CN214117542U - Concrete pouring workbench - Google Patents

Concrete pouring workbench Download PDF

Info

Publication number
CN214117542U
CN214117542U CN202022899717.8U CN202022899717U CN214117542U CN 214117542 U CN214117542 U CN 214117542U CN 202022899717 U CN202022899717 U CN 202022899717U CN 214117542 U CN214117542 U CN 214117542U
Authority
CN
China
Prior art keywords
installation pipe
mounting
concrete pouring
pipe
station according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022899717.8U
Other languages
Chinese (zh)
Inventor
孙莲芬
郑洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Zhengcheng Construction Co ltd
Original Assignee
Wenzhou Zhengcheng Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Zhengcheng Construction Co ltd filed Critical Wenzhou Zhengcheng Construction Co ltd
Priority to CN202022899717.8U priority Critical patent/CN214117542U/en
Application granted granted Critical
Publication of CN214117542U publication Critical patent/CN214117542U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a concrete placement workstation relates to housing construction's technical field, and it includes the stage body and horizontal slip set up in landing slab on the stage body, the one end terminal surface of landing slab is provided with the mounting bracket, be provided with the installation pipe on the mounting bracket, the installation pipe supplies concrete conveying pipe to peg graft. Through setting up the installation pipe that supplies concrete conveying pipe to peg graft for constructor can fix concrete conveying pipe, thereby liberated constructor's both hands, and then effectively reduced constructor's work burden.

Description

Concrete pouring workbench
Technical Field
The application relates to the field of house construction, in particular to a concrete pouring workbench.
Background
The concrete pouring work bench is one kind of auxiliary equipment for concrete pouring in building work.
The patent that the correlation technique is CN207063540U discloses a concrete placement workstation, and it includes the landing slab and sets up in the strutting arrangement of landing slab below, and strutting arrangement is provided with the removal subassembly including setting up respectively in the crossbeam at landing slab both ends and setting up the supporting legs at the crossbeam both ends respectively on the landing slab, and the removal subassembly is including rotating the wheel of rolling of connecting in the landing slab, and the wheel that rolls is along crossbeam length direction roll connection in crossbeam.
In the related art, when the above-described work table is used, a worker usually stands on a platform plate, holds a concrete delivery pipe with the hand, and performs a casting work through the concrete delivery pipe. However, since the concrete delivery pipe is heavy, the workload of the constructor is increased. The inventors have recognized that there is a drawback of increasing the workload of the constructors.
SUMMERY OF THE UTILITY MODEL
In order to reduce constructor's work burden as far as, this application provides a concrete placement workstation.
The application provides a concrete placement workstation adopts following technical scheme:
the utility model provides a concrete placement workstation, include the stage body and horizontal slip set up in landing slab on the stage body, the one end terminal surface of landing slab is provided with the mounting bracket, be provided with the installation pipe on the mounting bracket, the installation pipe supplies concrete conveying pipe to peg graft.
Through adopting above-mentioned technical scheme, through setting up the installation pipe that supplies concrete conveying pipe to peg graft for constructor can fix concrete conveying pipe. Thereby liberating constructor's both hands, and then effectively reduced constructor's work burden.
Optionally, the outer wall of the installation pipe is connected with the mounting frame through a universal shaft, and a locking piece used for fixing the installation pipe is arranged between the installation pipe and the mounting frame.
By adopting the technical scheme, the installation pipe is connected with the installation frame through the universal shaft, so that the installation pipe can drive the concrete conveying pipe to swing. In case the concrete conveying pipe appears the condition of cutting off or leaking on ground and waters, constructor can drive the concrete conveying pipe swing through the installation pipe to make the lower port of installation pipe aim at the position that ground leaked and watered, thereby realize timely the subsiding on ground and water. Not only can improve the pouring stability, but also can improve the practicability.
Optionally, the outer wall of installation pipe is provided with the mounting panel, the locking piece for slide set up in locking lever on the mounting panel, be provided with the backup pad on the mounting panel, be provided with the confession in the backup pad locking lever male locking groove, the cross section of locking lever is the rectangle, the locking groove all around the inner wall with the locking lever agrees with mutually.
Through adopting above-mentioned technical scheme, through setting up simple structure, simple operation's locking piece, realize the quick unblock and the locking of installation pipe. The operation convenience can be improved, and the working efficiency can be improved.
Optionally, the locking lever adopts iron material to make, the diapire of locking groove is provided with magnet.
Through adopting above-mentioned technical scheme, attract the locking lever through magnet to improve the locking stability of locking lever, and then improve stability in use.
Optionally, a plurality of mounting holes penetrate through the outer wall of the mounting pipe, the mounting holes are uniformly distributed along the circumferential direction of the mounting pipe, each mounting hole is internally provided with a tightening column in a threaded manner, and the end part of the tightening column, which is located outside the mounting pipe, is provided with a hand wheel.
Through adopting above-mentioned technical scheme, respectively the rotatory a plurality of hand wheels drive corresponding tight post motion of supporting to make a plurality of tight posts of supporting be located the intraductal tip of installation and be close to each other or keep away from. Thereby realize a plurality of tight regulation of interval between the post of supporting, and then make the installation pipe can supply the concrete conveying pipe of different bores to insert, and then improve and use the suitability.
Optionally, the outer wall of the installation pipe is provided with a handle.
Through adopting above-mentioned technical scheme, through setting up the handle, the constructor of being convenient for is to the swing of installation pipe to improve the operation convenience.
Optionally, a plurality of anti-skidding blocks are uniformly distributed on the upper end surface of the platform plate.
Through adopting above-mentioned technical scheme, through setting up the non slipping spur, increase the frictional force between constructor foot and the landing slab. Avoid constructor sole to skid to improve the safety in utilization.
Optionally, a plurality of peepholes are uniformly distributed on the platform plate.
Through adopting above-mentioned technical scheme, through setting up the peephole, the constructor of being convenient for is to pouring the observation of position to improve and use convenient degree.
In summary, the present application includes at least one of the following beneficial technical effects:
1. by arranging the installation pipe for inserting the concrete conveying pipe, a constructor can fix the concrete conveying pipe, so that the two hands of the constructor are liberated, and the workload of the constructor is effectively reduced;
2. by connecting the mounting pipe with the mounting frame through the universal shaft, once the concrete conveying pipe is cut off or the ground is in a non-casting condition, a constructor can drive the concrete conveying pipe to swing through the mounting pipe and enable the lower port of the mounting pipe to be aligned to the ground non-casting position, so that the ground can be timely re-cast, the pouring stability can be improved, and the practicability can be improved;
3. through setting up a plurality of tight posts of supporting to through adjusting a plurality of intervals of supporting between the tight post, realize the fixed of the concrete conveying pipe of different bores, and then improve and use the suitability.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present application.
Fig. 2 is an enlarged schematic view of region a in fig. 1.
Fig. 3 is a partial cross-sectional view of an embodiment of the present application.
Description of reference numerals: 1. a table body; 2. a platform plate; 3. anti-skid blocks; 4. a peephole; 5. a mounting frame; 6. installing a pipe; 7. a cardan shaft; 8. a handle; 9. mounting a plate; 10. a locking lever; 11. a support plate; 12. a locking groove; 13. a magnet; 14. mounting holes; 15. tightly abutting against the column; 16. a handwheel.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses concrete placement workstation. Referring to fig. 1, the concrete pouring work bench includes a bench 1, and a platform plate 2 is horizontally and slidably connected to the bench 1. The up end equipartition of landing slab 2 has a plurality of non slipping spur 3 to increase the frictional force between constructor foot and the landing slab 2. Meanwhile, a plurality of peep holes 4 are uniformly distributed on the platform plate 2, so that the constructors can conveniently observe the ground.
Referring to fig. 1 and 2, one end face of the platform plate 2 is fixedly connected with a mounting frame 5, and a mounting pipe 6 for inserting the concrete conveying pipe is vertically arranged on the side wall of the mounting frame 5, so as to fix the concrete conveying pipe. The outer wall of the installation pipe 6 close to one side of the platform plate 2 is connected with the installation frame 5 through a universal shaft 7, so that the installation pipe 6 can swing in multiple directions. When the ground appears leaking and waters, constructor can carry out the operation of watering again to ground. Simultaneously, the outer wall fixedly connected with handle 8 of installation pipe 6 near one side of landing slab 2 to the swing operation of constructor to installation pipe 6. Meanwhile, a locking piece for fixing the installation pipe 6 is arranged between the installation pipe 6 and the installation frame 5.
Referring to fig. 2 and 3, the outer wall of the mounting tube 6 is horizontally and fixedly connected with a mounting plate 9, the locking piece is an iron locking rod 10 horizontally and slidably connected to the upper end surface of the mounting plate 9, and the sliding direction of the locking rod 10 is parallel to the moving direction of the platform plate 2. Simultaneously, the vertical fixedly connected with backup pad 11 of up end of 2 one ends of landing slab is kept away from to mounting bracket 5, and backup pad 11 is close to the lateral wall of installation pipe 6 one side and has been seted up and supply locking rod 10 male locking groove 12. The cross section of the locking rod 10 is rectangular, and the inner wall of the periphery of the locking groove 12 is engaged with the locking rod 10 to realize the position limitation of the locking rod 10 in the circumferential direction. Meanwhile, the bottom wall of the locking groove 12 is fixedly embedded with a magnet 13 against which the locking rod 10 is abutted, and the magnet 13 attracts the locking rod 10 to improve the connection stability of the locking rod 10 and the support plate 11.
Referring to fig. 2 and 3, a plurality of mounting holes 14 are perforated through the outer wall of the mounting pipe 6, and the mounting holes 14 communicate with the inside of the mounting pipe 6. Meanwhile, the plurality of mounting holes 14 are uniformly distributed in the circumferential direction of the mounting pipe 6. The tight columns 15 penetrate through the mounting holes 14 in a horizontal threaded mode, the end portions, located in the mounting pipe 6, of the tight columns 15 are close to each other, and the end portions, located outside the mounting pipe 6, of the tight columns 15 are arranged in a divergent mode. Meanwhile, the end part of the tightening column 15, which is positioned outside the mounting pipe 6, is fixedly connected with a hand wheel 16, so that the tightening column 15 can be conveniently rotated by constructors.
The implementation principle of concrete placement workstation of the embodiment of this application does: the concrete conveying pipe is inserted into the installation pipe 6, then the hand wheels 16 are respectively rotated to drive the corresponding tightening posts 15 to move, the end faces, close to each other, of the tightening posts 15 are respectively tightened against the concrete conveying pipe, and therefore the concrete conveying pipe is fixed. When 2 horizontal motions of landing slab, can utilize landing slab 2 to drive mounting bracket 5, installation pipe 6 and concrete feeding pipe synchronous motion, and then realize the operation of pouring on ground.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a concrete placement workstation, include stage body (1) and horizontal slip set up in landing slab (2) on stage body (1), its characterized in that: the one end terminal surface of landing slab (2) is provided with mounting bracket (5), be provided with installation pipe (6) on mounting bracket (5), installation pipe (6) supply concrete duct to peg graft.
2. A concrete pouring station according to claim 1, wherein: the outer wall of installation pipe (6) with mounting bracket (5) are connected through cardan shaft (7), installation pipe (6) with be provided with between mounting bracket (5) and be used for right installation pipe (6) carry out the locking piece fixed.
3. A concrete pouring station according to claim 2, wherein: the outer wall of installation pipe (6) is provided with mounting panel (9), the locking piece for slide set up in locking lever (10) on mounting panel (9), be provided with backup pad (11) on mounting bracket (5), be provided with the confession on backup pad (11) locking lever (10) male locking groove (12), the cross section of locking lever (10) is the rectangle, locking groove (12) inner wall all around with locking lever (10) agree with mutually.
4. A concrete pouring station according to claim 3, wherein: the locking rod (10) is made of iron materials, and a magnet (13) is arranged on the bottom wall of the locking groove (12).
5. A concrete pouring station according to claim 1, wherein: the outer wall of installation pipe (6) runs through and has a plurality of mounting holes (14), and is a plurality of mounting holes (14) are followed the circumference direction evenly distributed of installation pipe (6), every equal screw thread is worn to be equipped with in mounting hole (14) and is supported tight post (15), support tight post (15) and be located the outer tip of installation pipe (6) is provided with hand wheel (16).
6. A concrete pouring station according to claim 5, wherein: the outer wall of the installation pipe (6) is provided with a handle (8).
7. A concrete pouring station according to claim 1, wherein: a plurality of anti-skidding blocks (3) are uniformly distributed on the upper end surface of the platform plate (2).
8. A concrete pouring station according to claim 7, wherein: a plurality of peepholes (4) are uniformly distributed on the platform plate (2).
CN202022899717.8U 2020-12-04 2020-12-04 Concrete pouring workbench Active CN214117542U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022899717.8U CN214117542U (en) 2020-12-04 2020-12-04 Concrete pouring workbench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022899717.8U CN214117542U (en) 2020-12-04 2020-12-04 Concrete pouring workbench

Publications (1)

Publication Number Publication Date
CN214117542U true CN214117542U (en) 2021-09-03

Family

ID=77509142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022899717.8U Active CN214117542U (en) 2020-12-04 2020-12-04 Concrete pouring workbench

Country Status (1)

Country Link
CN (1) CN214117542U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016745A (en) * 2021-11-15 2022-02-08 河南方元建筑工程有限公司 Concrete building workbench for house construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016745A (en) * 2021-11-15 2022-02-08 河南方元建筑工程有限公司 Concrete building workbench for house construction

Similar Documents

Publication Publication Date Title
CN214117542U (en) Concrete pouring workbench
CN210421868U (en) But height-adjusting's stable form engineering construction scaffold
CN116290475B (en) Prefabricated building component and construction method thereof
CN203939225U (en) Floor concrete casting operation platform is built in room
CN212656230U (en) Film drum type vibrator for concrete curing
CN205996793U (en) A kind of processing of stone platform with comprehensive polishing function
CN209556342U (en) Architectural engineering plane template
CN216767261U (en) Underground continuous wall drilling plugging device with low disturbance degree
CN212613690U (en) Flat iron type rigid wall connecting piece for building construction scaffold
CN210255094U (en) Height-adjustable control panel for machine tool
CN209861850U (en) Novel sprinkling irrigation device
CN210659234U (en) Adjustable independent supporting device
CN212188341U (en) Mechanical environmental protection dust device of building
CN214055766U (en) Can dismantle concrete maintenance frame
CN216180437U (en) Working frame for maintaining construction engineering machinery
CN210982050U (en) Cantilever type turning drawing instrument
CN218485507U (en) Automatic dust suppression device of mining area full topography
CN212954203U (en) Temporary supporting platform for super high-rise building equipment
CN203228219U (en) Adjustable object placing platform for round cylinder
CN214462606U (en) Quick fastener of construction template
CN209442545U (en) A kind of field irrigation motor-pumped well bracket
CN219697230U (en) Junction tube pre-burying device
CN111111070A (en) Anti-drop's fire hose
CN218407459U (en) Concrete spraying construction device
CN217081678U (en) Fire-fighting pipeline fixer for fire engineering