- CN214195230U CN214195230U CN202022442371.9U CN202022442371U CN214195230U CN 214195230 U CN214195230 U CN 214195230U CN 202022442371 U CN202022442371 U CN 202022442371U CN 214195230 U CN214195230 U CN 214195230U
- Authority
- CN
- China
- Prior art keywords
- steel
- plate
- movable cavity
- foundation column
- steel sheet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to the technical field of house construction, in particular to a steel structure of a house foundation column which is quickly installed, comprising a foundation column and four steel plates, wherein the steel plates are provided with four steel plates which are positioned around the periphery of the foundation column, the right end in the steel plate is provided with a first movable cavity, the left wall of the first movable cavity is fixedly connected with a first return spring, the right end of the first return spring is fixedly connected with a first clamping block, the right side of the front end of the steel plate and the front part of the first movable cavity are provided with a second clamping groove, the left side of the front end of the steel plate is provided with a first clamping groove, and the left front part in the steel plate is provided with a second movable cavity; through encircleing four steel sheets around to basic post, then make first fixture block and first draw-in groove on two adjacent steel sheets carry out the joint, make second fixture block and second draw-in groove carry out the joint again to can be quick install four steel sheets to basic post all around, and need not to additionally support the steel sheet, avoid the steel sheet to empty when strengthening fixedly, reduce the installation trouble.
Description
Technical Field
The utility model relates to a housing construction technical field especially relates to a steel construction of house foundation post of quick installation.
Background
A foundation column for building is a pile foundation for building and supporting the foundation, and features that its pile body is buried in soil and the bottom of pile cap is in contact with soil body, so called low pile cap pile foundation, and if the upper part of pile body is exposed to ground and the bottom of pile cap is above ground, it is called high pile cap pile foundation. The deformation of the pile foundation under the action of earthquake force is small, the stability is good, and the method is an effective measure for solving the earthquake resistance problem of the weak foundation and the earthquake liquefied foundation in the earthquake region.
At present, the steel construction of house foundation post, when the steel sheet was installed in the periphery of foundation post, need carry out the thread tightening through a plurality of bolts, it is convenient fast inadequately to install, and in the middle of the installation, every steel sheet all need carry out extra support, prevents that the steel sheet from producing to empty, and the installation is too troublesome, and the steel sheet is only fixed through the bolt moreover, does not install extra reinforced structure, easily leads to stability and the fastness after the installation not good enough.
SUMMERY OF THE UTILITY MODEL
The utility model provides a steel construction of house foundation post of quick installation to the steel sheet installation process who solves above-mentioned background art and propose is too troublesome, and it is convenient fast inadequately to install, and the stability after the installation and the not good enough problem of fastness.
In order to solve the prior art problem, the utility model discloses a house foundation column's steel construction of quick installation, including foundation column and steel sheet, the steel sheet is equipped with four altogether, and four the steel sheet is located around the periphery of foundation column:
the right end of the inner part of the steel plate is provided with a first movable cavity, the left wall of the first movable cavity is fixedly connected with a first return spring, the right end of the first return spring is fixedly connected with a first clamping block, the right side of the front end of the steel plate is positioned in the front part of the first movable cavity and is provided with a second clamping groove, the left side of the front end of the steel plate is provided with a first clamping groove, the left front part of the inner part of the steel plate is provided with a second movable cavity, the right wall of the second movable cavity is fixedly connected with a second return spring, the left end of the second return spring is fixedly connected with a second clamping block, the outer sides of the four steel plates are respectively provided with a plurality of positioning grooves, the left end and the right end of the outer side of the steel plate are respectively and fixedly connected with an L-shaped plate, the middle end of the outer side of the steel plate is positioned between the left L-shaped plate and the right L-shaped plate and is rotatably connected with a locking screw rod, the outer sides of the left L-shaped plate and the right plate are respectively provided with a locking plate, the inner side of each locking plate is fixedly connected with a plurality of reinforcing rods, and a reinforcing plate is arranged on the periphery of each steel plate.
Further, four be the rectangle between the steel sheet wrap up in around the periphery of basic post, just first fixture block right-hand member runs through out first activity chamber, first fixture block with first activity chamber sliding connection, just first fixture block and first draw-in groove joint, first fixture block front end is the slope form.
Furthermore, the left end of the second fixture block penetrates out of the second movable cavity, the second fixture block is connected with the second movable cavity in a sliding mode, the second fixture block is connected with the second clamping groove in a clamping mode, and the front end of the second fixture block is inclined.
Furthermore, the reinforcing plate is L type form, and four the reinforcing plate joint respectively in two adjacent on the steel sheet two adjacent L template inboards.
Furthermore, the tail end of the reinforcing rod penetrates through the L-shaped plate and the reinforcing plate in sequence, the reinforcing rod is connected with the L-shaped plate and the reinforcing plate in a sliding mode, the positioning groove is located in the inner side of the L-shaped plate, and the tail end of the reinforcing rod is inserted into the positioning groove.
Compared with the prior art, the utility model discloses the beneficial effect who realizes:
through encircleing four steel sheets around to the foundation post, then make first fixture block and first draw-in groove on two adjacent steel sheets carry out the joint, make second fixture block and second draw-in groove carry out the joint again, thereby can be quick install four steel sheets to the foundation post all around, make the steel sheet reach the effect of pre-installation, and need not to additionally support the steel sheet, avoid the steel sheet to empty when strengthening fixedly, reduce the troublesome installation, connect to two adjacent L templates inboards on two adjacent steel sheets with the enhancement integrated circuit board that will be the L type after that, make the stiffener insert in the constant head tank again, thereby can be fast and stable install the stiffener at the steel sheet periphery, improve the steadiness after the steel sheet installation, also do benefit to the fastness that improves the foundation post.
Drawings
Fig. 1 is a schematic overall top view structure of the present invention;
FIG. 2 is a schematic view of the steel plate structure of the present invention;
FIG. 3 is a schematic view of a partially enlarged structure A of the present invention;
FIG. 4 is a schematic overall side view of the present invention;
fig. 5 is a schematic view of the overall overlooking and disassembling structure of the present invention.
In FIGS. 1-5: the steel plate locking device comprises a foundation column 1, a steel plate 2, an L-shaped plate 3, a reinforcing plate 4, a locking plate 5, a locking screw 6, a reinforcing rod 7, a positioning groove 8, a first movable cavity 9, a first return spring 10, a first clamping block 11, a first clamping groove 12, a second movable cavity 13, a second return spring 14, a second clamping block 15 and a second clamping groove 16.
Detailed Description
The following description is provided for illustrative purposes, and other advantages and features of the present invention will become apparent to those skilled in the art from the following detailed description.
Please refer to fig. 1 to 5:
the utility model provides a house foundation column's of quick installation steel construction, includes foundation column 1 and steel sheet 2, steel sheet 2 is equipped with four altogether, and four steel sheet 2 is located around foundation column 1's periphery, its characterized in that:
the right end in the steel plate 2 is provided with a first movable cavity 9, the left wall of the first movable cavity 9 is fixedly connected with a first return spring 10, the right end of the first return spring 10 is fixedly connected with a first clamping block 11, the right side of the front end of the steel plate 2 is positioned in front of the first movable cavity 9 and is provided with a second clamping groove 16, the left side of the front end of the steel plate 2 is provided with a first clamping groove 12, the left front part in the steel plate 2 is provided with a second movable cavity 13, the right wall of the second movable cavity 13 is fixedly connected with a second return spring 14, the left end of the second return spring 14 is fixedly connected with a second clamping block 15, the four steel plates 2 are wrapped around the periphery of the foundation column 1 in a rectangular shape, the right end of the first clamping block 11 penetrates through the first movable cavity 9, the first clamping block 11 is connected with the first movable cavity 9 in a sliding manner, and the first clamping block 11 is clamped with the first clamping groove 12, the front end of the first clamping block 11 is inclined, the left end of the second clamping block 15 penetrates through the second movable cavity 13, the second clamping block 15 is connected with the second movable cavity 13 in a sliding mode, the second clamping block 15 is clamped with the second clamping groove 16, and the front end of the second clamping block 15 is inclined;
specifically, four steel plates 2 are distributed around a base column 1 in a rectangular shape, the inner side of one steel plate 2 is firstly contacted with the base column 1, and then the other three steel plates 2 are sequentially pressed, because the first fixture block 11 and the second fixture block 15 are both in an inclined shape, the first fixture block 11 and the second fixture block 15 are contacted with the other steel plates 2 through inclined planes, and the other steel plates 2 extrude the first fixture block 11 and the second fixture block 15 through inclined planes, so that the first fixture block 11 and the second fixture block 15 respectively slide towards the first movable cavity 9 and the second movable cavity 13, and simultaneously extrude the first return spring 10 and the second return spring 14, when the first fixture block 11 and the second fixture block 15 respectively move to the openings of the first clamping groove 12 and the second clamping groove 16, the first return spring 10 and the second return spring 14 reset, so that the first fixture block 11 and the second fixture block 15 are respectively clamped into the first clamping groove 12 and the second clamping groove 16 through return force, finally make four stable parcels of steel sheet 2 around the periphery of basic post 1, make steel sheet 2 reach the effect of quick preinstallation, and need not to additionally support steel sheet 2, avoid steel sheet 2 to empty when strengthening fixedly, reduce the installation trouble.
The outer sides of the four steel plates 2 are respectively provided with a plurality of positioning grooves 8, the left end and the right end of the outer side of each steel plate 2 are respectively fixedly connected with an L-shaped plate 3, a locking screw 6 is rotatably connected between the left L-shaped plate 3 and the right L-shaped plate 2 at the middle outer side end, and the outer sides of the left L-shaped plate 3 and the right L-shaped plate 3 are provided with locking plates 5, the inner side of each locking plate 5 is fixedly connected with a plurality of reinforcing rods 7, and a reinforcing plate 4 is arranged on the periphery of each steel plate 2, the reinforcing plates 4 are L-shaped, four reinforcing plates 4 are respectively clamped on the inner sides of two adjacent L-shaped plates 3 on two adjacent steel plates 2, the tail end of the reinforcing rod 7 penetrates through the L-shaped plates 3 and the reinforcing plates 4 in sequence, the reinforcing rod 7 is connected with the L-shaped plate 3 and the reinforcing plate 4 in a sliding mode, the positioning groove 8 is located on the inner side of the L-shaped plate 3, and the tail end of the reinforcing rod 7 is inserted into the positioning groove 8;
further, in order to improve the stability after the installation of steel sheet 2, 4 joints of reinforcing plate to two blocks of L templates 3 inboards on two adjacent steel sheets 2 that will be the L type after that, then screw up locking screw 6, locking screw 6 then drives locking plate 5 and is close to steel sheet 2, thereby make in the quick constant head tank 8 that inserts of a plurality of stiffeners 7, through stiffener 7 to steel sheet 2 further spacing fixed, thereby can be fast and stable install reinforcing plate 4 in steel sheet 2 periphery, improve the steadiness after the installation of steel sheet 2, also do benefit to the fastness that improves foundation column 1.
The above embodiments are merely illustrative of the principles and effects of the present invention, and are not to be construed as limiting the invention. Modifications and variations can be made to the above-described embodiments by those skilled in the art without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which may be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.
Claims (5)
1. The utility model provides a house foundation column's of quick installation steel construction, includes foundation column (1) and steel sheet (2), steel sheet (2) are equipped with four altogether, and four steel sheet (2) are located around the periphery of foundation column (1), its characterized in that:
the right end in the steel plate (2) is provided with a first movable cavity (9), the left wall of the first movable cavity (9) is fixedly connected with a first return spring (10), the right end of the first return spring (10) is fixedly connected with a first clamping block (11), the right side of the front end of the steel plate (2) is positioned at the front part of the first movable cavity (9) and is provided with a second clamping groove (16), the left side of the front end of the steel plate (2) is provided with a first clamping groove (12), the left front part in the steel plate (2) is provided with a second movable cavity (13), the right wall of the second movable cavity (13) is fixedly connected with a second return spring (14), the left end of the second return spring (14) is fixedly connected with a second clamping block (15), the four outer sides of the steel plate (2) are respectively provided with a plurality of positioning grooves (8), and the left end and the right end of the outer side of the steel plate (2) are respectively fixedly connected with an L-shaped plate (3), steel sheet (2) outside middle-end just is located about two rotate between L template (3) and be connected with locking screw (6), and control two L template (3) outside is equipped with locking plate (5), every a plurality of stiffeners (7) of the equal fixedly connected with in locking plate (5) inboard, and every reinforcing plate (4) are all installed to steel sheet (2) periphery.
2. The steel structure of a quickly installed house foundation column of claim 1, wherein: four be rectangle parcel between steel sheet (2) in around the periphery of basic post (1), just first fixture block (11) right-hand member runs through out first activity chamber (9), first fixture block (11) with first activity chamber (9) sliding connection, just first fixture block (11) and first draw-in groove (12) joint, first fixture block (11) front end is the slope form.
3. The steel structure of a quickly installed house foundation column of claim 1, wherein: the left end of the second clamping block (15) penetrates out of the second movable cavity (13), the second clamping block (15) is connected with the second movable cavity (13) in a sliding mode, the second clamping block (15) is connected with the second clamping groove (16) in a clamping mode, and the front end of the second clamping block (15) is inclined.
4. The steel structure of a quickly installed house foundation column of claim 1, wherein: the reinforcing plates (4) are L-shaped, and the four reinforcing plates (4) are respectively clamped on the inner sides of two adjacent L-shaped plates (3) on the two adjacent steel plates (2).
5. The steel structure of a quickly installed house foundation column of claim 4, wherein: the tail end of the reinforcing rod (7) penetrates through the L-shaped plate (3) and the reinforcing plate (4) in sequence, the reinforcing rod (7) is connected with the L-shaped plate (3) and the reinforcing plate (4) in a sliding mode, the positioning groove (8) is located in the inner side of the L-shaped plate (3), and the tail end of the reinforcing rod (7) is inserted into the positioning groove (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022442371.9U CN214195230U (en) | 2020-10-29 | 2020-10-29 | Steel construction of house foundation column of quick installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022442371.9U CN214195230U (en) | 2020-10-29 | 2020-10-29 | Steel construction of house foundation column of quick installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214195230U true CN214195230U (en) | 2021-09-14 |
Family
ID=77643456
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022442371.9U Active CN214195230U (en) | 2020-10-29 | 2020-10-29 | Steel construction of house foundation column of quick installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214195230U (en) |
-
2020
- 2020-10-29 CN CN202022442371.9U patent/CN214195230U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105401599A (en) | Open trench tunnel main structure tall side wall unilateral vertical mold and construction process thereof | |
CN214195230U (en) | Steel construction of house foundation column of quick installation | |
CN210805552U (en) | Anti-drop connection structure of electrical switch | |
CN212336289U (en) | Supporting equipment of assembled PC balcony component | |
CN210341867U (en) | On-spot ground bearing capacity detection device | |
CN209413674U (en) | Photocatalyst heat insulation bridge-cut-off window | |
CN221481109U (en) | Assembled shear wall structure | |
CN214945501U (en) | Bridging support | |
CN219622067U (en) | Glass curtain wall beam and upright post connecting structure | |
CN219794243U (en) | Wallboard mounting structure | |
CN221073061U (en) | Prefabricated member reinforcing structure | |
CN216477574U (en) | Engine cylinder support with reinforcing ribs | |
CN213166719U (en) | Valve terminal control group of injection mold | |
CN214403058U (en) | Wind shield pull rod mounting structure | |
CN220190716U (en) | Photovoltaic bracket convenient to install | |
CN213308471U (en) | Connecting mechanism of shelf beam | |
CN211286010U (en) | Novel assembled baling box top and bottom corner fitting and supporting corner post | |
CN108999279B (en) | Connecting device of wind-resistant, compression-resistant and shock-resistant double-spliced wooden beam and supporting steel column | |
CN213206186U (en) | Quick-assembling tee coupling device for goods shelves | |
CN218301272U (en) | Photovoltaic support with layer board structure | |
CN221545912U (en) | Frame type steel structure building connecting piece | |
CN220086230U (en) | Energy storage battery convenient to installation | |
CN112145805B (en) | A antidetonation gallows structure assembly for electromechanical device installation | |
CN218001082U (en) | Stability structure | |
CN219138344U (en) | Formwork reinforcing structure at plug plate of shear wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |