
As shown in fig. 1, the first nose portion 13 of the bridge elevating conveyor 1 is located at the tail end of the first tail 21, and the second nose portion 23 of the transition belt conveyor 2 is located at the tail end of the second tail 31, i.e. the telescopic portion of the conveying system is in a contracted state;
(2) first working phase
As shown in fig. 5, the bridge type reversed loader 1 is tunneled forwards along with the tunneling and anchoring machine 5 and the anchoring and breaking integrated machine 4, during the tunneling process, the first machine head 13 moves forwards along the first machine tail 21 (the transition belt conveyor 2 and the telescopic belt conveyor 3 are not moved), when the first machine head 13 moves to the head end of the first machine tail 21, the first working phase is ended (as shown in fig. 5), for example, the moving distance of the bridge type reversed loader 1 in the phase is 50 meters;
(3) second working phase
As shown in fig. 6, the transition belt conveyor 2 is pulled in the driving direction (i.e. forward), during which the first tail 21 moves forward relative to the first head 13 (the bridge type elevating conveyor 1 and the telescopic belt conveyor 3 are not moving), and the second head 23 moves forward along the second tail 31, and when the first head 13 is located at the head end of the first tail 21, the pulling is stopped, and when the second head 23 is located at the head end of the second tail 31, the second working phase is finished (as shown in fig. 6), for example, the moving distance of the transition belt conveyor 2 at this stage is 50 meters;
(4) the third working phase
As shown in fig. 7, the bridge type reversed loader 1 continues to dig forward along with the digging and anchoring machine 5 and the anchoring and breaking integrated machine 4, during which the first machine head 13 moves forward along the first machine tail 21 (the transition belt conveyor 2 and the telescopic belt conveyor 3 are not moving), and when the first machine head 13 moves to the head end of the first machine tail 21 again, the third working phase is ended (as shown in fig. 7), for example, the moving distance of the bridge type reversed loader 1 at this phase is 50 meters. At this point, the bridge type reversed loader 1 finishes the reversed loading stroke of 100 meters, then the telescopic belt conveyor 3 is manually extended, and then the transition belt conveyor 2 is pulled forwards, so that the relative positions of the bridge type reversed loader 1, the transition belt conveyor 2 and the telescopic belt conveyor 3 return to the initial state.
The utility model discloses a set up transition belt conveyor 2, make bridge type elevating conveyor 1 just need prolong telescopic belt conveyor 3 once after two sections slip, compare with prior art, prolonged bridge type elevating conveyor 1's displacement, reduced the frequency that prolongs telescopic belt conveyor 3, increased the continuous operation time of entry driving machine, improve tunnelling efficiency, alleviateed workman's intensity of labour.
The utility model discloses well first locomotive portion 13 can rotate ground and 21 laps of first tail, second locomotive portion 23 can rotate ground and 31 laps of second tail to first locomotive portion 13 and the degree of freedom of second locomotive portion 23 have been increased, for example make the locomotive portion have around every single move, tilt and horizontal rotation's degree of freedom, improve the mobility and the flexibility of system, the adaptability of reinforcing equipment to the change of tunnel topography, and eliminate the influence of tunnel topography change to equipment truss atress.
As shown in fig. 1, further, the bridge type reversed loader 1 further includes a tail receiving trough 11 connected to the tail of the first reversed loader body 12, that is, the tail receiving trough 11, the first reversed loader body 12 and the first head 13 are connected in sequence, the first reversed loader body 12 is connected to the anchor transporting and breaking all-in-one machine 4 through the tail receiving trough 11, and the tail receiving trough 11 can receive the materials transported by the anchor transporting and breaking all-in-one machine 4.
As shown in fig. 4, further, the machine tail receiving trough 11 includes a frame body 111, a plurality of carrier roller assemblies 112 arranged on the frame body 111, and anti-overflow skirtboards 113 arranged on the carrier roller assemblies 112, the carrier roller assemblies 112 are arranged at intervals along the length direction of the frame body 111, each carrier roller assembly 112 includes a left carrier roller, a middle carrier roller and a right carrier roller which are sequentially connected along the width direction of the frame body 111, the left carrier roller, the middle carrier roller and the right carrier roller enclose a V-shaped or U-shaped blanking trough, the number of the anti-overflow skirtboards 113 is two, and the two anti-overflow skirtboards 113 are respectively arranged at two sides of the blanking trough to prevent the overflow of the material in the blanking trough.
When components/devices with different arrangement positions but the same structure and operation principle are introduced, the components/devices are not distinguished by names and reference numbers for the sake of simplicity of description.
As shown in fig. 8 and 9, in an embodiment of the present invention, the first nose portion 13 and the first tail 21, and the second nose portion 23 and the second tail 31 are overlapped by the three-degree-of-freedom overlapping mechanism 6, the three-degree-of-freedom overlapping mechanism 6 includes an overlapping trolley 61, a middle turntable 62 and a top turntable 63, the overlapping trolley 61 is movably connected to the first tail 21 or the second tail 31, that is, the lapping trolley 61 on the first tail 21 can move along the first tail 21, the lapping trolley 61 on the second tail 31 can move along the second tail 31, the middle turntable 62 is rotatably connected with the lapping trolley 61 through the first connecting shaft 64, the top turntable 63 is rotatably connected with the middle turntable 62 through the second connecting shaft 65, the top turntable 63 is rotatably connected with the first nose part 13 or the second nose part 23 through the third connecting shaft 66, and the first connecting shaft 64, the second connecting shaft 65 and the third connecting shaft 66 are perpendicular to each other.
Specifically, the first connecting shaft 64 and the second connecting shaft 65 are both provided in the horizontal direction to provide the head with the freedom of pitching back and forth and tilting left and right, and the third connecting shaft 66 is provided in the vertical direction to provide the head with the freedom of rotating horizontally. For example, the first connecting shaft 64 is provided along the width direction (left-right direction) of the first tail 21 or the second tail 31 to provide the nose portion with the degree of freedom of pitching forward and backward, and the second connecting shaft 65 is provided along the length direction (front-back direction) of the first tail 21 or the second tail 31 to provide the nose portion with the degree of freedom of tilting left and right.
Further, the first connecting shaft 64, the second connecting shaft 65 and the third connecting shaft 66 are pin shafts, so that the structure is simple, and the assembly and disassembly are convenient.
As shown in fig. 1 and 3, further, the first tail 21 and the second tail 31 both have two tail rails 211 arranged in parallel and a buffering material receiving portion 212 located between the two tail rails 211, the lapping trolley 61 has two sets of rail clamping wheels 611 and two sets of wheels 612 (as shown in fig. 9), the two sets of rail clamping wheels 611 are respectively in rolling fit with the outer side surfaces of the two tail rails 211, the two sets of wheels 612 are respectively in rolling fit with the top surfaces of the two tail rails 211, the stable movement of the nose is ensured by the two sets of rail clamping wheels 611 and the two sets of wheels 612, and the nose can be prevented from being turned over by the arrangement of the rail clamping wheels 611. Fig. 3 shows a sectional structure view of the first tail 21, a sectional structure of the second tail 31 is the same as that of the first tail 21, and a connecting structure of the second tail 31 and the lap cart 61 is the same as that of the first tail 21 and the lap cart 61.
As shown in fig. 3, the buffering material receiving portion 212 is a buffering blanking section formed by a plurality of buffering roller sets which are sequentially arranged along the length direction of the tail, for example, each buffering roller set is formed by three rollers sequentially connected along the width direction of the tail, and each buffering roller set is substantially V-shaped or U-shaped, so that the material receiving and conveying are facilitated, and the buffering effect on the blanking can be achieved.
As shown in fig. 1 and 3, further, the first tail 21 includes a plurality of first floor shoe assemblies 213 arranged at intervals along the length direction of the first tail 21, and each first floor shoe assembly 213 includes two first floor shoes that are arranged at intervals along the width direction of the first tail 21 and can slide along the ground, so that the first tail 21 can slide on the ground; the second tail 31 includes a plurality of second bottom plate shoe assemblies 311 (shown in fig. 1) arranged at intervals along the length direction of the second tail 31, and each second bottom plate shoe assembly 311 includes two second bottom plate shoes arranged at intervals along the width direction of the second tail 31 and capable of sliding along the ground, so that the second tail 31 can slide on the ground.
Specifically, two first bottom plate sliding shoes of the first bottom plate sliding shoe assembly 213 are respectively fixed at the bottoms of two tail rails 211 of the first tail 21, and two second bottom plate sliding shoes of the second bottom plate sliding shoe assembly 311 are respectively fixed at the bottoms of two tail rails 211 of the second tail 31, so as to ensure that the first tail 21 and the second tail 31 slide stably.
Further, the cable frames are arranged at the side edges of the first machine tail 21 and the second machine tail 31, and cable clamps for clamping cables are arranged in the cable frames, so that when the bridge type reversed loader 1 and the transition belt conveyor 2 move in the tunneling process, the cables can integrally move along with the equipment, the cables do not need to be connected in the tunneling process, and the tunneling efficiency and the tunneling speed are further improved.
As shown in fig. 1, in an embodiment of the present invention, a first sliding shoe rack 14 capable of sliding along the ground is disposed at the tail of the first transfer machine body 12, and the first sliding shoe rack 14 can support the tail receiving trough 11 and the tail of the first transfer machine body 12; the afterbody of second elevating conveyor body 22 is equipped with the gliding second boots frame 24 of ability along ground, the afterbody of second elevating conveyor body 22 is supported to the gliding boots frame 24 of second, this embodiment sets up first boots frame 14 through the afterbody at first elevating conveyor body 12, make the afterbody of bridge type elevating conveyor 1 sit on ground by ground support, thereby make bridge type elevating conveyor 1 remove and the fortune material more steady, and among the prior art, the afterbody of bridge type elevating conveyor is unsettled state and is connected with broken all-in-one of anchor fortune, the stationarity that the bridge type elevating conveyor removed and fortune material is relatively poor, and the afterbody weight of bridge type elevating conveyor presses on broken all-in-one of anchor fortune, easily damage broken all-in-one of anchor fortune, the dismouting between broken all-in-one of anchor fortune and the bridge type elevating conveyor is also inconvenient. In the embodiment, the sliding shoe frame is arranged at the tail part of the second transfer machine body 22, so that the tail part of the second transfer machine body 22 of the transition belt conveyor 2 is supported by the ground by sitting on the ground, and the movement and the material transportation of the transition belt conveyor 2 are more stable.
As shown in fig. 1 and 2, each of the first and second bootlegs 14 and 24 includes a bracket 141 and two bottom plates 142, the two bottom plates 142 are fixed at the bottom of the bracket 141 and are spaced apart from each other, the two bottom plates 142 are used for contacting with the ground and sliding along the ground, the top of the bracket 141 of the first bootleg 14 is fixedly connected to the first reloading body 12, and the top of the bracket 141 of the second bootleg 24 is fixedly connected to the second reloading body 22.
As shown in fig. 1, in an embodiment of the present invention, a first traction winch 25 is disposed at the tail of the transition belt conveyor 2 for driving the transition belt conveyor 2 to move toward the tunneling direction, and a second traction winch 32 is disposed at the tail of the telescopic belt conveyor 3 for driving the telescopic belt conveyor 3 to move toward the tunneling direction. Specifically, the steel wire rope of the first traction winch 25 is fixedly connected with the anchoring and transporting integrated machine 4 through a steel wire rope seat, and the steel wire rope of the second traction winch 32 is fixedly connected with the second sliding shoe frame 24 of the transition belt conveyor 2 through the steel wire rope seat.
As shown in fig. 1 and fig. 2, in an embodiment of the present invention, the bridge type transloader 1 further includes a first belt 15 for supporting and conveying the material, the first transloader body 12 includes a first bridge type transloader truss 121 and a first roller mechanism 122 disposed on the first bridge type transloader truss 121, the first nose portion 13 includes a first nose portion frame 132, a first nose roller 131 rotatably disposed on the first nose portion frame 132 and a first driving device connected to the first nose roller 131, the first belt 15 is in a tensioning state and is sleeved on the machine tail receiving slot 11, the first roller mechanism 122 and the first nose roller 131, the first driving device drives the first nose roller 131 to rotate so that the first nose roller 131 drives the first belt 15 to rotate, so as to convey the material through the first belt 15.
Specifically, the top of the bracket 141 of the first sliding shoe rack 14 is fixedly connected to the bottom of the first bridge type reprinting truss 121 to support the tail of the first bridge type reprinting truss 121, the first idler mechanism 122 includes an upper idler assembly and a lower idler assembly, a plurality of idlers of the upper idler assembly are arranged at intervals along the length direction of the first bridge type reprinting truss 121, the lower idler assembly is located below the upper idler assembly, a plurality of idlers of the lower idler assembly are arranged at intervals along the length direction of the first bridge type reprinting truss 121, and the upper idler assembly and the lower idler assembly respectively support the upper part and the lower part of the first belt 15; the first head frame 132 and the top turntable 63 of the three-degree-of-freedom overlapping mechanism 6 are rotatably connected by a third connecting shaft 66.
As shown in fig. 8, in an embodiment of the present invention, the transition belt conveyor 2 further includes a second belt 26 for supporting and conveying the material, the first tail 21 has a first buffering material receiving portion (i.e. buffering material receiving portion 212), the second reprinting machine body 22 includes a second bridge type reprinting truss 221 and a second roller mechanism 222 (as shown in fig. 11) disposed on the second bridge type reprinting truss 221, the second machine head 23 includes a second head frame body 232, a second head roller 231 rotatably disposed on the second head frame body 232, and a second driving device connected to the second head roller 231, the second belt 26 is sleeved on the first buffering material receiving portion, the second roller mechanism 222, and the second head roller 231, and the second driving device drives the second head roller 231 to rotate so that the second head roller 231 drives the second belt 26 to rotate, so as to convey the material through the second belt 26.
Specifically, as shown in fig. 10, the top of the support of the second sliding shoe frame 24 is fixedly connected to the bottom of the second bridge-type transfer truss 221 to support the tail of the second bridge-type transfer truss 221; the specific structure of the second idler mechanism 222 is the same as the first idler mechanism 122, and therefore, the detailed description thereof is omitted.
As shown in fig. 12 and 14, in an embodiment of the present invention, the underground coal mine transportation system further includes a telescopic belt 33 for supporting and conveying the material, a belt storage bin 7 for storing the telescopic belt 33, and a material transporting platform car 8 movably disposed on the body section 34 of the telescopic belt conveyor 3, the second tail 31 has a second buffering material receiving portion, the structure of the second buffering material receiving portion is the same as the buffering material receiving portion 212, and the telescopic belt 33 passes through the body section 34 of the telescopic belt conveyor 3 and is sleeved on the second buffering material receiving portion.
Wherein, the material transporting platform vehicle 8 is used for the transportation of tunneling and anchoring materials in the tunneling process, and the connection mode between the material transporting platform vehicle 8 and the body section 34 of the telescopic belt conveyor 3 is the same as the connection mode between the first tail 21 and the lapping trolley 61, so the description is omitted.
As shown in fig. 15, further, the tape magazine 7 includes a tape magazine frame 71, an adjustable head 72, a tensioning winch 73, a tensioning car 74, and a tape magazine rail 75, the tape magazine rail 75 is provided on the tape magazine frame 71, and extends between the head and tail of the magazine frame 71, the tensioning carriage 74 is movably mounted on a magazine rail 75, the adjustable head 72 is arranged at the tail part of the belt storage bin frame body 71, the tensioning winch 73 is arranged at the head part of the belt storage bin frame body 71, a steel wire rope of the tensioning winch 73 is connected with the tensioning trolley 74, the tensioning winch 73 is used for providing tensioning force, the telescopic belt 33 bypasses the adjustable head 72 and the tensioning trolley 74, when the tensioning car 74 is positioned at the end of the magazine rail 75, the maximum amount of tape in the magazine 7, when the tensioning carriage 74 moves toward the head of the belt magazine body 71, the telescopic belt 33 is released and the second tail 31 of the telescopic belt conveyor 3 is moved back for use.
As shown in fig. 15, further, the adjustable head 72 includes a head direction-changing drum 721, an upper stretching rod 722 and a lower stretching rod 723, the telescopic belt 33 goes around the head direction-changing drum 721, the head direction-changing drum 721 is connected with the upper stretching rod 722 and the lower stretching rod 723, and the height of the head direction-changing drum 721 is adjusted by the telescopic movement of the upper stretching rod 722 and the lower stretching rod 723. For example, the upper and lower telescoping rods 722, 723 are hydraulic cylinders, pneumatic cylinders, or jacks.
Second embodiment
As shown in fig. 12, the utility model also provides a rapid tunneling system, its colliery underground transportation system that includes broken all-in-one of anchor fortune 4, driving anchor machine 5 and embodiment mode one, colliery underground transportation system's first elevating conveyor body 12 receives silo 11 to be connected with the broken all-in-one of anchor fortune 4 through the tail, and telescopic belt conveyor 3, transition belt conveyor 2, bridge type elevating conveyor 1, the broken all-in-one of anchor fortune 4 and driving anchor machine 5 set gradually towards the direction of drivage promptly.
The digging and anchoring machine 5 of the utility model carries out necessary anchor net supporting while the tunnel is developed; the anchor transporting and breaking integrated machine 4 is matched with the tunneling and anchoring machine 5 for use, the anchor transporting and breaking integrated machine 4 supports the rest anchor rods and anchor cables, the functions of reinforcement, anchor supplementing and transferring are achieved, the tunneling and supporting balance is achieved, the tunneling quality is guaranteed, the working efficiency of the tunneling and anchoring machine 5 is improved, and the tunneling speed is accelerated; the underground coal mine transportation system transports materials conveyed by the anchoring and breaking integrated machine 4 to the outside of a roadway, and the transition belt conveyor 2 is arranged, so that the moving distance of the bridge type reversed loader 1 is prolonged, the frequency of the telescopic belt conveyor 3 is reduced, the continuous working time of the tunneling machine is prolonged, the tunneling efficiency is further improved, the tunneling speed is accelerated, and the labor intensity of workers is reduced.
As shown in fig. 12 and 13, in an embodiment of the present invention, the anchor driving and transporting machine 5 includes a first transporting device 51, the anchor driving and transporting integrated machine 4 includes a frame 41, a second transporting device 42, a crushing device 43, a top anchor supporting device and a side anchor supporting device, the second transporting device 42 is disposed on the frame 41, a material receiving box 46 corresponding to a discharge port of the first transporting device 51 is disposed at a head end of the second transporting device 42, the material receiving box 46 is used for receiving materials transported by a transportation chute of the anchor driving machine 5, a discharge port at a tail end of the second transporting device 42 faces the machine tail material receiving box 11, the crushing device 43 is fixed outside the material receiving box 46 and above the chute of the second transporting device 42 for crushing large materials, the materials received by the material receiving box 46 are transported to the discharge port by the second transporting device 42 and then fall into the machine tail material receiving box 11 from the discharge port, for example, the first transporting device 51 and the second transporting device 42 are both scraper conveyors, the top anchor supporting device comprises a plurality of top anchor rod drilling machines 44 arranged on the rack 41, the anchor rod supporting device comprises a plurality of anchor rod drilling machines 45 arranged on the rack 41, and roadway full-section anchor rod anchor cable supporting operation is rapidly completed through the top anchor rod drilling machines 44 and the anchor rod drilling machines 45.
Further, the top anchor supporting device further comprises a translation sliding box portion arranged on the rack 41, the top anchor drilling machine 44 is connected with the rack 41 through the translation sliding box portion, and the top anchor drilling machine 44 can move towards two sides along with the movable box body of the translation sliding box portion, so that the top anchor supporting position is adjusted.
For example, the number of the top roof-bolter 44 is three, the translational slide box portion includes a fixed box body and two slide box bodies slidably connected with the fixed box body, the two slide box bodies can respectively slide in a translational manner towards two sides of the fixed box body, the three top roof-bolter 44 is respectively connected with the fixed box body and the two slide box bodies, and the two slide box bodies can drive the two top roof-bolter 44 connected with the two slide box bodies to slide in a translational manner towards two sides of the fixed box body, so as to adjust the supporting position of the two top roof-bolter 44. However, the present invention is not limited thereto, and the roof bolting rig 44 may also be connected to the frame by other existing translatable or horizontal telescoping mechanisms.
Further, the anchor supporting device further comprises a corner oil cylinder arranged on the frame 41, the anchor rod drilling machine 45 is connected with the frame 41 through the corner oil cylinder, and the anchor rod drilling machine 45 can rotate along with the corner oil cylinder, so that the anchor supporting position is adjusted.
For example, the number of the side roof bolters 45 is two, the two side roof bolters 45 are respectively connected with the frame 41 through a corner oil cylinder, and the rotation angle of the corner oil cylinder relative to the frame 41 can be adjusted, so that the rotation angle of the two side roof bolters 45 relative to the frame 41 can also be adjusted, and the supporting position of the two side roof bolters 45 can be adjusted. However, the present invention is not limited thereto, and the upper anchor drilling machine 45 may be connected to the frame 41 through other conventional rotatable mechanisms.
As shown in fig. 13, the anchor transporting and breaking all-in-one machine 4 further includes an automatic lapping mechanism 47, the automatic lapping mechanism 47 is connected with the frame 41, and the anchor transporting and breaking all-in-one machine 4 has an automatic lapping function by setting the automatic lapping mechanism 47, so that the tunneling efficiency is further improved, and the labor intensity of workers is reduced.
As shown in fig. 13, further, the anchoring and transporting integrated machine 4 further comprises a lifting platform 48, the lifting platform 48 comprises a platform body, the platform body is hinged to the frame 41 through a lifting cylinder and a link mechanism, and the platform body can move up and down under the driving of the lifting cylinder, so that the anchoring and protecting construction at different height positions in a roadway can be well met.
The devices such as the anchor driving machine 5, the crushing device 43, the top anchor drilling machine 44, the side anchor drilling machine 45, the automatic net laying mechanism 47 and the lifting platform 48 in the embodiment are the prior art, so the utility model discloses the concrete structure and the theory of operation of these devices are no longer introduced.
The utility model discloses an in the embodiment, the quick excavation system still includes the ventilation dust pelletizing system, and the ventilation dust pelletizing system adopts the method of "long pressure short pumping", improves the working face environment, improves the security. The structure of the ventilation and dust removal system is the prior art, and is not described in detail.
The utility model discloses an in the embodiment, the system of tunnelling fast still includes air supply system, and air supply system includes first dryer, second dryer and third dryer, and first dryer is the steel dryer, and the second dryer is folding scalable dryer, and the third dryer is ordinary dryer, and first dryer is fixed on the broken all-in-one of anchor fortune 4, and the both ends of second dryer are connected with first dryer and third dryer respectively. During initial tunneling, the whole second air duct is in a folding compression state (namely an initial state), the second air duct is gradually unfolded along with tunneling, and the third air duct is extended after the second air duct is completely unfolded, so that the second air duct is folded and compressed to the initial state. The foldable and telescopic second air duct has the advantages that the air duct does not need to be frequently prolonged in the tunneling process, and the tunneling efficiency and the tunneling speed are favorably improved.
The utility model discloses a quick excavation system has following advantage:
(1) by arranging the transition belt conveyor, the tunneling efficiency is improved, the footage speed is improved by more than one time under the same condition, the number of tunneling heads is reduced by 50 percent, the working reliability is higher, the labor intensity of workers is reduced, and the number of workers is reduced;
(2) by arranging the tunneling and anchoring machine and the anchoring and transporting integrated machine, parallel and balanced operation of tunneling and supporting is realized, and continuous outward transportation of materials of a tunneling head is realized;
(3) the roof jumbolter and the side jumbolter are arranged for supporting, so that the empty roof distance is very small, and safe operation can be realized;
(4) the complete set of the tunneling equipment is realized, the system is simple, efficient, safe and reliable in matching, and the equipment is independent and easy to maintain.
The above description is only exemplary of the present invention, and is not intended to limit the scope of the present invention. Any person skilled in the art should also realize that such equivalent changes and modifications can be made without departing from the spirit and principles of the present invention. Moreover, it should be noted that the components of the present invention are not limited to the above-mentioned integral application, and various technical features described in the present invention can be selected to be used alone or in combination according to actual needs, so that the present invention naturally covers other combinations and specific applications related to the invention of the present invention.

Claims (10)

1. The utility model provides a colliery is transportation system in pit which characterized in that, colliery is transportation system in pit includes bridge type elevating conveyor, transition belt conveyor and telescopic belt conveyor, bridge type elevating conveyor is including the first elevating conveyor body and the first aircraft nose that connect gradually, transition belt conveyor is including the first aircraft tail, second elevating conveyor body and the second aircraft nose that connect gradually, telescopic belt conveyor includes the second aircraft tail, first aircraft nose can rotate ground with first aircraft tail overlap joint can be followed first aircraft tail removes, the second aircraft nose can rotate ground with second aircraft tail overlap joint can be followed the second aircraft tail removes.
2. The underground coal mine transportation system of claim 1, wherein the first nose section and the first tail, and the second nose section and the second tail are all lapped by a three-degree-of-freedom lapping mechanism, the three-degree-of-freedom lapping mechanism comprises a lapping trolley, a middle turntable and a top turntable, the lapping trolley is movably connected with the first tail or the second tail, the middle turntable is rotatably connected with the lapping trolley by a first connecting shaft, the top turntable is rotatably connected with the middle turntable by a second connecting shaft, the top turntable is rotatably connected with the first nose section or the second nose section by a third connecting shaft, and the first connecting shaft, the second connecting shaft and the third connecting shaft are perpendicular to each other.
3. The underground coal mine transportation system of claim 2, wherein the first tail and the second tail each have two parallel side-by-side tail rails and a buffer material receiving portion between the two tail rails, the lapping trolley has two sets of rail clamping wheels and two sets of wheels, the two sets of rail clamping wheels are respectively in rolling fit with the outer side surfaces of the two tail rails, and the two sets of wheels are respectively in rolling fit with the top surfaces of the two tail rails.
4. The underground coal mine transportation system of claim 1, wherein the tail portion of the first transfer machine body is provided with a first skid shoe frame capable of sliding along the ground, and the first skid shoe frame supports the tail portion of the first transfer machine body; the tail part of the second transshipping machine body is provided with a second skid shoe rack capable of sliding along the ground, and the second skid shoe rack supports the tail part of the second transshipping machine body.
5. The underground coal mine transportation system of claim 1, wherein the first tail comprises a plurality of first bottom plate skid shoe assemblies arranged at intervals along the length direction of the first tail, each first bottom plate skid shoe assembly comprises two first bottom plate skid shoes which are arranged at intervals along the width direction of the first tail and can slide along the ground; the second tail comprises a plurality of second bottom plate sliding shoe assemblies which are arranged along the length direction of the second tail at intervals, and each second bottom plate sliding shoe assembly comprises two second bottom plate sliding shoes which are arranged along the width direction of the second tail at intervals and can slide along the ground.
6. The underground coal mine transportation system according to any one of claims 1 to 5, wherein the bridge type transloader further comprises a tail receiving slot connected with a tail part of the first transloader body and a first belt for supporting materials, the first transloader body comprises a first bridge type transloader truss and a first roller mechanism arranged on the first bridge type transloader truss, the first nose part comprises a first nose roller and a first driving device connected with the first nose roller, the first belt is sleeved on the tail receiving slot, the first roller mechanism and the first nose roller, and the first driving device drives the first belt to rotate through the first nose roller.
7. The underground coal mine transportation system of any one of claims 1 to 5, wherein the transition belt conveyor further comprises a second belt for supporting and conveying materials, the first tail has a first buffering material receiving portion, the second transfer conveyor body comprises a second bridge transfer truss and a second idler mechanism arranged on the second bridge transfer truss, the second head comprises a second head roller and a second driving device connected with the second head roller, the second belt is sleeved on the first buffering material receiving portion, the second idler mechanism and the second head roller, and the second driving device drives the second belt to rotate through the second head roller.
8. The underground coal mine transportation system of any one of claims 1 to 5, further comprising a telescopic belt for supporting and transporting materials, a belt storage bin for storing the telescopic belt, and a material transporting platform vehicle movably arranged on the body section of the telescopic belt conveyor, wherein the second tail is provided with a second buffering material receiving part, and the telescopic belt penetrates through the body section of the telescopic belt conveyor and is sleeved on the second buffering material receiving part.
9. A rapid tunneling system, which is characterized by comprising an anchor driving machine, an anchor transporting and breaking all-in-one machine and the underground coal mine transportation system as claimed in any one of claims 1 to 8, wherein a first transfer machine body of the underground coal mine transportation system is connected with the anchor transporting and breaking all-in-one machine.
10. The rapid excavation system of claim 9, wherein the excavation anchor machine includes a first transfer device, the anchor transporting and breaking integrated machine comprises a frame, a second transfer device, a crushing device, a top anchor supporting device and a side anchor supporting device, the second transfer device is arranged on the frame, a material receiving box corresponding to the discharge hole of the first transfer device is arranged at the head end of the second transfer device, the bridge type reversed loader also comprises a tail receiving groove connected with the tail part of the first reversed loader body, a discharge opening at the tail end of the second transfer device faces the tail receiving groove, the crushing device is fixed on the outer side of the material receiving box and is positioned above the chute of the second transfer device, the top anchor supporting device comprises a plurality of top anchor rod drilling machines arranged on the rack, and the side anchor supporting device comprises a plurality of side anchor rod drilling machines arranged on the rack.
CN202022870167.7U 2020-12-04 2020-12-04 Underground coal mine transportation system and rapid tunneling system Active CN214217088U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022870167.7U CN214217088U (en) 2020-12-04 2020-12-04 Underground coal mine transportation system and rapid tunneling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022870167.7U CN214217088U (en) 2020-12-04 2020-12-04 Underground coal mine transportation system and rapid tunneling system

Publications (1)

Publication Number Publication Date
CN214217088U true CN214217088U (en) 2021-09-17

Family

ID=77701836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022870167.7U Active CN214217088U (en) 2020-12-04 2020-12-04 Underground coal mine transportation system and rapid tunneling system

Country Status (1)

Country Link
CN (1) CN214217088U (en)

Similar Documents

Publication Publication Date Title
CN112389943A (en) Underground coal mine transportation system and rapid tunneling system
US8151968B2 (en) Belt conveyors and mining
CA2167182C (en) Highwall mining system
AU2015324922B2 (en) Launch vehicle with a multi-dip deck for highwall mining
US6729464B2 (en) Mine conveying system
US4896764A (en) Monorail advanced system for conveyors in a mining apparatus
CN112357506B (en) Multistage continuous transport system
RU2648134C2 (en) Device for discharging material excavated in underground workings
CN106948814A (en) A kind of coal excavation apparatus and coal-mining method
US4589701A (en) Cutting machine
CN115402730A (en) Intelligent fast digging follow-up continuous transportation system for coal mine
CN110725695A (en) Belt conveying system and tunneling equipment with same
US9822640B2 (en) Launch vehicle with a tilt deck for highwall mining
CN214217088U (en) Underground coal mine transportation system and rapid tunneling system
CN111689130A (en) Synchronous self-moving transshipment transportation system
CN211058804U (en) Belt conveying system and tunneling equipment with same
CN111285008A (en) Continuous mining and continuous transporting cooperative conveying multi-joint transfer system
CN114294055B (en) Self-moving unloading device and using method
CN211894728U (en) Continuous mining and continuous transporting cooperative conveying multi-joint transfer system
CN211894727U (en) Speed-adjustable driving tensioning and remote-control self-locking device of multi-joint transfer system
GB2050291A (en) Device for conveying hewn material in galleries and tunnels
CN115402729A (en) Underground intelligent follow-up device for coal mine and underground transportation system for coal mine
CN115465605A (en) Automatic extension method for belt frame of coal mine tunnel conveyor and underground tunnel driving working face transportation system
JP2002211730A (en) Belt conveyor system
CN115417090A (en) Auxiliary method for moving machine from tail to front and moving machine back and underground coal mine transportation system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant