CN214130898U - Waste gas spray tower for sludge treatment - Google Patents

Waste gas spray tower for sludge treatment Download PDF

Info

Publication number
CN214130898U
CN214130898U CN202022772819.3U CN202022772819U CN214130898U CN 214130898 U CN214130898 U CN 214130898U CN 202022772819 U CN202022772819 U CN 202022772819U CN 214130898 U CN214130898 U CN 214130898U
Authority
CN
China
Prior art keywords
pipe
main body
plate
storage tank
water storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022772819.3U
Other languages
Chinese (zh)
Inventor
魏惠娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ezhou Mingchuanghai Ecological Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022772819.3U priority Critical patent/CN214130898U/en
Application granted granted Critical
Publication of CN214130898U publication Critical patent/CN214130898U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model provides a waste gas spray tower for sludge treatment, include: the water storage tank comprises a main body, a water storage tank and a supporting plate; a water storage tank is arranged on the side part of the main body, and the main body is connected with the water storage tank in a welding mode; the support plate is arranged in the main body, and the upper part of the support plate is provided with a filler; the side guard plate is arranged at the upper part of the supporting plate, and a pressing plate is arranged at the upper part of the side guard plate; the pump is arranged at the upper part of the water storage tank and is connected with the water storage tank through a pipeline; the water supply pipe is arranged on the side part of the main body and is connected with the pump; the connecting pipe is arranged in the main body and is connected with the water supply pipe; the pipe support is arranged at the lower part of the connecting pipe and is connected with the connecting pipe in a welding mode; through the improvement to current device, the device has and sprays more abundant, can less wall flow phenomenon, the abundant effectual advantage of exhaust-gas treatment, thereby effectual solution the utility model discloses the problem that proposes in the background art is with not enough.

Description

Waste gas spray tower for sludge treatment
Technical Field
The utility model relates to a waste gas treatment technical field, more specifically say, especially relate to a waste gas spray tower for sludge treatment.
Background
The spray tower is a device for treating waste gas, and is mainly characterized by that it has a water-spraying pipeline and a packing layer to treat waste gas, the spray liquid of the spray tower is sprayed onto the packing material from tower top by means of liquid distributor, and flows down along the surface of the packing material, and the gas is fed into the spray tower from tower bottom, and after being distributed by means of gas distribution device, and continuously passed through the gap of packing layer in countercurrent mode with liquid, and on the surface of the packing material, the gas phase and liquid phase are closely contacted to make mass transfer so as to treat waste gas.
Traditional exhaust gas spray tower, its spray line are discoid layering setting in spray tower's inside with the packing layer, when spraying the processing, wall flow phenomenon easily appears, leads to mass transfer efficiency to descend, influences the exhaust-gas treatment effect.
In view of the above, the present invention provides a waste gas spray tower for sludge treatment, which is improved in view of the conventional problems, and aims to solve the problems and improve the practical value by the technology.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a waste gas spray column for sludge treatment to solve the traditional waste gas spray column that provides in the above-mentioned background art, its spray line is discoid layering setting in the inside of spray column with the packing layer, when spraying the processing, wall flow phenomenon easily appears, leads to mass transfer efficiency to descend, influences the problem and the not enough of exhaust-gas treatment effect.
An exhaust gas spray tower for sludge treatment, comprising: the device comprises a main body, a water storage tank, a supporting plate, a filler, a side guard plate, a pressing plate, a pump, a water supply pipe, a connecting pipe, a pipe frame, a spray pipe, a rotational flow plate, an induced draft fan and an air inlet pipe; a water storage tank is arranged on the side part of the main body, and the main body is connected with the water storage tank in a welding mode; the supporting plate is arranged inside the main body, and the upper part of the supporting plate is provided with a filler; the side guard plate is arranged at the upper part of the supporting plate, and a pressing plate is arranged at the upper part of the side guard plate; the pump is arranged at the upper part of the water storage tank and is connected with the water storage tank through a pipeline; the water supply pipe is arranged on the side part of the main body and is connected with the pump; the connecting pipe is arranged inside the main body and is connected with the water supply pipe; the pipe frame is arranged at the lower part of the connecting pipe and is connected with the connecting pipe in a welding mode; the spraying pipe is arranged on the periphery of the pipe frame and is connected with the pipe frame in a welding mode; the cyclone plate is arranged in the main body, and an induced draft fan is arranged above the cyclone plate; the air inlet pipe is arranged on the side portion of the main body and connected with the main body in a welding mode.
As a further optimization of the technical scheme, the side protection plate is arranged on the upper portion of the supporting plate in a funnel shape, and the filler in the side protection plate is of a circular truncated cone-shaped structure.
As a further optimization of the technical scheme, a plurality of through holes are formed in the surface of the side guard plate.
As a further optimization of the technical scheme, the pipe support is of a circular ring-shaped structure, and five spraying pipes connected with the connecting pipe are arranged in the middle of the pipe support.
As a further optimization of the technical scheme, the spray pipes are radially arranged at a plurality of positions on the periphery of the pipe frame, and the spray pipes are parallel to the surface of the side protection plate.
Because of above-mentioned technical scheme's application, compared with the prior art, the utility model have the following advantage:
1. through setting up the side guard plate that leaks hopper-shaped for pack and be the round platform form and set up in the inside of side guard plate, through setting up the pipe support of annular form, make the shower can encircle the side guard plate and set up, it can fully spray packing, reduces the wall flow phenomenon, is favorable to double-phase abundant contact mass transfer, has improved gaseous treatment effect.
2. The utility model discloses an improvement to current device has and sprays more abundant, can less wall flow phenomenon, the abundant effectual advantage of exhaust-gas treatment, thereby effectual solution the utility model discloses the problem of proposing in background art one with not enough.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification. In the drawings:
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the point A structure of the present invention;
fig. 3 is a schematic view of the overlooking structure of the pipe frame of the present invention.
In the figure: the device comprises a main body 1, a water storage tank 2, a supporting plate 3, a filler 4, a side guard plate 5, a pressing plate 6, a pump 7, a water supply pipe 8, a connecting pipe 9, a pipe frame 10, a spray pipe 11, a rotational flow plate 12, an induced draft fan 13 and an air inlet pipe 14.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
It is to be noted that, in the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
Meanwhile, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "connected" and "connected" should be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; the connection can be mechanical connection or electrical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
An exhaust gas spray tower for sludge treatment, comprising: the device comprises a main body 1, a water storage tank 2, a supporting plate 3, a filler 4, a side guard plate 5, a pressing plate 6, a pump 7, a water supply pipe 8, a connecting pipe 9, a pipe frame 10, a spray pipe 11, a rotational flow plate 12, an induced draft fan 13 and an air inlet pipe 14; a water storage tank 2 is arranged on the side part of the main body 1, and the main body 1 is connected with the water storage tank 2 in a welding mode; the supporting plate 3 is arranged inside the main body 1, and the upper part of the supporting plate 3 is provided with a filler 4; the side guard plate 5 is arranged at the upper part of the support plate 3, and the upper part of the side guard plate 5 is provided with a pressure plate 6; the pump 7 is arranged at the upper part of the water storage tank 2, and the pump 7 is connected with the water storage tank 2 through a pipeline; a water supply pipe 8 is provided at a side portion of the main body 1, and the water supply pipe 8 is connected with the pump 7; a connection pipe 9 is provided inside the main body 1, and the connection pipe 9 is connected with the water supply pipe 8; the pipe frame 10 is arranged at the lower part of the connecting pipe 9, and the pipe frame 10 is connected with the connecting pipe 9 in a welding mode; the spray pipe 11 is arranged on the periphery of the pipe frame 10, and the spray pipe 11 is connected with the pipe frame 10 in a welding mode; the rotational flow plate 12 is arranged inside the main body 1, and an induced draft fan 13 is arranged above the rotational flow plate 12; the air inlet pipe 14 is arranged at the side part of the main body 1, and the air inlet pipe 14 is connected with the main body 1 by welding.
Specifically, the side guard plate 5 is arranged on the upper portion of the supporting plate 3 in a funnel shape, the filler 4 inside the side guard plate 5 is in a circular truncated cone-shaped structure, and a space is reserved in the peripheral portion of the side guard plate for installing the spray pipe 11, so that the spraying effect is improved, and the wall flow phenomenon is reduced.
Specifically, the surface of the side guard plate 5 is provided with a plurality of through holes for the passage of the spray liquid, so that the spray liquid can contact with the filler 4.
Specifically, the pipe support 10 is of a circular ring-shaped structure, and five spraying pipes connected with the connecting pipe 9 are arranged in the middle of the pipe support 10, so that the spraying liquid is supplied and conveyed, and meanwhile, the upper part of the filler 4 can be sprayed.
Specifically, the spray pipes 11 are radially arranged at a plurality of positions on the periphery of the pipe frame 10, and the spray pipes 11 are parallel to the surface of the side guard plate 5 and are used for spraying the filler 4, so that the spraying effect is improved, and the wall flow phenomenon is reduced.
The method comprises the following specific implementation steps: when the device is used, the pump 7 conveys the spraying liquid to the connecting pipe 9 through the water supply pipe 8, then the connecting pipe 9 conveys the spraying liquid to the annular pipe support 10 through five pipelines for spraying, five spraying pipes for connecting the pipe support 10 and the connecting pipe are utilized, and a plurality of spraying pipes 11 at the periphery of the pipe support 10 spray the filler 4, gas enters through the air inlet pipe 14, mass transfer treatment is carried out through the filler 4, the treated gas is discharged through the rotational flow plate 12, and is discharged under the action of the draught fan 13, the spraying mode is favorable for less wall flow phenomenon, the mass transfer efficiency is improved, and the treatment effect is better.
In summary, the following steps: this a waste gas spray tower for sludge treatment, side guard plate through setting up hourglass hopper-shaped, make the filler be the inside of round platform form setting at the side guard plate, through setting up the pipe support of annular form, make the shower can encircle the side guard plate and set up, it can fully spray the seasoning layer, reduce the wall flow phenomenon, be favorable to double-phase abundant contact mass transfer, the treatment effect of gas has been improved, traditional waste gas spray tower has been solved, its shower pipe is discoid layering setting in the inside of spray tower with the filler layer, when spraying the processing, the wall flow phenomenon easily appears, lead to mass transfer efficiency to descend, influence the problem of waste gas treatment effect.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. An exhaust gas spray tower for sludge treatment, comprising: the device comprises a main body (1), a water storage tank (2), a supporting plate (3), a filler (4), a side protection plate (5), a pressing plate (6), a pump (7), a water supply pipe (8), a connecting pipe (9), a pipe frame (10), a spray pipe (11), a rotational flow plate (12), an induced draft fan (13) and an air inlet pipe (14); the method is characterized in that: the side part of the main body (1) is provided with a water storage tank (2), and the main body (1) is connected with the water storage tank (2) in a welding mode; the support plate (3) is arranged inside the main body (1), and the filler (4) is arranged on the upper part of the support plate (3); the side guard plate (5) is arranged on the upper part of the support plate (3), and a pressure plate (6) is arranged on the upper part of the side guard plate (5); the pump (7) is arranged at the upper part of the water storage tank (2), and the pump (7) is connected with the water storage tank (2) through a pipeline; the water supply pipe (8) is arranged on the side part of the main body (1), and the water supply pipe (8) is connected with the pump (7); the connecting pipe (9) is arranged inside the main body (1), and the connecting pipe (9) is connected with the water supply pipe (8); the pipe frame (10) is arranged at the lower part of the connecting pipe (9), and the pipe frame (10) is connected with the connecting pipe (9) in a welding mode; the spraying pipe (11) is arranged on the periphery of the pipe frame (10), and the spraying pipe (11) is connected with the pipe frame (10) in a welding mode; the cyclone plate (12) is arranged inside the main body (1), and an induced draft fan (13) is arranged above the cyclone plate (12); the air inlet pipe (14) is arranged on the side portion of the main body (1), and the air inlet pipe (14) is connected with the main body (1) in a welding mode.
2. The waste gas spray tower for sludge treatment according to claim 1, wherein: the side guard plate (5) is arranged on the upper portion of the supporting plate (3) in a funnel shape, and the filler (4) inside the side guard plate (5) is of a circular truncated cone-shaped structure.
3. The waste gas spray tower for sludge treatment according to claim 1, wherein: the surface of the side guard plate (5) is provided with a plurality of through holes.
4. The waste gas spray tower for sludge treatment according to claim 1, wherein: the pipe support (10) is of a circular ring-shaped structure, and five spraying pipes connected with the connecting pipe (9) are arranged in the middle of the pipe support (10).
5. The waste gas spray tower for sludge treatment according to claim 1, wherein: the spray pipes (11) are radially arranged at a plurality of positions on the periphery of the pipe frame (10), and the spray pipes (11) are parallel to the surface of the side guard plate (5).
CN202022772819.3U 2020-11-25 2020-11-25 Waste gas spray tower for sludge treatment Active CN214130898U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022772819.3U CN214130898U (en) 2020-11-25 2020-11-25 Waste gas spray tower for sludge treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022772819.3U CN214130898U (en) 2020-11-25 2020-11-25 Waste gas spray tower for sludge treatment

Publications (1)

Publication Number Publication Date
CN214130898U true CN214130898U (en) 2021-09-07

Family

ID=77566910

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022772819.3U Active CN214130898U (en) 2020-11-25 2020-11-25 Waste gas spray tower for sludge treatment

Country Status (1)

Country Link
CN (1) CN214130898U (en)

Similar Documents

Publication Publication Date Title
CN205392069U (en) Waste heat utilization type exhaust purification processing apparatus
CN214130898U (en) Waste gas spray tower for sludge treatment
CN210206372U (en) Polyvinyl alcohol drying tail gas purification system
CN206965504U (en) A kind of single column double circulation desulphurization tower
CN209196826U (en) A kind of boiler arranges drained water recovery system surely
CN202212090U (en) HCl (hydrogen chloride) waste gas treatment device using water as absorbent
CN208660815U (en) A kind of waste gas purification apparatus with filler
CN210751973U (en) Vertical absorption tower for treating waste gas of sulfur-containing plant
CN216295623U (en) Waste gas treatment separation and purification device
CN212881812U (en) A waste gas collection purification treatment equipment for cyclopropyl ethyl ester amination workshop
CN205730888U (en) Two-track movable bed activated carbon denitrification apparatus in parallel
CN214233430U (en) Energy-saving efficient type purifying column
CN209968094U (en) DMF waste gas recovery system
CN210934427U (en) Deodorizing device is used in bio-organic fertilizer production
CN208448889U (en) A kind of Tower for purifying waste gas
CN207933093U (en) Chemical industry biochemical tail water reaction tower
CN215463149U (en) Double-pipe air inlet acid mist absorption tower
CN217068341U (en) Washing tower for blue algae and sludge drying waste gas treatment
CN217367815U (en) Spray tower for industrial VOC waste gas treatment
CN219355830U (en) Spray type yellow phosphorus flue gas recovery structure
CN204275771U (en) A kind of finish-baking room for automobile emission-control equipment
CN217391988U (en) Absorption tower for maleic anhydride tail gas treatment
CN216756772U (en) Dust removal system of carbon product roasting furnace
CN212440730U (en) HES series waste gas purifying tower
CN211462660U (en) Spray tower for treating asphalt waste gas

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230619

Address after: 436000 Second span plant, No. 1, Sanjiang Avenue, Dianzhen, Huarong District, Ezhou City, Hubei Province

Patentee after: Ezhou Mingchuanghai Ecological Technology Co.,Ltd.

Address before: 510000 a1-1603, Huangpu garden, No. 438, fengle South Road, Huangpu District, Guangzhou City, Guangdong Province