CN214176765U - Comprehensive support for cable bridge - Google Patents

Comprehensive support for cable bridge Download PDF

Info

Publication number
CN214176765U
CN214176765U CN202120240250.8U CN202120240250U CN214176765U CN 214176765 U CN214176765 U CN 214176765U CN 202120240250 U CN202120240250 U CN 202120240250U CN 214176765 U CN214176765 U CN 214176765U
Authority
CN
China
Prior art keywords
crane span
span structure
slide
bridge
driving plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120240250.8U
Other languages
Chinese (zh)
Inventor
陈文杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou Shunli Electrical Equipment Co ltd
Original Assignee
Fuzhou Shunli Electrical Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Shunli Electrical Equipment Co ltd filed Critical Fuzhou Shunli Electrical Equipment Co ltd
Priority to CN202120240250.8U priority Critical patent/CN214176765U/en
Application granted granted Critical
Publication of CN214176765U publication Critical patent/CN214176765U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a cable testing bridge is with synthesizing support, which comprises a bridge frame, the both sides at crane span structure top all are provided with supporting mechanism, the inside top swing joint of crane span structure has the slide, the first spout that uses with the slide cooperation is all seted up to the both sides of crane span structure inner wall. The utility model discloses a set up the crane span structure, supporting mechanism, the supporting shoe, the connecting rod, first bracing piece, the second bracing piece, the fixed block, the slide, first spout, chucking mechanism, the driving plate, the fixture block, the draw-in groove, a spring, the through-hole, the slider, the second spout, handle and dead lever cooperation are used, possess easy to assemble and fixed firm advantage, it is very practical to have solved current cable crane span structure, but when user installs cable crane span structure because the cable crane span structure need install in half the sky with need fixed very firm, extravagant user's time, and have very big potential safety hazard to the user, the problem of the installation of not convenient to use.

Description

Comprehensive support for cable bridge
Technical Field
The utility model belongs to the technical field of the cable testing bridge, especially, relate to a cable testing bridge is with synthesizing support.
Background
The cable bridge is divided into structures such as a groove type structure, a tray type structure, a ladder type structure and a grid type structure, and is composed of a support, a supporting arm, an installation accessory and the like, the bridge in a building can be independently erected and also can be laid on various buildings and pipe gallery supports, the characteristics of simple structure, attractive appearance, flexible configuration, convenience in maintenance and the like are reflected, all parts are required to be galvanized, and the bridge is installed outside the building in the open air.
Need use the cable testing bridge when the electric wire needs to support in the midair, though current cable testing bridge is very practical, because the cable testing bridge need install in the midair and need fixed very firm when the user installs the cable testing bridge, extravagant user's time, and have very big potential safety hazard to the user, the installation of not convenient to use.
SUMMERY OF THE UTILITY MODEL
Problem to prior art existence, the utility model provides a cable testing bridge is with synthesizing support possesses easy to assemble and fixed firm advantage, has solved current cable testing bridge very practical, but when user installation cable testing bridge because the cable testing bridge need install in half empty with need fixed very firm, user's time is wasted, and has very big potential safety hazard to the user, the problem of the installation of not convenient for use.
The utility model discloses a realize like this, a cable testing bridge is with synthesizing support, which comprises a bridge frame, the both sides at crane span structure top all are provided with supporting mechanism, the inside top swing joint of crane span structure has the slide, the first spout that uses with the slide cooperation is all seted up to the both sides of crane span structure inner wall, the inside of slide is provided with chucking mechanism.
As the utility model discloses it is preferred, the supporting mechanism includes the supporting shoe, the inside swing joint of supporting shoe has the connecting rod, the front side of connecting rod and the first bracing piece of the equal fixedly connected with in rear side, there is the second bracing piece at the top of first bracing piece through first pivot swing joint, there is the fixed block at the top of second bracing piece through second pivot swing joint.
As the utility model discloses it is preferred, chucking mechanism includes the driving plate, the left side fixedly connected with fixture block of driving plate, the draw-in groove of using with the fixture block cooperation is seted up in the left side of crane span structure inner wall, the right side fixedly connected with spring of driving plate, the inner wall fixed connection of spring and slide.
As the utility model discloses it is preferred, the through-hole has all been seted up to the both sides of crane span structure, a plurality of through-hole evenly distributed in the both sides of crane span structure.
As the utility model discloses it is preferred, the bottom fixedly connected with slider of driving plate, the second spout that uses with the slider cooperation is seted up to the bottom of slide inner wall.
As the utility model discloses it is preferred, the top fixedly connected with handle of driving plate, and extend to the outside of slide, the inside swing joint of spring has the dead lever, the inner wall fixed connection of dead lever and slide.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up the crane span structure, supporting mechanism, the supporting shoe, the connecting rod, first bracing piece, the second bracing piece, the fixed block, the slide, first spout, chucking mechanism, the driving plate, the fixture block, the draw-in groove, a spring, the through-hole, the slider, the second spout, handle and dead lever cooperation are used, possess easy to assemble and fixed firm advantage, it is very practical to have solved current cable crane span structure, but when user installs cable crane span structure because the cable crane span structure need install in half the sky with need fixed very firm, extravagant user's time, and have very big potential safety hazard to the user, the problem of the installation of not convenient to use.
2. The utility model discloses a set up supporting mechanism, can play the supporting role to the crane span structure through supporting mechanism.
3. The utility model discloses a set up chucking mechanism, can play fixed effect through chucking mechanism to slide and crane span structure.
4. The utility model discloses a set up the through-hole, can carry out ventilation cooling through the cable of through-hole pair crane span structure inside.
5. The utility model discloses a set up slider and second spout, can use the effect of playing smooth and easy removal to the transmission plate through the cooperation of slider and second spout.
6. The utility model discloses a set up handle and dead lever, can play the effect of application of force to the driving plate through the handle, can play assistance-localization real-time's effect to the spring through the dead lever.
Drawings
Fig. 1 is a schematic structural diagram provided in an embodiment of the present invention;
fig. 2 is a front sectional view provided by an embodiment of the present invention;
fig. 3 is a partial enlarged view of a portion a in fig. 2 according to an embodiment of the present invention.
In the figure: 1. a bridge frame; 2. a support mechanism; 201. a support block; 202. a connecting rod; 203. a first support bar; 204. a second support bar; 205. a fixed block; 3. a slide plate; 4. a first chute; 5. a chucking mechanism; 501. a drive plate; 502. a clamping block; 503. a card slot; 504. a spring; 6. a through hole; 7. a slider; 8. a second chute; 9. a handle; 10. and (5) fixing the rod.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 3, the embodiment of the utility model provides a cable testing bridge is with synthesizing support, including crane span structure 1, the both sides at crane span structure 1 top all are provided with supporting mechanism 2, and the inside top swing joint of crane span structure 1 has slide 3, and first spout 4 that uses with slide 3 cooperation is all seted up to the both sides of crane span structure 1 inner wall, and slide 3's inside is provided with chucking mechanism 5.
Referring to fig. 2, the supporting mechanism 2 includes a supporting block 201, a connecting rod 202 is movably connected inside the supporting block 201, a first supporting rod 203 is fixedly connected to both the front side and the rear side of the connecting rod 202, a second supporting rod 204 is movably connected to the top of the first supporting rod 203 through a first rotating shaft, and a fixing block 205 is movably connected to the top of the second supporting rod 204 through a second rotating shaft.
Adopt above-mentioned scheme: by arranging the supporting mechanism 2, the bridge frame 1 can be supported by the supporting mechanism 2.
Referring to fig. 3, the clamping mechanism 5 includes a driving plate 501, a clamping block 502 is fixedly connected to the left side of the driving plate 501, a clamping groove 503 matched with the clamping block 502 is formed in the left side of the inner wall of the bridge 1, a spring 504 is fixedly connected to the right side of the driving plate 501, and the spring 504 is fixedly connected to the inner wall of the sliding plate 3.
Adopt above-mentioned scheme: by arranging the clamping mechanism 5, the sliding plate 3 and the bridge frame 1 can be fixed by the clamping mechanism 5.
Referring to fig. 1, through holes 6 are formed in both sides of the bridge 1, and the through holes 6 are uniformly distributed in both sides of the bridge 1.
Adopt above-mentioned scheme: through setting up through-hole 6, can carry out ventilation cooling through-hole 6 to the cable of crane span structure 1 inside.
Referring to fig. 3, a sliding block 7 is fixedly connected to the bottom of the driving plate 501, and a second sliding groove 8 matched with the sliding block 7 for use is formed in the bottom of the inner wall of the sliding plate 3.
Adopt above-mentioned scheme: through setting up slider 7 and second spout 8, can use through the cooperation of slider 7 and second spout 8 and play smooth and easy effect of removing to drive plate 501.
Referring to fig. 3, a handle 9 is fixedly connected to the top of the driving plate 501 and extends to the outside of the sliding plate 3, a fixing rod 10 is movably connected to the inside of the spring 504, and the fixing rod 10 is fixedly connected to the inner wall of the sliding plate 3.
Adopt above-mentioned scheme: by providing the handle 9 and the fixing lever 10, the handle 9 can exert a force on the driving plate 501, and the fixing lever 10 can assist the positioning of the spring 504.
The utility model discloses a theory of operation:
when the bridge frame 1 is used, when a user installs the bridge frame 1, firstly, the connecting rod 202 is placed in the supporting block 201, the bridge frame 1 can be fixedly supported through the first supporting rod 203 and the second supporting rod 204 and the fixing block 205 connected with a ceiling, then, the installation is finished, when the user dismantles, the bridge frame 1 only needs to be moved upwards a little, then, the connecting rod 202 can be easily taken out from the inside of the supporting block 201, then, the disassembly is finished, when the user needs to take out the sliding plate 3, firstly, the clamping needs to be released, the handle 9 moves backwards, the handle 9 drives the driving plate 501 to move backwards, the driving plate 501 drives the clamping block 502 to move backwards, the clamping block 502 can be moved out from the inside of the clamping groove 503, the clamping is released, then, the sliding plate 3 is taken out through the first sliding groove 4, when the user installs the sliding plate 3, the sliding plate 3 is firstly moved to the inside of the first sliding groove 4 through the first sliding groove 4, move backward through handle 9, contract fixture block 502 in the inside of slide 3, when moving to suitable position, then loosen handle 9, promote driving plate 501 and fixture block 502 through spring 504, push fixture block 502 to the inside of draw-in groove 503, reach the chucking effect, then the installation is finished.
In summary, the following steps: this cable testing bridge is with synthesizing support, through setting up crane span structure 1, supporting mechanism 2, supporting shoe 201, connecting rod 202, first bracing piece 203, second bracing piece 204, fixed block 205, slide 3, first spout 4, chucking mechanism 5, driving plate 501, fixture block 502, draw-in groove 503, spring 504, through-hole 6, slider 7, second spout 8, handle 9 and dead lever 10 cooperation are used, possess easy to assemble and fixed firm advantage, it is very practical to have solved current cable testing bridge, but because the cable testing bridge need install in half the sky and need fixed very firm when the user installs the cable testing bridge, extravagant user's time, and have very big potential safety hazard to the user, the problem of the installation of being not convenient for to use.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a cable testing bridge is with synthesizing support, includes crane span structure (1), its characterized in that: the supporting mechanism (2) is arranged on each of two sides of the top of the bridge (1), a sliding plate (3) is movably connected to the top of the inner portion of the bridge (1), first sliding grooves (4) matched with the sliding plates (3) for use are formed in the two sides of the inner wall of the bridge (1), and clamping mechanisms (5) are arranged inside the sliding plates (3).
2. The integrated bracket for a cable tray of claim 1, wherein: the supporting mechanism (2) comprises a supporting block (201), a connecting rod (202) is movably connected inside the supporting block (201), a first supporting rod (203) is fixedly connected to the front side and the rear side of the connecting rod (202), a second supporting rod (204) is movably connected to the top of the first supporting rod (203) through a first rotating shaft, and a fixing block (205) is movably connected to the top of the second supporting rod (204) through a second rotating shaft.
3. The integrated bracket for a cable tray of claim 1, wherein: chucking mechanism (5) are including driving plate (501), left side fixedly connected with fixture block (502) of driving plate (501), draw-in groove (503) of using with fixture block (502) cooperation are seted up in the left side of crane span structure (1) inner wall, right side fixedly connected with spring (504) of driving plate (501), inner wall fixed connection of spring (504) and slide (3).
4. The integrated bracket for a cable tray of claim 1, wherein: through-hole (6) have all been seted up to the both sides of crane span structure (1), and a plurality of through-hole (6) evenly distributed is in the both sides of crane span structure (1).
5. A composite bracket as defined in claim 3, further comprising: the bottom fixedly connected with slider (7) of driving plate (501), second spout (8) that use with slider (7) cooperation are seted up to the bottom of slide (3) inner wall.
6. A composite bracket as defined in claim 3, further comprising: the top fixedly connected with handle (9) of driving plate (501), and extend to the outside of slide (3), the inside swing joint of spring (504) has dead lever (10), inner wall fixed connection of dead lever (10) and slide (3).
CN202120240250.8U 2021-01-28 2021-01-28 Comprehensive support for cable bridge Active CN214176765U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120240250.8U CN214176765U (en) 2021-01-28 2021-01-28 Comprehensive support for cable bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120240250.8U CN214176765U (en) 2021-01-28 2021-01-28 Comprehensive support for cable bridge

Publications (1)

Publication Number Publication Date
CN214176765U true CN214176765U (en) 2021-09-10

Family

ID=77594322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120240250.8U Active CN214176765U (en) 2021-01-28 2021-01-28 Comprehensive support for cable bridge

Country Status (1)

Country Link
CN (1) CN214176765U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114665421A (en) * 2022-01-21 2022-06-24 广州市良粤电力设备有限公司 Simple to operate's electric wire fire prevention wire casing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114665421A (en) * 2022-01-21 2022-06-24 广州市良粤电力设备有限公司 Simple to operate's electric wire fire prevention wire casing
CN114665421B (en) * 2022-01-21 2024-01-23 广州市良粤电力设备有限公司 Wire fireproof wire slot convenient to install

Similar Documents

Publication Publication Date Title
CN108729631A (en) A kind of vertical automatic Wall brick device of construction
CN214176765U (en) Comprehensive support for cable bridge
CN212784606U (en) Cable bridge convenient to maintenance
CN111472477A (en) Assembled steel construction wall body
CN213212978U (en) Cable bridge convenient to installation
CN211974034U (en) Grid ceiling structure
CN215443216U (en) Environmental protection architectural decoration auxiliary stay device
CN213359197U (en) Product structure of mineral acoustic board
CN211447941U (en) But cyclic utilization's assembled public lavatory
CN208702849U (en) A kind of interchangeable ironware
CN210918068U (en) Embedded interior decoration decorates wallboard
KR20090025485A (en) Construction structure of wall decorating- panel
CN217652058U (en) Steel construction wall body of making an uproar falls in installation type of being convenient for
CN207672971U (en) A kind of decoration worker's finishing ceiling lifting gear
CN215529202U (en) Switch convenient to installation
CN218719284U (en) Modularization assembled computer lab pipeline construction equipment
CN215888598U (en) Concatenation type prefabricated building
CN218912061U (en) Wallboard convenient to installation
CN220733162U (en) Fan interlocking control box convenient to installation
CN214615796U (en) Rail guard for construction
CN216446250U (en) Partition wall convenient to disassemble and assemble for building
CN220080719U (en) Elevator shaft operation platform
CN220469113U (en) Support frame of color steel house
CN111287361B (en) Aluminum plate curtain wall structure
CN220848175U (en) Spliced modular partition support for hotel hall space decoration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant