CN214089970U - Novel prefabricated installation baffle structure - Google Patents

Novel prefabricated installation baffle structure Download PDF

Info

Publication number
CN214089970U
CN214089970U CN202021721185.2U CN202021721185U CN214089970U CN 214089970 U CN214089970 U CN 214089970U CN 202021721185 U CN202021721185 U CN 202021721185U CN 214089970 U CN214089970 U CN 214089970U
Authority
CN
China
Prior art keywords
steel corbel
baffle
connecting pipe
cabin
novel prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021721185.2U
Other languages
Chinese (zh)
Inventor
蔡惠华
朱寅
徐铁峥
韩文强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd
CCCC Third Harbor Engineering Co Ltd
Original Assignee
Nanjing Branch Of Cccc Third Harbor Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Branch Of Cccc Third Harbor Engineering Co ltd filed Critical Nanjing Branch Of Cccc Third Harbor Engineering Co ltd
Priority to CN202021721185.2U priority Critical patent/CN214089970U/en
Application granted granted Critical
Publication of CN214089970U publication Critical patent/CN214089970U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Body Structure For Vehicles (AREA)

Abstract

The utility model discloses a novel prefabricated installation baffle structure, including the piping lane, the inside of piping lane is provided with general cabin, electric power cabin and the cabin of fleing, be provided with the baffle between general cabin, electric power cabin and the cabin of fleing and keep apart respectively through the baffle, both ends all are provided with flexible steel corbel about the piping lane, flexible steel corbel includes first steel corbel, second steel corbel and telescoping device, the telescoping device includes baffle and spacing connecting pipe, the baffle is located the outside and perpendicular to first steel corbel of one end of first steel corbel and second steel corbel respectively and second steel corbel, spacing connecting pipe includes connecting pipe and limiting plate, the limiting plate is located the inside and perpendicular to connecting pipe in both ends of connecting pipe. The utility model discloses an improve the steel corbel and be telescopic, can effectively improve baffle installation effectiveness.

Description

Novel prefabricated installation baffle structure
Technical Field
The utility model relates to a piping lane construction equipment technical field specifically is a novel prefabricated installation baffle structure.
Background
The cantilever system has a rest structure between the suspension beam and the cantilever, and the partial structure of the cantilever end and the suspension beam end is generally called a bracket. The bracket is used for connecting the cantilever beam and the hanging beam and transferring the load from the hanging beam. Here due to the overlapping of the beams.
However, the existing novel prefabricated installation partition has the following problems in the use process: because the shield has the left turn and the right turn, linear non-straight line, and the section of jurisdiction installation has the wrong platform, leads to baffle both sides space uneven etc.. For this reason, a corresponding technical scheme needs to be designed to solve the existing technical problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel prefabricated installation baffle structure has solved the problem that proposes in the background art, satisfies the in-service use demand.
In order to achieve the above object, the utility model provides a following technical scheme: including the piping lane, the inside of piping lane is provided with general cabin, electric power cabin and the cabin of fleing, be provided with the baffle between general cabin, electric power cabin and the cabin of fleing and keep apart respectively through the baffle, both ends all are provided with flexible steel corbel about the piping lane, flexible steel corbel includes first steel corbel, second steel corbel and telescoping device, the telescoping device includes baffle and spacing connecting pipe, the baffle is located the outside and perpendicular to first steel corbel of one end of first steel corbel and second steel corbel respectively and second steel corbel of perpendicular to, spacing connecting pipe includes connecting pipe and limiting plate, the limiting plate is located the inside and perpendicular to connecting pipe in both ends of connecting pipe.
As a preferred embodiment of the utility model, all be provided with the round hole in the middle of the upper portion of baffle and limiting plate, the inside of round hole is provided with the bolt, the bolt passes the round hole on baffle and limiting plate (11), the one end of bolt is provided with the nut (16) of supporting use.
As a preferred embodiment of the present invention, the telescopic steel corbel has an "i" shaped structure.
As a preferred embodiment of the utility model, the limit connecting pipe (10) is of a hollow I-shaped structure.
As a preferred embodiment of the present invention, the baffle is located inside the telescopic device.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. through improving the steel corbel into retractable, at the position that some steel corbels need the extension, can improve the mode of former welding extension through flexible mode, make the baffle can be better be connected with the steel corbel at both ends to the problem that the baffle both sides space is uneven has been solved.
Drawings
Fig. 1 is an overall schematic view of the present invention;
FIG. 2 is a structural view of the telescopic steel corbel of the present invention;
FIG. 3 is a structural diagram of the retractable baffle of the present invention;
figure 4 is a structural diagram of the limit connecting pipe of the utility model,
fig. 5 is a structure diagram of the circular hole of the present invention.
In the drawing, a pipe gallery-1, an electric power cabin-2, a telescopic steel corbel-3, a comprehensive cabin-4, an escape cabin-5, a partition plate-6, a first steel corbel-7, a baffle plate-8, a second steel corbel-9, a limiting connecting pipe-10, a limiting plate-11, a telescopic device-12, a connecting pipe-13, a round hole-14, a bolt-15 and a nut-16.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: a novel prefabricated mounting deck structure comprising: the pipe gallery 1, the inside of the pipe gallery 1 is provided with a comprehensive cabin 4, an electric power cabin 2, an escape cabin 5 and a comprehensive cabin 4, be provided with baffle 6 between electric power cabin 2 and the cabin of fleing 5 and keep apart respectively through baffle 6, both ends all are provided with flexible steel corbel 3 about piping lane 1, flexible steel corbel 3 is "worker" column structure, flexible steel corbel 3 includes first steel corbel 7, second steel corbel 9 and telescoping device 12, telescoping device 12 includes baffle 8 and spacing connecting pipe 10, baffle 8 is located the outside and perpendicular to first steel corbel 7 of one end of first steel corbel 7 and second steel corbel 9 respectively and second steel corbel 9, spacing connecting pipe 10 is hollow "worker" column structure, spacing connecting pipe 10 includes connecting pipe 13 and limiting plate 11, limiting plate 11 is located the inside and perpendicular to connecting pipe 13 in the both ends of connecting pipe 13, baffle 8 is located the inside of telescoping device 12.
Further improved, as shown in fig. 5: round holes 14 are formed in the middle of the upper portions of the baffle plate 8 and the limiting plate 11, bolts 15 are arranged inside the round holes 14, the bolts 15 penetrate through the round holes 14 in the baffle plate 8 and the limiting plate 11, and nuts 16 matched with the bolts 15 are arranged at one ends of the bolts 15.
When in use: the utility model discloses after the shield constructs the machine construction and finishes, install the steel corbel in the both sides of piping lane so that the installation of baffle 6, in straight part of piping lane, the distance of baffle 6 and piping lane both sides equals, but in parts such as bend, baffle 6 can appear and the piping lane between the distance appear both ends have the phenomenon of difference, through flexible steel corbel 9, can effectively solve the problem that has the difference, and simultaneously, constructor's work has been made things convenient for, the efficiency of construction work has effectively been improved, upper portion at flexible steel corbel 9 is provided with round hole 14 and bolt 15, can be under the condition that flexible steel corbel 9 was opened, strengthen the intensity of flexible part, the working capacity of flexible steel corbel 9 has effectively been improved.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides a novel prefabricated installation baffle structure which characterized in that: comprises a pipe rack (1), wherein a comprehensive cabin (4), an electric power cabin (2) and an escape cabin (5) are arranged inside the pipe rack (1), a partition plate (6) is arranged between the comprehensive cabin (4), the electric power cabin (2) and the escape cabin (5) and is respectively isolated through the partition plate (6), telescopic steel corbels (3) are arranged at the left end and the right end of the pipe rack (1), each telescopic steel corbel (3) comprises a first steel corbel (7), a second steel corbel (9) and a telescopic device (12), each telescopic device (12) comprises a baffle (8) and a limiting connecting pipe (10), each baffle (8) is respectively positioned outside one end of each of the first steel corbel (7) and the second steel corbel (9) and is perpendicular to each of the first steel corbel (7) and the second steel corbel (9), each limiting connecting pipe (10) comprises a connecting pipe (13) and a limiting plate (11), the limiting plates (11) are positioned inside two ends of the connecting pipe (13) and are perpendicular to the connecting pipe (13).
2. A novel prefabricated partition wall structure according to claim 1, wherein: round holes (14) are formed in the middle of the upper portions of the baffle (8) and the limiting plate (11), bolts (15) are arranged inside the round holes (14), the bolts (15) penetrate through the round holes (14) in the baffle (8) and the limiting plate (11), and nuts (16) used in a matched mode are arranged at one ends of the bolts (15).
3. A novel prefabricated partition wall structure according to claim 1, wherein: the telescopic steel bracket (3) is of an I-shaped structure.
4. A novel prefabricated partition wall structure according to claim 1, wherein: the limiting connecting pipe (10) is of a hollow I-shaped structure.
5. A novel prefabricated partition wall structure according to claim 1, wherein: the baffle (8) is positioned inside the telescopic device (12).
CN202021721185.2U 2020-08-18 2020-08-18 Novel prefabricated installation baffle structure Active CN214089970U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021721185.2U CN214089970U (en) 2020-08-18 2020-08-18 Novel prefabricated installation baffle structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021721185.2U CN214089970U (en) 2020-08-18 2020-08-18 Novel prefabricated installation baffle structure

Publications (1)

Publication Number Publication Date
CN214089970U true CN214089970U (en) 2021-08-31

Family

ID=77419106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021721185.2U Active CN214089970U (en) 2020-08-18 2020-08-18 Novel prefabricated installation baffle structure

Country Status (1)

Country Link
CN (1) CN214089970U (en)

Similar Documents

Publication Publication Date Title
CN214089970U (en) Novel prefabricated installation baffle structure
CN209130471U (en) A kind of antidetonation suspension and support
CN112010172A (en) Sound barrier unit plate mounting trolley for railway construction
CN211647537U (en) Communication tower reinforcing apparatus
CN210489661U (en) Lightweight integral battery pack support system
CN209873537U (en) Temporary bridge structure for working of trash rack
CN110654991A (en) Portable hoisting support
CN217030719U (en) Fixing device for fixing electric meter box and service wire
CN205622181U (en) Tunnel cable support
CN215701321U (en) Assembling platform for trolley
CN218643527U (en) Steel structure staggered installation device
CN211169484U (en) Length-adjustable balance beam for hoisting
CN213649332U (en) Transfer case installation fixed knot constructs
CN220014519U (en) Simple and easy cardboard structure of dismantling of girder steel installation
CN113772327B (en) Tail stress bearing mechanism of belt conveyor
CN219576529U (en) Vertical bridge support
CN215009537U (en) Cable fire-proof plate integral type support
CN214192350U (en) Tower crane frame structure
CN215631481U (en) Attached bridge type overhanging scaffold device
CN216549160U (en) Steel plate shell
CN212182414U (en) Novel chassis battery bracket
CN214495516U (en) A conversion flange device for climbing outer hanging tower crane girder steel of interior
CN209891393U (en) I-steel structure
CN220732292U (en) Electric power calandria mounting structure
CN103758334A (en) Scaffold structure for constructing exterior wall of building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230929

Address after: 139 Pingjiang Road, Xuhui District, Shanghai

Patentee after: CCCC THIRD HARBOR ENGINEERING Co.,Ltd.

Patentee after: NO.3 ENGINEERING CO., LTD. OF CCCC THIRD HARBOR ENGINEERING Co.,Ltd.

Address before: 210000 No.3 Jiangbian Road, Gulou District, Nanjing, Jiangsu Province

Patentee before: NANJING BRANCH OF CCCC THIRD HARBOR ENGINEERING CO.,LTD.