CN214194879U - Drainage pipeline's for municipal works erect mechanism - Google Patents

Drainage pipeline's for municipal works erect mechanism Download PDF

Info

Publication number
CN214194879U
CN214194879U CN202120030659.7U CN202120030659U CN214194879U CN 214194879 U CN214194879 U CN 214194879U CN 202120030659 U CN202120030659 U CN 202120030659U CN 214194879 U CN214194879 U CN 214194879U
Authority
CN
China
Prior art keywords
sides
base plate
plate
drainage pipeline
municipal works
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120030659.7U
Other languages
Chinese (zh)
Inventor
尹伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120030659.7U priority Critical patent/CN214194879U/en
Application granted granted Critical
Publication of CN214194879U publication Critical patent/CN214194879U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model discloses an erection mechanism of drainage pipe for municipal works, including the backing plate, the both sides of backing plate all are provided with the support column, the top of backing plate all is connected with the supporting seat by both sides, the equal equidistance in both sides of support column has seted up a plurality of installing port, the inboard of a plurality of installing port is provided with a plurality of stabilizer bar, be connected with the limiting plate by the top between two spinal branch daggers, the inside of backing plate is provided with the boss by the bottom center, the top equidistance of backing plate has seted up a plurality of spacing groove, the bottom inboard of supporting seat is provided with the spacing post, one side that the supporting seat is close to the backing plate center is provided with bradyseism pad one, one side that the stabilizer bar is close to the backing plate center is provided with bradyseism pad two; a drainage pipe's mechanism of erectting for municipal works for drainage pipe's mechanism of erectting for municipal works can adapt to not unidimensional drainage pipe, has improved drainage pipe's for municipal works adaptability of mechanism of erectting.

Description

Drainage pipeline's for municipal works erect mechanism
Technical Field
The utility model relates to a pipeline erects the mechanism field, in particular to drainage pipe's for municipal works erects mechanism.
Background
With the continuous development of municipal infrastructure construction engineering of cities in China, the number of municipal engineering projects such as urban roads, bridges, underground pipelines, tunnels, riverways and sewage treatment is increasing day by day, and when drainage pipeline projects are built, the foundation stability of the drainage pipeline needs to be ensured through an erection mechanism of the drainage pipeline for municipal engineering.
Firstly, the adaptability of the existing erection mechanism of the drainage pipeline for the municipal engineering is still to be improved, the existing erection mechanism of the drainage pipeline for the municipal engineering can only erect the drainage pipeline with a specific size, and the use cost is high; secondly, current drainage pipe for municipal works's mechanism of erectting lacks the good stable structure to the drainage pipe top, and is relatively poor to the stability ability at drainage pipe top, can lead to drainage pipe's top and bottom atress uneven, influences drainage pipe's life.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims at providing an erection device of drainage pipeline for municipal engineering, which can effectively solve the problem that the adaptability of the existing erection device of drainage pipeline for municipal engineering in the background art is still to be improved, the existing erection device of drainage pipeline for municipal engineering can only erect the drainage pipeline with specific size, and the use cost is high; secondly, current drainage pipe for municipal works's mechanism of erectting lacks the good stable structure to the drainage pipe top, and is relatively poor to the stability ability at drainage pipe top, can lead to drainage pipe's top and bottom atress uneven, influences drainage pipe life's technical problem.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the erecting mechanism of the drainage pipeline for the municipal engineering comprises a base plate, wherein supporting columns are arranged on two sides of the base plate, supporting seats are connected to the top of the base plate close to the two sides, a plurality of mounting openings are formed in the two sides of each supporting column at equal intervals, a plurality of stabilizing rods are arranged on the inner sides of the mounting openings, and a limiting plate is connected between the two supporting columns close to the top;
a reinforcing block is arranged in the base plate close to the center of the bottom end, a plurality of limiting grooves are formed in the top of the base plate at equal intervals, limiting columns are arranged on the inner side of the bottom of the supporting seat, a first cushioning pad is arranged on one side, close to the center of the base plate, of the supporting seat, and a second cushioning pad is arranged on one side, close to the center of the base plate, of the stabilizing rod;
adjusting screw is installed near the center in the top of limiting plate, and the bottom of limiting plate is close to the position of adjusting screw both sides and all installs auxiliary screw, and adjusting screw's bottom is connected with the arched steel plate, and the bottom of arched steel plate is provided with the bradyseism and fills up three, and the inside equidistance of arched steel plate is provided with a plurality of pressure spring.
As a further scheme of the utility model, support column and backing plate both sides fixed connection, the outside size of stabilizer bar is the same with the inboard size of installing port.
As a further scheme of the utility model, the outside size of spacing post is the same with the inboard size of spacing groove, and the inboard size of spacing groove is less than the inboard size of installing port, the inboard fixed connection of boss and backing plate.
As a further scheme of the utility model, the spacing groove does not contact with the boss, and the limiting plate passes through the fixing bolt cooperation nut and the inboard fixed connection of support column that both sides set up, and the installing port setting that is closest to the support column top surface is in the limiting plate below.
As the utility model discloses a further scheme, the outside thickness that the bradyseism fills up three is the same with the outside height of backing plate, the inboard top surface fixed connection of pressure spring top surface and arched steel sheet, the inboard fixed connection in pressure spring bottom and bradyseism pad three tops.
As the utility model discloses a further scheme, the inboard top surface of arch steel sheet is close to auxiliary screw's bottom, and auxiliary screw's outside length is less than adjusting screw's outside length, and the pressure spring does not contact with adjusting screw and auxiliary screw.
Compared with the prior art, the utility model discloses following beneficial effect has: the utility model discloses in through setting up backing plate cooperation supporting seat, set up the backing plate on the horizontal plane, weld the supporting seat in the both sides of backing plate, then set up two supporting seats in suitable position according to drainage pipe's outside size, make a plurality of spacing post top pass the spacing groove and set up in the bottom of supporting seat, weld the bottom surface of spacing post, make the one end of a plurality of stabilizer bar pass the installing port and set up in the supporting seat inboard, weld one side of stabilizer bar, set up drainage pipe between two supporting seats, extrude bradyseism pad one, pass the installing port with the one end of a plurality of stabilizer bar and laminate mutually with the outside of drainage pipe, extrude bradyseism pad two, make the erection mechanism of drainage pipe for municipal works can adapt to drainage pipe of different sizes, the adaptability of the erection mechanism of drainage pipe for municipal works has been improved;
through arranging the supporting columns and matching the limiting plates, after the drainage pipeline is stably arranged at the top of the base plate, the limiting plates are fixedly arranged at the positions between the supporting columns and close to the top through fixing bolts and matching nuts, the adjusting screw rod and the auxiliary screw rod with proper lengths are selected, the adjusting screw rod penetrates through the center of the inside of the limiting plate, the arched steel plate is arranged at the bottom of the adjusting screw rod, the arched steel plate moves downwards through rotating the adjusting screw rod, the two auxiliary screw rods are arranged inside the arched steel plate from the bottom of the arched steel plate, the three bottoms of the shock absorption pads are tightly attached to the top of the drainage pipeline, the three shock absorption pads and the pressure spring are extruded, the auxiliary screw rods are rotated from the two sides of the auxiliary screw rod to fixedly connect the top of the auxiliary screw rod with the inside of the limiting plate, the stability of the drainage pipeline erecting mechanism for municipal engineering to the top of the drainage pipeline is enhanced, and the top and the bottom of the drainage pipeline are uniformly stressed, the service life of the drainage pipeline is prolonged.
Drawings
FIG. 1 is a schematic view of the overall structure of an erection mechanism of a municipal drainage pipeline according to the present invention;
FIG. 2 is a front sectional view of the junction between the bottom of the support column and the base plate of the erecting mechanism of the drainage pipeline for municipal works;
FIG. 3 is the utility model relates to a positive cross-sectional view of limiting plate and adjusting screw junction of drainage pipe's for municipal works mechanism of erectting.
In the figure: 1. a base plate; 2. a support pillar; 3. a supporting seat; 4. an installation port; 5. a stabilizer bar; 6. a limiting plate; 7. a reinforcing block; 8. a limiting groove; 9. a limiting column; 10. a first cushioning pad; 11. a second cushioning pad; 12. an arched steel plate; 13. an auxiliary screw; 14. a third cushioning pad; 15. a pressure spring; 16. adjusting the screw rod.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-3, an erection mechanism of a drainage pipeline for municipal engineering comprises a base plate 1, wherein support columns 2 are arranged on two sides of the base plate 1, a support seat 3 is connected to the top of the base plate 1 close to the two sides, a plurality of mounting ports 4 are arranged on the two sides of each support column 2 at equal intervals, a plurality of stabilizer bars 5 are arranged on the inner sides of the mounting ports 4, and a limiting plate 6 is connected between the two support columns 2 close to the top;
a reinforcing block 7 is arranged in the base plate 1 close to the center of the bottom end, a plurality of limiting grooves 8 are formed in the top of the base plate 1 at equal intervals, limiting columns 9 are arranged on the inner side of the bottom of the supporting seat 3, a first cushioning pad 10 is arranged on one side, close to the center of the base plate 1, of the supporting seat 3, and a second cushioning pad 11 is arranged on one side, close to the center of the base plate 1, of the stabilizing rod 5;
an adjusting screw 16 is installed close to the center at the top of the limiting plate 6, auxiliary screws 13 are installed at positions, close to two sides of the adjusting screw 16, of the bottom of the limiting plate 6, an arched steel plate 12 is connected to the bottom of the adjusting screw 16, a third cushioning pad 14 is arranged at the bottom of the arched steel plate 12, and a plurality of pressure springs 15 are arranged in the arched steel plate 12 at equal intervals.
Support column 2 and backing plate 1 both sides fixed connection, the outside size of stabilizer bar 5 is the same with the inboard size of installing port 4, makes things convenient for the user of service to set up stabilizer bar 5 in the inboard of installing port 4.
The outside size of spacing post 9 is the same with the inboard size of spacing groove 8, and the inboard size of spacing groove 8 is less than the inboard size of installing port 4, and boss 7 and the inboard fixed connection of backing plate 1, boss 7 reinforcing backing plate 1's stability.
Spacing groove 8 does not contact with boss 7, and limiting plate 6 is through the fixing bolt cooperation nut and the inboard fixed connection of support column 2 that both sides set up, and installing port 4 closest to 2 top surfaces of support column sets up in limiting plate 6 below.
The thickness of the outer side of the third cushioning pad 14 is the same as the height of the outer side of the base plate 1, the top surface of the pressure spring 15 is fixedly connected with the top surface of the inner side of the arched steel plate 12, the bottom of the pressure spring 15 is fixedly connected with the inner side of the top of the third cushioning pad 14, and the pressure spring 15 is matched with the third cushioning pad 14 to enhance the cushioning capacity of the top of the drainage pipeline.
The bottom of the auxiliary screw 13 is close to the top surface of the inner side of the arched steel plate 12, the length of the outer side of the auxiliary screw 13 is smaller than that of the outer side of the adjusting screw 16, and the pressure spring 15 is not in contact with the adjusting screw 16 and the auxiliary screw 13, so that the influence of the adjusting screw 16 and the auxiliary screw 13 on the cushioning effect of the cushioning pad III 14 is avoided.
It should be noted that the utility model relates to a drainage pipeline erection device for municipal works, when in use, firstly, a user sets a backing plate 1 on a horizontal plane, welds a support seat 3 on both sides of the backing plate 1, then sets two support seats 3 at proper positions according to the outside size of the drainage pipeline, makes the tops of a plurality of spacing posts 9 pass through a spacing groove 8 and set at the bottom of the support seats 3, welds the bottom surfaces of the spacing posts 9, makes one end of a plurality of stabilizer bars 5 pass through a mounting port 4 and set at the inner side of the support seats 3, welds one side of the stabilizer bars 5, sets a drainage pipeline between the two support seats 3, extrudes a cushioning pad 10, makes one end of a plurality of stabilizer bars 5 pass through the mounting port 4 and be attached to the outer side of the drainage pipeline, extrudes a cushioning pad two 11, then fixedly installs a limiting plate 6 between the support posts 2 by the top through a fixing bolt and a nut, selecting an adjusting screw 16 and an auxiliary screw 13 with proper lengths, firstly penetrating the adjusting screw 16 through the center in the limiting plate 6, installing the arched steel plate 12 at the bottom of the adjusting screw 16, enabling the arched steel plate 12 to move downwards by rotating the adjusting screw 16, arranging the two auxiliary screws 13 inside the arched steel plate 12 from the bottom of the arched steel plate 12, enabling the bottom of the third cushioning pad 14 to be tightly attached to the top of the drainage pipeline, extruding the third cushioning pad 14 and the pressure spring 15, and rotating the auxiliary screws 13 from the two sides of the auxiliary screws 13 to enable the tops of the auxiliary screws to be fixedly connected with the inside of the limiting plate 6.
The utility model arranges the backing plate 1 on the horizontal plane in cooperation with the supporting seat 3, welds the supporting seat 3 on the two sides of the backing plate 1, then the two supporting seats 3 are arranged at proper positions according to the outside size of the drainage pipeline, the tops of a plurality of limiting columns 9 pass through the limiting grooves 8 to be arranged at the bottoms of the supporting seats 3, the bottom surface of the limiting post 9 is welded, one end of a plurality of stabilizer bars 5 is arranged at the inner side of the supporting seat 3 through the mounting port 4, welding one side of the stabilizer bars 5, arranging the drainage pipeline between the two supporting seats 3, extruding the first shock absorption pad 10, enabling one ends of the stabilizer bars 5 to penetrate through the mounting openings 4 to be attached to the outer side of the drainage pipeline, extruding the second shock absorption pad 11, the erecting mechanism of the drainage pipeline for the municipal engineering can adapt to drainage pipelines with different sizes, and the adaptability of the erecting mechanism of the drainage pipeline for the municipal engineering is improved; by arranging the supporting columns 2 to be matched with the limiting plates 6, after the drainage pipeline is stably arranged at the top of the base plate 1, the limiting plates 6 are fixedly arranged at positions between the supporting columns 2 and close to the top through fixing bolts and matching nuts, the adjusting screw rods 16 and the auxiliary screw rods 13 with proper lengths are selected, the adjusting screw rods 16 penetrate through the inner centers of the limiting plates 6, the arched steel plates 12 are arranged at the bottoms of the adjusting screw rods 16, the arched steel plates 12 move downwards through rotating the adjusting screw rods 16, the two auxiliary screw rods 13 are arranged in the arched steel plates 12 from the bottoms of the arched steel plates 12, the bottoms of the third shock-absorbing pads 14 are tightly attached to the tops of the drainage pipeline, the third shock-absorbing pads 14 and the pressure springs 15 are extruded, the auxiliary screw rods 13 are rotated from the two sides of the auxiliary screw rods 13 to fixedly connect the tops of the auxiliary screw rods 13 with the interiors of the limiting plates 6, and the stability of the drainage pipeline erection mechanism for municipal engineering to the top of the drainage pipeline is enhanced, the top and the bottom of the drainage pipeline are stressed uniformly, and the service life of the drainage pipeline is prolonged.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides an erection mechanism of drainage pipe for municipal works which characterized in that: the base plate comprises a base plate (1), wherein supporting columns (2) are arranged on two sides of the base plate (1), supporting seats (3) are connected to the top of the base plate (1) close to the two sides, a plurality of mounting openings (4) are formed in the two sides of each supporting column (2) at equal intervals, a plurality of stabilizing rods (5) are arranged on the inner sides of the mounting openings (4), and a limiting plate (6) is connected between the two supporting columns (2) close to the top;
a reinforcing block (7) is arranged in the base plate (1) close to the center of the bottom end, a plurality of limiting grooves (8) are formed in the top of the base plate (1) at equal intervals, limiting columns (9) are arranged on the inner side of the bottom of the supporting seat (3), a first cushioning pad (10) is arranged on one side, close to the center of the base plate (1), of the supporting seat (3), and a second cushioning pad (11) is arranged on one side, close to the center of the base plate (1), of the stabilizer bar (5);
adjusting screw (16) are installed near the center in the top of limiting plate (6), and auxiliary screw (13) are all installed to the position that the bottom of limiting plate (6) is close to adjusting screw (16) both sides, and the bottom of adjusting screw (16) is connected with arched steel plate (12), and the bottom of arched steel plate (12) is provided with bradyseism pad three (14), and the inside equidistance of arched steel plate (12) is provided with a plurality of pressure spring (15).
2. The erection mechanism of a municipal works drainage pipeline according to claim 1, wherein: the supporting column (2) is fixedly connected with the two sides of the base plate (1), and the outer side size of the stabilizer bar (5) is the same as the inner side size of the mounting opening (4).
3. The erection mechanism of a municipal works drainage pipeline according to claim 1, wherein: the outside size of spacing post (9) is the same with the inboard size of spacing groove (8), and the inboard size of spacing groove (8) is less than the inboard size of installing port (4), and boss (7) and backing plate (1) inboard fixed connection.
4. The erection mechanism of a municipal works drainage pipeline according to claim 1, wherein: spacing groove (8) do not contact with boss (7), and limiting plate (6) are through the fixing bolt cooperation nut and the inboard fixed connection of support column (2) that both sides set up, and installing port (4) that are closest to support column (2) top surface sets up in limiting plate (6) below.
5. The erection mechanism of a municipal works drainage pipeline according to claim 1, wherein: the thickness of the outer side of the third shock absorption pad (14) is the same as the height of the outer side of the backing plate (1), the top surface of the pressure spring (15) is fixedly connected with the top surface of the inner side of the arched steel plate (12), and the bottom of the pressure spring (15) is fixedly connected with the inner side of the top of the third shock absorption pad (14).
6. The erection mechanism of a municipal works drainage pipeline according to claim 1, wherein: the bottom of the auxiliary screw rod (13) is close to the top surface of the inner side of the arched steel plate (12), the length of the outer side of the auxiliary screw rod (13) is smaller than that of the outer side of the adjusting screw rod (16), and the pressure spring (15) is not in contact with the adjusting screw rod (16) and the auxiliary screw rod (13).
CN202120030659.7U 2021-01-07 2021-01-07 Drainage pipeline's for municipal works erect mechanism Active CN214194879U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120030659.7U CN214194879U (en) 2021-01-07 2021-01-07 Drainage pipeline's for municipal works erect mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120030659.7U CN214194879U (en) 2021-01-07 2021-01-07 Drainage pipeline's for municipal works erect mechanism

Publications (1)

Publication Number Publication Date
CN214194879U true CN214194879U (en) 2021-09-14

Family

ID=77634142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120030659.7U Active CN214194879U (en) 2021-01-07 2021-01-07 Drainage pipeline's for municipal works erect mechanism

Country Status (1)

Country Link
CN (1) CN214194879U (en)

Similar Documents

Publication Publication Date Title
CN104988989A (en) Movable building structure and making method thereof
CN102367653A (en) Support structure for large-span continuous beam construction
CN103276676B (en) Traffic guidance display screen frame
CN214194879U (en) Drainage pipeline's for municipal works erect mechanism
CN213064874U (en) Ditch pipeline strutting arrangement for municipal construction
CN109797984B (en) Variable-curvature multipurpose steering device for external prestressed tendons
CN219011718U (en) Ribbon curtain wall roof structure
CN212153131U (en) Supporting equipment for assembling steel-concrete I-shaped composite beam
CN201206173Y (en) Structure for preventing shifting of aluminum busbar guide frame
CN217824194U (en) Light combined calandria fixing structure
CN202482766U (en) Support structure for large span continuous beam constructions
KR102455356B1 (en) Anchor bolt installation device for solar panel installation
CN202839658U (en) Photovoltaic support with adjustable inclination angle
CN201531141U (en) Framework for ultra-high voltage AC transmission line
CN213775409U (en) Double-arch ring loess cave dwelling supporting device
CN212247732U (en) Prefabricated high strength concrete floor tile bearing structure of assembled
CN112922026A (en) Novel assembled prefabricated cable inspection well and installation method thereof
CN207047754U (en) A kind of road and bridge safety guide rail
CN221320628U (en) Subway construction steel temporary bridge
CN212178070U (en) Cable tower pump pipe counterfort fixing device
CN211228023U (en) Clay shovel leveling device for highway construction
CN214694945U (en) Roadbed reinforced structure for highway engineering construction
CN218116776U (en) Assembled steel construction building H shaped steel installation base
CN102121220A (en) Combined shock-resistant energy-saving multifunctional multi-layer three-dimensional traffic highway
CN215107348U (en) Continuous beam construction support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant