CN214116647U - Soft soil buries sewage pipe construction bearing structure deeply - Google Patents

Soft soil buries sewage pipe construction bearing structure deeply Download PDF

Info

Publication number
CN214116647U
CN214116647U CN202023085271.1U CN202023085271U CN214116647U CN 214116647 U CN214116647 U CN 214116647U CN 202023085271 U CN202023085271 U CN 202023085271U CN 214116647 U CN214116647 U CN 214116647U
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
soft soil
sewage pipe
inner support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023085271.1U
Other languages
Chinese (zh)
Inventor
王生涛
冯东东
邵李
杨庆
赵亮
潘成峻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Road and Bridge Engineering Co Ltd
Original Assignee
Anhui Road and Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Road and Bridge Engineering Co Ltd filed Critical Anhui Road and Bridge Engineering Co Ltd
Priority to CN202023085271.1U priority Critical patent/CN214116647U/en
Application granted granted Critical
Publication of CN214116647U publication Critical patent/CN214116647U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a soft soil deeply buries sewage pipe construction bearing structure, including steel sheet pile subassembly, multiunit the steel sheet pile subassembly is hammered and is inserted in the soft soil foundation through the crawler-type excavator of taking vibrations hammer, the utility model discloses multiunit steel sheet pile subassembly is that one-column structure hammering inserts in the soft soil foundation, through the lock between the fore shaft bent plate, is just to the formula of straggling hasp structure inserts in the soft soil foundation between the multiunit steel sheet pile subassembly, the foundation ditch supporting structure when the soft soil deeply buries sewage pipe construction is constituteed to two steel sheet pile subassemblies of both sides, interior supporting plate subassembly is hung on the top plate body of steel sheet pile subassembly through the couple, interior supporting plate subassembly is carried between two sets of interior supporting plate subassemblies through carrying the diaphragm, support when the soft soil deeply buries sewage pipe construction is realized through the foundation ditch supporting structure that multiunit interior supporting plate subassembly and two sets of interior supporting plate subassemblies are constituteed to the steel sheet pile subassembly of both sides, thereby facilitating the subsequent excavation of the soft soil foundation pit and the subsequent laying construction operation of the sewage pipe.

Description

Soft soil buries sewage pipe construction bearing structure deeply
Technical Field
The utility model belongs to the technical field of the weak soil buries the construction deeply, concretely relates to weak soil buries sewage pipe construction bearing structure deeply.
Background
In the soft soil foundation pit excavation process, need protect it and support, otherwise can appear oozing water, surrounding soil body displacement and subside to cause the destruction that closes on the building etc. from this.
The prior art has the following problems: the soft soil deep-buried sewage pipe construction supporting structure which is convenient to use and high in safety is not beneficial to excavation of a soft soil foundation pit.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a weak soil buries sewage pipe construction bearing structure deeply has convenient to use and the high characteristics of security.
In order to achieve the above object, the utility model provides a following technical scheme: a supporting structure for construction of a soft soil deep-buried sewage pipe comprises steel sheet pile assemblies, wherein a plurality of groups of steel sheet pile assemblies are hammered and inserted into a soft soil foundation through a crawler-type excavator with a vibration hammer, the plurality of groups of steel sheet pile assemblies are hammered and inserted into the soft soil foundation in a two-column structure, inner supporting plate assemblies are hung on the inner sides of the two rows of steel sheet pile assemblies, and a plurality of groups of inner supporting pipe assemblies are tightly propped and erected between the two groups of inner supporting plate assemblies;
the steel sheet pile assembly comprises a U-shaped steel sheet pile, and plate bodies on two sides of the U-shaped steel sheet pile are both fixedly provided with a locking bent plate;
the inner support plate assembly comprises an I-shaped inner support plate, a plurality of pull rings are fixedly arranged at the top of the I-shaped inner support plate, and hooks are arranged on the pull rings through steel wire pull ropes;
the inner support pipe assembly comprises a circular inner support pipe, and a carrying transverse plate is fixedly arranged on the circular inner support pipe.
Preferably, the multiunit in the steel sheet pile subassembly is a formula structure hammering and inserts the soft soil foundation, through the lock between the fore shaft bent plate, the multiunit be just to inserting in the soft soil foundation to the formula hasp structure that falls by mistake between the steel sheet pile subassembly.
Preferably, the two lines of the steel sheet pile components on the two sides form a foundation pit supporting structure during construction of the soft soil deep-buried sewage pipe.
Preferably, the inner support plate component is hung on a top plate body of the steel plate pile component through a hook.
Preferably, the inner support tube assembly is carried between the two groups of inner support plate assemblies through carrying transverse plates.
Preferably, a foundation pit supporting structure formed by the steel sheet pile assemblies on two sides is internally supported through the multiple groups of inner supporting pipe assemblies and the two groups of inner supporting plate assemblies, so that supporting during construction of the soft soil deep buried sewage pipe is realized.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses multiunit steel sheet pile subassembly is in one formula structure hammering inserts the weak soil foundation, through the lock between the fore shaft bent plate, be just to inserting the weak soil foundation to the formula hasp structure that misplaces between the multiunit steel sheet pile subassembly, two of both sides are steel sheet pile subassembly and constitute the excavation supporting construction when the weak soil buries sewage pipe construction deeply, interior supporting plate subassembly hangs through the couple and establishes on the top plate body of steel sheet pile subassembly, interior supporting plate subassembly carries on between two sets of supporting plate subassemblies through carrying on the diaphragm, support when realizing the weak soil and bury sewage pipe construction deeply support in the excavation of sewage pipe and the construction operation of laying of follow-up sewage pipe in support pipe subassembly and two sets of supporting plate subassembly in the multiunit.
Drawings
Fig. 1 is a perspective view of the present invention;
FIG. 2 is a perspective view of a part of the structure of the present invention;
fig. 3 is a perspective view of the steel sheet pile assembly of the present invention;
fig. 4 is a perspective view of the inner support plate assembly of the present invention;
fig. 5 is a perspective view of an inner support tube assembly of the present invention;
in the figure: 1. a steel sheet pile assembly; 11. u-shaped steel sheet piles; 12. a locking notch bent plate; 2. an inner support plate assembly; 21. an I-shaped inner support plate; 22. a pull ring; 23. a steel wire rope; 24. hooking; 3. an inner support tube assembly; 31. a circular inner support tube; 32. carrying a transverse plate; 4. soft soil foundation.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides the following technical solutions: a supporting structure for construction of a soft soil deep-buried sewage pipe comprises steel sheet pile assemblies 1, wherein a plurality of groups of steel sheet pile assemblies 1 are hammered and inserted into a soft soil foundation 4 through a crawler-type excavator with a vibration hammer, the plurality of groups of steel sheet pile assemblies 1 are hammered and inserted into the soft soil foundation 4 in a two-column structure, inner supporting plate assemblies 2 are hung on the inner sides of the two rows of steel sheet pile assemblies 1, and a plurality of groups of inner supporting plate assemblies 3 are tightly propped and erected between the two groups of inner supporting plate assemblies 2;
the steel sheet pile assembly 1 comprises a U-shaped steel sheet pile 11, and plate bodies on two sides of the U-shaped steel sheet pile 11 are both fixedly provided with a locking bent plate 12;
the inner support plate assembly 2 comprises an I-shaped inner support plate 21, a plurality of pull rings 22 are fixedly arranged at the top of the I-shaped inner support plate 21, and hooks 24 are tied on the pull rings 22 through steel wire pull ropes 23;
the inner support tube assembly 3 comprises a circular inner support tube 31, and a carrying transverse plate 32 is fixedly arranged on the circular inner support tube 31.
In this embodiment, it is preferred that multiunit steel sheet pile subassembly 1 is in one formula structure hammering inserts soft soil foundation 4, and through the lock between the fore shaft bent plate 12, be just to inserting soft soil foundation 4 to the formula hasp structure that falls by mistake between the multiunit steel sheet pile subassembly 1.
In this embodiment, preferably, the two rows of steel sheet pile assemblies 1 on the two sides form a foundation pit supporting structure during construction of the soft soil deep-buried sewage pipe.
In this embodiment, preferably, the inner support plate assembly 2 is hung on the top plate body of the steel sheet pile assembly 1 through a hook 24.
In this embodiment, the inner support tube assembly 3 is preferably mounted between the two sets of inner support plate assemblies 2 by means of mounting cross plates 32.
In this embodiment, preferably, the foundation pit supporting structure formed by the steel sheet pile assemblies 1 on the two sides is internally supported by the multiple groups of inner supporting pipe assemblies 3 and the two groups of inner supporting plate assemblies 2, so that supporting during construction of the soft soil deep-buried sewage pipe is realized.
The utility model discloses a theory of operation and use flow: the utility model discloses multiunit steel sheet pile subassembly 1 is in one row formula structure hammering inserts soft soil foundation 4, lock between through fore shaft bent plate 12, be just to inserting soft soil foundation 4 to the formula hasp structure that misplaces between multiunit steel sheet pile subassembly 1, two of both sides are steel sheet pile subassembly 1 and constitute the weak soil and bury the underground structure when sewage pipe construction deeply, interior supporting plate subassembly 2 is hung through couple 24 and is established on the top plate body of steel sheet pile subassembly 1, interior supporting plate subassembly 3 carries through carrying diaphragm 32 between two sets of supporting plate subassemblies 2, support in the underground structure who supports subassembly 3 and two sets of supporting plate subassemblies 2 and constitute both sides steel sheet pile subassembly 1 through the multiunit, realize the weak soil and bury the support when sewage pipe construction deeply, thereby make things convenient for the excavation of follow-up weak soil and the construction operation of laying of follow-up sewage pipe.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a soft soil buries sewage pipe construction bearing structure deeply, includes steel sheet pile subassembly (1), its characterized in that: multiple groups of steel sheet pile assemblies (1) are hammered and inserted into a soft soil foundation (4) through a crawler-type excavator with a vibration hammer, multiple groups of steel sheet pile assemblies (1) are hammered and inserted into the soft soil foundation (4) in a two-column structure, inner support plate assemblies (2) are hung on the inner sides of the two columns of steel sheet pile assemblies (1), and multiple groups of inner support plate assemblies (3) are tightly propped and erected between the two groups of inner support plate assemblies (2);
the steel sheet pile assembly (1) comprises a U-shaped steel sheet pile (11), and plate bodies on two sides of the U-shaped steel sheet pile (11) are both fixedly provided with a locking bent plate (12);
the inner support plate assembly (2) comprises an I-shaped inner support plate (21), a plurality of pull rings (22) are fixedly arranged at the top of the I-shaped inner support plate (21), and hooks (24) are tied on the pull rings (22) through steel wire pull ropes (23);
the inner support tube assembly (3) comprises a circular inner support tube (31), and a carrying transverse plate (32) is fixedly arranged on the circular inner support tube (31).
2. The supporting structure for construction of the soft soil deep-buried sewage pipe according to claim 1, wherein: multiunit steel sheet pile subassembly (1) is in one formula structure hammering inserts soft soil foundation (4), through the lock between fore shaft bent plate (12), multiunit it just inserts in soft soil foundation (4) to be to the formula hasp structure that falls by mistake between steel sheet pile subassembly (1).
3. The supporting structure for construction of the soft soil deep-buried sewage pipe according to claim 1, wherein: and the two lines on the two sides form a foundation pit supporting structure during construction of the soft soil deep-buried sewage pipe by the steel sheet pile assemblies (1).
4. The supporting structure for construction of the soft soil deep-buried sewage pipe according to claim 1, wherein: the inner support plate component (2) is hung on a top plate body of the steel sheet pile component (1) through a hook (24).
5. The supporting structure for construction of the soft soil deep-buried sewage pipe according to claim 1, wherein: the inner support tube assembly (3) is carried between the two groups of inner support plate assemblies (2) through carrying transverse plates (32).
6. The supporting structure for construction of the soft soil deep-buried sewage pipe according to claim 1, wherein: the foundation pit supporting structure formed by the steel sheet pile assemblies (1) on the two sides is internally supported through the multiple groups of inner supporting pipe assemblies (3) and the two groups of inner supporting plate assemblies (2), so that supporting during construction of the soft soil deep buried sewage pipe is realized.
CN202023085271.1U 2020-12-21 2020-12-21 Soft soil buries sewage pipe construction bearing structure deeply Active CN214116647U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023085271.1U CN214116647U (en) 2020-12-21 2020-12-21 Soft soil buries sewage pipe construction bearing structure deeply

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023085271.1U CN214116647U (en) 2020-12-21 2020-12-21 Soft soil buries sewage pipe construction bearing structure deeply

Publications (1)

Publication Number Publication Date
CN214116647U true CN214116647U (en) 2021-09-03

Family

ID=77512551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023085271.1U Active CN214116647U (en) 2020-12-21 2020-12-21 Soft soil buries sewage pipe construction bearing structure deeply

Country Status (1)

Country Link
CN (1) CN214116647U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113863410A (en) * 2021-10-25 2021-12-31 中铁十九局集团广州工程有限公司 Assembly type supporting assembly for trench excavation and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113863410A (en) * 2021-10-25 2021-12-31 中铁十九局集团广州工程有限公司 Assembly type supporting assembly for trench excavation and construction method

Similar Documents

Publication Publication Date Title
CN214116647U (en) Soft soil buries sewage pipe construction bearing structure deeply
JP5698405B1 (en) Ground improvement solid foundation method
CN210621727U (en) Large-scale marine anchorage construction combination formula cofferdam structure
JP6068774B1 (en) Earth retaining prior construction method using adjustable erection
CN111549788A (en) Installation method of foundation pit section steel combined support
CN202745063U (en) Deep foundation pit steel plate pile and anchor cable shoring system construction structure
CN217601452U (en) Bracing-free enclosure structure
CN213773450U (en) Tower crane retaining wall construction equipment
CN115288184A (en) Shallow-covering-layer offshore wind power single-pile composite foundation construction method and composite foundation thereof
CN211849466U (en) Deep foundation pit supporting system under large dynamic load
CN211948452U (en) Deep foundation pit supporting structure
JP5739051B1 (en) Liquefaction countermeasure structure for ground improvement solid foundation and correction method for occurrence of uneven settlement due to liquefaction
KR20140015974A (en) Arch wall shoring structure
CN108396735B (en) Self-lifting operation platform for large-aperture hole digging pile
CN218813746U (en) Deep foundation pit supporting structure for cast-in-situ bored pile
CN218622253U (en) Pile supporting system
CN218540716U (en) Foundation pit supporting structure
CN108643182B (en) Pile pulling method for different soil qualities
KR20140015980A (en) Method for constructing earth retaining wall using arch pannel
CN219793952U (en) Outer braced system of steel sheet pile
CN212452668U (en) Installation device for foundation pit profile steel combined support
CN216552101U (en) Protection structure for reducing settlement of peripheral buildings caused by deep foundation pit excavation
CN112982390A (en) Steel casing of rock-socketed cast-in-place pile capable of not sinking along with punching
JP3272704B2 (en) Soil retaining method for deep trench for burying underground pipes, and sheet pile retaining tower used for it
CN212477842U (en) Water level balance pressure reducing structure for basement water leakage prevention

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant