CN214099080U - Progress management device for construction cost - Google Patents

Progress management device for construction cost Download PDF

Info

Publication number
CN214099080U
CN214099080U CN202120185213.1U CN202120185213U CN214099080U CN 214099080 U CN214099080 U CN 214099080U CN 202120185213 U CN202120185213 U CN 202120185213U CN 214099080 U CN214099080 U CN 214099080U
Authority
CN
China
Prior art keywords
fixedly connected
bottom plate
groove
management device
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120185213.1U
Other languages
Chinese (zh)
Inventor
魏爱婕
魏爱敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiang Yonghua
Original Assignee
Guangzhou City Construction College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou City Construction College filed Critical Guangzhou City Construction College
Priority to CN202120185213.1U priority Critical patent/CN214099080U/en
Application granted granted Critical
Publication of CN214099080U publication Critical patent/CN214099080U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

The utility model discloses a progress management device for engineering cost, including the panel, the panel below is equipped with the base, sliding connection has the support column on the base, support column and panel fixed connection, be equipped with show mechanism on the panel, show mechanism includes the bottom plate, closes lid, stay cord, casing, wind spring, standing groove, observation window and hangs and detain. The utility model discloses in, be provided with show mechanism, open and close the lid, the pulling stay cord makes the wind spring stretched, place the file in the standing groove, the wind spring needs the reconversion, the drive closes to cover and closes, it contacts with the stopper to drive to hang to detain, make spring and telescopic link shrink, will hang and detain the back on the card, compressed spring and telescopic link reconversion, will hang to detain and block, avoid show mechanism because of stop gear is not hard up or place the file in the standing groove forget after will closing and close, thereby the effect of protection file has been played.

Description

Progress management device for construction cost
Technical Field
The utility model relates to an engineering cost technical field especially relates to a progress management device for engineering cost.
Background
The construction cost refers to the construction price of the project, and refers to the total sum of all the expenses expected or actually required for completing the construction of one project. The project cost is defined from the perspective of investors, and is the construction cost of a project, namely the investment cost of all fixed assets expected to be paid or actually paid for constructing a project. These costs include equipment and tool acquisition costs, construction and installation costs, other costs of construction, preparation costs, interest in construction periods, and fixed asset investment direction adjustment taxes.
Current engineering cost progress management device sets up a protection casing mostly and protects the show file, avoids the file to be damaged or can be covered with the dust after long-time, but current device can be because protection casing chucking mechanism is not hard up or place the file forget after in the protection casing and close the protection casing, leads to the protection casing not to play the effect of protection to influence the bandwagon effect.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: in order to solve the above problems, a schedule management apparatus for construction cost is proposed.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a progress management device for engineering cost, includes the panel, the panel below is equipped with the base, sliding connection has the support column on the base, support column and panel fixed connection, be equipped with show mechanism on the panel, show mechanism includes the bottom plate, closes lid, stay cord, casing, wind spring, standing groove, observation window and hangs the knot, bottom plate and panel fixed connection, close the lid and pass through hinge joint with the bottom plate lower extreme, the bottom plate is kept away from and is closed lid one side fixedly connected with casing, the inside wind spring that is equipped with of casing, the both ends of wind spring respectively with stay cord one end and casing fixed connection, the stay cord other end runs through the bottom plate covers upper end fixed connection with closing, close covering and be equipped with standing groove, observation window and hang the knot.
As a further description of the above technical solution:
the novel multifunctional combined cover is characterized in that a placing groove is formed in the inner side wall of the combined cover, an observation window matched with the placing groove is formed in the combined cover, a hanging buckle is fixedly connected to the outer side wall of the combined cover, and a limiting mechanism matched with the hanging buckle is arranged on the bottom plate.
As a further description of the above technical solution:
stop gear includes recess, telescopic link, stopper and spring, the bottom plate is close to close and cover one side and seted up the recess, the inside end table wall of recess with the one end fixed connection of telescopic link, the other end of telescopic link with stopper fixed connection, telescopic link outside cover is equipped with the spring, the both ends of spring respectively with inside end table wall of recess and stopper fixed connection.
As a further description of the above technical solution:
the observation window is embedded with a transparent lens.
As a further description of the above technical solution:
the exhibition mechanism is provided with a plurality of, a plurality of exhibition mechanism is the rectangular array and distributes on the panel.
As a further description of the above technical solution:
the base is provided with a sliding groove, the sliding groove is embedded with a limiting pin matched with the supporting column, and the upper end face of the display board is fixedly connected with a baffle.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
the utility model discloses in, be provided with show mechanism, open and close the lid, the pulling stay cord makes the wind spring stretched, place the file in the standing groove, the wind spring needs the reconversion, the drive closes to cover and closes, it contacts with the stopper to drive to hang to detain, make spring and telescopic link shrink, will hang and detain the back on the card, compressed spring and telescopic link reconversion, will hang to detain and block, avoid show mechanism because of stop gear is not hard up or place the file in the standing groove forget after will closing and close, thereby the effect of protection file has been played.
Drawings
Fig. 1 shows a schematic overall structure diagram provided according to an embodiment of the present invention;
fig. 2 is a schematic side view of a display mechanism according to an embodiment of the present invention;
fig. 3 shows an enlarged schematic view of a structure at a provided according to an embodiment of the present invention.
Illustration of the drawings:
1. exhibition boards; 2. a base; 3. a support pillar; 4. a chute; 5. a spacing pin; 6. a baffle plate; 7. a display mechanism; 701. a base plate; 702. closing the cover; 703. pulling a rope; 704. a housing; 705. a coil spring; 706. a placement groove; 707. an observation window; 708. hanging and buckling; 8. a groove; 9. a telescopic rod; 10. a limiting block; 11. a spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a progress management device for engineering cost comprises a display board 1, a base 2 is arranged below the display board 1, a support column 3 is connected on the base 2 in a sliding manner, the support column 3 is fixedly connected with the display board 1, a display mechanism 7 is arranged on the display board 1, the display mechanism comprises a bottom plate 701, a closing cover 702, a pull rope 703, a shell 704, a coil spring 705, a placing groove 706, an observation window 707 and a hanging buckle 708, the bottom plate 701 is fixedly connected with the display board 1, the closing cover 702 is hinged with the lower end of the bottom plate 701 through a hinge, the shell 704 is fixedly connected with one side of the bottom plate 701 far away from the closing cover 702, the coil spring 705 is arranged inside the shell 704, two ends of the coil spring 705 are respectively and fixedly connected with one end of the pull rope 703 and the shell 704, the other end of the pull rope 703 penetrates through the bottom plate 701 and is fixedly connected with the upper end of the closing cover 702, the placing groove 706, the observation window 707 and the hanging buckle 708 are arranged on the closing cover 702, the display mechanism 7 is arranged, the closing cover 702 is provided with the display mechanism 7, the pull rope 703 to enable the coil spring to be stretched, the file is placed in the placing groove 706, the coil spring 705 needs to be restored to the original state to drive the closing cover 702 to close, so that the phenomenon that the display mechanism 7 forgets to close the closing cover 702 after the file is placed in the placing groove 706 due to looseness of the limiting mechanism is avoided, and the effect of protecting the file is achieved.
Specifically, as shown in fig. 1, fig. 2 and fig. 3, a placement groove 706 is formed on the inner side wall of the closing cover 702, an observation window 707 matched with the placement groove 706 is formed on the closing cover 702, a hanging buckle 708 is fixedly connected to the outer side wall of the closing cover 702, a limiting mechanism matched with the hanging buckle 708 is arranged on the bottom plate 701, the limiting mechanism 7 comprises a groove 8, a telescopic rod 9, a limiting block 10 and a spring 11, a groove 8 is formed on the side, close to the closing cover 702, of the bottom plate 701, a bottom surface wall inside the groove 8 is fixedly connected with one end of the telescopic rod 9, the other end of the telescopic rod 9 is fixedly connected with the limiting block 10, the spring 11 is sleeved outside the telescopic rod 9, two ends of the spring 11 are respectively fixedly connected with the bottom surface wall inside the groove 8 and the limiting block 10, a transparent lens is embedded in the observation window 707, the closing cover 702 drives the hanging buckle 708 to contact with the limiting block 10, so that the spring 11 and the telescopic rod 9 contract, and the hanging buckle 708 is clamped, the compressed spring 11 and the telescopic rod 9 are restored to the original state, and the hanging buckle 708 is clamped.
Specifically, as shown in fig. 1, the display mechanism 7 is provided with a plurality of, and a plurality of display mechanism 7 is rectangular array and distributes on the panel 1, has seted up spout 4 on the base 2, and spout 4 is embedded to have and 3 matched with spacer pins 5 with the support column, and the up end fixedly connected with baffle 6 of panel 1, the setting of spout 4 and spacer pins 5 makes the height of panel 1 and display mechanism 7 can be adjusted.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The progress management device for the engineering cost comprises a display board (1) and is characterized in that a base (2) is arranged below the display board (1), a support column (3) is connected to the base (2) in a sliding mode, the support column (3) is fixedly connected with the display board (1), a display mechanism (7) is arranged on the display board (1), the display mechanism (7) comprises a bottom plate (701), a closing cover (702), a pull rope (703), a shell (704), a coil spring (705), a placing groove (706), an observation window (707) and a hanging buckle (708), the bottom plate (701) is fixedly connected with the display board (1), the closing cover (702) is hinged to the lower end of the bottom plate (701) through a hinge, the shell (704) is fixedly connected to one side of the closing cover (702) far away from the bottom plate (701), a coil spring (705) is arranged inside the shell (704), two ends of the coil spring (705) are respectively fixedly connected with one end of the pull rope (703) and the shell (704), the other end of the pull rope (703) penetrates through the bottom plate (701) and is fixedly connected with the upper end of the closing cover (702), and a placing groove (706), an observation window (707) and a hanging buckle (708) are arranged on the closing cover (702).
2. The progress management device for construction cost according to claim 1, wherein a placement groove (706) is formed in the inner side wall of the close cover (702), an observation window (707) matched with the placement groove (706) is formed in the close cover (702), a hanging buckle (708) is fixedly connected to the outer side wall of the close cover (702), and a limiting mechanism matched with the hanging buckle (708) is arranged on the bottom plate (701).
3. The progress management device for construction cost according to claim 2, wherein the limiting mechanism comprises a groove (8), a telescopic rod (9), a limiting block (10) and a spring (11), the bottom plate (701) is close to one side of the close cover (702) and is provided with the groove (8), the inner bottom surface wall of the groove (8) is fixedly connected with one end of the telescopic rod (9), the other end of the telescopic rod (9) is fixedly connected with the limiting block (10), the spring (11) is sleeved on the outer side of the telescopic rod (9), and two ends of the spring (11) are respectively fixedly connected with the inner bottom surface wall of the groove (8) and the limiting block (10).
4. A schedule management apparatus for construction costs according to claim 2 in which the viewing window (707) is embedded with transparent lenses.
5. A progress management device for construction costs according to claim 1, characterised in that said display means (7) are provided in a plurality, said display means (7) being distributed on said display board (1) in a rectangular array.
6. The progress management device for construction cost according to claim 1, wherein the base (2) is provided with a sliding groove (4), the sliding groove (4) is embedded with a limit pin (5) matched with the support column (3), and the upper end face of the display board (1) is fixedly connected with a baffle (6).
CN202120185213.1U 2021-01-24 2021-01-24 Progress management device for construction cost Active CN214099080U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120185213.1U CN214099080U (en) 2021-01-24 2021-01-24 Progress management device for construction cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120185213.1U CN214099080U (en) 2021-01-24 2021-01-24 Progress management device for construction cost

Publications (1)

Publication Number Publication Date
CN214099080U true CN214099080U (en) 2021-08-31

Family

ID=77439580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120185213.1U Active CN214099080U (en) 2021-01-24 2021-01-24 Progress management device for construction cost

Country Status (1)

Country Link
CN (1) CN214099080U (en)

Similar Documents

Publication Publication Date Title
CN214099080U (en) Progress management device for construction cost
CN207292954U (en) A kind of line winder for cable cabinet
CN210052309U (en) Multimedia device for English teaching
CN210691864U (en) Multifunctional media wall
CN214012230U (en) Portable pronunciation exercise teaching aid for english
CN213783899U (en) Device for rapidly reading data of combustible gas alarm
CN214785751U (en) Lifting device for building construction
CN212995278U (en) Real platform of instructing of computer big data teaching
CN113205711B (en) Intelligent interactive publicity column for ideological and political education and use method thereof
CN213452612U (en) High stability projecting apparatus support is used in business administration teaching
CN209691192U (en) A kind of electronic technology teaching aid
CN215244024U (en) English teaching is with blackboard that has light-shielding structure
CN210039163U (en) Think political affairs class and lead auxiliary assembly for teacher's teaching
CN112885165A (en) Information display device is used in business administration teaching
CN208872991U (en) A kind of Portable fishing sample shot box
KR102064329B1 (en) Portable battery case
CN210606284U (en) Drug simulation sample model for drug inhibition education
CN214751305U (en) Financial statement presentation device based on computer
CN221685582U (en) External camera shooting identification type water meter
CN216690513U (en) Sunshade suitable for building foundation pile dynamic testing appearance
CN216708867U (en) Video high definition stand wisdom blackboard
CN215173581U (en) Environmental monitoring device for building engineering
CN216311245U (en) Explosion-proof liquid crystal splicing screen
CN214647154U (en) Interactive teaching display device for international education
CN221489455U (en) Multifunctional mobile phone storage device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240621

Address after: No. 55 Jiangjia, Dongwushan Village, Yinhu Street, Fuyang District, Hangzhou City, Zhejiang Province, 311402

Patentee after: Jiang Yonghua

Country or region after: China

Address before: No. 166, Huanshi East Road, Conghua, Guangzhou, Guangdong 510000

Patentee before: GUANGZHOU CITY CONSTRUCTION College

Country or region before: China

TR01 Transfer of patent right