CN214144805U - Steel column measurement correction tool - Google Patents

Steel column measurement correction tool Download PDF

Info

Publication number
CN214144805U
CN214144805U CN202022425585.5U CN202022425585U CN214144805U CN 214144805 U CN214144805 U CN 214144805U CN 202022425585 U CN202022425585 U CN 202022425585U CN 214144805 U CN214144805 U CN 214144805U
Authority
CN
China
Prior art keywords
steel column
correction
tool
orientation
correcting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022425585.5U
Other languages
Chinese (zh)
Inventor
邓毅军
邓亨军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Benli Construction Engineering Co ltd
Original Assignee
Sichuan Benli Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Benli Construction Engineering Co ltd filed Critical Sichuan Benli Construction Engineering Co ltd
Priority to CN202022425585.5U priority Critical patent/CN214144805U/en
Application granted granted Critical
Publication of CN214144805U publication Critical patent/CN214144805U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a steel column measurement and correction tool, which comprises two tool bodies with the same structure; the frock body is including the reverse section of bending and forward installation section, the reverse section of bending is equipped with the U-shaped recess, be equipped with the correction groove on the forward installation section, the orientation of correcting the groove is opposite with the orientation of U-shaped recess, be provided with the correction plate on the correction groove, the orientation of correction plate perpendicular to U-shaped recess. The steel column measurement and correction tool of the utility model respectively puts two tool bodies on the lower steel column ear plate of the lower steel column; the upper steel column ear plate of the upper steel column is inverted, so that the jack can be placed between the correcting plates of the two tool bodies for steel column adjustment, the time for measuring and correcting the steel column can be greatly saved, most of welder processes are left, iron plates do not need to be welded on the steel column, cutting and subsequent polishing and paint spraying are not needed, and welding materials, gas and other materials are saved.

Description

Steel column measurement correction tool
Technical Field
The utility model relates to a steel column construction technical field especially relates to a steel column measurement rectifies frock.
Background
When traditional steel column is rectified, a welder is required to match with a measurement and correction group, and an ear plate or an iron block is welded on the steel column to be used as a fixed jack. Thereby make the jack enable to make and go up the elevation and the coordinate of strength timing steel column, guarantee the exactness of steel column installation, this kind of mode needs to weld iron plate on the steel column, need cut and subsequent polishing and spray paint after the end, and efficiency is very low.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems in the prior art, the utility model provides a steel column measurement and correction tool, which is characterized in that two tool bodies are respectively placed on a lower steel column ear plate of a lower steel column; the upper steel column ear plate of the upper steel column is inverted, so that the jack can be placed between the correcting plates of the two tool bodies for steel column adjustment, the time for measuring and correcting the steel column can be greatly saved, most of welder processes are left, iron plates do not need to be welded on the steel column, cutting and subsequent polishing and paint spraying are not needed, and welding materials, gas and other materials are saved.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a steel column measurement and correction tool, which comprises two tool bodies with the same structure;
the frock body is including the reverse section of bending and forward installation section, the reverse section of bending is equipped with the U-shaped recess, be equipped with the correction groove on the forward installation section, the orientation of correcting the groove is opposite with the orientation of U-shaped recess, be provided with the correction plate on the correction groove, the orientation of correction plate perpendicular to U-shaped recess.
The steel column measurement and correction tool of the utility model respectively puts two tool bodies on the lower steel column ear plate of the lower steel column; the upper steel column ear plate of the upper steel column is inverted, so that the jack can be placed between the correcting plates of the two tool bodies for steel column adjustment, the time for measuring and correcting the steel column can be greatly saved, most of welder processes are left, iron plates do not need to be welded on the steel column, cutting and subsequent polishing and paint spraying are not needed, and welding materials, gas and other materials are saved.
In a further technical scheme, the tool body is provided with an anti-falling structure.
Because the tool body and the lug plate are only in plug-in positioning, the tool body can fall under the action of gravity under the condition without support, and the falling prevention structure can prevent the tool body from falling and ensure the operation safety.
In a further technical scheme, the anti-falling structure is an anti-falling hole formed in the tool body.
Through set up on the frock body and prevent weighing down the hole, when proofreading, surround on the steel column and prevent weighing down the rope to will prevent weighing down the rope and pass and prevent weighing down the hole, can guarantee that the frock body can not fall, the operation is both simple and convenient, and is safe again.
Has the advantages that:
1. the steel column measurement and correction tool of the utility model respectively puts two tool bodies on the lower steel column ear plate of the lower steel column; the upper steel column ear plate of the upper steel column is inverted, so that the jack can be placed between the correcting plates of the two tool bodies for steel column adjustment, the time for measuring and correcting the steel column can be greatly saved, most of welder processes are left, iron plates do not need to be welded on the steel column, cutting and subsequent polishing and paint spraying are not needed, and welding materials, gas and other materials are saved.
2. Because the tool body and the lug plate are only in plug-in positioning, the tool body can fall under the action of gravity under the condition without support, and the falling prevention structure can prevent the tool body from falling and ensure the operation safety.
3. Through set up on the frock body and prevent weighing down the hole, when proofreading, surround on the steel column and prevent weighing down the rope to will prevent weighing down the rope and pass and prevent weighing down the hole, can guarantee that the frock body can not fall, the operation is both simple and convenient, and is safe again.
Drawings
Fig. 1 is a schematic structural view of a single tool body of a steel column measurement and correction tool according to an embodiment of the present invention;
FIG. 2 is a right side view of FIG. 1;
fig. 3 is a schematic view of the steel column measurement and correction tool according to an embodiment of the present invention.
Reference numerals:
10. a tool body; 11. reversely bending the sections; 12. a forward mounting section; 13. a correction plate; 14. an anti-falling hole; 20. a lower steel column; 21. a lower steel column ear plate; 30. steel column mounting; 31. an upper steel column ear plate; 40. preventing falling of the rope; 50. a jack.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings:
example 1:
a steel column measurement and correction tool comprises two tool bodies with the same structure;
as shown in fig. 1 and 2, the tool body comprises a reverse bending section and a forward mounting section, the reverse bending section 11 is provided with a U-shaped groove, the forward mounting section 12 is provided with a correction groove, the orientation of the correction groove is opposite to that of the U-shaped groove, the correction groove is provided with a correction plate 13, and the correction plate 13 is perpendicular to the orientation of the U-shaped groove.
During calibration, as shown in fig. 3, two tool bodies 10 are respectively placed on the lower steel column ear plates 21 of the lower steel columns 20; one upper steel column ear plate 31 of the upper steel column 30 is placed upside down, the jack 50 is placed between the correcting plates 13 of the two tool bodies 10 for steel column adjustment, the time for measuring and correcting the steel column can be greatly saved, most of welding processes are left, iron plates do not need to be welded on the steel column, cutting and subsequent polishing and paint spraying are not needed, and materials such as welding materials and gas are saved.
In another embodiment, the tool body 10 is provided with a falling prevention structure.
Because the tool body 10 and the lug plate are only positioned in an insertion mode, the tool body 10 can fall under the action of gravity under the condition of no support, the tool body 10 can be prevented from falling through the arrangement of the anti-falling structure, and operation safety is guaranteed.
In another embodiment, as shown in fig. 1, the anti-falling structure is an anti-falling hole 14 formed in the fixture body 10.
Through set up on the frock body 10 and prevent weighing down hole 14, when proofreading, as shown in fig. 3, surround on the steel column and prevent weighing down rope 40 to will prevent weighing down rope 40 and pass and prevent weighing down hole 14, can guarantee that the frock body 10 can not fall, the operation is both simple and convenient, and is safe again.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention.

Claims (3)

1. A steel column measurement and correction tool is characterized by comprising two tool bodies with the same structure;
the frock body is including the reverse section of bending and forward installation section, the reverse section of bending is equipped with the U-shaped recess, be equipped with the correction groove on the forward installation section, the orientation of correcting the groove is opposite with the orientation of U-shaped recess, be provided with the correction plate on the correction groove, the orientation of correction plate perpendicular to U-shaped recess.
2. The steel column measurement and correction tool according to claim 1, wherein an anti-falling structure is arranged on the tool body.
3. The steel column measurement and correction tool of claim 2, wherein the anti-falling structure is an anti-falling hole formed in the tool body.
CN202022425585.5U 2020-10-27 2020-10-27 Steel column measurement correction tool Active CN214144805U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022425585.5U CN214144805U (en) 2020-10-27 2020-10-27 Steel column measurement correction tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022425585.5U CN214144805U (en) 2020-10-27 2020-10-27 Steel column measurement correction tool

Publications (1)

Publication Number Publication Date
CN214144805U true CN214144805U (en) 2021-09-07

Family

ID=77560321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022425585.5U Active CN214144805U (en) 2020-10-27 2020-10-27 Steel column measurement correction tool

Country Status (1)

Country Link
CN (1) CN214144805U (en)

Similar Documents

Publication Publication Date Title
CN202037429U (en) Side beam welding follower fixture
CN102049647A (en) Welding fixture for girder of truss
CN214144805U (en) Steel column measurement correction tool
CN208276406U (en) A kind of automatic section box girder bed die angle steel positioning system
CN203808537U (en) Steel column butt-joint plane position correcting device
CN106378578B (en) A kind of pipe fitting spot welding fixture (SWFX)
CN206263522U (en) A kind of pipe fitting spot welding fixture (SWFX)
CN212885656U (en) Spot welding machine with gas protection function
CN211519803U (en) Adjustable base for mounting ship building medium-sized equipment
CN204339167U (en) A kind of structural member apparatus for welding and positioning
CN202053039U (en) Welding clamp for truss girder
CN103962711A (en) Electrode cap changing tool for projection welding robot workstation welding
CN206779786U (en) A kind of auxiliary locator blue with welding method
CN216780821U (en) Tunnel bow member connecting plate welding position auxiliary member
CN214818325U (en) Be applicable to socket joint type dish knot formula scaffold mounting tool
CN217167234U (en) Spiral rectifier diode outer lead welding frock
CN219425982U (en) Steel column installation weld joint correcting device
CN210412047U (en) Grounding flat steel bending machine device
CN210549122U (en) Slag rake welding device
CN211759512U (en) Welding tool for new energy forklift
CN219547854U (en) Protection device capable of preventing template from deforming
CN216370764U (en) Butt welding structure
CN212634841U (en) Laser equipment braced frame welding frock
CN215491399U (en) Detection tool for preventing welding missing
CN212733635U (en) Large furnace shell assembling and correcting tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant