CN214174041U - Shear creep gauge for landfill liner system - Google Patents

Shear creep gauge for landfill liner system Download PDF

Info

Publication number
CN214174041U
CN214174041U CN202023145713.7U CN202023145713U CN214174041U CN 214174041 U CN214174041 U CN 214174041U CN 202023145713 U CN202023145713 U CN 202023145713U CN 214174041 U CN214174041 U CN 214174041U
Authority
CN
China
Prior art keywords
box
horizontal force
shear
shearing box
fixing strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023145713.7U
Other languages
Chinese (zh)
Inventor
叶辽羽
唐王龙
蒋洪
杨成
林悦
蒋浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202023145713.7U priority Critical patent/CN214174041U/en
Application granted granted Critical
Publication of CN214174041U publication Critical patent/CN214174041U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model relates to the technical field of test equipment, a cut creep deformation appearance for landfill liner system is disclosed, including last shearing box, the shearing box down, vertical force loading system, horizontal force loading system and horizontal force detecting system, go up shearing box and shearing box range upon range of arrangement down, vertical force loading system includes vertical force loading unit and vertical power transmission subassembly, horizontal force loading system includes horizontal force loading unit and horizontal power transmission subassembly, horizontal force detecting system is connected with the rear end of shearing box down, the fore-and-aft direction's of shearing box size is greater than the fore-and-aft direction's of shearing box size down, the top surface of shearing box down forms the removal space that supplies shearing box back-and-forth movement with the bottom surface of shearing box on along the size difference of fore-and-aft direction. Because the top surface of the lower shearing box is provided with a moving space for the upper shearing box to move back and forth, the overlapping area of the upper shearing box and the lower shearing box is kept fixed when the upper shearing box moves back and forth, thereby improving the allowable maximum shearing displacement and improving the precision of the detection result.

Description

Shear creep gauge for landfill liner system
Technical Field
The utility model relates to a test equipment technical field especially relates to a shear creep appearance for landfill liner system.
Background
The main function of the pad system of the refuse landfill is to block the percolate of the landfill and avoid the seepage to pollute the underground water and the surrounding soil, which is a key structure for controlling the pollution of the landfill. The liner system is often laid on the bottom and sides of the landfill, the liner system at the bottom mainly comprising: (1) an anti-seepage system: the soil-block composite waterproof carpet consists of materials such as compacted clay, geomembrane or soil-block composite bentonite waterproof carpet, and the like, wherein the guide and drainage system comprises the following components in percentage by weight: the material adopted by the drainage guide system mainly comprises a geotechnical composite drainage net, gravels, geotechnical fabrics and the like.
The number of layers of the geosynthetic material of the liner system of the landfill site is large, the shear strength between various geosynthetic materials and the geosynthetic material is generally low in the long-term use process of the landfill site, the liner system of the refuse landfill site is easy to generate instability damage under the action of high shear force, and the geosynthetic material in the liner system on the slope of the landfill site is easy to generate tension damage under the action of the self weight and settlement of refuse soil, so that the safety of the landfill site is influenced.
The creep of the composite liner system is a phenomenon that constant normal stress and tangential stress are simultaneously applied between the geosynthetic material and the geosynthetic material or bottom layer clay, and displacement between the geosynthetic material and the geosynthetic material or bottom layer clay is increased along with the increase of time, and is represented by the relevance of stress, strain and time, so that the creep duration can reflect the magnitude of creep deformation values between the geosynthetic materials to a certain extent. In the practice of landfill engineering, the creep deformation process of the interface between the geotechnical materials is very long, the geotextile geomembrane is easy to be pulled and extended in the long-term creep process, and a soil sample creep instrument is generally adopted to test the creep phenomenon of a liner system.
The patent of Chinese utility model with the publication number of CN208860687U discloses a stress control type direct shear creep deformation instrument, which comprises a test supporting platform, a lower shear box, an upper shear box, a vertical loading device and a horizontal loading device, wherein the lower shear box is arranged on the test supporting platform through a horizontal moving mechanism, the upper shear box is arranged on the lower shear box, and the interior of the lower shear box and the upper shear box is filled with a material to be measured; c-shaped steel is fixed on the test supporting platform, and the C-shaped steel is fixed with one end of the upper shearing box through L-shaped steel; the upper shearing box is provided with a vertical loading device for applying positive pressure to the material to be tested; one end of the lower shearing box is connected with the horizontal loading device and is used for applying shearing force to the material to be tested; and a digital display type force measuring dial indicator is arranged on the test supporting platform and used for measuring the displacement change of the lower shearing box. The stress control type direct shear creep tester adopts a vertical loading device and a horizontal loading device to respectively apply acting force on an upper shear box and a lower shear box, and the creep phenomenon of the geotechnical material is tested by utilizing the relative movement of the upper shear box and the lower shear box to simulate the acting force between the geotechnical materials.
However, the existing creep gauge is not completely suitable for interface creep between geosynthetics, the areas of the bottom surfaces of the upper shear box and the lower shear box are the same, and after the upper shear box and the lower shear box are subjected to shear displacement, the upper shear box and the lower shear box are dislocated and cannot be completely overlapped, so that the contact area between the upper shear box and the lower shear box is changed, and a detection result has errors.
SUMMERY OF THE UTILITY MODEL
The utility model aims at: the utility model provides a cut creep appearance for landfill liner system to upper shear box among the solution prior art, lower shear box do not have sufficient displacement space and slide, and the maximum shear displacement who allows is on the small side, relative slip between shear box and the geosynthetic material, the relatively poor problem of testing result precision.
In order to achieve the above object, the present invention provides a shear creep gauge for a pad system of a landfill site, comprising an upper shear box, a lower shear box, a vertical force loading system, a horizontal force loading system and a horizontal force detecting system, wherein the upper shear box and the lower shear box are arranged in a stacked manner, the vertical force loading system comprises a vertical force loading unit and a vertical force transmission assembly, the vertical force transmission assembly is connected between the vertical force loading unit and the top of the upper shear box, the horizontal force loading system comprises a horizontal force loading unit and a horizontal force transmission assembly, the horizontal force transmission assembly is connected between the horizontal force loading unit and the front end of the upper shear box, the horizontal force detecting system is connected with the rear end of the lower shear box, the size of the front-back direction of the lower shear box is larger than that of the front-back direction of the upper shear box, the size difference between the top surface of the lower shearing box and the bottom surface of the upper shearing box along the front-back direction forms a moving space for the upper shearing box to move back and forth.
Preferably, the upper shearing box comprises a rectangular upper box body and a pressure bearing cover arranged at the top of the upper box body, the pressure bearing cover is used for contacting with the vertical force transmission assembly, and a push rod used for being connected with the horizontal force transmission assembly is arranged on the front side of the upper box body.
Preferably, the inside of going up the box body is seted up and is used for holding the chamber that holds of compaction clay, the pressure-bearing lid activity is arranged hold the top in chamber, the diapire that holds the chamber is hollow out construction.
Preferably, be provided with the first fixed strip that is used for the fixed geotechnological material that awaits measuring of centre gripping on the side of last box body, first fixed strip with go up the box body and pass through fixing bolt and connect.
Preferably, the first fixing strip comprises a front fixing strip arranged on the front side of the upper box body and a rear fixing strip enclosing a closed rectangle with the front fixing strip, and the rear fixing strip is of a U-shaped structure.
Preferably, the bottom surface of the rear fixing strip is higher than the bottom surface of the upper box body.
Preferably, the lower shear box comprises a rectangular lower box body, a second fixing strip for clamping and fixing the geotechnical material to be detected is fixed on the lower box body, and the second fixing strip is connected with the lower box body through a fixing bolt.
Preferably, the second fixing strip comprises a top fixing strip arranged at the top of the lower box body and an end fixing strip arranged at the front end of the lower box body, and the top fixing strip and the end fixing strip are both of U-shaped structures.
Preferably, the horizontal force detection system includes a force measuring ring connected to a rear side of the lower shear box and a force measuring dial indicator disposed within the force measuring ring.
Preferably, a displacement sensor for detecting the horizontal displacement of the horizontal force transmission assembly is further arranged on the horizontal force transmission assembly.
The embodiment of the utility model provides a shear creep appearance for landfill liner system compares with prior art, and its beneficial effect lies in: vertical force loading system upwards shears the box and applys the effort of vertical direction, simulate the extrusion force of the rubbish that the liner system bore, horizontal force loading system exerts by preceding horizontal direction's after to last shearing box effort to last shearing box, it meets and moves by preceding to back to lower shearing box, thereby it shears the deformation to drive the geotechnological material between last shearing box and the lower shearing box, because the top surface of lower shearing box and the bottom surface of last shearing box form the removal space that supplies the box back-and-forth movement of last shearing along the size difference of fore-and-aft direction, overlap area with lower shearing box when going up the box back-and-forth movement keeps fixed, the removal space provides sufficient displacement space for last shearing box, thereby the biggest shearing displacement that has improved the allowwing, the precision of testing result has been improved.
Drawings
FIG. 1 is a schematic diagram of a shear creep gauge for a landfill liner system according to the present invention;
FIG. 2 is a schematic structural view of an upper shear box of the shear creep gauge for a landfill liner system of FIG. 1;
FIG. 3 is a schematic structural view of a first holding bar of the shear creep gauge for a landfill liner system of FIG. 1;
FIG. 4 is a schematic illustration of the construction of the lower shear box of the shear creep gauge for a landfill liner system of FIG. 1;
FIG. 5 is a schematic structural view of a second holding bar of the shear creep gauge for a landfill liner system of FIG. 1;
fig. 6 is a schematic diagram of the upper shear box of the shear creep gauge for a landfill liner system of the present invention with a containment chamber.
In the figure, 1, a cutting box is arranged; 11. an upper box body; 12. a pressure bearing cover; 13. a push rod; 14. an accommodating chamber; 2. a lower shear box; 21. a lower box body; 3. a first fixing strip; 31. a front fixing strip; 32. a rear fixing strip; 4. a second fixing strip; 41. pushing the fixing strip; 42. an end fixing strip; 5. a vertical force loading system; 51. a vertical force loading unit; 52. a vertical force loading beam; 53. a vertical dowel bar; 6. a horizontal force loading system; 61. a horizontal force loading unit; 62. a horizontal force loading beam; 63. a horizontal force conducting contact bar; 64. a horizontal bar; 7. a horizontal force detection system; 71. a force measuring ring; 72. a measuring force dial indicator; 8. and (5) fixing the bolt.
Detailed Description
The following detailed description of the embodiments of the present invention is provided with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
The utility model discloses a preferred embodiment of a shear creep appearance for landfill liner system, as shown in fig. 1 to 6, this a shear creep appearance for landfill liner system includes cut box 1 on, cut box 2 down, vertical force loading system 5, horizontal force loading system 6 and horizontal force detecting system 7, cut box 1 and cut box 2 range upon range of arrangement down on, be used for laying the geotechnological material that awaits measuring between cut box 1 and the cut box 2 down, vertical force loading system 5 is used for shearing box 1 upward and applys the effort of vertical direction, horizontal force loading system 6 is used for shearing box 1 upward and applys the effort by preceding horizontal direction to the back, horizontal force detecting system 7 is used for detecting the shearing force that cut box 2 and bear down. Bolt holes are formed in the upper shearing box and the lower shearing box, tip bolts can be placed, and the tip bolts are used for fixing the geosynthetic materials.
Go up to cut box 1 and include box body 11, pressure-bearing cover 12 and push rod 13, go up box body 11 and be the rectangle structure, pressure-bearing cover 12 arranges the top at last box body 11, goes up box body 11 and is used for contacting with vertical power loading system 5 to bear the effort of vertical direction, push rod 13 is used for being connected with horizontal force loading system 6, in order to bear the effort of horizontal direction, push rod 13 and last box body 11 structure as an organic whole, in order to increase the structural strength who cuts box 1. In this embodiment, pressure-bearing cover 12 and upper box body 11 welded fastening form wholly to reduce structural error, go up shear box 1 and be solid construction, adopt the lighter steel preparation of quality.
In other embodiments, preferably, the upper box body 11 is a cavity structure, the accommodating cavity 14 for accommodating the compacted clay is opened in the upper box body 11, the pressure-bearing cover 12 is movably arranged at the top of the accommodating cavity 14, the bottom wall of the accommodating cavity 14 is a hollow structure, and the compacted clay can be in close contact with the geotechnical material to be measured at the bottom of the upper box body 11 during the hollow structure. When mechanical properties is cuted at the interface between needs research compaction clay and the geosynthetic material, can choose for use to have the last box body 11 that holds chamber 14, and the activity of pressure-bearing cover 12 is arranged, is convenient for place compaction clay in upwards the box body 11, and pressure-bearing cover 12 covers on compaction clay this moment to make vertical power act on compaction clay through pressure-bearing cover 12.
Be provided with first fixed strip 3 on the side of last box body 11, when experimental, the geotechnological material that awaits measuring arranges on the bottom surface of last box body 11 after tailorring, then adopts first fixed strip 3 to fix the edge centre gripping of geotechnological material that awaits measuring in the side of last box body 11, avoids the geotechnological material that awaits measuring to remove. Be connected through fixing bolt 8 between first fixed strip 3 and the last box body 11, fixing bolt 8 is the high strength bolt to increase the joint strength between first fixed strip 3 and the last box body 11. And fixing bolt 8 is the tip bolt, goes up and sets up the screw hole with fixing bolt 8 adaptation on the box body 11, and its tip carries the geotechnological material that awaits measuring to get into the screw hole after fixing bolt 8 screws, can prevent that the geotechnological material that awaits measuring from removing.
First fixed strip 3 encloses into the back fixed strip 32 of closed rectangle including arranging the preceding fixed strip 31 of the front side of last box body 11 and with preceding fixed strip 31, and preceding fixed strip 31 all adopts the high strength steel preparation to form with back fixed strip 32, and preceding fixed strip 31 is fixed to all four edges of the geotechnological material that awaits measuring after with back fixed strip 32 closure, improves fixed strength. The rear fixing strip 32 is of a U-shaped structure, and the bottom surface of the rear fixing strip 32 is higher than the bottom surface of the upper box body 11, and the height is 1cm in the embodiment, so that the rear fixing strip 32 can be prevented from being overlapped with the second fixing strip 4 on the lower cutting box 2.
The lower shearing box 2 comprises a rectangular lower box body 21, a second fixing strip 4 used for clamping and fixing the geotechnical material to be detected is arranged on the lower box body 21, and the second fixing strip 4 is connected with the lower box body 21 through a fixing bolt 8. During the test, the geotechnical material that awaits measuring arranges under on the top surface of box body 21 after tailorring, then adopts second fixed strip 4 to fix the side of box body 21 under with the edge centre gripping of geotechnical material that awaits measuring, avoids the geotechnical material that awaits measuring to remove. The structure of the fixing bolt 8 on the second fixing strip 4 and the structural strength of the fixing bolt 8 on the upper case 11 are repeated here.
The second fixed strip 4 is including arranging the top fixed strip 41 at the top of box body 21 under and arranging the end fixed strip 42 at the front end of box body 21 down, and top fixed strip 41 and end fixed strip 42 are the U-shaped structure, can increase the area of contact between second fixed strip 4 and the geotechnological material that awaits measuring, can make the geosynthetic material that awaits measuring and box body 21 complete laminating together down, can not take place relative slip. The top fixing strip 41 is in a flat plate shape so that the top fixing strip 41 is attached to the top of the lower box body 21; the end fixing strip 42 is in a three-dimensional shape and is attached to the side surface of the lower box body 21, and the openings of the top fixing strip 41 and the end fixing strip 42 are oppositely arranged.
The size of the lower box body 21 in the front-back direction is larger than that of the upper box body 11 in the front-back direction, and the size difference forms a moving space for the upper cutting box 1 to move back and forth, so that the overlapping area of the upper cutting box 1 and the lower cutting box 2 is kept constant when the upper cutting box 1 moves back and forth. In this embodiment, the difference between the front-back direction dimension of the lower box body 21 and the front-back direction dimension of the upper box body 11 is 6cm, and the difference can satisfy the distance of relative sliding between the upper shear box 1 and the lower shear box 2, satisfy the deformation amount of the geotechnical material to be detected, and improve the accuracy of the detection result. In other embodiments, the difference may be 4cm, 5cm, 7cm, 8cm, etc. according to the different geotechnical materials to be detected.
The vertical force loading system 5 comprises a vertical force loading unit 51 and a vertical force transmission assembly, and the vertical force transmission assembly is connected between the vertical force loading unit 51 and the pressure bearing cover 12 of the upper shear box 1. In the embodiment, the vertical force loading unit 51 is a hydraulic unit, the maximum range of the vertical force loading unit 51 is not more than 2000kPa, and the vertical loading force is 400kPa at most in the test at ordinary times. The vertical force is applied to the upper shearing box 1 in a hydraulic mode, the stability is high, the change of the loading capacity caused by the vibration of the surrounding environment is avoided, and the reliability and the precision of loading are further ensured.
The vertical force transfer assembly comprises a vertical force loading beam 52 and a vertical dowel 53, the vertical dowel 53 being arranged perpendicular to the vertical loading beam. The vertical force transmission rods 53 are three in number and are arranged at intervals along the extending direction of the vertical force loading beam 52, the bottom end of the vertical force transmission rod 53 positioned in the middle is contacted with the pressure bearing cover 12 of the upper shearing box 1, and the vertical force loading unit 51 is arranged in the middle of the vertical force loading beam 52 and is on the same vertical line with the vertical force transmission rod 53 positioned in the middle.
The horizontal force loading system 6 comprises a horizontal force loading unit 61 and a horizontal force transmission assembly connected between the horizontal force loading unit 61 and the front end of the upper shear box 1. The horizontal force loading unit 61 is a hydraulic unit, applies horizontal force to the upper shear box 1 in a hydraulic mode, is high in stability, cannot cause load capacity change due to vibration of the surrounding environment, and further ensures load loading reliability and precision.
The horizontal force transmission assembly comprises a horizontal force loading beam 62, a horizontal force transmission contact bar 63 and a horizontal bar 64, wherein the horizontal force transmission contact bar 63 and the horizontal bar 64 are parallel to each other and are perpendicular to the horizontal force loading beam 62, the rear end of the horizontal force transmission contact bar 63 is connected with the push rod 13 of the upper shear box 1, the horizontal force loading unit 61 is arranged on the horizontal force loading beam 62, and horizontal force is applied to the upper shear box 1 through the horizontal force loading beam 62 and the horizontal force transmission contact bar 63.
A displacement sensor, in this embodiment an infrared sensor, is also disposed on the horizontal force loading beam 62 for detecting the horizontal displacement of the horizontal force transfer assembly. When the horizontal force loading unit 61 applies a horizontal force, the horizontal force loading beam 62 generates a horizontal displacement, and the displacement sensor detects the horizontal displacement of the horizontal force loading beam 62, which is the horizontal displacement of the upper shear box 1.
The horizontal force detection system 7 is connected with the rear end of the lower shearing box 2, and the horizontal force detection system 7 is used for detecting the shearing force borne by the lower shearing box 2. The horizontal force detecting system 7 includes a force measuring ring 71 and a force measuring dial 72, the force measuring ring 71 being connected to the rear side of the lower shear box 2, and the force measuring dial 72 being disposed inside the force measuring ring 71 and connected to the front end of the force measuring ring 71. The force measuring dial indicator 72 is an electronic structure and can transmit the detected shearing force to a computer, the value read by the force measuring dial indicator 72 of the force measuring ring 71 is the magnitude of the interfacial shearing force between the geosynthetic material and the geosynthetic material, the magnitude of the force measuring ring 71 is multiplied by 1.85, which is the magnitude of the horizontal force, and 1.85 is the coefficient of the force measuring ring 71.
Under the creep condition, the magnitude of the horizontal force needs to be kept basically unchanged, and when the magnitude of the horizontal force is set to be changed in a small range, the change is automatically fed back to the horizontal force loading system 6, so that the horizontal force loading system 6 can finely adjust the horizontal force. When the horizontal force changes in a large range, the fact that the horizontal force exceeds the limit and whether the horizontal force continues to change or not is prompted, and then the experimenter judges the horizontal force.
The utility model discloses a working process does: in carrying out the test, the following steps are included:
(1) arranging the upper shearing box 1 and the lower shearing box 2 in a stacking manner, aligning the front ends of the upper shearing box 1 and the lower shearing box 2, and fixing the geotechnical material to be detected on the upper shearing box 1 and the lower shearing box 2 by using the first fixing strip 3 and the second fixing strip 4 respectively;
(2) starting a computer system, firstly setting the vertical force to be 0, slowly descending a vertical force loading system 5, stopping descending after a vertical force transfer rod 53 is contacted with a pressure bearing cover 12 of an upper shearing box 1, then inputting the required vertical stress by the computer system, converting the vertical force loading unit 51 into the stress of the vertical force according to the area after receiving a signal, applying the vertical force to a vertical force loading beam 52 by the vertical force loading unit 51, and placing for a period of time;
(3) selecting a direct shear test mode by a computer, wherein when the mode is adopted, the horizontal force conduction contact rod 63 and the horizontal rod 64 of the horizontal force loading system 6 can shear at a constant speed, if displacement can be set to be 0.8mm/min, 0.1mm/min and the like, at the moment, relative sliding can be generated between the geosynthetic material and the geosynthetic material quickly, peak shear stress exists, and the peak shear stress is recorded;
(4) replacing the upper shearing box 1 and the lower shearing box 2 again, repeating the step (2), wherein the input horizontal force is 0, and the horizontal force loading system 6 slowly moves forwards and stops after contacting with the push rod 13 of the upper shearing box 1; inputting the magnitude of the horizontal force, setting the magnitude of the horizontal force (primarily setting) according to the peak shear stress required by the test by taking the peak shear stress measured by the direct shear test in the step (3) as a reference, when the reading in the force measuring dial indicator 72 in the force measuring ring 71 reaches the peak shear stress percentage (such as 80% of the peak shear stress), the horizontal force cannot be increased, the reading in the force measuring dial indicator 72 is stabilized at the peak shear stress percentage, recording the reading of the magnitude of the horizontal force of the computer at the moment, and removing the horizontal force and the vertical force;
(5) aligning the upper shearing box 1 and the lower shearing box 2, repeating the step (2), inputting the recorded magnitude of the horizontal force, quickly applying the magnitude of the horizontal force recorded in the step (4) after the horizontal force conduction contact rod 63 is contacted with the upper shearing box 1, and immediately starting reading by a computer after the horizontal force is applied;
(6) the tester sets the measuring time by self, and the computer automatically draws a time strain curve;
(7) and (4) taking out the creep-formed geosynthetic material after the test is finished, measuring that the length direction of the creep-formed geosynthetic material is not stretched and extended, and recording the stretching and extending length if the creep-formed geosynthetic material is stretched and extended.
To sum up, the embodiment of the utility model provides a shearing creepmeter for landfill liner system, the effort of vertical direction is applyed to its vertical force loading system shearing box, the extrusion force of the rubbish that simulation liner system bore, horizontal force loading system applys the effort by preceding horizontal direction to the back to shearing box, shearing box meets and is moved after by preceding to the downcut box, thereby it shears the deformation to drive the geotechnological material between box and the downcut box, because the top surface of downcut box and the bottom surface of shearing box form the removal space that supplies shearing box back-and-forth movement along the size difference of fore-and-aft direction, the overlap area with shearing box keeps fixed when going up the shearing box back-and-forth movement, the removal space provides sufficient displacement space for shearing box, thereby the biggest shearing displacement that has improved the allowwing, the precision of testing result has been improved.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and replacements can be made without departing from the technical principle of the present invention, and these modifications and replacements should also be regarded as the protection scope of the present invention.

Claims (10)

1. The utility model provides a shear creep deformation appearance for landfill liner system, its characterized in that, includes cut box, lower shear box, vertical force loading system, horizontal force loading system and horizontal force detecting system, it arranges with lower shear box range upon range of, vertical force loading system includes vertical force loading unit and vertical biography power subassembly, vertical biography power subassembly is connected vertical force loading unit with between the top of cut box on, horizontal force loading system includes horizontal force loading unit and horizontal biography power subassembly, horizontal biography power subassembly is connected horizontal force loading unit with between the front end of cut box on, horizontal force detecting system with the rear end of cut box down is connected, the fore-and-aft direction's of cut box size is greater than the fore-and-aft direction's of cut box on, the top surface of cut box down with the bottom surface of cut box on forms along the difference in fore-and-aft direction's size and supplies the box of cut moves from beginning to end A moving space.
2. The shear creep gauge for landfill liner system of claim 1, wherein the upper shear box comprises a rectangular upper box body and a pressure bearing cover arranged on the top of the upper box body, the pressure bearing cover is used for contacting with the vertical force transmission assembly, and the front side of the upper box body is provided with a push rod used for connecting with the horizontal force transmission assembly.
3. The shear creep gauge for a pad system of a landfill site as claimed in claim 2, wherein the upper box body is opened with a cavity for containing compacted clay therein, the pressure-bearing cover is movably arranged on the top of the cavity, and the bottom wall of the cavity is a hollow structure.
4. The shear creep gauge for a pad system of a landfill site according to claim 2, wherein a first fixing strip for clamping and fixing the geotechnical material to be measured is provided on the side surface of the upper box body, and the first fixing strip is connected with the upper box body through a fixing bolt.
5. The shear creep gauge for a landfill liner system of claim 4, wherein the first fixing strip includes a front fixing strip disposed at a front side of the upper box body and a rear fixing strip enclosing a closed rectangle with the front fixing strip, the rear fixing strip being of a U-shaped configuration.
6. The shear creep gauge for a landfill liner system of claim 5, wherein the bottom surface of the rear fixing strip is higher than the bottom surface of the upper box.
7. The shear creep gauge for a pad system of a landfill site according to any one of claims 1 to 6, wherein the lower shear box comprises a rectangular lower box body, a second fixing strip for clamping and fixing the geotechnical material to be measured is fixed on the lower box body, and the second fixing strip is connected with the lower box body through a fixing bolt.
8. The shear creep gauge for a landfill liner system of claim 7, wherein the second fixing strip includes a top fixing strip disposed at the top of the lower box and an end fixing strip disposed at the front end of the lower box, the top fixing strip and the end fixing strip both being of a U-shaped configuration.
9. The shear creep gauge for a landfill liner system of any one of claims 1 to 6, wherein the horizontal force detection system includes a force measuring ring connected to the rear side of the lower shear box and a force measuring dial gauge disposed within the force measuring ring.
10. A shear creep gauge for a landfill liner system according to any one of claims 1 to 6, wherein a displacement sensor is also arranged on the horizontal force transfer assembly for detecting horizontal displacement of the horizontal force transfer assembly.
CN202023145713.7U 2020-12-23 2020-12-23 Shear creep gauge for landfill liner system Expired - Fee Related CN214174041U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023145713.7U CN214174041U (en) 2020-12-23 2020-12-23 Shear creep gauge for landfill liner system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023145713.7U CN214174041U (en) 2020-12-23 2020-12-23 Shear creep gauge for landfill liner system

Publications (1)

Publication Number Publication Date
CN214174041U true CN214174041U (en) 2021-09-10

Family

ID=77608454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023145713.7U Expired - Fee Related CN214174041U (en) 2020-12-23 2020-12-23 Shear creep gauge for landfill liner system

Country Status (1)

Country Link
CN (1) CN214174041U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112595607A (en) * 2020-12-23 2021-04-02 中国建筑第四工程局有限公司 Shear creep gauge for landfill liner system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112595607A (en) * 2020-12-23 2021-04-02 中国建筑第四工程局有限公司 Shear creep gauge for landfill liner system

Similar Documents

Publication Publication Date Title
Vieira et al. Sand-geotextile interface characterisation through monotonic and cyclic direct shear tests
Stark et al. Landfill liner interface strengths from torsional-ring-shear tests
Bergado et al. Evaluation of interface shear strength of composite liner system and stability analysis for a landfill lining system in Thailand
Eid Shear strength of geosynthetic composite systems for design of landfill liner and cover slopes
Thusyanthan et al. Tension in geomembranes on landfill slopes under static and earthquake loading—Centrifuge study
CN214174041U (en) Shear creep gauge for landfill liner system
Sharma et al. Centrifuge modelling of an embankment on soft clay reinforced with a geogrid
Ferreira et al. Pullout behavior of different geosynthetics—influence of soil density and moisture content
Singh et al. Shear strength testing of intact and recompacted samples of municipal solid waste
CN112595607A (en) Shear creep gauge for landfill liner system
Kaddouri et al. Influence of effective stress and temperature on the creep behavior of a saturated compacted clayey soil
CN104034608A (en) Vertical pull-type bidirectional contact surface shearing strength parameter testing device and testing method
Dave et al. Transition of earth pressure on rigid retaining walls subjected to surcharge loading
Tano et al. Large-scale tests to assess the efficiency of a geosynthetic reinforcement over a cavity
Feng et al. Repeated shear behaviors of geotextile/geomembrane and geomembrane/clay interfaces
Feng et al. Multi-functional direct shear apparatus for geosynthetic interfaces with its application on various GMB/GCL interfaces
CN211374374U (en) Soil embodiment field direct shear test device
Santos et al. Use of recycled construction and demolition wastes (RCDW) as backfill of reinforced soil structures
Bolton et al. Embankments with base reinforcement on soft clay
CN111024521A (en) Soil embodiment field direct shear test device and using method thereof
Oweis Stability of landfills
Yu et al. Variations of waste unit weight during mechanical and degradation processes at landfills
CN205719817U (en) Sand/geosynthetics multilayer shearing test device
Mitchell et al. Stability considerations in the design and construction of lined waste repositories
CN212483302U (en) Geosynthetic material double-interface friction test device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210910

CF01 Termination of patent right due to non-payment of annual fee