CN214209982U - Novel zeolite runner air inlet structure - Google Patents

Novel zeolite runner air inlet structure Download PDF

Info

Publication number
CN214209982U
CN214209982U CN202023072579.2U CN202023072579U CN214209982U CN 214209982 U CN214209982 U CN 214209982U CN 202023072579 U CN202023072579 U CN 202023072579U CN 214209982 U CN214209982 U CN 214209982U
Authority
CN
China
Prior art keywords
zeolite
desorption
pipe
rotating wheel
zeolite runner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023072579.2U
Other languages
Chinese (zh)
Inventor
孙建庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Ruima Environmental Protection Technology Co ltd
Original Assignee
Changzhou Ruima Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Ruima Environmental Protection Technology Co ltd filed Critical Changzhou Ruima Environmental Protection Technology Co ltd
Priority to CN202023072579.2U priority Critical patent/CN214209982U/en
Application granted granted Critical
Publication of CN214209982U publication Critical patent/CN214209982U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sorption Type Refrigeration Machines (AREA)
  • Separation Of Gases By Adsorption (AREA)
  • Drying Of Gases (AREA)

Abstract

The utility model discloses a novel zeolite runner air inlet structure, which comprises a frame, the inboard of frame is equipped with the runner mount, and is equipped with the zeolite runner in the runner mount, be equipped with adsorption zone, cooling space and desorption district on the zeolite runner, one side of zeolite runner is equipped with first desorption fan, and the opposite side of zeolite runner is equipped with second desorption fan, the desorption district intercommunication of first connecting pipe and zeolite runner is passed through to the inlet end of first desorption fan, the inlet end of second desorption fan passes through the cooling space intercommunication of second connecting pipe and zeolite runner, and one side of second desorption fan is equipped with the heating pipe, the one end of heating pipe and the end intercommunication of giving vent to anger of second desorption fan. Compare with traditional zeolite runner air inlet structure, the utility model discloses can follow two positive and negative directions, realize the alternative air inlet of zeolite runner, make it be heated more evenly, the effectual life who improves the zeolite runner.

Description

Novel zeolite runner air inlet structure
Technical Field
The utility model relates to a zeolite runner technical field specifically is a novel zeolite runner air inlet structure.
Background
The body of the zeolite wheel is a rotating wheel filled with adsorbent, which is divided into 3 zones, namely an adsorption zone, a desorption zone and a cooling zone. The organic waste gas is introduced into the adsorption zone through a blower, the organic pollutants in the organic waste gas are adsorbed, and the gas is purified and discharged. Subsequently, the adsorbent is rotated to the desorption zone, and during the contact with the high temperature air, VOCS are desorbed and flow out with the regeneration air, while the adsorbent is regenerated. The regenerated adsorbent is cooled through a cooling area, and then is rotated to an adsorption area for adsorption again. Along with the rotation of the rotating wheel, the adsorbent is periodically adsorbed, desorbed and cooled, so that the organic waste gas is purified. In the prior art, the zeolite rotating wheel adopts a unilateral air inlet mode when in desorption, continuous high-temperature gas is introduced, the unilateral local heating of the zeolite rotating wheel is easy to cause the damage of the zeolite rotating wheel.
Therefore, a novel zeolite runner air inlet structure is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel zeolite runner air inlet structure to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a novel zeolite rotating wheel air inlet structure comprises a rack, wherein a rotating wheel fixing frame is arranged on the inner side of the rack, a zeolite rotating wheel is arranged in the rotating wheel fixing frame, an adsorption area, a cooling area and a desorption area are arranged on the zeolite rotating wheel, a first desorption fan is arranged on one side of the zeolite rotating wheel, a second desorption fan is arranged on the other side of the zeolite rotating wheel, the air inlet end of the first desorption fan is communicated with the desorption area of the zeolite rotating wheel through a first connecting pipe, the air inlet end of the second desorption fan is communicated with the cooling area of the zeolite rotating wheel through a second connecting pipe, a heating pipe is arranged on one side of the second desorption fan, one end of the heating pipe is communicated with the air outlet end of the second desorption fan, the other end of the heating pipe is communicated with the desorption area of the zeolite rotating wheel, a first air outlet pipe is further arranged on the heating pipe, and the heating pipe is communicated with the first connecting pipe through a fixing pipe, and electromagnetic valves are arranged on the heating pipe and the first connecting pipe.
Preferably, the first desorption fan is fixed in the frame through a screw, and a second air outlet pipe is arranged at the air outlet end of the first desorption fan.
Preferably, the electromagnetic valve is fixedly connected with the heating pipe and the first connecting pipe through flanges.
Preferably, one end of the heating pipe is provided with a heating groove, and an electric heating plate is arranged in the heating groove.
Preferably, the fixed pipe is U-shaped, and the fixed pipe is communicated with the heating pipe and the first connecting pipe through three-way pipe joints.
Preferably, the rotating wheel fixing frame is in a square shape and is in rotating connection with the zeolite rotating wheel through a bearing seat.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a both sides at the runner mount respectively set up a desorption fan, one side in zeolite runner desorption district is equipped with first connecting pipe, the opposite side is equipped with the heating pipe, in the use, first desorption fan work, gas gets into the heating pipe through the second connecting pipe, flow through the zeolite runner after the heating and carry out desorption treatment to the zeolite runner, waste gas after the processing is discharged through first connecting pipe and second outlet duct, then first desorption fan stops at work, second desorption fan work, two solenoid valves also can start simultaneously, cut first connecting pipe and heating pipe, waste gas after the heating this moment can get into first connecting pipe through fixed pipe, carry out desorption treatment to the zeolite runner from the opposite direction, waste gas after desorption discharges through heating pipe and first outlet duct. Compare with traditional zeolite runner air inlet structure, the utility model discloses can follow two positive and negative directions, realize the alternative air inlet of zeolite runner, make it be heated more evenly, the effectual life who improves the zeolite runner.
Drawings
Fig. 1 is a top view of the present invention;
fig. 2 is a front view of the wheel fixing frame of the present invention.
In the figure: 1. a frame; 2. a rotating wheel fixing frame; 3. a zeolite wheel; 4. a first desorption fan; 5. a second desorption fan; 6. a first connecting pipe; 7. a second connecting pipe; 8. heating a tube; 9. a first air outlet pipe; 10. a fixed tube; 11. an electromagnetic valve; 12. a second air outlet pipe; 13. and (4) heating the tank.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the utility model provides a novel zeolite wheel air intake structure, which comprises a frame 1, wherein a wheel fixing frame 2 is arranged at the inner side of the frame 1, a zeolite wheel 3 is arranged in the wheel fixing frame 2, an adsorption region, a cooling region and a desorption region are arranged on the zeolite wheel 3, a first desorption fan 4 is arranged at one side of the zeolite wheel 3, a second desorption fan 5 is arranged at the other side of the zeolite wheel 3, an air inlet end of the first desorption fan 4 is communicated with the desorption region of the zeolite wheel 3 through a first connecting pipe 6, an air inlet end of the second desorption fan 5 is communicated with the cooling region of the zeolite wheel 3 through a second connecting pipe 7, a heating pipe 8 is arranged at one side of the second desorption fan 5, one end of the heating pipe 8 is communicated with an air outlet end of the second desorption fan 5, and the other end of the heating pipe 8 is communicated with the desorption region of the zeolite wheel 3, the heating pipe 8 is further provided with a first air outlet pipe 9, the heating pipe 8 is communicated with the first connecting pipe 6 through a fixing pipe 10, and the heating pipe 8 and the first connecting pipe 6 are both provided with electromagnetic valves 11.
First desorption fan 4 passes through the screw fixation in frame 1, and the end of giving vent to anger of first desorption fan 4 is equipped with second outlet duct 12. The electromagnetic valve 11 is fixedly connected with the heating pipe 8 and the first connecting pipe 6 through flanges, and the model of the electromagnetic valve 11 is ZCZP-16CDN 50. One end of the heating pipe 8 is provided with a heating groove 13, an electric heating plate is arranged in the heating groove 13, and waste gas is heated through the electric heating plate. The fixed pipe 10 is U-shaped, and the fixed pipe 10 is communicated with the heating pipe 8 and the first connecting pipe 6 through three-way pipe joints. The rotating wheel fixing frame 2 is in a square shape, and the rotating wheel fixing frame 2 is rotatably connected with the zeolite rotating wheel 3 through a bearing seat.
In order to better understand the utility model by those skilled in the art, the working process of the utility model is briefly described with reference to the attached drawings: through respectively setting up a desorption fan in the both sides at runner mount 2, be equipped with first connecting pipe 6 in one side in the desorption district of zeolite runner 3, the opposite side is equipped with heating pipe 8, during the use, first desorption fan 4 work, gas gets into heating pipe 8 through second connecting pipe 7, flow through zeolite runner 3 and carry out desorption treatment to zeolite runner 3 after the heating, the waste gas after the processing is discharged through first connecting pipe 6 and second outlet duct 12, then first desorption fan 4 stops working, second desorption fan 5 work, two solenoid valves 11 also can start simultaneously, cut off first connecting pipe 6 and heating pipe 8, the waste gas after the heating this moment can get into first connecting pipe 6 through fixed pipe 10, carry out desorption treatment to zeolite runner 3 from opposite direction, the waste gas after desorption discharges through heating pipe 8 and first outlet duct 9.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a novel zeolite runner air inlet structure, includes frame (1), its characterized in that: the inner side of the rack (1) is provided with a rotating wheel fixing frame (2), a zeolite rotating wheel (3) is arranged in the rotating wheel fixing frame (2), an adsorption area, a cooling area and a desorption area are arranged on the zeolite rotating wheel (3), one side of the zeolite rotating wheel (3) is provided with a first desorption fan (4), the other side of the zeolite rotating wheel (3) is provided with a second desorption fan (5), the air inlet end of the first desorption fan (4) is communicated with the desorption area of the zeolite rotating wheel (3) through a first connecting pipe (6), the air inlet end of the second desorption fan (5) is communicated with the cooling area of the zeolite rotating wheel (3) through a second connecting pipe (7), one side of the second desorption fan (5) is provided with a heating pipe (8), one end of the heating pipe (8) is communicated with the air outlet end of the second desorption fan (5), and the other end of the heating pipe (8) is communicated with the desorption area of the zeolite rotating wheel (3), still be equipped with first outlet duct (9) on heating pipe (8), and communicate through fixed pipe (10) between heating pipe (8) and first connecting pipe (6), all be equipped with solenoid valve (11) on heating pipe (8) and first connecting pipe (6).
2. The novel zeolite runner air intake structure of claim 1, wherein: first desorption fan (4) pass through the screw fixation in frame (1), and the end of giving vent to anger of first desorption fan (4) is equipped with second outlet duct (12).
3. The novel zeolite runner air intake structure of claim 1, wherein: the electromagnetic valve (11) is fixedly connected with the heating pipe (8) and the first connecting pipe (6) through flanges.
4. The novel zeolite runner air intake structure of claim 1, wherein: one end of the heating pipe (8) is provided with a heating groove (13), and an electric heating plate is arranged in the heating groove (13).
5. The novel zeolite runner air intake structure of claim 1, wherein: the fixed pipe (10) is U-shaped, and the fixed pipe (10) is communicated with the heating pipe (8) and the first connecting pipe (6) through three-way pipe joints.
6. The novel zeolite runner air intake structure of claim 1, wherein: the rotating wheel fixing frame (2) is in a square shape, and the rotating wheel fixing frame (2) is rotatably connected with the zeolite rotating wheel (3) through a bearing seat.
CN202023072579.2U 2020-12-19 2020-12-19 Novel zeolite runner air inlet structure Active CN214209982U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023072579.2U CN214209982U (en) 2020-12-19 2020-12-19 Novel zeolite runner air inlet structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023072579.2U CN214209982U (en) 2020-12-19 2020-12-19 Novel zeolite runner air inlet structure

Publications (1)

Publication Number Publication Date
CN214209982U true CN214209982U (en) 2021-09-17

Family

ID=77703515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023072579.2U Active CN214209982U (en) 2020-12-19 2020-12-19 Novel zeolite runner air inlet structure

Country Status (1)

Country Link
CN (1) CN214209982U (en)

Similar Documents

Publication Publication Date Title
JP7264542B2 (en) Parallel piping type gas adsorption concentrator
CN204247028U (en) The device of vacuum desorption recycling organic exhaust gas
CN206730800U (en) Improved waste gas adsorption concentration device
WO2022142424A1 (en) Voc treatment rotating-wheel system and voc treatment method
CN207951073U (en) A kind of blasting regeneration absorption drier
CN110240129B (en) Pressure swing adsorption nitrogen production and drying integrated energy-saving device and method
CN214209982U (en) Novel zeolite runner air inlet structure
CN212327851U (en) Cylinder runner zeolite air-cooled heat sink
CN212108865U (en) Energy-saving constant-temperature humidity control air conditioning system for drying precision casting shell
CN209295348U (en) Fresh air dehumidification unit
CN208512201U (en) A kind of new zeolite runner enrichment facility
CN206027388U (en) Little heating regeneration adsorbing formula desiccator
CN217392007U (en) Blast regeneration internal cold blowing zero gas consumption energy-saving adsorption type dryer
CN216856214U (en) VOCs treatment system suitable for intermittent coating
CN207012777U (en) A kind of energy-efficient drying device of absorption type and system
CN115751337A (en) Exhaust treatment device is used in industrial paint production
CN210980049U (en) Runner heating clean system based on solar heat pump regeneration
CN106731473A (en) Industrial organic waste-gas purification device
CN208018373U (en) A kind of heat safe air cleaning unit
CN209801661U (en) Rotary dehumidifier without exhaust pipe
CN209204972U (en) A kind of zeolite runner waste gas purification apparatus
CN209406008U (en) A kind of renewable absorption drier
CN108579336B (en) High-efficient environmental protection's organic waste gas adsorbs concentrator
CN206566700U (en) Industrial organic waste-gas purification device
CN220750275U (en) Energy-saving rotary dehumidifier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant