CN214189065U - Construction progress show board for construction management - Google Patents

Construction progress show board for construction management Download PDF

Info

Publication number
CN214189065U
CN214189065U CN202023044737.3U CN202023044737U CN214189065U CN 214189065 U CN214189065 U CN 214189065U CN 202023044737 U CN202023044737 U CN 202023044737U CN 214189065 U CN214189065 U CN 214189065U
Authority
CN
China
Prior art keywords
construction progress
construction
display board
board body
progress display
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023044737.3U
Other languages
Chinese (zh)
Inventor
董昕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Yachao Engineering Technology Co ltd
Original Assignee
Tianjin Yachao Engineering Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Yachao Engineering Technology Co ltd filed Critical Tianjin Yachao Engineering Technology Co ltd
Priority to CN202023044737.3U priority Critical patent/CN214189065U/en
Application granted granted Critical
Publication of CN214189065U publication Critical patent/CN214189065U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a construction progress display board for construction management, which comprises a construction progress display board body, a first telescopic rod and a first fixed plate, wherein the lower surface of the construction progress display board body is provided with the first telescopic rod, and the upper surface of the first telescopic rod is symmetrically and fixedly provided with the first fixed plate; through the screw of design, first fixed plate, first telescopic link, first linkage block and nut, through screwing the first fixed plate of screw cooperation, first fixed plate drives the screw fixation afterwards, can stimulate first telescopic link this moment and adjust, when adjusting suitable angle, can insert the inside of nut with first linkage block, screw the nut afterwards, can carry on spacingly to first telescopic link this moment, through the optimization to construction progress show board body, when preventing to appear needing to dismantle and installing, because fix and lead to the installation and dismantle inconvenient on ground, thereby the condition of dismantling appears in extravagant manpower, the effectual effect of convenient to detach that has increased.

Description

Construction progress show board for construction management
Technical Field
The utility model belongs to the technical field of the show tablet, concretely relates to construction management is with construction progress show board.
Background
In the construction process, in order to realize the show to the construction progress, often need use construction progress management display device, present construction progress management display device generally includes a plate body, the administrator is when using, need manually write project name and current project progress on the plate body, economic system has huge change simultaneously, the paces of urbanization construction progressively accelerate, demand to construction constantly increases thereupon, and then the demand of equipment is also more and more for construction management, progress show board for construction management, mainly used audio-visual record and show construction management progress, degree show board kind pattern is different on the market.
Present construction management is with construction progress show board is mostly fixed subaerial, because fixed subaerial, it is comparatively troublesome when leading to needing to dismantle, and can leave the hole subaerial, construction management is with construction progress show board current simultaneously, can not rain-proof when outdoor use, because the condition of raining can appear in the open air, lead to construction management to be with construction progress show board the back that drenches can appear, the problem of the condition that the rust mark influences life appears, we propose a construction management for this reason and use construction progress show board.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction management is with construction progress show board, construction management for the construction progress show board that proposes in solving above-mentioned background art is mostly fixed subaerial, because fixed subaerial, it is comparatively troublesome when leading to needing to dismantle, and can subaerial leave the hole, construction management is with construction progress show board current simultaneously, can not rain-proof when outdoor use, because the condition of rain can appear in the open air, lead to construction management to be with construction progress show board the back that drenches can appear, the problem of the condition that rust stain influences life appears.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a construction progress show board for construction management, includes construction progress show board body, first telescopic link and first fixed plate, the lower surface of construction progress show board body is equipped with first telescopic link, the last surface symmetry fixed mounting of first telescopic link has first fixed plate, the equal symmetry in inside of first fixed plate is inserted and is equipped with the screw, the surface cover of first telescopic link is equipped with the second telescopic link, two the equal fixedly connected with first link of the opposite face of first telescopic link, the surface of first link all is overlapped and is equipped with the nut, first recess has all been seted up to a side of keeping away from the screw of second telescopic link, first link runs through in the surface of second telescopic link, and the surface of first link closely laminates with the surface of first recess, the opposite face of screw is equipped with the connecting rod.
Preferably, the slide rail has been seted up to the equal symmetry in surface both sides of construction progress show board body, the inside of slide rail all is equipped with the slider, the slider is kept away from the equal fixedly connected with second connecting block in a side of construction progress show board body, the equal fixed mounting in a side of slider is kept away from to the second connecting block has the connecting plate, a side that construction progress show board body was kept away from to the connecting plate all is equipped with the second fixed plate, the second recess has all been seted up to the surface of connecting plate, the inside of second recess is all inserted and is equipped with spacing bolt, the third recess has all been seted up to the equal symmetry in both sides of construction progress show board body, the equal fixed mounting in upper surface of connecting plate has the weather shield, the waterproof groove has all been seted up to.
Preferably, the outer surface of the connecting rod penetrates through the outer surface of the second telescopic rod, and the two ends of the connecting rod are fixedly connected with the outer surface of the screw.
Preferably, the lower surface of the second telescopic rod is provided with a base, a rubber pad is paved on the lower surface of the base, and irregular grains are arranged on the outer surface of the rubber pad.
Preferably, the equal fixed mounting in a side that construction progress show board body was kept away from to the stop bolt has the handle, the surface of handle all overlaps and is equipped with the rubber sleeve, and the surface of rubber sleeve has all seted up irregular line.
Preferably, the outer surface of the sliding block is tightly attached to the outer surface of the sliding rail, and the outer surface of the sliding block is connected with the outer surface of the sliding rail in a sliding mode.
Preferably, the handle penetrates through the outer surface of the sliding rail, and the outer surface of the handle is tightly attached to the outer surface of the third groove.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through the designed screw, the first fixing plate, the first telescopic rod, the first connecting block and the nut, the screw is matched with the first fixing plate to be screwed tightly, then the first fixing plate drives the screw to be fixed, at the moment, the first telescopic rod can be pulled to be adjusted, when the angle is adjusted to a proper angle, the first connecting block can be inserted into the nut, and then the nut is screwed tightly, at the moment, the first telescopic rod can be limited, when the device needs to be disassembled, the screw can be taken out from the inner part of the first fixed plate by loosening the screw, then the first telescopic rod can be disassembled from the surface of the construction progress display board body, and the disassembly and the assembly are prevented by optimizing the construction progress display board body, because fix and lead to the installation inconvenient with the dismantlement on ground to the condition that extravagant manpower was dismantled appears, the effectual effect that has increased convenient to detach.
2. Through the connecting plate of design, the second connecting block, the slider, slide rail and stop cock, drive the second connecting block through the pulling connecting plate and remove, the second connecting block drives the inside that the slider slided into the slide rail afterwards, stop cock carries on spacingly to the connecting plate this moment, through the optimization to construction progress show board body, when preventing that outdoor use from raining, the rainwater drenches to the surface of construction progress show board body rust mark appears, lead to the condition that life reduces to appear in the construction progress show board body.
Drawings
Fig. 1 is a schematic front view of the present invention;
fig. 2 is a schematic front view of the cross-sectional structure of the present invention;
FIG. 3 is a schematic view of the rain shield of the present invention;
fig. 4 is a schematic view of the connection plate structure of the present invention.
In the figure: 1. a construction progress display board body; 2. a first telescopic rod; 3. a first fixing plate; 4. a screw; 5. a second telescopic rod; 6. a first connection block; 7. a nut; 8. a first groove; 9. a connecting rod; 10. a base; 11. a slide rail; 12. a slider; 13. a second connecting block; 14. a connecting plate; 15. a second fixing plate; 16. A second groove; 17. a limit bolt; 18. a handle; 19. a third groove; 20. a rain shield; 21. a waterproof groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a construction progress display board for construction management comprises a construction progress display board body 1, first telescopic rods 2 and first fixing plates 3, wherein the lower surface of the construction progress display board body 1 is provided with the first telescopic rods 2, the upper surfaces of the first telescopic rods 2 are symmetrically and fixedly provided with the first fixing plates 3, screws 4 are symmetrically inserted into the first fixing plates 3, the outer surface of each first telescopic rod 2 is sleeved with a second telescopic rod 5, the opposite surfaces of the two first telescopic rods 2 are fixedly connected with first connecting blocks 6, the outer surface of each first connecting block 6 is sleeved with a nut 7, one side surface of each second telescopic rod 5, which is far away from the screws 4, is provided with a first groove 8, and each first connecting block 6 penetrates through the outer surface of the second telescopic rod 5, and the outer surface of the first connecting block 6 is tightly attached to the outer surface of the first groove 8, and the opposite surfaces of the screws 4 are provided with connecting rods 9.
In the embodiment, when the device is used, the screw 4 is matched with the first fixing plate 3 to be screwed, then the first fixing plate 3 drives the screw 4 to be fixed, at the moment, the first telescopic rod 2 can be pulled to be adjusted, when the angle is adjusted to a proper angle, the first connecting block 6 can be inserted inside the nut 7, and then the nut 7 is screwed, at which point the first telescopic rod 2 can be restrained, when the device needs to be disassembled, the screw 4 can be taken out from the inner part of the first fixing plate 3 by unscrewing the screw 4, then the first telescopic rod 2 can be disassembled from the surface of the construction progress display plate body 1, by optimizing the construction progress display board body 1, when the disassembly and the installation are required, because fix and lead to the installation inconvenient with the dismantlement on ground to the condition that extravagant manpower was dismantled appears, the effectual effect that has increased convenient to detach.
Specifically, slide rail 11 has been seted up to the equal symmetry in surface both sides of construction progress show board body 1, slide rail 11's inside all is equipped with slider 12, slider 12 keeps away from the equal fixedly connected with second connecting block 13 in a side of construction progress show board body 1, the equal fixed mounting in a side of slider 12 is kept away from to second connecting block 13 has connecting plate 14, a side of construction progress show board body 1 is kept away from to connecting plate 14 all is equipped with second fixed plate 15, second recess 16 has all been seted up to connecting plate 14's surface, stop pin 17 has all been inserted in the inside of second recess 16, third recess 19 has been seted up to the equal symmetry in both sides of construction progress show board body 1, the equal fixed mounting in upper surface of connecting plate 14 has weather shield 20, waterproof groove 21 has been seted up to the equal symmetry in upper surface of weather shield 20.
In this embodiment, the device during the use, drive second connecting block 13 through pulling connecting plate 14 and remove, second connecting block 13 drives the inside that slider 12 slided into slide rail 11 afterwards, pulling handle 18 drives stop bolt 17 this moment, stop bolt 17 inserts the inside of third recess 19 afterwards, stop bolt 17 spacing to connecting plate 14 this moment, through the optimization to construction progress show board body 1, when preventing that outdoor use from raining, the rainwater drenches to construction progress show board body 1's surface rust mark appears, lead to construction progress show board body 1 to appear the condition that life reduces.
Specifically, the outer surface of the connecting rod 9 penetrates through the outer surface of the second telescopic rod 5, and both ends of the connecting rod 9 are fixedly connected with the outer surface of the screw 4.
In this embodiment, the both ends of connecting rod 9 all are connected with the external fixed surface of screw 4, the effectual stability that has increased prevents the condition of the unstable dislocation of device.
Specifically, the lower surface of second telescopic link 5 all is equipped with base 10, and the rubber pad has all been laid to the lower surface of base 10, and the surface of rubber pad has all seted up irregular line.
In this embodiment, irregular lines have all been seted up to the surface of rubber pad, are favorable to increasing frictional force, prevent the smooth condition that can not use of hand.
Specifically, the equal fixed mounting in a side that construction progress show board body 1 was kept away from to stop bolt 17 has handle 18, and handle 18's surface all overlaps and is equipped with the rubber sleeve, and the surface of rubber sleeve has all seted up irregular line.
In this embodiment, irregular line has all been seted up to the surface of rubber sleeve, and the effectual frictional force that has increased prevents that the device surface from having the condition that water used the difficulty.
Specifically, the outer surface of the slider 12 is closely attached to the outer surface of the slide rail 11, and the outer surface of the slider 12 is slidably connected to the outer surface of the slide rail 11.
In this embodiment, the outer surface of the slider 12 is connected with the outer surface of the slide rail 11 in a sliding manner, so that the stability is effectively improved, and the situation of unstable dislocation of the device is prevented.
Specifically, the handle 18 penetrates through the outer surface of the slide rail 11, and the outer surface of the handle 18 is closely attached to the outer surface of the third groove 19.
In this embodiment, the outer surface of the handle 18 is closely attached to the outer surface of the third groove 19, so that the stability is effectively increased, and the situation of dislocation is prevented.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a construction management is with construction progress show board, includes construction progress show board body (1), first telescopic link (2) and first fixed plate (3), the lower surface of construction progress show board body (1) is equipped with first telescopic link (2), the last surface symmetry fixed mounting of first telescopic link (2) has first fixed plate (3), its characterized in that: the utility model discloses a nut (7) for the electric connector, including first fixed plate (3), the inside equal symmetry of first fixed plate (3) is inserted and is equipped with screw (4), the surface cover of first telescopic link (2) is equipped with second telescopic link (5), two the equal fixedly connected with first connecting block (6) of the opposite face of first telescopic link (2), the surface of first connecting block (6) all overlaps and is equipped with nut (7), first recess (8) have all been seted up to the side of keeping away from screw (4) of second telescopic link (5), first connecting block (6) run through in the surface of second telescopic link (5), and the surface of first connecting block (6) closely laminates with the surface of first recess (8), the facies of screw (4) is equipped with connecting rod (9).
2. The construction progress display board for construction management according to claim 1, characterized in that: the construction progress display board comprises a construction progress display board body (1), sliding rails (11) are symmetrically arranged on two sides of the outer surface of the construction progress display board body (1), sliding blocks (12) are arranged inside the sliding rails (11), a second connecting block (13) is fixedly connected to one side face, far away from the construction progress display board body (1), of each sliding block (12), a connecting plate (14) is fixedly installed on one side face, far away from the sliding blocks (12), of each second connecting block (13), a second fixing plate (15) is arranged on one side face, far away from the construction progress display board body (1), of each connecting plate (14), second grooves (16) are formed in the outer surface of each connecting plate (14), limit bolts (17) are inserted into the inner portions of the second grooves (16), third grooves (19) are symmetrically formed in two sides of the construction progress display board body (1), and rain baffles (20) are fixedly installed on the upper surfaces of the connecting plates (14), waterproof grooves (21) are symmetrically formed in the upper surface of the rain baffle (20).
3. The construction progress display board for construction management according to claim 1, characterized in that: the outer surface of the connecting rod (9) penetrates through the outer surface of the second telescopic rod (5), and the two ends of the connecting rod (9) are fixedly connected with the outer surface of the screw (4).
4. The construction progress display board for construction management according to claim 1, characterized in that: the lower surface of the second telescopic rod (5) is provided with a base (10), a rubber pad is paved on the lower surface of the base (10), and irregular grains are formed in the outer surface of the rubber pad.
5. The construction progress display board for construction management according to claim 2, characterized in that: the utility model discloses a construction progress show board body, including stopper (17), the equal fixed mounting in a side of construction progress show board body (1) has handle (18) to stop cock (17), the surface of handle (18) all overlaps and is equipped with the rubber sleeve, and the surface of rubber sleeve has all seted up irregular line.
6. The construction progress display board for construction management according to claim 2, characterized in that: the outer surface of the sliding block (12) is tightly attached to the outer surface of the sliding rail (11), and the outer surface of the sliding block (12) is in sliding connection with the outer surface of the sliding rail (11).
7. The construction progress display board for construction management according to claim 5, characterized in that: the handle (18) penetrates through the outer surface of the sliding rail (11), and the outer surface of the handle (18) is tightly attached to the outer surface of the third groove (19).
CN202023044737.3U 2020-12-17 2020-12-17 Construction progress show board for construction management Expired - Fee Related CN214189065U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023044737.3U CN214189065U (en) 2020-12-17 2020-12-17 Construction progress show board for construction management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023044737.3U CN214189065U (en) 2020-12-17 2020-12-17 Construction progress show board for construction management

Publications (1)

Publication Number Publication Date
CN214189065U true CN214189065U (en) 2021-09-14

Family

ID=77653714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023044737.3U Expired - Fee Related CN214189065U (en) 2020-12-17 2020-12-17 Construction progress show board for construction management

Country Status (1)

Country Link
CN (1) CN214189065U (en)

Similar Documents

Publication Publication Date Title
CN214189065U (en) Construction progress show board for construction management
CN216768746U (en) Support connection structure of water pipe among drainage engineering
CN211498600U (en) But remote operation's high-speed license plate discernment banister all-in-one
CN210890945U (en) Camera base
CN210397336U (en) Glass fiber board mounting structure
CN210165003U (en) Be used for rig module high pressure hose protection device
CN110847084B (en) High-speed license plate recognition barrier gate all-in-one machine capable of being operated remotely
CN221897509U (en) Monitoring equipment convenient to install
CN219710847U (en) Metal assembly part convenient to install and fix
CN208309957U (en) The readily removable turnable system of spring torsion fast-assembling
CN208056788U (en) A kind of connection component being connect with column for guardrail net
CN206145845U (en) Outer quick -witted safety auxiliary device of air conditioner
CN216251634U (en) Power distribution equipment energy consumption monitoring system
CN213509088U (en) Integrated assembly structure of glass curtain wall
CN219755813U (en) Building security monitoring convenient to overhaul
CN221593845U (en) Hydraulic engineering side slope subsides monitoring devices
CN216520774U (en) Intelligent building security protection supervisory equipment based on thing networking
CN220892560U (en) Outdoor protection type air heat source pump
CN210601887U (en) Positioning and mounting equipment for water supply and drainage heating and ventilation
CN221321416U (en) Anti-drop mounting structure that glass curtain wall and wall connection
CN214687109U (en) Quick installation mould of cable pit capping
CN218990197U (en) Supporting structure for foundation pit excavation
CN220817170U (en) LED display screen back frame convenient to installation
CN107681577B (en) A kind of interspersed cable special stand of municipal works
CN217692129U (en) Dustproof electrical control cabinet with heat pipe for heat dissipation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210914

CF01 Termination of patent right due to non-payment of annual fee