CN214135871U - A prevent splashing geological hammer for geological exploration - Google Patents
A prevent splashing geological hammer for geological exploration Download PDFInfo
- Publication number
- CN214135871U CN214135871U CN202021033351.XU CN202021033351U CN214135871U CN 214135871 U CN214135871 U CN 214135871U CN 202021033351 U CN202021033351 U CN 202021033351U CN 214135871 U CN214135871 U CN 214135871U
- Authority
- CN
- China
- Prior art keywords
- tup
- geological
- hammer
- splashing
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
The utility model discloses a prevent splashing geological hammer for geological exploration, including tup and action bars, the one end of action bars is fixed in to one side of tup, the surface of tup is provided with prevents splashing the structure, prevent splashing the structure and include the sleeve, the surface of tup is located to the sleeve cover. The utility model discloses utilize the rubber sleeve can protect tup and rock contact surface, and then can effectually prevent that the rock piece from splashing, and then can collect the rock piece through the rubber sleeve, subsequent taking of being convenient for, and easy operation, convenient to use, and through buffer spring's setting, can effectually cushion the rubber sleeve, avoid long-time hammer to pound, cause the damage of rubber sleeve, and can save the rock piece of sample through the shrink groove, through the setting of bolt, be convenient for to prevent splashing the dismantlement of structure, thereby the convenience is changed the structure of preventing splashing.
Description
Technical Field
The utility model relates to a prevent splashing the geological hammer, specifically be a prevent splashing the geological hammer for geological exploration.
Background
The "geology" is exactly called geology and is used to be called geology. Geology is one of seven natural sciences, and is mainly used for researching the earth and the cause and evolution development of the earth. Earthquake prediction, search and exploration of various mineral products, disastrous landslide and evolution of ancient creatures. All objects built on the ground have to be known in advance about the underground situation. Geological exploration is to find an industrially significant mineral deposit in mineral census, provide mineral reserves and geological data required by mine construction design for finding out the quality and quantity of mineral products and technical conditions of mining and utilization, and carry out investigation and research work on geological conditions such as rocks, strata, structures, mineral products, hydrology, landforms and the like in a certain area.
In the middle of the real life, when the staff carries out geological exploration work again, need use the geological hammer to hammer and pound delay ground, however the geological hammer of current one is not convenient for use, and the in-process that the hammer pound again, rock piece splashes, causes the staff injured easily, and prevents splashing the geological hammer and be not convenient for dismantle to when appearing damaging, be not convenient for change when being not convenient for
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a prevent splashing geological hammer for geological exploration to solve the problem that provides in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a prevent splashing geological hammer for geological exploration, includes tup and action bars, one side of tup is fixed in the one end of action bars, the surface of tup is provided with prevents splashing the structure, prevent splashing the structure and include the sleeve, the muffjoint is located the surface of tup, the equal fixedly connected with connecting plate in both sides at telescopic top, two one side that the connecting plate is relative all is provided with the bolt, telescopic bottom fixedly connected with buffer spring, buffer spring's the bottom fixedly connected with lantern ring, the bottom fixedly connected with rubber sleeve of the lantern ring.
Preferably, the rubber sleeve is of a circular truncated cone shape.
Preferably, the top of the hammer head is provided with a contraction groove, and a cover plate is hinged to one side of the top of the hammer head.
Preferably, the other side of the cover plate is provided with a locking structure, and the locking structure is connected with one side of the top of the hammer head.
Preferably, the outer surface of the operating rod is fixedly connected with a first buffer sleeve and a second buffer sleeve from left to right in sequence.
Preferably, the other end of the operating rod is provided with a suspension rope, the outer surface of the operating rod is provided with two shrinkage grooves, a U-shaped handle is connected between the two shrinkage grooves in a sliding mode, and anti-skidding lines are arranged on the outer surface of the U-shaped handle.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses the setting is through the handheld action bars of operating personnel, make the tup pound to the rock, through pounding behind the rock, the tup need not be taken up, can protect tup and rock contact surface through the rubber sleeve, and then can effectually prevent that the rock piece from splashing, and then can collect the rock piece through the rubber sleeve, subsequent taking of being convenient for, moreover, the operation is simple, and convenient to use, and through buffer spring's setting, can effectually cushion the rubber sleeve, avoid long-time hammering, cause the damage of rubber sleeve, and through the setting of U type handle, the staff's of being convenient for carry, and can save the rock piece of sample through contracting the groove, through the setting of bolt, be convenient for to prevent splashing the dismantlement of structure, thereby the convenience is changed to preventing splashing the structure.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a partially enlarged view of a portion a in fig. 1 according to the present invention.
In the figure: 1. a hammer head; 2. an operating lever; 3. a splash prevention structure; 31. a sleeve; 32. a connecting plate; 33. a bolt; 34. a buffer spring; 35. a collar; 36. a rubber sleeve; 4. a contraction groove; 5. a cover plate; 6. a locking structure; 7. a first cushion collar; 8. a second cushion collar; 9. a suspension rope; 10. a contraction groove; 11. a U-shaped handle; 12. and (4) anti-skid lines.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides an embodiment:
the utility model provides a prevent splashing geological hammer for geological exploration, includes tup 1 and action bars 2, one side of tup 1 is fixed in action bars 2's one end, the surface of tup 1 is provided with prevents splashing structure 3, prevent splashing structure 3 includes sleeve 31, sleeve 31 cover is located the surface of tup 1, the equal fixedly connected with connecting plate 32 in both sides at sleeve 31's top, two one side that connecting plate 32 is relative all is provided with bolt 33, sleeve 31's bottom fixedly connected with buffer spring 34, buffer spring 34's bottom fixedly connected with lantern ring 35, the bottom fixedly connected with rubber sleeve 36 of lantern ring 35.
In the present embodiment, the rubber boot 36 is provided in a truncated cone shape.
In this embodiment, a contraction groove 4 is formed in the top of the hammer head 1, and a cover plate 5 is hinged to one side of the top of the hammer head 4.
In this embodiment, the other side of the cover plate 5 is provided with a locking structure 6, the locking structure 6 is connected with one side of the top of the hammer head 1, and the locking structure 6 adopts a locking device in the prior art for locking the cover plate 5.
In this embodiment, a first buffer sleeve 7 and a second buffer sleeve 8 are fixedly connected to the outer surface of the operating rod 2 from left to right.
In this embodiment, a suspension rope 9 is disposed at the other end of the operating rod 2, two shrinkage grooves 10 are formed in the outer surface of the operating rod 2, a U-shaped handle 11 is slidably connected between the two shrinkage grooves 10, and anti-skid threads 12 are disposed on the outer surface of the U-shaped handle 11.
The working principle is as follows: through the handheld action bars 2 of operating personnel, make tup 1 pound to the rockstone, through pounding behind the rockstone, tup 1 need not be taken up, can protect tup 1 and rockstone contact surface through rubber sleeve 36, and then can effectually prevent that the rockstone piece from splashing, and then can collect the rockstone piece through rubber sleeve 36, subsequent taking of being convenient for, and thus the operation is simple, and convenient to use, and through buffer spring 34's setting, can effectually cushion rubber sleeve 36, avoid long-time hammering, cause the damage of rubber sleeve 36, and through the setting of U type handle 11, the staff of being convenient for carries, and can save the rockstone piece of sample through shrink groove 4.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a prevent splashing geological hammer for geological exploration, includes tup and action bars, its characterized in that: one side of tup is fixed in the one end of action bars, the surface of tup is provided with prevents splashing the structure, prevent splashing the structure and include the sleeve, the muffjoint is located the surface of tup, the equal fixedly connected with connecting plate in both sides at telescopic top, two one side that the connecting plate is relative all is provided with the bolt, telescopic bottom fixedly connected with buffer spring, buffer spring's the bottom fixedly connected with lantern ring, the bottom fixedly connected with rubber sleeve of the lantern ring.
2. The anti-splash geological hammer for geological exploration, according to claim 1, characterized in that: the rubber sleeve is in a circular truncated cone shape.
3. The anti-splash geological hammer for geological exploration, according to claim 1, characterized in that: the top of tup has seted up the shrink groove, one side hinge at the top of tup is provided with the apron.
4. The anti-splash geological hammer for geological exploration, according to claim 3, wherein: the other side of apron is provided with locking structure, locking structure with one side at the top of tup is connected.
5. The anti-splash geological hammer for geological exploration, according to claim 1, characterized in that: the outer surface of the operating rod is fixedly connected with a first buffer sleeve and a second buffer sleeve from left to right in sequence.
6. The anti-splash geological hammer for geological exploration, according to claim 1, characterized in that: the other end of the operating rod is provided with a suspension rope, the outer surface of the operating rod is provided with two shrinkage grooves, a U-shaped handle is connected between the two shrinkage grooves in a sliding mode, and anti-skidding lines are arranged on the outer surface of the U-shaped handle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021033351.XU CN214135871U (en) | 2020-06-08 | 2020-06-08 | A prevent splashing geological hammer for geological exploration |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021033351.XU CN214135871U (en) | 2020-06-08 | 2020-06-08 | A prevent splashing geological hammer for geological exploration |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214135871U true CN214135871U (en) | 2021-09-07 |
Family
ID=77520994
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021033351.XU Active CN214135871U (en) | 2020-06-08 | 2020-06-08 | A prevent splashing geological hammer for geological exploration |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214135871U (en) |
-
2020
- 2020-06-08 CN CN202021033351.XU patent/CN214135871U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214135871U (en) | A prevent splashing geological hammer for geological exploration | |
CN205530409U (en) | Novel powerful excavator with excavating hook | |
CN108590650B (en) | A kind of ore pillar and top plate slowly sink the method in processing goaf | |
CN108625358A (en) | Pile body protective tip and prefabricated pile with the pile body protective tip | |
CN103941282B (en) | Judging method for rock burst risk area during excavating lower step of deep large cross-section tunnel | |
CN203494549U (en) | Novel fixed hydraulic stone crusher | |
CN210768846U (en) | Coal mine excavation roadway support device | |
CN213039219U (en) | Hydrogeological exploration drilling tool | |
CN211824111U (en) | Hand-held type guard plate for coal mine blasting | |
CN101109282B (en) | Tunneling machine | |
CN208885278U (en) | Tunnel piercing impact grinding ridge buster | |
CN216967679U (en) | Multifunctional geological exploration hammer | |
CN102913244B (en) | Underground mining method for kaolin mine | |
CN211729053U (en) | Novel multi-functional geological hammer | |
CN214424552U (en) | Ventilation safety monitoring equipment for coal mine | |
CN215332832U (en) | Mining shovel | |
CN211037094U (en) | Bulldozing leveling mechanism | |
CN216839612U (en) | Earth-digging chisel | |
CN209831546U (en) | Geological hammer for hydraulic and hydroelectric engineering | |
CN212583721U (en) | Hydraulic top plate pressure monitor | |
CN214574259U (en) | Bulldozer scarifier supporting angle | |
CN213574160U (en) | Coal mine tunneling and supporting device | |
CN216813829U (en) | Portable mine lamp for coal mine | |
CN217440016U (en) | Wellhead reinforcing structure for hydraulic ring sampling well | |
CN214273675U (en) | Supporting device for coal mine excavation safety protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |