CN214171622U - Connecting device for air nozzle primary air coal pipe of continuous fuming furnace - Google Patents

Connecting device for air nozzle primary air coal pipe of continuous fuming furnace Download PDF

Info

Publication number
CN214171622U
CN214171622U CN202023274371.9U CN202023274371U CN214171622U CN 214171622 U CN214171622 U CN 214171622U CN 202023274371 U CN202023274371 U CN 202023274371U CN 214171622 U CN214171622 U CN 214171622U
Authority
CN
China
Prior art keywords
pipe
coal
resistant rubber
primary air
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023274371.9U
Other languages
Chinese (zh)
Inventor
汪琴
石俊阳
石宏娇
梁金凤
石仁章
王小明
梁瑞勇
何路波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Leiyang Yanxin Non Ferrous Metals Co ltd
Original Assignee
Leiyang Yanxin Non Ferrous Metals Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Leiyang Yanxin Non Ferrous Metals Co ltd filed Critical Leiyang Yanxin Non Ferrous Metals Co ltd
Priority to CN202023274371.9U priority Critical patent/CN214171622U/en
Application granted granted Critical
Publication of CN214171622U publication Critical patent/CN214171622U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Blast Furnaces (AREA)

Abstract

A connecting device of a tuyere primary air coal pipe of a continuous fuming furnace comprises an upper pressure-resistant rubber pipe, a connecting pipe, a tightening piece and a lower pressure-resistant rubber pipe; the port of the air-coal distribution pipe and the upper end of the connecting pipe of the continuous fuming furnace are sleeved in the upper pressure-resistant rubber pipe, the port of the air nozzle primary air-coal pipe and the lower end of the connecting pipe are sleeved in the lower pressure-resistant rubber pipe, and the air-coal distribution pipe and the air nozzle primary air-coal pipe are aligned with the connecting pipe; the tightening piece is fixed outside the upper pressure-resistant rubber tube and the lower pressure-resistant rubber tube. Thus, the utility model changes the traditional full rubber tube which is easy to wear through and leak coal into the combination of the connecting tube, the pressure-resistant rubber tube and the binding piece, which enables the continuous fuming furnace to operate safely and stably for a long time and avoids the faults and dangers which may be caused by adopting the full rubber tube; the major potential safety hazards that the traditional full rubber tube is easy to leak coal powder and explode are eliminated; meets the requirement of continuous fuming production.

Description

Connecting device for air nozzle primary air coal pipe of continuous fuming furnace
Technical Field
The utility model relates to a non-ferrous smelting's continuous fuming furnace technique, concretely relates to continuous fuming furnace's tuyere is wind coal pipe's connecting device once.
Background
The traditional fuming furnace has relatively mature technology, the air nozzle primary air coal pipe is sleeved with the port of the air coal distribution pipe by adopting a full rubber pipe, and the rubber pipe has the following advantages: one is to align the possible up and down port tilt error between the wind coal distribution pipe port and the wind nozzle primary wind coal pipe port. From the mechanical assembly point of view, the ports of the air coal distribution pipe positioned above and the ports of the air nozzle primary air coal pipe positioned below cannot be completely vertically aligned, and the use of the rubber pipe well solves the form and position deviation between the two ports and automatically aligns the axes. And secondly, if the fuming furnace is in failure in the operation process, the rubber tube can be detached to clean the slag in the tube and replace the slag when the slag flows backwards. Therefore, the rubber tube is an ideal pipeline connecting material, and the prepared rhizome of rehmannia is applied to the traditional fuming furnace for a long time.
However, the use of rubber tubing still has some drawbacks and drawbacks. The inner wall of the rubber pipe is subjected to high-speed friction and collision of a large amount of coal dust particles in the air coal sent by the primary air coal port, and the inner wall of the rubber pipe is very easy to thin to crack and leak coal under the conditions of friction and high temperature. Generally, stokehole workers need to check the rubber pipe for multiple times every day to prevent the rubber pipe from being worn through and spraying coal dust, and the sprayed coal dust is easy to explode in a high-temperature operation environment and has serious potential safety hazards. The conventional fuming furnace is operated intermittently, and the operation principle is that after one furnace slag is filled and the temperature in the furnace is continuously raised to form liquid furnace slag, a mixture of air and pulverized coal is continuously blown into the liquid furnace slag, so that valuable metals in the furnace slag are volatilized into smoke dust, the smoke dust is separated from the furnace slag, and then the residual furnace slag in the fuming furnace is emptied and fed in, and the fuming process is carried out repeatedly. Because the intermittent type nature of traditional fuming furnace operation, the state of the rubber tube of the check many times of stokehold worker is in time changed or is wrapped the operation but cracked rubber tube temporarily when empty stove. This is cumbersome and dangerous for conventional fuming furnace operation, but is still feasible. However, the continuous fuming furnace is not intermittent like the traditional process, once the continuous fuming furnace is started, the furnace can not be stopped at any time, and the rubber air-coal connecting pipe can not be replaced. Therefore, the continuous fuming furnace has higher requirements on the stability, the continuity and the safety of the connecting pipe, and the connecting pipe must meet the requirement that the continuous fuming furnace can safely and uninterruptedly operate for a long time.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a connecting device of a wind nozzle primary air coal pipe of a continuous fuming furnace, aiming at the defects of the prior art, and ensuring the long-term, safe and stable operation of the continuous fuming furnace.
In order to achieve the above purpose, the technical scheme adopted by the utility model is as follows: a connecting device of a tuyere primary air coal pipe of a continuous fuming furnace is characterized by comprising an upper pressure-resistant rubber pipe, a connecting pipe, a tightening piece and a lower pressure-resistant rubber pipe; wherein: the port of the air-coal distribution pipe and the upper end of the connecting pipe of the continuous fuming furnace are sleeved in the upper pressure-resistant rubber pipe, the port of the air nozzle primary air-coal pipe and the lower end of the connecting pipe are sleeved in the lower pressure-resistant rubber pipe, and the air-coal distribution pipe and the air nozzle primary air-coal pipe are aligned with the connecting pipe; the tightening piece is fixed outside the upper pressure-resistant rubber pipe and the lower pressure-resistant rubber pipe to ensure that the upper pressure-resistant rubber pipe, the port of the air-coal distribution pipe and the upper end of the connecting pipe as well as the lower pressure-resistant rubber pipe, the primary air-coal pipe of the air nozzle and the lower end of the connecting pipe are airtight and not loosened.
Preferably, the connecting pipe is made of a thick-wall seamless pipe. The drift diameter of the connecting pipe is the same as that of the primary air coal pipe of the air nozzle.
Preferably, the binding piece is an iron wire and a binding hoop.
Preferably, the length of the upper pressure-resistant rubber pipe and the lower pressure-resistant rubber pipe is 2-3 times of the diameter of the primary air coal pipe of the air nozzle.
Thus, the utility model improves the traditional full rubber tube which is easy to wear through and leak coal into the combination of the connecting tube, the pressure-resistant rubber tube and the binding piece, is simple, easy to operate and reliable, can ensure the continuous fuming furnace to safely and stably operate for a long time, and avoids the faults and dangers possibly caused by adopting the full rubber tube; the major potential safety hazards that the traditional full rubber tube is easy to leak coal powder and explode are eliminated; waste in time, materials and personnel is reduced; meets the requirement of continuous fuming production.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is an enlarged view of a in fig. 1.
In the figure, 1-main wind coal pipe; 2-air coal distribution pipe; 3-installing a pressure-resistant rubber pipe; 4-connecting pipe; 5-binding the fastening piece; 6-lower pressure-resistant rubber tube; 7-air nozzle primary air coal pipe; 8-air nozzle.
Detailed Description
Referring to fig. 1 and 2, the present invention relates to a connection device for a primary air coal pipe of a tuyere of a continuous fuming furnace, which comprises an upper pressure-resistant rubber pipe 3, a connection pipe 4, a binding piece 5 and a lower pressure-resistant rubber pipe 6; wherein: the upper ends of the port of the air coal distribution pipe 2 and the connecting pipe 4 of the continuous fuming furnace are sleeved in the upper pressure-resistant rubber pipe 3, the lower ends of the port of the air nozzle primary air coal pipe 7 and the connecting pipe 4 are sleeved in the lower pressure-resistant rubber pipe 6, and the air coal distribution pipe 2 and the air nozzle primary air coal pipe 7 are aligned with the connecting pipe 4; the tightening piece 5 is fixed outside the upper pressure-resistant rubber tube 3 and the lower pressure-resistant rubber tube 6 to ensure that the upper pressure-resistant rubber tube 3 and the air-coal distribution tube port and the upper end of the connecting tube 4 as well as the lower pressure-resistant rubber tube 6 and the air nozzle primary air-coal tube 7 and the lower end of the connecting tube 4 are airtight and not loose.
Preferably, the connecting pipe 4 is made of a thick-wall seamless pipe, and the diameter of the thick-wall seamless pipe is preferably the same as that of the primary air coal pipe 7 of the air nozzle.
Preferably, the length of the upper pressure-resistant rubber tube 3 and the lower pressure-resistant rubber tube 6 is 2 to 3 times the diameter of the air nozzle primary air coal tube 7.
Preferably, the tightening member 5 is a wire and a binding band.

Claims (5)

1. A connecting device of a tuyere primary air coal pipe of a continuous fuming furnace is characterized by comprising an upper pressure-resistant rubber pipe (3), a connecting pipe (4), a binding piece (5) and a lower pressure-resistant rubber pipe (6); wherein: the port of an air coal distribution pipe (2) and the upper end of a connecting pipe (4) of the continuous fuming furnace are sleeved in the upper pressure-resistant rubber pipe (3), the port of an air nozzle primary air coal pipe (7) and the lower end of the connecting pipe (4) are sleeved in the lower pressure-resistant rubber pipe (6), and the air coal distribution pipe (2) and the air nozzle primary air coal pipe (7) are aligned with the connecting pipe (4); the binding piece (5) is fixed outside the upper pressure-resistant rubber pipe (3) and the lower pressure-resistant rubber pipe (6) to ensure that the upper pressure-resistant rubber pipe (3) and the air-coal distribution pipe port and the upper end of the connecting pipe (4) as well as the lower pressure-resistant rubber pipe (6) and the air nozzle primary air-coal pipe (7) and the lower end of the connecting pipe (4) are airtight and not loose.
2. The connection device of the tuyere primary air coal pipe of the continuous fuming furnace as recited in claim 1, wherein the connection pipe (4) is made of a thick-walled seamless pipe.
3. The connection device of the tuyere primary air coal pipe of the continuous fuming furnace as recited in claim 1, wherein the diameter of the connection pipe (4) is the same as that of the tuyere primary air coal pipe (7).
4. The connection device of the tuyere primary air coal pipe of the continuous fuming furnace as recited in claim 1, wherein the binding member (5) is an iron wire and a binding hoop.
5. The connection device of the tuyere primary air coal pipe of the continuous fuming furnace as recited in claim 1, wherein the length of the upper pressure-resistant rubber tube (3) and the lower pressure-resistant rubber tube (6) is 2 to 3 times the diameter of the tuyere primary air coal pipe (7).
CN202023274371.9U 2020-12-31 2020-12-31 Connecting device for air nozzle primary air coal pipe of continuous fuming furnace Active CN214171622U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023274371.9U CN214171622U (en) 2020-12-31 2020-12-31 Connecting device for air nozzle primary air coal pipe of continuous fuming furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023274371.9U CN214171622U (en) 2020-12-31 2020-12-31 Connecting device for air nozzle primary air coal pipe of continuous fuming furnace

Publications (1)

Publication Number Publication Date
CN214171622U true CN214171622U (en) 2021-09-10

Family

ID=77610834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023274371.9U Active CN214171622U (en) 2020-12-31 2020-12-31 Connecting device for air nozzle primary air coal pipe of continuous fuming furnace

Country Status (1)

Country Link
CN (1) CN214171622U (en)

Similar Documents

Publication Publication Date Title
CN101225914B (en) Automatic abutting joint for gas pipe
CN214171622U (en) Connecting device for air nozzle primary air coal pipe of continuous fuming furnace
CN209701410U (en) A kind of library in cement plant, storehouse feed opening blockage-clearing device
CN104513880B (en) Converter sublance body
CN106475365A (en) A kind of carbon dust pipe dredging device
CN205716129U (en) A kind of high hydraulic valve block flange pipe joint
CN112628513A (en) Method for manufacturing and installing connecting pipe of air nozzle primary air coal pipe of continuous fuming furnace
CN206694735U (en) Spliced pipeline maintenance dedicated connecting sleeve
CN209340729U (en) The long protecting pipe of welded stainless steel
CN202209431U (en) Hollow tube trip valve of hollow electrode
CN207294828U (en) One kind combination wire feeder structure
CN103924016B (en) A kind of method changing the large cover of cinder monkey
CN205226731U (en) Big high temperature resistant one -way telescopic joint of pipe diameter
CN207147209U (en) A kind of oxygen-enriched concentrated combustion device of furnace cupola
CN211782720U (en) Melt heating and heat preserving device of side-blown smelting furnace
CN202576472U (en) Air hole type anti-sticking oxygen lance
CN201152418Y (en) Gas pipeline automatic butt-joint device
CN206799665U (en) A kind of abrasionproof leakage equipment for the transmission of gas base solid particle
CN204986045U (en) High pressure acetylene pipeline
CN205650807U (en) Oxygen lance frock and oxygen lance external member
CN208237292U (en) Explosion-proof reducer union
CN214464067U (en) Novel buffering wear-resisting glib cover
CN209385177U (en) A kind of external jet pipe filling pulp making device
CN220185172U (en) Portable quick plug and filling device special for ultra-high water filling mining of coal mine
CN215668067U (en) Oxygen blowing lance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant