CN214159119U - Novel high-efficient desulfurizing tower - Google Patents

Novel high-efficient desulfurizing tower Download PDF

Info

Publication number
CN214159119U
CN214159119U CN202021279889.9U CN202021279889U CN214159119U CN 214159119 U CN214159119 U CN 214159119U CN 202021279889 U CN202021279889 U CN 202021279889U CN 214159119 U CN214159119 U CN 214159119U
Authority
CN
China
Prior art keywords
desulfurizing tower
flue gas
gas outlet
outlet pipe
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021279889.9U
Other languages
Chinese (zh)
Inventor
何小荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Yiman Environmental Protection Equipment Co ltd
Original Assignee
Chongqing Yiman Environmental Protection Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Yiman Environmental Protection Equipment Co ltd filed Critical Chongqing Yiman Environmental Protection Equipment Co ltd
Priority to CN202021279889.9U priority Critical patent/CN214159119U/en
Application granted granted Critical
Publication of CN214159119U publication Critical patent/CN214159119U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model discloses a novel high-efficiency desulfurizing tower, which comprises a spraying desulfurizing tower main body and a clean flue gas outlet pipe, wherein the upper surface of the spraying desulfurizing tower main body is provided with a lower flange, the lower surface of the clean flue gas outlet pipe is provided with an upper flange, the upper flange is fixedly connected with the lower flange through a plurality of groups of bolts, two groups of positioning mechanisms are also arranged between the upper flange and the lower flange, each positioning mechanism comprises an installation block and a positioning block, the lower surface of the installation block is provided with an inserted bar, and the inside of the inserted bar is provided with an installation groove; the utility model discloses a positioning mechanism of design is convenient for fix a position the last flange when hoist and mount, conveniently hoists clean flue gas outlet pipe, has avoided the tradition clean flue gas outlet pipe can appear rocking when hoist and mount it, leads to the condition of not good installation, makes things convenient for the bolt to the hole, and easy operation has practiced thrift hoisting time for installer's installation effectiveness.

Description

Novel high-efficient desulfurizing tower
Technical Field
The utility model belongs to the technical field of the desulfurizing tower, concretely relates to novel high-efficient desulfurizing tower.
Background
The desulfurizing tower is tower equipment for desulfurizing industrial waste gas, most of which can be desulfurized by using a spray desulfurizing tower, has the advantages of simple structure, mature and reliable process and high desulfurizing efficiency, and can be widely applied to large-scale power plants and medium and small-sized low-sulfur flue gas treatment.
Current desulfurizing tower needs to use the loop wheel machine hoist and mount to the desulfurizing tower with clean flue gas outlet pipe when the equipment, then uses the bolt to fix, but at the hoist and mount in-process, clean flue gas outlet pipe appears rocking at the hoist and mount in-process, leads to the installation when the installation not good, causes the bolt not good to the hole, has increased installation time, has reduced installer installation effectiveness's problem, for this we propose a novel high-efficient desulfurizing tower.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel high-efficient desulfurizing tower to solve the current desulfurizing tower that proposes in the above-mentioned background art when the equipment, need use the loop wheel machine hoist and mount to the desulfurizing tower with clean flue gas outlet pipe, then use the bolt to fix, but at the hoist and mount in-process, clean flue gas outlet pipe appears rocking in hoist and mount in-process, lead to the installation not good when the installation, cause the bolt not good to the hole, increased installation time, reduced installer installation effectiveness's problem.
In order to achieve the above object, the utility model provides a following technical scheme: a novel high-efficiency desulfurizing tower comprises a spraying desulfurizing tower main body and a clean flue gas outlet pipe, wherein the upper surface of the spraying desulfurizing tower main body is provided with a lower flange, the lower surface of the clean flue gas outlet pipe is provided with an upper flange, the upper flange is fixedly connected with the lower flange through a plurality of groups of bolts, two groups of positioning mechanisms are also arranged between the upper flange and the lower flange, each positioning mechanism comprises an installation block and a positioning block, the lower surface of the installation block is provided with an insertion rod, the inside of the insertion rod is provided with an installation groove, the inside of the positioning block is respectively provided with a movable groove and an insertion groove for the bottom of the insertion rod to penetrate, the inside of the movable groove is respectively provided with an insertion strip and a moving rod, the end part of the insertion strip can penetrate into the inside of the installation groove, the outside of the insertion strip is provided with two groups of barrier strips, and the, the tip of carriage release lever is provided with draws the piece, the outer wall cover of carriage release lever is equipped with the spring.
Preferably, the side of spraying desulfurizing tower main part is provided with the water tank, be provided with water pump and two sets of mount pads on the water tank respectively, the upper surface of mount pad is provided with the support column, the top of support column is provided with the weather shed.
Preferably, still be provided with the water pipe on the water tank, the side of water pipe is provided with two sets of connecting pipes, the tip of connecting pipe extends to the inside of spraying the desulfurizing tower main part, the tip of connecting pipe is provided with the spray thrower.
Preferably, a manhole is arranged on the front surface of the spray desulfurization tower main body.
Preferably, a flue gas inlet is arranged on the other side of the spray desulfurization tower main body.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the utility model discloses a positioning mechanism of design is convenient for fix a position the last flange when hoist and mount, conveniently hoists clean flue gas outlet pipe, has avoided the tradition clean flue gas outlet pipe can appear rocking when hoist and mount it, leads to the condition of not good installation, makes things convenient for the bolt to the hole, and easy operation has practiced thrift hoisting time for installer's installation effectiveness.
(2) The utility model discloses a mount pad, support column and the rain shelter of design combine together, and the rain shelter can block the rainwater, has avoided in use can prevent that the water pump from being drenched by the rainwater when raining when the weather appears, causes to damage the water pump and the rusty condition appears, has extended the life of water pump.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the positioning mechanism of the present invention;
fig. 3 is an enlarged schematic view of a portion a in fig. 2 according to the present invention;
FIG. 4 is a schematic sectional view of the insertion rod and the positioning block of the present invention;
FIG. 5 is a connection diagram of the installation base, the supporting column and the rain shelter of the present invention;
in the figure: 1. a flue gas inlet; 2. spraying and spraying the desulfurizing tower main body; 3. a clean flue gas outlet pipe; 4. a water pipe; 5. a water tank; 6. a manhole; 7. an upper flange; 8. a lower flange; 9. mounting blocks; 10. inserting a rod; 11. positioning blocks; 12. mounting grooves; 13. cutting; 14. a spring; 15. a movable groove; 16. pulling the block; 17. a travel bar; 18. blocking strips; 19. a slot; 20. a water pump; 21. a rain shelter; 22. a support pillar; 23. and (7) mounting a seat.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: a novel high-efficiency desulfurizing tower comprises a spraying desulfurizing tower main body 2 and a clean flue gas outlet pipe 3, wherein the upper surface of the spraying desulfurizing tower main body 2 is provided with a lower flange 8, the lower surface of the clean flue gas outlet pipe 3 is provided with an upper flange 7, the upper flange 7 is fixedly connected with the lower flange 8 through a plurality of groups of bolts, two groups of positioning mechanisms are also arranged between the upper flange 7 and the lower flange 8, each positioning mechanism comprises an installation block 9 and a positioning block 11, the lower surface of the installation block 9 is provided with an insertion rod 10, the inside of the insertion rod 10 is provided with an installation groove 12, the inside of the positioning block 11 is respectively provided with a movable groove 15 and a slot 19 for the bottom of the insertion rod 10 to penetrate, the inside of the movable groove 15 is respectively provided with an insertion strip 13 and a moving rod 17, the end part of the insertion strip 13 can penetrate into the inside of the installation groove 12, the outside of the insertion strip 13 is provided with two groups of barrier strips 18, and the end part of the moving rod 17 extends to the side surface of the positioning block 11, the tip of carriage release lever 17 is provided with draws piece 16, and the outer wall cover of carriage release lever 17 is equipped with spring 14, and positioning mechanism through the design is convenient for fix a position last flange 7 when hoist and mount, conveniently hoist clean flue gas outlet pipe 3, has avoided the tradition clean flue gas outlet pipe 3 can appear rocking when hoist and mount it, leads to the condition of not good installation, makes things convenient for the bolt to the hole, and easy operation has practiced thrift the hoist and mount time for installer's installation effectiveness.
In this embodiment, it is preferred, the side of spraying desulfurizing tower main part 2 is provided with water tank 5, be provided with water pump 20 and two sets of mount pad 23 on the water tank 5 respectively, the upper surface of mount pad 23 is provided with support column 22, the top of support column 22 is provided with rain shelter 21, mount pad 23 through the design, support column 22 and rain shelter 21 combine together, rain shelter 21 can block the rainwater, in use can prevent that water pump 20 from being drenched by the rainwater when rainy day appears, cause the rusty condition of damage water pump 20 and appearance, the life of water pump 20 has been prolonged in the extension.
In this embodiment, preferably, the water tank 5 is further provided with a water pipe 4, two groups of connecting pipes are arranged on the side surface of the water pipe 4, the end portions of the connecting pipes extend into the spraying desulfurization tower main body 2, and a sprayer is arranged at the end portions of the connecting pipes.
In this embodiment, preferably, the front surface of the spray desulfurization tower main body 2 is provided with a manhole 6.
In this embodiment, preferably, the other side of the spray desulfurization tower main body 2 is provided with a flue gas inlet 1.
The utility model discloses a theory of operation and use flow: flue gas enters a spray desulfurization tower main body 2 from a flue gas inlet 1, then a sprayer sprays cleaning solution to desulfurize the flue gas, and the clean flue gas after desulfurization is discharged from a clean flue gas outlet pipe 3;
when the utility model is used, the clean flue gas outlet pipe 3 is hung above the spray desulfurizing tower main body 2 by a crane, the bottom of the inserted bar 10 is matched with the position of the slot 19, then the clean flue gas outlet pipe 3 is moved downwards, at the moment, the clean flue gas outlet pipe 3 drives the upper flange 7 to move, the upper flange 7 drives the mounting block 9 to move, the mounting block 9 drives the inserted bar 10 to move downwards, then the bottom of the inserted bar 10 penetrates into the slot 19, in the process that the bottom of the inserted bar 10 penetrates into the slot 19, the bottom of the inserted bar 10 is contacted with the inserted bar 13, at the moment, the inserted bar 13 is influenced by the inserted bar 10 to move outwards, the inserted bar 13 drives the movable bar 17 to move outwards, at the moment, the spring 14 is compressed by the extrusion of the inserted bar 13, then, after the inserted bar 10 completely penetrates into the slot 19, at the moment, the end part of the inserted bar 13 is matched with the position of the mounting groove 12, then the spring 14 extends back to push the inserting strip 13 to move inwards, then the end part of the inserting strip 13 penetrates into the mounting groove 12, the inserting rod 10 can be clamped, the upper flange 7 can be limited, and finally the upper flange 7 and the lower flange 8 can be fixed by using bolts;
when the clean flue gas outlet pipe 3 needs to be disassembled, the pulling block 16 is held firstly to move outwards, the pulling block 16 drives the moving rod 17 to move, the moving rod 17 drives the inserting strip 13 to move outwards, then the end part of the inserting strip 13 is separated from the mounting groove 12, at the moment, the bolt is unscrewed, the clean flue gas outlet pipe 3 is lifted, and the clean flue gas outlet pipe 3 can be disassembled after the bottom of the inserting rod 10 is separated from the slot 19.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a novel high-efficient desulfurizing tower, includes spray desulfurizing tower main part (2) and clean flue gas outlet pipe (3), its characterized in that: the upper surface of the spray desulfurization tower main body (2) is provided with a lower flange (8), the lower surface of the clean flue gas outlet pipe (3) is provided with an upper flange (7), the upper flange (7) is fixedly connected with the lower flange (8) through a plurality of groups of bolts, two groups of positioning mechanisms are further arranged between the upper flange (7) and the lower flange (8), each positioning mechanism comprises an installation block (9) and a positioning block (11), the lower surface of the installation block (9) is provided with an inserted bar (10), an installation groove (12) is formed in the insertion bar (10), a movable groove (15) and an insertion groove (19) for the bottom of the inserted bar (10) to penetrate are respectively formed in the positioning block (11), an insertion strip (13) and a moving bar (17) are respectively arranged in the movable groove (15), and the end part of the insertion strip (13) can penetrate into the installation groove (12), the outside of cutting (13) is provided with two sets of blend stops (18), the tip of carriage release lever (17) extends to the side of locating piece (11), the tip of carriage release lever (17) is provided with draws piece (16), the outer wall cover of carriage release lever (17) is equipped with spring (14).
2. The novel high-efficiency desulfurizing tower of claim 1, wherein: the side of spraying desulfurizing tower main part (2) is provided with water tank (5), be provided with water pump (20) and two sets of mount pad (23) on water tank (5) respectively, the upper surface of mount pad (23) is provided with support column (22), the top of support column (22) is provided with weather enclosure (21).
3. The novel high-efficiency desulfurizing tower of claim 2, wherein: still be provided with water pipe (4) on water tank (5), the side of water pipe (4) is provided with two sets of connecting pipes, the tip of connecting pipe extends to the inside of spraying desulfurizing tower main part (2), the tip of connecting pipe is provided with the spray thrower.
4. The novel high-efficiency desulfurizing tower of claim 1, wherein: the front surface of the spray desulfurization tower main body (2) is provided with a manhole (6).
5. The novel high-efficiency desulfurizing tower of claim 1, wherein: and a flue gas inlet (1) is formed in the other side of the spraying desulfurization tower main body (2).
CN202021279889.9U 2020-07-02 2020-07-02 Novel high-efficient desulfurizing tower Active CN214159119U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021279889.9U CN214159119U (en) 2020-07-02 2020-07-02 Novel high-efficient desulfurizing tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021279889.9U CN214159119U (en) 2020-07-02 2020-07-02 Novel high-efficient desulfurizing tower

Publications (1)

Publication Number Publication Date
CN214159119U true CN214159119U (en) 2021-09-10

Family

ID=77589723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021279889.9U Active CN214159119U (en) 2020-07-02 2020-07-02 Novel high-efficient desulfurizing tower

Country Status (1)

Country Link
CN (1) CN214159119U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117042373A (en) * 2023-09-01 2023-11-10 盐城译道译科技有限公司 Rainproof structure of shell of data processing terminal equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117042373A (en) * 2023-09-01 2023-11-10 盐城译道译科技有限公司 Rainproof structure of shell of data processing terminal equipment

Similar Documents

Publication Publication Date Title
CN214159119U (en) Novel high-efficient desulfurizing tower
CN107030052A (en) A kind of cable cleaning device for Communication power industry
CN211707535U (en) Cleaning equipment for photovoltaic power generation device
CN211753459U (en) Efficient and energy-saving dust settling device for building construction
CN210597906U (en) Roof greening layer drainage structure
CN201643975U (en) Spraying device of circulating slurry for desulfurizing flue gas
CN212413110U (en) Solar photovoltaic panel convenient to clean
CN213740818U (en) Building construction dust device
CN210207923U (en) Gas jet cleaning device for treating denitration catalyst pore channel blockage
CN210316697U (en) Sunlight shed for efficient crystal silicon solar photovoltaic power generation
CN207411081U (en) A kind of novel garden irrigation rig
CN207523668U (en) A kind of efficient architectural engineering car washing installation
CN215530310U (en) Novel grape planting greenhouse
CN214468728U (en) Biomass stove with tail gas treatment function
CN219502307U (en) Dust removal spray set for construction site
CN218521571U (en) Highway engineering bridge construction bridge face concrete curing means
CN2214840Y (en) Dust-removing cover for chimney
CN215086132U (en) Reactor of high-efficient SOx/NOx control device of flue gas
CN211864336U (en) Municipal administration sanitation watering dust collector
CN211411491U (en) Environmental protection dust collecting equipment of building engineering construction
CN220353043U (en) Prefabricated pump station of integration of convenient residue clearance
CN219111189U (en) Environment-friendly dust removal box
CN218687716U (en) Environmental protection structure for power plant heat energy power engineering
CN220860877U (en) Filter screen cleaning device for carbon capture
CN218014715U (en) Automatic high-pressure water cleaning system for interior of long gas cylinder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant