CN214188196U - Injection mold with blow water installation - Google Patents

Injection mold with blow water installation Download PDF

Info

Publication number
CN214188196U
CN214188196U CN202022870844.5U CN202022870844U CN214188196U CN 214188196 U CN214188196 U CN 214188196U CN 202022870844 U CN202022870844 U CN 202022870844U CN 214188196 U CN214188196 U CN 214188196U
Authority
CN
China
Prior art keywords
water
water receiving
pipe
injection mold
bed die
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022870844.5U
Other languages
Chinese (zh)
Inventor
郑学平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou Pinjia Electronic Technology Co.,Ltd.
Original Assignee
Wujiang Pinjia Plastic Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wujiang Pinjia Plastic Products Co ltd filed Critical Wujiang Pinjia Plastic Products Co ltd
Priority to CN202022870844.5U priority Critical patent/CN214188196U/en
Application granted granted Critical
Publication of CN214188196U publication Critical patent/CN214188196U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Moulds For Moulding Plastics Or The Like (AREA)

Abstract

The utility model discloses an injection mold with blow water installation, comprising a base plate, the bed die is installed to bottom plate top one side, the bed die top is provided with the mould, the inlet opening has been seted up to bed die one side, the apopore has been seted up to the bed die opposite side, bottom plate top one side fixed mounting has the air-blower, the fixed intercommunication in air-blower one side has a tuber pipe, it has the heater to go out tuber pipe one end fixed mounting, the fixed intercommunication of heater one end has the blast pipe, the fixed intercommunication of blast pipe one end and inlet opening one end, the fixed intercommunication of apopore one end has the water receiving subassembly, the water receiving subassembly sets up in bottom plate top one side. The utility model discloses an at the structural increase heater of traditional water blowing device, heat the wind that blast apparatus blew off through the heater, use hot-blast inside remaining water to injection mold to clear up, the more thorough of clearance can accelerate clearance speed moreover.

Description

Injection mold with blow water installation
Technical Field
The utility model relates to an injection mold technical field specifically is an injection mold with blow water installation.
Background
An injection mold is a tool for producing plastic products; and is also a tool for giving the plastic product complete structure and accurate dimension. Injection molding is a process used to mass produce parts of some complex shapes. Specifically, the plastic melted by heating is injected into a mold cavity from an injection molding machine at high pressure, and a formed product is obtained after cooling and solidification. The injection mold is divided into a thermosetting plastic mold and a thermoplastic plastic mold according to the molding characteristics; according to the forming process, the method is divided into a transfer mold, a blow mold, a cast mold, a hot forming mold, a hot pressing mold (compression mold), an injection mold and the like, wherein the hot pressing mold can be divided into a flash type, a semi-flash type and a non-flash type by a flash mode, and the injection mold can be divided into a cold runner mold and a hot runner mold by a pouring system; the device can be divided into a movable type and a fixed type according to the loading and unloading mode.
Generally, the injection mold is cooled by cooling water in the using process, but in such a way, part of water is remained inside the mold and is easy to corrode the mold, so a water blowing device is generally installed on the mold, but most of the existing water blowing devices cannot thoroughly clean the water remained inside the mold and the cleaning speed is slow. We therefore propose an injection mould with a water blowing device.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an injection mold with blow water installation adopts and blows the structural heater that increases of water installation at the tradition, heats the wind that blast apparatus blew off through the heater, uses hot-blast inside remaining water of injection mold to clear up, and the more thorough of clearance can accelerate the clearance speed moreover to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides an injection mold with blow water installation, includes the bottom plate, the bed die is installed to bottom plate top one side, the bed die top is provided with the mould, the inlet opening has been seted up to bed die one side, the apopore has been seted up to the bed die opposite side, bottom plate top one side fixed mounting has the air-blower, the fixed intercommunication in air-blower one side has the tuber pipe, tuber pipe one end fixed mounting has the heater, the fixed intercommunication of heater one end has the blast pipe, blast pipe one end and the fixed intercommunication of inlet opening one end, the fixed intercommunication of apopore one end has the water receiving subassembly, the water receiving subassembly sets up in bottom plate top one side.
Preferably, a first quick coupling is installed at one end of the water inlet through threads, and one end of the air supply pipe is installed inside the first quick coupling.
Preferably, the water receiving assembly comprises a water receiving pipe and a water receiving bottle, one end of the water receiving pipe is fixedly communicated with one end of the water outlet hole, and the other end of the water receiving pipe is fixedly communicated with one side of the top of the water receiving bottle.
Preferably, a second quick coupling is installed at apopore one end screw thread, second water receiving pipe one end is installed inside quick coupling.
Preferably, the bottle cap is installed at the top of the water receiving bottle in a threaded mode, a threaded sleeve is fixedly communicated with one side of the top of the bottle cap, a third quick connector is installed on the inner portion of the threaded sleeve in a threaded mode, and one end of the water receiving pipe is installed inside the third quick connector.
Preferably, a ventilation pipe is fixedly communicated with one side of the water receiving bottle, a fixing sleeve is installed at one end of the ventilation pipe in a threaded mode, and a dehumidifying filter layer is arranged inside one end of the fixing sleeve.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses an installing the heater between the play tuber pipe and sending the branch pipe, heating through the wind that the heater blew off the air-blower, use hot-blast inside remaining water to injection mold to clear up, the more thorough of clearance can accelerate clearance speed moreover.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a partial cross-sectional structure of a lower mold of the present invention;
fig. 3 is a schematic view of the fixing sleeve of the present invention in a partial sectional structure;
fig. 4 is an enlarged schematic structural diagram of a portion a of fig. 1 according to the present invention.
In the figure: 1. a base plate; 2. a lower die; 3. an upper die; 4. a water inlet hole; 5. a water outlet hole; 6. a blower; 7. an air outlet pipe; 8. a heater; 9. an air supply pipe; 10. a water receiving component; 1001. a water receiving pipe; 1002. a water receiving bottle; 11. a first quick coupling; 12. a second quick coupling; 13. a bottle cap; 14. a threaded sleeve; 15. a third quick coupling; 16. a vent pipe; 17. fixing a sleeve; 18. a dehumidifying filter layer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution:
the injection mold with the water blowing device comprises a bottom plate 1, a lower mold 2 is installed on one side of the top of the bottom plate 1, an upper mold 3 is arranged on the top of the lower mold 2, a water inlet hole 4 is formed in one side of the lower mold 2, the water inlet hole 4 is used for enabling water to enter the injection mold from the water inlet hole 4 when the injection mold is cooled by cooling, a water outlet hole 5 is formed in the other side of the lower mold 2, the water outlet hole 5 is used for discharging cooling water, an air blower 6 is fixedly installed on one side of the top of the bottom plate 1, the air blower 6 is used for cleaning residual cooling water in the injection mold, an air outlet pipe 7 is fixedly communicated with one side of the air blower 6, the air outlet pipe 7 and an air supply pipe 9 are matched for sending air blown by the air blower 6 into the lower mold 2, a heater 8 is fixedly installed at one end of the air outlet pipe 7, the heater 8 is used for heating the air blown by the air blower 6, and an air supply pipe 9 is fixedly communicated with one end of the heater 8, 9 one end of blast pipe and the fixed intercommunication of 4 one ends of inlet opening, 5 one ends of apopore are fixed to be communicated and have water receiving subassembly 10, and water receiving subassembly 10 is used for collecting 2 inside remaining water of bed die, water receiving subassembly 10 sets up 1 top one side of bottom plate.
4 one end screw threads of inlet opening install first quick-operation joint 11, and 9 one ends of blast pipe are installed inside first quick-operation joint 11, and first quick-operation joint 11 is used for installing blast pipe 9, and it is more convenient to use moreover.
Water receiving subassembly 10 includes water receiving pipe 1001 and water receiving bottle 1002, and water receiving pipe 1001 one end is fixed the intercommunication with 5 one ends of apopore, and the fixed intercommunication in water receiving pipe 1001 other end and water receiving bottle 1002 top one side, and water receiving pipe 1001 and water receiving bottle 1002 cooperate the use and be used for collecting the water that is blown out by the wind.
A second quick coupling 12 is installed to 5 one end screw threads of apopore, and inside second quick coupling 12 was installed to water receiving pipe 1001 one end, second quick coupling 12 was used for installing water receiving pipe 1001 one end, and this kind of mounting means is more convenient.
Connect water bottle 1002 top screw thread to install bottle lid 13, bottle lid 13 is used for sealed water bottle 1002, and the fixed intercommunication in bottle lid 13 top one side has threaded sleeve 14, and threaded sleeve 14 is used for installing third quick-operation joint 15, and third quick-operation joint 15 is installed to 14 inside screw threads of threaded sleeve, and water receiving pipe 1001 one end is installed inside third quick-operation joint 15, and third quick-operation joint 15 is used for installing water receiving pipe 1001 one end, and this side mounting means is more convenient.
Connect the fixed intercommunication in water-jug 1002 one side to have ventilation pipe 16, ventilation pipe 16 is used for the ventilation, fixed cover 17 is installed to ventilation pipe 16 one end screw thread, fixed cover 17 is used for installing dehumidification filter layer 18, install dehumidification filter layer 18 in ventilation pipe 16 one end through fixed cover 17 and be convenient for change dehumidification filter layer 18, fixed cover 17 one end is inside to be provided with dehumidification filter layer 18, dehumidification filter layer 18 is with moisture and the filtration greasy dirt in the absorbed air.
The first quick coupling 11, the second quick coupling 12 and the third quick coupling 15 are all prior art, and for example, the model of the first quick coupling 11, the second quick coupling 12 and the third quick coupling 15 may be set to ristocen PC.
When the water blowing device is used for cleaning water remained in the injection mold, the air blower 6 and the heater 8 are started, air blown out by the air blower 6 enters the air outlet pipe 7, then enters the air supply pipe 9 after being heated by the heater 8, then enters the lower mold 2 through the water inlet hole 4, part of water is blown out by the air, is discharged from the water outlet hole 5, enters the water receiving bottle 1002 through the water receiving pipe 1001, and is evaporated by the other part of water through hot air, so that the water remained in the injection mold is cleaned more thoroughly, and the evaporation speed of part of water can be accelerated through hot air cleaning, so that the cleaning speed is accelerated; when the cleaning of the residual water in the injection mold is finished, the heater 8 is closed, the air blower 6 still continues blowing air until the temperature of the injection mold is reduced to the normal temperature, and then the air blower 6 is closed.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an injection mold with blow water installation, includes bottom plate (1), its characterized in that: bottom plate (1) top one side is installed bed die (2), bed die (2) top is provided with mould (3), inlet opening (4) have been seted up to bed die (2) one side, apopore (5) have been seted up to bed die (2) opposite side, bottom plate (1) top one side fixed mounting has air-blower (6), the fixed intercommunication in air-blower (6) one side has air-out pipe (7), air-out pipe (7) one end fixed mounting has heater (8), the fixed intercommunication in heater (8) one end has blast pipe (9), blast pipe (9) one end and inlet opening (4) one end fixed intercommunication, the fixed intercommunication in apopore (5) one end has water receiving subassembly (10), water receiving subassembly (10) set up in bottom plate (1) top one side.
2. The injection mold with the water blowing device according to claim 1, wherein: a first quick coupling (11) is installed to inlet opening (4) one end screw thread, blast pipe (9) one end is installed inside first quick coupling (11).
3. The injection mold with the water blowing device according to claim 1, wherein: the water receiving assembly (10) comprises a water receiving pipe (1001) and a water receiving bottle (1002), one end of the water receiving pipe (1001) is fixedly communicated with one end of the water outlet hole (5), and the other end of the water receiving pipe (1001) is fixedly communicated with one side of the top of the water receiving bottle (1002).
4. An injection mold with a water blowing device according to claim 3, characterized in that: a second quick coupling (12) is installed at one end of the water outlet hole (5) in a threaded mode, and one end of the water receiving pipe (1001) is installed inside the second quick coupling (12).
5. An injection mold with a water blowing device according to claim 4, characterized in that: bottle lid (13) are installed to water receiving bottle (1002) top screw thread, fixed intercommunication has threaded bush (14) in bottle lid (13) top one side, third quick-operation joint (15) are installed to the internal thread of threaded bush (14), water receiving pipe (1001) one end is installed inside third quick-operation joint (15).
6. An injection mold with a water blowing device according to claim 5, characterized in that: the water receiving bottle is characterized in that one side of the water receiving bottle (1002) is fixedly communicated with a vent pipe (16), one end of the vent pipe (16) is provided with a fixed sleeve (17) in a threaded manner, and a dehumidification filtering layer (18) is arranged inside one end of the fixed sleeve (17).
CN202022870844.5U 2020-12-02 2020-12-02 Injection mold with blow water installation Active CN214188196U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022870844.5U CN214188196U (en) 2020-12-02 2020-12-02 Injection mold with blow water installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022870844.5U CN214188196U (en) 2020-12-02 2020-12-02 Injection mold with blow water installation

Publications (1)

Publication Number Publication Date
CN214188196U true CN214188196U (en) 2021-09-14

Family

ID=77649677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022870844.5U Active CN214188196U (en) 2020-12-02 2020-12-02 Injection mold with blow water installation

Country Status (1)

Country Link
CN (1) CN214188196U (en)

Similar Documents

Publication Publication Date Title
CN105500655A (en) Mold forming system and method for direct air-cooling formed object
CN214188196U (en) Injection mold with blow water installation
CN210026186U (en) Heat abstractor is used in mould production
CN113021752B (en) Injection molding machine with cooling device
CN208035249U (en) A kind of special exhaust structure of plastic mould
CN212097317U (en) Auto parts injection mold with cooling function
CN211120442U (en) Automobile ornament injection molding raw material drying device
CN107471578A (en) A kind of preparation technology of automobile lampshade
CN209320243U (en) A kind of automatic temperature-control injection mold
CN218803931U (en) Hollow blow molding machine die head
CN207481197U (en) Blow moulding machine forming die system
CN213972330U (en) Oil filling port die of automobile oil tank
CN209699798U (en) A kind of rapid heat cycle equipment for automotive air-conditioning controller panel injection mold
CN216635145U (en) Heat recovery mechanism that injection molding machine was used
CN214354003U (en) Injection mold with blow water installation
CN211334479U (en) Glass fiber reinforced plastic production equipment
CN218948290U (en) Injection mold with quick heat radiation structure
CN208745219U (en) A kind of injection molded junction box mold that the die cavity of optimization increases
CN211965885U (en) Convenient type aluminium wheel hub mould heating instrument
CN208133504U (en) A kind of outer layer bulb injection mold
CN213353120U (en) Dehumidification dryer for dehumidifying by using thermoplastic molding waste heat
CN220973160U (en) Processing injection mold for degrading plastics
CN209521285U (en) A kind of thermoplastic glass fiber product pultrusion die
CN217196654U (en) Easily radiating injection mold
CN209007853U (en) A kind of residual heat of injection molding machine recycle device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240409

Address after: 344000 South of Weiliu Road, Fuzhou High tech Industrial Development Zone, Fuzhou City, Jiangxi Province

Patentee after: Fuzhou Pinjia Electronic Technology Co.,Ltd.

Country or region after: China

Address before: No.58 Lianhua Road, Youyi Industrial Zone, Songling Town, Wujiang District, Suzhou City, Jiangsu Province

Patentee before: Wujiang Pinjia plastic products Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right