CN214202450U - Construction progress management system - Google Patents

Construction progress management system Download PDF

Info

Publication number
CN214202450U
CN214202450U CN202023030926.5U CN202023030926U CN214202450U CN 214202450 U CN214202450 U CN 214202450U CN 202023030926 U CN202023030926 U CN 202023030926U CN 214202450 U CN214202450 U CN 214202450U
Authority
CN
China
Prior art keywords
module
input end
double
electrical connection
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023030926.5U
Other languages
Chinese (zh)
Inventor
姚焕果
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Junming Information Technology Co ltd
Original Assignee
Jiangsu Junming Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Junming Information Technology Co ltd filed Critical Jiangsu Junming Information Technology Co ltd
Priority to CN202023030926.5U priority Critical patent/CN214202450U/en
Application granted granted Critical
Publication of CN214202450U publication Critical patent/CN214202450U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses a construction progress management system relates to construction progress management and uses auxiliary system technical field, for solving current construction progress management system often because know the problem thoroughly inadequately and lead to staff's working strength to increase to the progress when using. The output end of the main processor is in double-electrical connection with the input end of the construction material control module, the input end of the main processor is in double-electrical connection with the output end of the anti-interference module, the input end of the main processor is in double-electrical connection with the output end of the user login module, the input end of the main processor is in double-electrical connection with the output end of the data receiving module, and the output end of the main processor is in double-electrical connection with the input end of the construction environment monitoring module.

Description

Construction progress management system
Technical Field
The utility model relates to a construction progress auxiliary system technical field for management specifically is a construction progress management system.
Background
With the rapid development of economy in China, the automation of industry in China is more and more common, and the automation means a process of realizing an expected target by automatic detection, information processing, analysis and judgment and operation control according to the requirements of people without the direct participation of people or few people in machine equipment, systems or processes (production and management processes), and a construction progress management system can be used when the automation is managed.
The construction progress management system is provided for solving the problem that the working strength of workers is increased due to incomplete progress knowledge when the conventional construction progress management system is used.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction progress management system to it often leads to the problem that staff's working strength increases owing to know thoroughly inadequately to the progress often to propose current construction progress management system in solving above-mentioned background art when using.
In order to achieve the above object, the utility model provides a following technical scheme: a construction progress management system comprises a main processor, a progress monitoring module, an information storage module, a data backup module, a construction environment monitoring module, an audible and visual alarm module, an anti-interference module, a construction material control module, a user login module and a data receiving module, the output end of the main processor is electrically connected with the input end of the construction material control module, the input end of the main processor is in double-electrical connection with the output end of the anti-interference module, the input end of the main processor is in double-electrical connection with the output end of the user login module, the input end of the main processor is in double-electrical connection with the output end of the data receiving module, the output end of the main processor is in double-electrical connection with the input end of the construction environment monitoring module, and the input end of the progress monitoring module is in double-electrical connection with the output end of the main processor.
Preferably, the input end of the main processor is electrically connected with the output end of the information storage module, and the input end of the information storage module is electrically connected with the output end of the data backup module.
Preferably, the output end of the construction environment monitoring module is electrically connected with the input end of the sound-light alarm module, and the input end of the progress monitoring module is electrically connected with the output end of the main processor.
Preferably, the construction environment monitoring module comprises an air quality sensor, a volume sensor, a humidity sensor and a temperature sensor, the output ends of the air quality sensor, the volume sensor, the humidity sensor and the temperature sensor are electrically connected with the input end of the sound and light alarm module, the model of the air quality sensor is MP503, the model of the temperature sensor is PT-100, the model of the volume sensor is LCS-CV4, and the model of the humidity sensor is HF 3223.
Preferably, the construction material control module includes distance measuring sensor, pressure sensor and wireless communication module, distance measuring sensor and pressure sensor's output and wireless communication module's input pass through electric connection, distance measuring sensor's model is AS5600-ASOT, pressure sensor's model is GKPT 124.
Preferably, the progress monitoring module comprises a data acquisition module, a sound acquisition module, a character acquisition module, AN image acquisition module and a data transmission module, the output ends of the data acquisition module, the sound acquisition module, the character acquisition module and the image acquisition module are electrically connected with the input end of the data transmission module, the model of the image acquisition module is OV7670, and the model of the sound acquisition module is AN 108.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this kind of construction progress management system compares with current construction progress auxiliary system for management, has been equipped with progress monitoring module, and progress monitoring module's design can let the staff know more clearly on the construction progress, has solved current construction progress management system often because know the problem that thoroughly leads to staff's working strength to increase inadequately often when using.
2. This kind of construction progress management system compares with current auxiliary system for construction progress management, has been equipped with construction environment monitoring module, and construction environment monitoring module's design can let the staff to the more careful of construction environment understanding, has solved current construction progress management system often use because to the construction environment understanding careful not enough and lead to the problem that the staff can't in time handle.
Drawings
FIG. 1 is a schematic diagram of a construction progress management system according to the present invention;
FIG. 2 is a schematic diagram of the construction environment monitoring module of the present invention;
FIG. 3 is a schematic view of the construction material control module according to the present invention;
fig. 4 is a schematic diagram of the progress monitoring module of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, the present invention provides an embodiment: a construction progress management system comprises a main processor, a progress monitoring module, an information storage module, a data backup module and a construction environment monitoring module, audible and visual alarm module, anti-interference module, construction material control module, user login module and data receiving module, the output of host processor passes through two electric connections with construction material control module's input, the input of host processor passes through two electric connections with anti-interference module's output, the input of host processor passes through two electric connections with user login module's output, the input of host processor passes through two electric connections with data receiving module's output, the output of host processor passes through two electric connections with construction environment monitoring module's input, progress monitoring module's input passes through two electric connections with the output of host processor, progress monitoring module's design can let the staff more convenient to the monitoring of progress.
Furthermore, the input end of the main processor is electrically connected with the output end of the information storage module, the input end of the information storage module is electrically connected with the output end of the data backup module, and the data can be stored more safely due to the design of the information storage module and the data backup module.
Furthermore, the output end of the construction environment monitoring module is in double-electrical connection with the input end of the sound-light alarm module, and the input end of the progress monitoring module is in double-electrical connection with the output end of the main processor.
Further, construction environment monitoring module includes air quality sensor, volume sensor, humidity transducer and temperature sensor, air quality sensor, volume sensor, humidity transducer and temperature sensor's output all passes through electric connection with audible and visual alarm module's input, air quality sensor's model is MP503, temperature sensor's model is PT-100, volume sensor's model is LCS-CV4, humidity transducer's model is HF3223, construction environment monitoring module's design can let the staff know more meticulous to construction environment.
Further, the construction material control module comprises a distance measuring sensor, a pressure sensor and a wireless communication module, the output ends of the distance measuring sensor and the pressure sensor are electrically connected with the input end of the wireless communication module, the model of the distance measuring sensor is AS5600-ASOT, the model of the pressure sensor is GKPT124, and the design of the construction material control module can enable workers to know the quantity of construction materials more carefully.
Further, progress monitoring module includes data acquisition module, sound collection module, characters collection module, image acquisition module and data transmission module, and data acquisition module, sound collection module, characters collection module and image acquisition module's output all pass through electric connection with data transmission module's input, and image acquisition module's model is OV7670, and sound collection module's model is AN108, and progress monitoring module's design can let the staff to the more careful of construction progress understanding.
The working principle is as follows: during the use staff can pass through data receiving module with data transmission for the host processor with data transmission, when the staff need know the surplus quantity of construction material, just at this moment can just know the surplus of construction material through range finding sensor and pressure sensor, when the surplus was low, range finding sensor and pressure sensor will give wireless communication module with signal transmission this moment, at this moment the staff just can supply construction material, when the staff need protect data, can protect data through information storage module and data backup module at this moment, when needs monitor construction environment, just can know construction environment through construction environment monitoring module.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a construction progress management system, includes host processing ware, progress monitoring module, information storage module, data backup module, construction environment monitoring module, audible-visual alarm module, anti-interference module, construction material control module, user login module and data receiving module, its characterized in that: the output end of the main processor is in double-electrical connection with the input end of the construction material control module, the input end of the main processor is in double-electrical connection with the output end of the anti-interference module, the input end of the main processor is in double-electrical connection with the output end of the user login module, the input end of the main processor is in double-electrical connection with the output end of the data receiving module, the output end of the main processor is in double-electrical connection with the input end of the construction environment monitoring module, and the input end of the progress monitoring module is in double-electrical connection with the output end of the main processor.
2. The construction progress management system according to claim 1, characterized in that: the input end of the main processor is in double-electrical connection with the output end of the information storage module, and the input end of the information storage module is in double-electrical connection with the output end of the data backup module.
3. The construction progress management system according to claim 1, characterized in that: the output end of the construction environment monitoring module is in double-electrical connection with the input end of the sound-light alarm module, and the input end of the progress monitoring module is in double-electrical connection with the output end of the main processor.
4. The construction progress management system according to claim 1, characterized in that: the construction environment monitoring module comprises an air quality sensor, a volume sensor, a humidity sensor and a temperature sensor, wherein the output ends of the air quality sensor, the volume sensor, the humidity sensor and the temperature sensor are electrically connected with the input end of the acousto-optic alarm module, the model of the air quality sensor is MP503, the model of the temperature sensor is PT-100, the model of the volume sensor is LCS-CV4, and the model of the humidity sensor is HF 3223.
5. The construction progress management system according to claim 1, characterized in that: the construction material control module comprises a distance measuring sensor, a pressure sensor and a wireless communication module, wherein the output ends of the distance measuring sensor and the pressure sensor are electrically connected with the input end of the wireless communication module, the model of the distance measuring sensor is AS5600-ASOT, and the model of the pressure sensor is GKPT 124.
6. The construction progress management system according to claim 1, characterized in that: the progress monitoring module comprises a data acquisition module, a sound acquisition module, a character acquisition module, AN image acquisition module and a data transmission module, wherein the output ends of the data acquisition module, the sound acquisition module, the character acquisition module and the image acquisition module are electrically connected with the input end of the data transmission module, the model of the image acquisition module is OV7670, and the model of the sound acquisition module is AN 108.
CN202023030926.5U 2020-12-16 2020-12-16 Construction progress management system Expired - Fee Related CN214202450U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023030926.5U CN214202450U (en) 2020-12-16 2020-12-16 Construction progress management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023030926.5U CN214202450U (en) 2020-12-16 2020-12-16 Construction progress management system

Publications (1)

Publication Number Publication Date
CN214202450U true CN214202450U (en) 2021-09-14

Family

ID=77652959

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023030926.5U Expired - Fee Related CN214202450U (en) 2020-12-16 2020-12-16 Construction progress management system

Country Status (1)

Country Link
CN (1) CN214202450U (en)

Similar Documents

Publication Publication Date Title
CN104568327A (en) Novel ring main unit SF6 gas leakage on-line monitoring device
CN103712728B (en) Electronic pressure gauge
CN214202450U (en) Construction progress management system
CN210626590U (en) Active capacitive pen detection device and IPAD active capacitive pen detection system
CN202793980U (en) Distributed wireless dust measuring instrument
CN204388910U (en) A kind of shellfish culture environment suitability degree monitoring alarm
CN210181206U (en) Remote verification data acquisition and transmission system for electric energy meter calibration device
CN207882257U (en) A kind of highly integrated intelligent multi-parameter water quality real time on-line monitoring system
CN206847677U (en) A kind of multi-parameter portable warehousing and transportation facilities detector
CN107727082A (en) A kind of modular system of monitering buoy in real time
CN202994783U (en) Single-chip based soil humidity detection system
CN106612012A (en) Power distribution network information processing system
CN202083493U (en) Automatic detection system of temperature sensor/transducer
CN206038057U (en) Indoor environment monitoring system
CN211278992U (en) Mud moisture on-line measuring system
CN215525753U (en) Online water quality monitoring Internet of things system
CN217424874U (en) Groundwater monitoring devices and groundwater pumping test monitoring devices
CN218413957U (en) Automatic dormancy induction device for screen of on-line turbidimeter
CN215930948U (en) Water quality monitoring data acquisition device
CN213957068U (en) Liquid density measuring system
CN212748062U (en) Handheld temperature measuring device
CN216696365U (en) Data receiving device of speed measuring sensor for wheel rapid acceleration test
CN218788020U (en) Agricultural air detector with dust detection and early warning functions
CN210109100U (en) Portable soil temperature and humidity detector
CN203929361U (en) Touch-screen leaded light device for detecting performance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210914