CN214119152U - Temporary placement frame for laying PE (polyethylene) pipes - Google Patents

Temporary placement frame for laying PE (polyethylene) pipes Download PDF

Info

Publication number
CN214119152U
CN214119152U CN202022764337.3U CN202022764337U CN214119152U CN 214119152 U CN214119152 U CN 214119152U CN 202022764337 U CN202022764337 U CN 202022764337U CN 214119152 U CN214119152 U CN 214119152U
Authority
CN
China
Prior art keywords
bevel gear
frame body
rod
fixedly connected
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022764337.3U
Other languages
Chinese (zh)
Inventor
但小娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Huaye Shengxin Pipe Industry Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022764337.3U priority Critical patent/CN214119152U/en
Application granted granted Critical
Publication of CN214119152U publication Critical patent/CN214119152U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

The utility model discloses a temporary arrangement frame for when PE tubular product is laid, including arrangement frame body, fixed knot structure, first supporting leg, carrier post, ground inserting pole, bell rod, knob, lead screw, first bevel gear, second bevel gear, dwang, screw rod, removal structure and arrangement structure. The utility model has the advantages that: the bottom side of the placing frame body is provided with four first supporting rods to support the placing frame body, the first supporting rods rotate inside the bearing columns, screw rods are arranged between the bearing columns and the first supporting rods, when PE pipes need to be laid on rugged mountains, the placing frame body needs to be fixed with the ground, a user rotates a knob to rotate the screw rods out, the bearing columns are rotated at the moment, the bearing columns and the ground are vertical, the screw rods rotate, the rotating angles of the bearing columns and the first supporting pins are fixed, the ground inserting rods are connected inside the bearing columns in a sliding mode, the bottom ends of the ground inserting rods are provided with conical rods, and the ground inserting rods are inserted into the ground more easily through the conical rods.

Description

Temporary placement frame for laying PE (polyethylene) pipes
Technical Field
The utility model relates to a PE pipe arrangement frame specifically is an interim arrangement frame that is used for when PE tubular product is laid, belongs to city construction technical field.
Background
PE pipe adds man-hour and does not add the heavy metal salt stabilizer, and the material is nontoxic, and no scaling layer does not breed the bacterium, has solved the easy hidden danger of secondary pollution of city drinking water well, corrosion resisting property more: besides a few strong oxidants, the catalyst can resist the erosion of various chemical media; the PE pipe has the advantages that the electric chemical corrosion is avoided, the PE pipe can be safely used for more than 50 years under the conditions of rated temperature and pressure, the PE pipe is good in toughness and high in impact strength, heavy objects directly press the pipe and cannot cause the pipe to be broken, the strength of a hot melting or electric melting interface of the PE pipe is higher than that of a pipe body, seams cannot be broken due to the action of soil movement or live load, the pipe is light in weight, the welding process is simple, construction is convenient, and the comprehensive construction cost is low.
When PE pipes are laid on a rugged mountain road, because a vehicle for loading the PE pipes cannot be driven into the mountain road, the PE pipes are usually temporarily placed by using a placing frame, and the common movable placing frame moves on the ground by using rollers, but is inconvenient to move and fix on the rugged mountain road.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a temporary placement frame for PE tubular product when laying for solving above-mentioned problem, the supporting legs that can make the rack both can insert the ground end in the mountain road and fix, can remove on the land again.
The utility model achieves the above purpose by the following technical proposal, a temporary placing rack used for laying PE pipes, which comprises a placing rack body, the bottom of the placing rack body is provided with a fixed structure, the fixed structure comprises a first supporting leg, a bearing column, a ground inserting rod, a conical rod, a knob, a lead screw, a first bevel gear, a second bevel gear, a rotating rod and a screw, the bottom of the placing rack body is fixedly connected with the first supporting leg, the bearing column is rotationally connected inside the first supporting leg, the lead screw is rotationally connected inside the bearing column, one end of the lead screw is in threaded connection with the ground inserting rod, the ground inserting rod is rotationally connected inside the bearing column, one end of the ground inserting rod departing from the lead screw is fixedly connected with the conical rod, one end of the lead screw is fixedly connected with the first bevel gear, the first bevel gear rotates inside the bearing column, first bevel gear one side meshing have the second bevel gear, second bevel gear rotate connect in the carrier post, second bevel gear one side fixedly connected with the dwang, the dwang rotate connect in the carrier post, dwang one side is located the carrier post outside, mounting frame body bottom is equipped with the moving structure, the inside placing structure that is equipped with of mounting frame body.
Preferably, in order to protect the rotating rod, the fixed structure further comprises a protection ring, the rotating rod is arranged at one end of the outer side of the bearing column and fixedly connected with the protection ring, and the protection ring is rotatably connected with the bearing column.
Preferably, in order to enable the support frame body to move through the universal wheel, the moving structure comprises a second supporting leg and a universal wheel, the bottom of the placing frame body is fixedly connected with the second supporting leg, and the universal wheel is installed at the bottom of the second supporting leg.
Preferably, the user will insert the ground pole and receive into first supporting legs, and the arrangement frame body can move through the universal wheel of second supporting legs bottom side, the second supporting legs is equipped with four, the universal wheel is equipped with four, the length of second supporting legs with the length of first supporting legs is the same.
Preferably, can separately place the PE pipe of different specifications, conveniently distinguish, place the structure including the arrangement board, the inside fixedly connected with of arrangement frame body the arrangement board, the arrangement board is equipped with two.
Preferably, in order to protect the PE pipe placed on the placing plate, the placing structure comprises a protective cover and a spring, the protective cover is arranged on the top side of the placing rack body, and the spring is arranged between the protective cover and the placing rack body.
Preferably, for the convenience of the user to lift the protective cover, the placing structure comprises a lifting ring, and the top side of the protective cover is fixedly connected with the lifting ring.
The utility model has the advantages that: the bottom side of the placing frame body is provided with four first supporting rods for supporting the placing frame body, the inside of each first supporting rod is rotatably connected with a bearing column, a screw rod is arranged between each bearing column and the corresponding first supporting rod, one side of each screw rod is fixedly connected with a knob, when PE pipes are required to be laid on the rugged mountain land, the placing frame body is required to be fixed with the ground, a user rotates the knob to rotate the screw rods out, the bearing columns are rotated to enable the bearing columns to be vertical to the ground, the rotation angles of the bearing columns and the first supporting pins are fixed, the inside of each bearing column is slidably connected with a ground inserting rod, the bottom end of each ground inserting rod is provided with a conical rod, the conical rod enables the ground inserting rod to be easily inserted into the ground so as to keep the fixing of the placing frame body and the ground, and the ground heights under the four first supporting pins on the rugged mountain land are possibly different, at this moment, in order to keep the balance of the placing frame body, the length of the four ground inserting rods is required to be adjusted by a user according to actual conditions, the rotating rod arranged on one side of the bearing column is rotated, the rotating rod drives the second bevel gear to rotate, the second bevel gear drives the first bevel gear to rotate, the lead screw fixedly connected with the inside of the first bevel gear rotates along with the lead screw, the ground inserting rods in threaded connection with the lead screw slide in the bearing column, and therefore the length of each ground inserting rod can be adjusted.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic structural view of the fixing structure shown in FIG. 1;
FIG. 3 is a schematic view of the connection structure between the first supporting leg and the load-bearing column shown in FIG. 2;
fig. 4 is a schematic view of a connection structure of the mounting bracket body and the mounting structure shown in fig. 1.
In the figure: 1. the device comprises a placing frame body, 2, a fixing structure, 21, a first supporting foot, 22, a bearing column, 23, a ground inserting rod, 24, a conical rod, 25, a knob, 26, a screw rod, 27, a first bevel gear, 28, a second bevel gear, 29, a rotating rod, 29a, a protection ring, 29b, a screw rod, 3, a moving structure, 31, a second supporting foot, 32, a universal wheel, 4, a placing structure, 41, a placing plate, 42, a protection cover, 43, a lifting ring, 44 and a spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a temporary placement frame for laying PE pipes includes a placement frame body 1, a fixing structure 2 is disposed at the bottom of the placement frame body 1, the fixing structure 2 includes a first supporting leg 21, a bearing column 22, a ground insertion rod 23, a tapered rod 24, a knob 25, a screw rod 26, a first bevel gear 27, a second bevel gear 28, a rotating rod 29 and a screw 29b, the first supporting leg 21 is fixedly connected to the bottom of the placement frame body 1, the bearing column 22 is rotatably connected to the inside of the first supporting leg 21, the screw rod 26 is rotatably connected to the inside of the bearing column 22, one end of the screw rod 26 is threadedly connected to the ground insertion rod 23, the ground insertion rod 23 is rotatably connected to the inside of the bearing column 22, one end of the ground insertion rod 23 opposite to the screw rod 26 is fixedly connected to the tapered rod 24, one end of the screw rod 26 is fixedly connected to the first bevel gear 27, first bevel gear 27 is in the inside rotation of carrier post 22, the meshing of first bevel gear 27 one side has second bevel gear 28, second bevel gear 28 rotate connect in carrier post 22, 28 one side fixedly connected with of second bevel gear dwang 29, dwang 29 rotate connect in carrier post 22, dwang 29 one side is located the carrier post 22 outside, the 1 bottom of arrangement frame body is equipped with mobile structure 3, the inside placement structure 4 that is equipped with of arrangement frame body 1.
As a technical optimization scheme of the utility model, fixed knot constructs 2 and still includes guard ring 29a, dwang 29 is located the one end fixedly connected with in the bearer post 22 outside guard ring 29a, guard ring 29a with bearer post 22 rotates to be connected.
As a technical optimization scheme of the utility model, it includes second supporting legs 31 and universal wheel 32 to remove structure 3, 1 bottom fixedly connected with of arrangement frame body second supporting legs 31, install second supporting legs 31 bottom universal wheel 32.
As a technical optimization scheme of the utility model, second supporting legs 31 is equipped with four, universal wheel 32 is equipped with four, second supporting legs 31 length with first supporting legs 21's length is the same.
As a technical optimization scheme of the utility model, it includes mounting plate 41 to place structure 4, 1 inside fixedly connected with of mounting frame body mounting plate 41, mounting plate 41 is equipped with two.
As a technical optimization scheme of the utility model, it includes protective cover 42 and spring 44 to place structure 4, rack body 1 top side is equipped with protective cover 42, protective cover 42 with be equipped with between the rack body 1 spring 44.
As a technical optimization scheme of the utility model, it includes the bail 43 to place structure 4, protective cover 42 top side fixedly connected with the bail 43.
When the utility model is used, firstly, the PE pipe to be laid is placed in the placing frame body 1, the lifting ring 43 arranged on the top side of the protective cover 42 is lifted upwards, the PE pipe is respectively placed on the placing plate 41, the lifting ring 43 is loosened, the protective cover 42 can slide towards the placing frame body 1 under the action force of the spring 44 to protect the PE pipe in the placing frame body 1, the placing frame body 1 is supported by arranging four first supporting rods 21 on the bottom side of the placing frame body 1, the bearing column 22 is rotatably connected inside the first supporting rod 21, a screw 29b is arranged between the bearing column 22 and the first supporting rod 21, a knob 25 is fixedly connected on one side of the screw 29b, when the PE pipe is required to be laid on rugged mountain lands, the placing frame body 1 is required to be fixed with the ground, a user rotates the knob 25, the screw 29b is rotated out, at this time, the bearing column 22 is rotated, the bearing column 22 and the ground are vertical, the screw 29b is rotated to fix the rotation angle between the bearing column 22 and the first support leg 21, the ground insertion rod 23 is slidably connected inside the bearing column 22, the bottom end of the ground insertion rod 23 is provided with the tapered rod 24, the tapered rod 24 enables the ground insertion rod 23 to be easily inserted into the ground so as to keep the fixing of the placing rack body 1 and the ground, the ground height under the four first support legs 21 may be different on a rugged mountain, at this time, in order to keep the balance of the placing rack body 1, a user needs to adjust the length of the four ground insertion rods 23 according to actual conditions, the rotating rod 28 arranged on one side of the bearing column 22 is rotated, the rotating rod 28 drives the second bevel gear 28 to rotate, the first bevel gear 27 is driven by the second bevel gear 28, the screw 26 fixedly connected inside the first bevel gear 27 rotates along with the screw, the ground insertion rod 23 in threaded connection with the screw 26 slides inside the bearing column 22, therefore, the length of each ground inserting rod 23 can be adjusted, after the PE pipe laying work is finished, when the placing frame body 1 leaves a mountain region and enters the flat ground, the bearing column 22 is rotated to the original position to be stored, and at this time, the four second supporting legs 31 arranged at the bottom side of the placing frame body 1 can move on the flat ground through the universal wheels 32 arranged at the bottom side.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (7)

1. The utility model provides a interim arrangement frame for when PE tubular product is laid, includes arrangement frame body (1), its characterized in that: the bottom of the placement frame body (1) is provided with a fixing structure (2), the fixing structure (2) comprises a first supporting leg (21), a bearing column (22), a ground inserting rod (23), a conical rod (24), a knob (25), a screw rod (26), a first bevel gear (27), a second bevel gear (28), a rotating rod (29) and a screw rod (29b), the bottom of the placement frame body (1) is fixedly connected with the first supporting leg (21), the first supporting leg (21) is internally and rotatably connected with the bearing column (22), the bearing column (22) is internally and rotatably connected with the screw rod (26), one end of the screw rod (26) is in threaded connection with the ground inserting rod (23), the ground inserting rod (23) is in internal and rotatably connected with the bearing column (22), and one end of the ground inserting rod (23) deviating from the screw rod (26) is fixedly connected with the conical rod (24), lead screw (26) one end fixedly connected with first bevel gear (27), first bevel gear (27) are in bear the weight of post (22) inside rotation, meshing of first bevel gear (27) one side has second bevel gear (28), second bevel gear (28) rotate connect in bear the weight of post (22), second bevel gear (28) one side fixedly connected with dwang (29), dwang (29) rotate connect in bear the weight of post (22), dwang (29) one side is located bear the weight of post (22) outside, place a body (1) bottom and be equipped with moving structure (3), place a body (1) inside is equipped with place structure (4).
2. The temporary placement frame for laying PE pipes in claim 1, wherein: fixed knot constructs (2) and still includes guard ring (29a), dwang (29) are located the one end fixedly connected with in the carrier post (22) outside guard ring (29a), guard ring (29a) with carrier post (22) rotate and are connected.
3. The temporary placement frame for laying PE pipes in claim 1, wherein: the movable structure (3) comprises second supporting legs (31) and universal wheels (32), the bottom of the placement frame body (1) is fixedly connected with the second supporting legs (31), and the universal wheels (32) are installed at the bottom of the second supporting legs (31).
4. A temporary placement frame for PE pipe laying according to claim 3, wherein: the number of the second supporting legs (31) is four, the number of the universal wheels (32) is four, and the length of the second supporting legs (31) is the same as that of the first supporting legs (21).
5. The temporary placement frame for laying PE pipes in claim 1, wherein: the placing structure (4) comprises two placing plates (41), the placing frame body (1) is fixedly connected with the inside of the placing plates (41), and the two placing plates (41) are arranged.
6. A temporary placement frame for PE pipe laying according to claim 5, wherein: place structure (4) including protective cover (42) and spring (44), place frame body (1) top side is equipped with protective cover (42), protective cover (42) with be equipped with between place frame body (1) spring (44).
7. A temporary placement frame for PE pipe laying according to claim 6, wherein: the placing structure (4) comprises a lifting ring (43), and the top side of the protecting cover (42) is fixedly connected with the lifting ring (43).
CN202022764337.3U 2020-11-25 2020-11-25 Temporary placement frame for laying PE (polyethylene) pipes Active CN214119152U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022764337.3U CN214119152U (en) 2020-11-25 2020-11-25 Temporary placement frame for laying PE (polyethylene) pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022764337.3U CN214119152U (en) 2020-11-25 2020-11-25 Temporary placement frame for laying PE (polyethylene) pipes

Publications (1)

Publication Number Publication Date
CN214119152U true CN214119152U (en) 2021-09-03

Family

ID=77506574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022764337.3U Active CN214119152U (en) 2020-11-25 2020-11-25 Temporary placement frame for laying PE (polyethylene) pipes

Country Status (1)

Country Link
CN (1) CN214119152U (en)

Similar Documents

Publication Publication Date Title
CN212201382U (en) Steel construction canopy that building site used
CN102392450A (en) Special device for offshore wind power sunk pile righting guide frame
CN214119152U (en) Temporary placement frame for laying PE (polyethylene) pipes
CN206454689U (en) A kind of Multifunctional chemical experiment iron stand
CN212772204U (en) Slope protection device for hydraulic and hydroelectric engineering
CN214516540U (en) Municipal administration pipeline dredging device
CN114396056A (en) Protective structure for geotechnical engineering foundation pit reinforcement
CN210917388U (en) Easy dismouting formula underground structure
CN210423973U (en) Pipeline bracket capable of bearing weight of full-flow pipeline and impact force of high-speed water flow
CN209938651U (en) Transformer convenient to remove transportation
CN207660310U (en) Civil engineering support device
CN216938196U (en) Pushing device for heavy spring processing
CN215596573U (en) Laying structure of water supply and drainage engineering pipeline
CN206417797U (en) Large diameter pipeline counterpart apparatus
CN207987857U (en) A kind of water conservancy construction beach bracket assembly
CN218375817U (en) Building road foundation pit safety device
CN205711826U (en) A kind of traffic safety warming device
CN212794919U (en) Civil engineering pipeline placing frame
CN218029453U (en) Protector that town road maintenance used
CN218644022U (en) A protector for deep basal pit excavation
CN211661404U (en) Welding jig jacking device
CN220317266U (en) Adjustable vehicle lifting mechanism
CN217629954U (en) Foundation pit supporting equipment for foundation pit supporting
CN219910282U (en) Foundation pit safety protection device
CN212411460U (en) Burying structure based on landscape area aerial view design structure display piece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231205

Address after: 831100 Sutong Small and Micro Entrepreneurship Park, Fuxi District, Fukang Industrial Park, Changji Hui Autonomous Prefecture, Xinjiang Uygur Autonomous Region (east side of Jinming Tengda Insulation Materials, south side of Haoxin Green Energy Logistics)

Patentee after: Xinjiang Huaye Shengxin Pipe Industry Co.,Ltd.

Address before: 510700 Room 203, No. 2, Xisan lane, Donghui Road, Xiagang, Huangpu District, Guangzhou, Guangdong

Patentee before: Dan Xiaojuan