CN214116903U - Town road construction drainage pipe installation device - Google Patents
Town road construction drainage pipe installation device Download PDFInfo
- Publication number
- CN214116903U CN214116903U CN202023067936.6U CN202023067936U CN214116903U CN 214116903 U CN214116903 U CN 214116903U CN 202023067936 U CN202023067936 U CN 202023067936U CN 214116903 U CN214116903 U CN 214116903U
- Authority
- CN
- China
- Prior art keywords
- fastening
- vertical
- seat
- base
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a town road construction drainage pipe installation device, insert, vice pinhole, fastening part including base, supporting seat, bulb stock, hexagonal column, a support section of thick bamboo, king-pin hole, ground, both ends are fixed with a vertical supporting seat, two respectively about the base threaded connection has a plurality of horizontally bulb stocks on the supporting seat respectively. The utility model discloses a position of each hexagonal post of manual rotation can be adjusted each bulb stock to can adjust the position of base, and reach the effect of location, then strike each place through the hammer and insert, thereby can provide powerful location and support, then install two fastening hoops on fastening ear through screw bolt and nut, thereby can fasten the pipeline, and can insert to each place through the pin and carry out the lifting location, thereby make things convenient for in the utility model discloses a transportation, and can accomodate the fastening hoop in the storage tank, can make things convenient for in the utility model discloses a hoist and mount and installation.
Description
Technical Field
The utility model relates to a drainage pipe installation device especially relates to a town road construction drainage pipe installation device.
Background
The drainage pipe refers to a system consisting of a pipe channel for collecting and discharging sewage, wastewater and rainwater and accessory facilities thereof. Including main pipes, branch pipes and pipes leading to the treatment plant, whether built on streets or anywhere else, as long as the pipes are functioning as drains, should be counted as drains.
Municipal road drainage pipe generally buries underground, need fill again after the piping erection and bury, at this in-process, lead to the pipeline to receive the extrusion of backfill and crooked easily, the skew even, patent number CN209854476U provides a fixing device for municipal road drainage pipe construction, the device can provide certain spacing support to the pipeline, but fixed knot of structure's fixing base has certain drawback in the transportation, the stock that can move about simultaneously can go deep into soil inside and provide certain spacing, but be not convenient for promote the position of pipeline, and the device need use the hoist to hoist many times at the in-process of using the installation, thereby its weak point has been highlighted.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a town road construction drainage pipe installation device to solve above-mentioned technical problem.
In order to realize the purpose, the utility model adopts the following technical scheme:
the utility model provides a town road construction drainage pipe installation device, includes base, supporting seat, bulb stock, hexagonal column, support a section of thick bamboo, king pin hole, ground is inserted, vice pinhole, fastening part, both ends are fixed with a vertical supporting seat respectively about the base, two threaded connection has a plurality of horizontally bulb stock respectively on the supporting seat, each bulb stock is pegged graft with the base left and right sides two clearances respectively, each bulb stock end is fixed with a horizontally hexagonal column respectively, two parts are fixed with a plurality of vertical support a section of thick bamboos respectively around the base, each support a section of thick bamboo upper portion and run through respectively has two horizontally king pin holes, each support a section of thick bamboo in respectively the activity peg graft have one vertically to insert, each insert the upper portion and run through a horizontal vice pinhole, a fastening part is installed on the base top.
On the basis of the technical scheme, the fastening part comprises a fastening seat, a lower rubber pad, a storage groove, fastening lugs, fastening hoops and an upper rubber pad, the vertical fastening seat is installed at the top end of the base through a bolt and a nut, the lower rubber pad is fixed at the top end of the fastening seat, the vertical storage groove is respectively formed in the front part and the rear part of the fastening seat, the vertical fastening lugs are respectively fixed on the left part and the right part of the top end of the fastening seat, the vertical fastening hoops are respectively installed in the front part and the rear part of the fastening lugs through the bolt and the nut, and the vertical upper rubber pad is jointly arranged on the inner wall of each of the two fastening hoops.
On the basis of the technical scheme, the ball head anchor rod can move left and right along the supporting seat by manually rotating each hexagonal column, each main pin hole can be butted with the auxiliary pin hole, and the two fastening hoops can be in sliding connection with the two storage grooves.
Compared with the prior art, the utility model has the advantages of it is following: the utility model discloses a position of each hexagonal post of manual rotation can be adjusted each bulb stock to can adjust the position of base, and reach the effect of location, then strike each place through the hammer and insert, thereby can provide powerful location and support, then install two fastening hoops on fastening ear through screw bolt and nut, thereby can fasten the pipeline, and can insert to each place through the pin and carry out the lifting location, thereby make things convenient for in the utility model discloses a transportation, and can accomodate the fastening hoop in the storage tank, can make things convenient for in the utility model discloses a hoist and mount and installation.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is an installation schematic diagram of the ground socket of the present invention.
Fig. 3 is an installation schematic diagram of the fastening hoop of the present invention.
Fig. 4 is a schematic view of the storage of the present invention.
In the figure: 1. the device comprises a base, 2, a supporting seat, 3, a ball head anchor rod, 4, a hexagonal column, 5, a supporting barrel, 6, a main pin hole, 7, a ground insert, 8, an auxiliary pin hole, 9, a fastening part, 10, a fastening seat, 11, a lower rubber pad, 12, a storage groove, 13, a fastening lug, 14, a fastening hoop, 15 and an upper rubber pad.
Detailed Description
The invention is explained in further detail below with reference to the figures and the embodiments.
As shown in fig. 1-4, a municipal road construction drainage pipeline installation device comprises a base 1, a support seat 2, ball head anchors 3, hexagonal columns 4, support cylinders 5, main pin holes 6, ground inserts 7, auxiliary pin holes 8 and fastening parts 9, wherein the left end and the right end of the base 1 are respectively fixed with a vertical support seat 2, the two support seats 2 are respectively in threaded connection with a plurality of horizontal ball head anchors 3, each ball head anchor 3 is respectively in clearance insertion connection with the left part and the right part of the base 1, the tail end of each ball head anchor 3 is respectively fixed with a horizontal hexagonal column 4, the front part and the rear part of the base 1 are respectively fixed with a plurality of vertical support cylinders 5, the upper parts of the support cylinders 5 are respectively penetrated with two horizontal main pin holes 6, the inside of the support cylinders 5 is respectively in movable insertion connection with a vertical ground insert 7, the upper parts of the ground inserts 7 are penetrated with a horizontal auxiliary pin hole 8, a fastening part 9 is installed on the top end of the base 1.
The fastening part 9 comprises a fastening seat 10, a lower rubber pad 11, a storage groove 12, fastening lugs 13, fastening hoops 14 and an upper rubber pad 15, wherein the top end of the base 1 is provided with a vertical fastening seat 10 through a bolt and a nut, the top end of the fastening seat 10 is fixedly provided with the lower rubber pad 11, the front part and the rear part of the fastening seat 10 are respectively provided with the vertical storage groove 12, the left part and the right part of the top end of the fastening seat 10 are respectively fixedly provided with the vertical fastening lugs 13, the front part and the rear part of the two fastening lugs 13 are respectively provided with the vertical fastening hoops 14 through the bolt and the nut, and the inner walls of the two fastening hoops 14 are jointly provided with the vertical upper rubber pad 15.
The ball head anchor rod 3 can move left and right along the supporting seat 2 by manually rotating each hexagonal column 4, each main pin hole 6 can be butted with the auxiliary pin hole 8, and the two fastening hoops 14 can be connected with the two storage grooves 12 in a sliding mode.
The utility model discloses a theory of operation: place supporting seat 2 in the position that needs the installation, then can adjust the position of each bulb stock 3 through each hexagonal post 4 of manual rotation, thereby can adjust the position of base 1, and reach the effect of location, then strike each place through the hammer and insert 7, thereby can provide powerful location and support, then install two fastening hoops 14 on fastening ear 13 through screw bolt and nut, thereby can fasten the pipeline, at this in-process, will go up 15 outer walls of rubber pad and paint lubricating oil, the installation of pipeline and fastening hoop 14 of can being convenient for.
The foregoing is a preferred embodiment of the present invention, and for those skilled in the art to understand the teaching of the present invention, the changes, modifications, replacements and variations to the embodiments will still fall within the protection scope of the present invention without departing from the principle and spirit of the present invention.
Claims (3)
1. The utility model provides a town road construction drainage pipe installation device, includes base (1), supporting seat (2), bulb stock (3), hexagonal column (4), support a section of thick bamboo (5), king pin hole (6), ground inserts (7), vice pinhole (8), fastening part (9), its characterized in that: the novel ball head anchor rod support is characterized in that a vertical support seat (2) is fixed to the left end and the right end of the base (1) respectively, a plurality of horizontal ball head anchor rods (3) are in threaded connection with the support seat (2) respectively, each ball head anchor rod (3) is in clearance insertion connection with the left portion and the right portion of the base (1), a horizontal hexagonal column (4) is fixed to the tail end of each ball head anchor rod (3) respectively, a plurality of vertical support cylinders (5) are fixed to the front portion and the rear portion of the base (1) respectively, two horizontal main pin holes (6) penetrate through the upper portions of the support cylinders (5) respectively, a vertical ground plug (7) is movably inserted into each support cylinder (5) in an insertion mode respectively, a horizontal auxiliary pin hole (8) penetrates through the upper portions of the ground plug (7), and a fastening portion (9) is installed at the top end of the.
2. The municipal road construction drainage pipeline installation device of claim 1, wherein: the fastening part (9) comprises a fastening seat (10), a lower rubber pad (11), a storage groove (12), a fastening lug (13), a fastening hoop (14) and an upper rubber pad (15), wherein the top end of the base (1) is provided with the vertical fastening seat (10) through a bolt and a nut, the top end of the fastening seat (10) is fixed with the lower rubber pad (11), the front part and the rear part of the fastening seat (10) are respectively provided with the vertical storage groove (12), the left part and the right part of the top end of the fastening seat (10) are respectively fixed with the vertical fastening lug (13), the front part and the rear part of the fastening lug (13) are respectively provided with the vertical fastening hoop (14) through the bolt and the nut, and the inner wall of the fastening hoop (14) is jointly provided with the vertical upper rubber pad (15).
3. The municipal road construction drainage pipeline installation device of claim 2, wherein: each ball head anchor rod (3) can move left and right along the supporting seat (2) by manually rotating each hexagonal column (4), each main pin hole (6) can be butted with an auxiliary pin hole (8), and the two fastening hoops (14) can be connected with the two storage grooves (12) in a sliding mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023067936.6U CN214116903U (en) | 2020-12-18 | 2020-12-18 | Town road construction drainage pipe installation device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023067936.6U CN214116903U (en) | 2020-12-18 | 2020-12-18 | Town road construction drainage pipe installation device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214116903U true CN214116903U (en) | 2021-09-03 |
Family
ID=77512267
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023067936.6U Active CN214116903U (en) | 2020-12-18 | 2020-12-18 | Town road construction drainage pipe installation device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214116903U (en) |
-
2020
- 2020-12-18 CN CN202023067936.6U patent/CN214116903U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20100257794A1 (en) | Lateral support device | |
CN112211223B (en) | Municipal pipe gallery structure and construction method | |
CN206448268U (en) | A kind of spliced water stopping type pre-stressed concrete hollow support pile | |
CN214116903U (en) | Town road construction drainage pipe installation device | |
CN204001665U (en) | A kind of scaffold assembling wall-connecting piece | |
CN104120874A (en) | Assembly type scaffold and wall connecting piece | |
CN204023599U (en) | Streetlamp foundation stake | |
CN216515641U (en) | Adjustable movable slot strutting arrangement | |
CN116201131A (en) | Foundation pit supporting structure and supporting method | |
CN212427209U (en) | Utility tunnel prevention of seepage shock attenuation protection architecture | |
CN211446959U (en) | Municipal works pipeline slot quick support device | |
CN211898441U (en) | Pipeline slot soil stone excavation protective structure | |
CN211550747U (en) | Municipal pipe network system for sponge city | |
CN209891235U (en) | Integral pre-buried structure of steel structure column lower margin bolt | |
CN209816699U (en) | Traffic light foundation | |
CN219571068U (en) | Rain sewage pipeline lays junction bearing structure | |
CN219825522U (en) | Improved generation collapse prevention device | |
CN217003381U (en) | Fixing and supporting device for burying anti-corrosion pipeline | |
CN214738128U (en) | Deep foundation pit narrow road supporting device | |
CN219198360U (en) | Water conservancy pipeline safety support device | |
CN209892972U (en) | Sewage treatment pond device | |
CN210315903U (en) | Quick jacking device for drain pipe fitting | |
CN221255085U (en) | Roadbed scouring protection system | |
CN220746983U (en) | Assembly foundation system capable of ensuring absolute level | |
CN109778896B (en) | Construction method for integral pre-buried structure of foundation bolt of steel structure column |