CN214144092U - A pipeline pull throughs for south water transfers engineering north - Google Patents

A pipeline pull throughs for south water transfers engineering north Download PDF

Info

Publication number
CN214144092U
CN214144092U CN202023285717.5U CN202023285717U CN214144092U CN 214144092 U CN214144092 U CN 214144092U CN 202023285717 U CN202023285717 U CN 202023285717U CN 214144092 U CN214144092 U CN 214144092U
Authority
CN
China
Prior art keywords
pipeline
ring
dredging
fixed rubber
rubber deformation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023285717.5U
Other languages
Chinese (zh)
Inventor
明梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202023285717.5U priority Critical patent/CN214144092U/en
Application granted granted Critical
Publication of CN214144092U publication Critical patent/CN214144092U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a pipeline pull throughs for south water transfers engineering north relates to pipeline mediation technical field. This a pipeline pull throughs for south water transfers engineering north, includes fixed rubber deformation shell, fixed rubber deformation shell is equipped with fixing device outward, fixing device includes the embedding ring, the last fixed surface of fixed rubber deformation shell is connected with the embedding ring, this a pipeline pull throughs for south water transfers engineering north, and the upward movement through fixed plate two drives embedding ring rebound down, goes up embedding ring and lower embedding ring and laminates each other, goes up embedding ring and laminates each other with embedding ring down and lets the pipeline embedded groove take place deformation, fixes the better surface of fixing at the pipeline of fixed rubber deformation shell, and this device passes through fixing device and fixes the pipeline pull throughs on the surface of pipeline, has improved pipeline pull throughs's stability, lets the better pipeline of machinery dredge.

Description

A pipeline pull throughs for south water transfers engineering north
Technical Field
The utility model relates to a pipeline mediation technical field specifically is a pipeline pull throughs for south water transfers engineering north.
Background
In recent years, urban waterlogging constantly occurs everywhere, which directly harms urban safe operation and people's life safety and causes huge economic loss. Urban inland inundation is caused by various reasons, such as overlarge rainfall, imperfect drainage system, damaged drainage pipeline and the like. In recent years, typhoons and rainstorms occur in coastal areas, rainfall in flood seasons rises year by year, and the original urban drainage system standard cannot meet the current drainage requirement. In addition, the force of city construction is getting bigger and bigger, the sandy soil required by engineering is very easy to drop and pile up on the road in the transportation, and flows into the drainage system along with the road surface washing, so that the increase of the sludge amount in the pipeline causes the pipeline blockage, and meanwhile, the drainage is not smooth in rainy days, further aggravates urban waterlogging, influences the smooth traffic, and even leads to traffic paralysis.
When the pipeline is dredged, the dredging effect of the pipeline is often influenced due to the shaking of the dredging machine.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pipeline pull throughs for south water transfers engineering north to solve the problem that provides in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a pipeline dredging device for south-to-north water transfer engineering comprises a fixed rubber deformation shell, wherein a fixing device is arranged outside the fixed rubber deformation shell and comprises an upper embedding ring, the upper surface of the fixed rubber deformation shell is fixedly connected with the upper embedding ring, a first fixed plate is fixedly connected to the back of the upper embedding ring, a first threaded connecting hole is formed in the upper surface of the first fixed plate, a threaded rod is movably connected into the first threaded connecting hole, and a nut is fixedly connected to the upper surface of the threaded rod; a power device is arranged in the fixed rubber deformation shell; and a dredging device is arranged outside the fixed rubber deformation shell.
Preferably, the lower fixed surface of the fixed rubber deformation shell is fixedly connected with a lower embedding ring, the back of the lower embedding ring is fixedly connected with a second fixed plate, the upper surface of the second fixed plate is provided with a second threaded connecting hole, and a threaded rod is movably connected in the second threaded connecting hole.
Preferably, power device includes flexible motor, the pipeline embedded groove has been seted up in the front of fixed rubber deformation shell, the flexible motor of positive fixedly connected with of pipeline embedded groove, the positive swing joint of flexible motor has the telescopic link, the positive fixedly connected with screw thread post of telescopic link.
Preferably, the pull throughs include the pull throughs, the positive fixedly connected with pull throughs semicircle ring of pull throughs, the upper surface of pull throughs semicircle ring is equipped with adsorption equipment, the rear surface of pull throughs has seted up threaded hole, threaded hole swing joint has the screw thread post.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the pipeline dredging device for the south-to-north water transfer engineering is characterized in that a fixed rubber deformation shell is fixed at a position to be dredged by moving the pipeline dredging device, a pipeline is fixed in a gap reserved between the fixed rubber deformation shell and a telescopic motor to limit the pipeline dredging device, after the pipeline dredging device is installed, a nut is downwards twisted, the twisting of the nut drives a threaded rod to rotate, the threaded rod is in threaded engagement with a first threaded connecting hole and a second threaded connecting hole, so that the first fixed plate and a second fixed plate are attached to each other by the rotation of the threaded rod, an upper embedding ring is driven to downwards move by the downward movement of the first fixed plate, a lower embedding ring is driven to upwards move by the upward movement of the second fixed plate, the upper embedding ring and the lower embedding ring are attached to each other to deform a pipeline embedding groove, and the fixed rubber deformation shell is better fixed on the surface of the pipeline, this device passes through fixing device and fixes the pipeline pull throughs on the surface of pipeline, has improved pipeline pull throughs's stability, lets the better pipeline of machinery dredge.
(2) The pipeline dredging device for the south-to-north water transfer engineering is characterized in that a telescopic motor is started, the telescopic motor is started to drive a telescopic rod to move back and forth, the telescopic rod moves forwards to drive a dredging ring to move forwards, sundries at the upper end of the inner wall of a pipeline are pushed by the dredging ring to move downwards to a dredging semicircular ring, the sundries at the lower end of the inner wall of the pipeline are pushed by the dredging semicircular ring to move, the sundries can be adsorbed by an adsorption device, the sundries are fixed in the dredging semicircular ring, dredging and adsorption of the sundries in the pipeline are realized, after cleaning is completed, a fixing device is taken down, the dredging semicircular ring is rotated, a transferring threaded column of the dredging semicircular ring rotates in a threaded hole, the dredging device is taken down, the sundries in the dredging device are taken down, and the use of a user is facilitated, and the device and the dredging and the adsorption are integrated, the work efficiency of the dredging device is greatly improved.
Drawings
Fig. 1 is a schematic structural view of the pipeline dredging device for the north-south water transfer project of the present invention;
FIG. 2 is a schematic structural view of the power plant of the present invention;
FIG. 3 is a schematic structural view of the dredging device of the present invention;
fig. 4 is a schematic structural view of the fixing device of the present invention.
In the figure: the device comprises a fixed rubber deformation shell 1, a pipeline embedded groove 2, a telescopic motor 3, a telescopic rod 4, a dredging ring 11, a threaded column 12, a threaded hole 13, a dredging semicircular ring 14, an adsorption device 15, an upper embedding ring 21, a first fixing plate 22, a first threaded connecting hole 23, a screw cap 24, a lower embedding ring 26, a threaded rod 27, a second threaded connecting hole 28 and a second fixing plate 29.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a pipeline dredging device for south-to-north water transfer engineering comprises a fixed rubber deformation shell 1, a fixing device is arranged outside the fixed rubber deformation shell 1 and comprises an upper embedding ring 21, the upper surface of the fixed rubber deformation shell 1 is fixedly connected with the upper embedding ring 21, a first fixing plate 22 is fixedly connected with the back of the upper embedding ring 21, a first threaded connecting hole 23 is formed in the upper surface of the first fixing plate 22, a threaded rod 27 is movably connected in the first threaded connecting hole 23, a nut 24 is fixedly connected to the upper surface of the threaded rod 27, a lower embedding ring 26 is fixedly connected to the lower surface of the fixed rubber deformation shell 1, a second fixing plate 29 is fixedly connected with the back of the lower embedding ring 26, a second threaded connecting hole 28 is formed in the upper surface of the second fixing plate 29, a threaded rod 27 is movably connected in the second threaded connecting hole 28, a power device is arranged in the fixed rubber deformation shell 1 and comprises a telescopic motor 3, the front of the fixed rubber deformation shell 1 is provided with a pipeline embedded groove 2, the front of the pipeline embedded groove 2 is fixedly connected with a telescopic motor 3, the front of the telescopic motor 3 is movably connected with a telescopic rod 4, the front of the telescopic rod 4 is fixedly connected with a threaded column 12, the fixed rubber deformation shell 1 is fixed at a position required to be dredged by moving a pipeline dredging device, a pipeline is fixed in a gap reserved between the fixed rubber deformation shell 1 and the telescopic motor 3, the pipeline dredging device is limited, after the pipeline dredging device is installed, a nut 24 is downwards twisted, the twisting of the nut 24 drives a threaded rod 27 to rotate, the threaded rod 27 is in threaded engagement with a threaded connecting hole I23 and a threaded connecting hole II 28, so that the rotation of the threaded rod 27 enables a fixed plate I22 and a fixed plate II 29 to be attached, the downward movement of the fixed plate I22 drives an upper embedded ring 21 to downwards, the upward movement of the second fixing plate 29 drives the lower embedding ring 26 to move upward, the upper embedding ring 21 and the lower embedding ring 26 are mutually attached to enable the pipeline embedding groove 2 to deform, the fixed rubber deformation shell 1 is better fixed on the surface of a pipeline, the device fixes the pipeline dredging device on the surface of the pipeline through the fixing device, the stability of the pipeline dredging device is improved, the pipeline is better dredged through machinery, the dredging device is arranged outside the fixed rubber deformation shell 1 and comprises a dredging ring 11, the front side of the dredging ring 11 is fixedly connected with a dredging semicircular ring 14, the upper surface of the dredging semicircular ring 14 is provided with an adsorption device 15, the rear surface of the dredging ring 11 is provided with a threaded hole 13, a threaded column 12 is movably connected in the threaded hole 13, and by starting the telescopic motor 3, the starting telescopic rod of the telescopic motor 3 drives the front and back movement of the telescopic rod 4, the positive removal of telescopic link 4 drives mediation ring 11 and moves to the front, the debris of pipeline inner wall upper end is promoted in the removal of mediation ring 11, let the debris of pipeline inner wall move down in mediation semicircle ring 14, and the debris of pipeline inner wall lower extreme are promoted in the removal of mediation semicircle ring 14, and adsorption equipment 15 can adsorb debris, let debris all fix in mediation semicircle ring 14, realize the mediation and the absorption to the debris in the pipeline, after the clearance is accomplished, take off fixing device, through rotating mediation semicircle ring 14, the assignment screw thread post 12 of mediation semicircle ring 14 is at screw hole 13, take off the pull throughs, take off the debris in the pull throughs, convenience of customers's use, this device and mediation and absorption are integrative, but improve pull throughs's work efficiency greatly.
The working principle is as follows:
the first step is as follows: the fixed rubber deformation shell 1 is fixed at the position to be dredged by moving the pipeline dredging device, the pipeline is fixed in a gap reserved between the fixed rubber deformation shell 1 and the telescopic motor 3, the limiting of the pipeline dredging device is realized, after the pipeline dredging device is installed, the screw cap 24 is downwards twisted, the twisting of the screw cap 24 drives the rotation of the threaded rod 27, the threaded rod 27 is in threaded engagement with the first threaded connecting hole 23 and the second threaded connecting hole 28, so the rotation of the threaded rod 27 enables the first fixed plate 22 and the second fixed plate 29 to be attached, the downward movement of the first fixed plate 22 drives the upper embedding ring 21 to downwards move, the upward movement of the second fixed plate 29 drives the lower embedding ring 26 to upwards move, the upper embedding ring 21 and the lower embedding ring 26 are attached to each other to enable the pipeline embedding groove 2 to deform, and the fixed rubber deformation shell 1 is better fixed on the surface of the pipeline, this device passes through fixing device and fixes the pipeline pull throughs on the surface of pipeline, has improved pipeline pull throughs's stability, lets the better pipeline of machinery dredge.
Secondly, by starting the telescopic motor 3, the telescopic motor 3 is started to drive the telescopic rod 4 to move back and forth, the telescopic rod 4 moves forwards to drive the dredging ring 11 to move forwards, the dredging ring 11 moves to push sundries at the upper end of the inner wall of the pipeline, the sundries at the inner wall of the pipeline move downwards to the dredging semicircular ring 14, the dredging semicircular ring 14 moves to push the sundries at the lower end of the inner wall of the pipeline, the adsorbing device 15 can adsorb the sundries, the sundries are all fixed in the dredging semicircular ring 14, the dredging and adsorbing of the sundries in the pipeline are realized, after the cleaning is finished, the fixing device is taken down, the transferring column 12 of the dredging semicircular ring 14 rotates in the threaded hole 13 by rotating the dredging semicircular ring 14, the dredging device is taken down, the sundries in the dredging device are taken down, the use of a user is facilitated, the device and the dredging are adsorbed integrally, the work efficiency of the dredging device is greatly improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a pipeline pull throughs for north engineering of south water transfer, includes fixed rubber deformation shell (1), fixed rubber deformation shell (1) is equipped with fixing device, its characterized in that outward: the fixing device comprises an upper embedding ring (21), the upper surface of the fixed rubber deformation shell (1) is fixedly connected with the upper embedding ring (21), the rear surface of the upper embedding ring (21) is fixedly connected with a first fixing plate (22), the upper surface of the first fixing plate (22) is provided with a first threaded connecting hole (23), a threaded rod (27) is movably connected in the first threaded connecting hole (23), and the upper surface of the threaded rod (27) is fixedly connected with a nut (24);
a power device is arranged in the fixed rubber deformation shell (1);
and a dredging device is arranged outside the fixed rubber deformation shell (1).
2. The pipeline dredging device for the north-south water diversion project of claim 1, wherein: the lower surface of the fixed rubber deformation shell (1) is fixedly connected with a lower embedded ring (26), and the rear surface of the lower embedded ring (26) is fixedly connected with a second fixed plate (29).
3. The pipeline dredging device for the north-south water diversion project of claim 2, wherein: and a second threaded connecting hole (28) is formed in the upper surface of the second fixing plate (29), and a threaded rod (27) is movably connected into the second threaded connecting hole (28).
4. The pipeline dredging device for the north-south water diversion project of claim 1, wherein: the power device comprises a telescopic motor (3), a pipeline embedded groove (2) is formed in the front of the fixed rubber deformation shell (1), the telescopic motor (3) is fixedly connected to the front of the pipeline embedded groove (2), a telescopic rod (4) is movably connected to the front of the telescopic motor (3), and a threaded column (12) is fixedly connected to the front of the telescopic rod (4).
5. The pipeline dredging device for the north-south water diversion project of claim 1, wherein: the dredging device comprises a dredging ring (11), the front face of the dredging ring (11) is fixedly connected with a dredging semicircular ring (14), and the upper surface of the dredging semicircular ring (14) is provided with an adsorption device (15).
6. The pipeline dredging device for the north-south water diversion project of claim 5, wherein: the rear surface of the dredging ring (11) is provided with a threaded hole (13), and a threaded column (12) is movably connected in the threaded hole (13).
CN202023285717.5U 2020-12-30 2020-12-30 A pipeline pull throughs for south water transfers engineering north Expired - Fee Related CN214144092U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023285717.5U CN214144092U (en) 2020-12-30 2020-12-30 A pipeline pull throughs for south water transfers engineering north

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023285717.5U CN214144092U (en) 2020-12-30 2020-12-30 A pipeline pull throughs for south water transfers engineering north

Publications (1)

Publication Number Publication Date
CN214144092U true CN214144092U (en) 2021-09-07

Family

ID=77544619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023285717.5U Expired - Fee Related CN214144092U (en) 2020-12-30 2020-12-30 A pipeline pull throughs for south water transfers engineering north

Country Status (1)

Country Link
CN (1) CN214144092U (en)

Similar Documents

Publication Publication Date Title
CN112704941B (en) Energy-conserving sewage filtration pipeline of new forms of energy
CN213194712U (en) Dust collector for photovoltaic power generation equipment
CN214144092U (en) A pipeline pull throughs for south water transfers engineering north
CN210827386U (en) Water conservancy water and electricity construction is with drainage canal
CN209907465U (en) Dredging device for urban hydraulic engineering
CN111483061A (en) Environment-friendly building outer wall perforating device
CN203200642U (en) Pavement joint cutter
CN204817378U (en) A disymmetry spiral sludge collector that is used for drainage pipeline networks desilting machine people
CN212375817U (en) Sluice convenient to detect and maintain
CN111350163A (en) Self-moving type dredging device for water environment treatment
CN112899705A (en) Road green belt with hydrophobic function
CN218063939U (en) Sand and stone prevention module for water supply and drainage construction of hydraulic engineering
CN211395898U (en) A big or small rainwater reposition of redundant personnel well for sponge city
CN209848481U (en) Water circulation device for greenbelt of waterfront building
CN215594221U (en) Rainwater collection module with self-cleaning function
CN214263215U (en) Afforestation soil environmental protection prosthetic devices
CN221335829U (en) Pipeline inner wall cleaning device for water conservancy construction
CN214116938U (en) Highway road surface drainage facility
CN215330409U (en) Municipal administration public works are led to stifled device with drainage
CN211645831U (en) Rainwater infiltration ditch
CN215483121U (en) Plug-in type safety well lid
CN211395414U (en) Water conservancy culvert capable of draining water in time
CN218322640U (en) Cut-off equipment for water conservancy construction
CN211839538U (en) Garbage disposal device of environmental protection
CN214402078U (en) Intelligent flood discharge well lid

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210907