Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022989351.3U
Other languages
Chinese (zh)
Inventor
马存金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022989351.3U priority Critical patent/CN214089849U/en
Application granted granted Critical
Publication of CN214089849U publication Critical patent/CN214089849U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses an anchor rod construction equipment that building engineering used, including the cavity loop bar, sliding sleeve connects footstock center department above the cavity loop bar outer wall, cavity loop bar top fixed connection connecting block bottom center department, connecting block top center department fixed connection protective sheath outer wall bottom, the cavity loop bar inner chamber rotates and cup joints the body of rod, cavity loop bar bottom fixed connection anchor head, cavity loop bar outer wall below slides and cup joints base center department, base top left and right sides difference fixed connection backup pad bottom. In the process that the rod body drills into the ground, the first arc-shaped plate is matched with the second arc-shaped plate to slide downwards on the sliding rod, meanwhile, the sliding rod is matched with the first arc-shaped plate and the second arc-shaped plate to slide downwards on the sliding groove, the phenomenon that the rod body is deviated in the ground drilling process is effectively avoided, the fixing bolt is convenient to adjust and the rod body is convenient to replace through the arrangement of the first arc-shaped plate and the second arc-shaped plate, and the practicability is improved.

Description

Anchor rod construction device for constructional engineering
Technical Field
The utility model relates to a construction equipment specifically is stock construction equipment that building engineering used.
Background
The building engineering refers to the general name of various buildings and engineering facilities for providing material and technology foundation for human life and production, anchor rods in the building engineering are the most basic components of roadway support in modern coal mines, and the anchor rods are used for reinforcing surrounding rocks of the roadway together to enable the surrounding rocks to support the anchor rods, and the existing anchor rods are not only used for mines, but also used in engineering technology to carry out main body reinforcement on slopes, tunnels and dams.
The existing anchor rod construction device can not avoid the deviation of the anchor rod after the anchor rod is drilled into the ground, and the anti-pulling effect of the anchor rod is not good. Therefore, a bolt construction device for construction work has been proposed to solve the above problems.
SUMMERY OF THE UTILITY MODEL
Anchor rod construction equipment that building engineering used, including the cavity loop bar, footstock center department is cup jointed in the slip of cavity loop bar outer wall top, cavity loop bar top fixed connection connecting block bottom center department, connecting block top center department fixed connection protective sheath outer wall bottom, the cavity loop bar inner chamber rotates and cup joints the body of rod, cavity loop bar bottom fixed connection anchor head, cavity loop bar outer wall below slides and cup joints base center department, base top left and right sides is fixed connection backup pad bottom respectively, two the backup pad top is fixed connection footstock bottom left and right sides respectively, the base left and right sides is threaded connection fixed long nail respectively.
Furthermore, two supporting plates are provided with vertical sliding grooves at one side close to each other, the sliding grooves are connected with sliding rods in a sliding mode respectively, and through grooves are formed in the centers of the sliding rods respectively.
Further, the left side and the right side of the bottom end of the top seat are fixedly connected with the top ends of the fixing rods respectively, the bottom ends of the fixing rods are fixedly connected with the left side and the right side of the top end of the base respectively, and the outer walls of the fixing rods are sleeved with the through grooves in a sliding mode respectively.
Further, fixed first arc inner chamber that cup joints in cavity loop bar outer wall left side, fixed second arc inner chamber that cup joints in cavity loop bar outer wall right side, the one end of fixed connection slide bar is located at first arc left side center, the one end of fixed connection slide bar is located at second arc right side center, both sides are the first fixed block of fixed connection respectively around the first arc outer wall, both sides are fixed connection second fixed block, two respectively around the first arc outer wall first fixed block is respectively through fixing bolt fixed connection second fixed block.
Further, connecting block bottom center department has seted up the second draw-in groove, second draw-in groove joint fixture block, fixture block top center department fixed connection connecting rod bottom, connecting rod slip cup joints connecting block center department, the one end of fixture block bottom fixed connection second spring, the first draw-in groove inner chamber bottom of other end fixed connection of second spring, first draw-in groove joint fixture block, first draw-in groove inlays on the body of rod top, connecting block top fixed connection protective sheath, be equipped with the connecting rod in the protective sheath.
Further, a plurality of recesses have been seted up respectively to the body of rod outer wall, the one end of the first spring of fixed connection respectively in the recess, the one end of the other end fixed connection barb of first spring, the barb slides and cup joints in the recess, just the barb slides and cup joints the through-hole, the through-hole is established at cavity loop bar outer wall.
The utility model has the advantages that: the utility model provides an anchor rod construction equipment that building engineering used.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without inventive exercise.
Fig. 1 is a schematic overall three-dimensional structure of an embodiment of the present invention;
fig. 2 is a schematic view of the overall internal structure of an embodiment of the present invention;
fig. 3 is an enlarged view of a structure at a in fig. 2 according to an embodiment of the present invention;
fig. 4 is a top view of a first curved plate connection structure according to an embodiment of the present invention;
fig. 5 is a schematic view of a rod connection structure according to an embodiment of the present invention.
In the figure: 1. cavity loop bar, 2, logical groove, 3, first arc, 4, the body of rod, 5, the anchor head, 6, fixed spike, 7, the base, 8, the spout, 9, the dead lever, 10, the slide bar, 11, the backup pad, 12, the footstock, 13, the second arc, 14, fixing bolt, 15, first fixed block, 16, the second fixed block, 17, the recess, 18, the through-hole, 19, the barb, 20, first spring, 21, the protective sheath, 22, the connecting block, 23, first draw-in groove, 24, the second spring, 25, the fixture block, 26, the second draw-in groove, 27, the connecting rod.
Detailed Description
In order to make the technical solution of the present invention better understood, the technical solution of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts shall belong to the protection scope of the present invention.
It should be noted that the terms "first," "second," and the like in the description and claims of the present invention and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used may be interchanged under appropriate circumstances for purposes of describing the embodiments of the invention herein. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
In the present invention, the terms "upper", "lower", "left", "right", "front", "rear", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal", and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings. These terms are used primarily to better describe the invention and its embodiments, and are not intended to limit the indicated devices, elements or components to a particular orientation or to be constructed and operated in a particular orientation.
Moreover, some of the above terms may be used to indicate other meanings besides the orientation or positional relationship, for example, the term "on" may also be used to indicate some kind of attachment or connection relationship in some cases. The specific meaning of these terms in the present invention can be understood by those of ordinary skill in the art as appropriate.
Furthermore, the terms "mounted," "disposed," "provided," "connected," and "sleeved" are to be construed broadly. For example, it may be a fixed connection, a removable connection, or a unitary construction; can be a mechanical connection, or an electrical connection; may be directly connected, or indirectly connected through intervening media, or may be in internal communication between two devices, elements or components. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
It should be noted that, in the present invention, the embodiments and features of the embodiments may be combined with each other without conflict. The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
Referring to fig. 1-5, the anchor rod construction device for construction engineering includes a cavity loop bar 1, a top seat 12 is slidably sleeved on the upper portion of the outer wall of the cavity loop bar 1, the top end of the cavity loop bar 1 is fixedly connected with the bottom end of a connecting block 22, the top end of the connecting block 22 is fixedly connected with the bottom end of the outer wall of a protecting sleeve 21, an inner cavity of the cavity loop bar 1 is rotatably sleeved with a rod body 4, the bottom end of the cavity loop bar 1 is fixedly connected with an anchor head 5, the lower portion of the outer wall of the cavity loop bar 1 is slidably sleeved with the center of a base 7, the left side and the right side of the top end of the base 7 are respectively and fixedly connected with the bottom ends of supporting plates 11, the top ends of the two supporting plates 11 are respectively and fixedly connected with the left side and the right side of the bottom seat 12, and the left side and the right side of the base 7 are respectively and fixedly connected with a long nail 6 through threads.
One side of each of the two support plates 11, which is close to each other, is respectively provided with a sliding groove 8 in the vertical direction, the two sliding grooves 8 are respectively connected with a sliding rod 10 in a sliding manner, the centers of the two sliding rods 10 are respectively provided with a through groove 2, so that the stability of the device in the ground drilling process is improved, the left side and the right side of the bottom end of the top seat 12 are respectively fixedly connected with the top end of a fixed rod 9, the bottom end of the two fixed rods 9 are respectively fixedly connected with the left side and the right side of the top end of a base 7, the outer wall of the two fixed rods 9 is respectively sleeved with the through groove 2 in a sliding manner, so that the deviation of a rod body 4 in the ground drilling process is avoided, the left side of the outer wall of the cavity loop bar 1 is fixedly sleeved with an inner cavity of a first arc-shaped plate 3, the right side of the outer wall of the cavity loop bar 1 is fixedly sleeved with an inner cavity of a second arc-shaped plate 13, the center of the left side of the first arc-shaped plate 3 is fixedly connected with one end of the sliding rod 10, the front side and the rear side of the outer wall of the first arc-shaped plate 3 are respectively fixedly connected with a first fixed block 15, the front side and the rear side of the outer wall of the first arc-shaped plate 3 are respectively fixedly connected with a second fixed block 16, the two first fixed blocks 15 are respectively fixedly connected with the second fixed blocks 16 through fixing bolts 14, so as to be convenient for fixing different rod bodies 4, the center of the bottom end of the connecting block 22 is provided with a second clamping groove 26, the second clamping groove 26 is clamped with a clamping block 25, the center of the top end of the clamping block 25 is fixedly connected with the bottom end of a connecting rod 27, the connecting rod 27 is slidably sleeved with the center of the connecting block 22, the bottom end of the clamping block 25 is fixedly connected with one end of a second spring 24, the other end of the second spring 24 is fixedly connected with the bottom end of the inner cavity of the first clamping groove 23, the first clamping groove 23 is clamped with the clamping block 25, the first clamping groove 23 is embedded at the top end of the rod body 4, the top end of the connecting block 22 is fixedly connected with a protective sleeve 21, and a connecting rod 27 is arranged in the protective sleeve 21, be convenient for control the position of the body of rod 4 in cavity loop bar 1, a plurality of recesses 17 have been seted up respectively to 4 outer walls of the body of rod, the one end of the first spring 20 of fixed connection respectively in the recess 17, the one end of the other end fixed connection barb 19 of first spring 20, barb 19 slides and cup joints in recess 17, just barb 19 slides and cup joints through-hole 18, through-hole 18 is established at 1 outer wall of cavity loop bar, increases the withdrawal resistance of device.
When the utility model is used, the electrical components in the utility model are all externally connected with a power supply and a control switch, the device is fixed on the ground through a fixing long nail 6, a connecting block 22 is connected with an external power device to drive a cavity loop bar 1 and a bar body 4 to drill into the ground, in the process that the bar body 4 drills into the ground, a first arc plate 3 is matched with a second arc plate 13 to slide downwards on a slide bar 10, simultaneously, the slide bar 10 is matched with the descending of the first arc plate 3 and the second arc plate 13 to slide downwards on a slide groove 8, the deviation in the process that the bar body 4 drills into the ground is effectively avoided, after the bar body 4 drills into the ground, a connecting rod 27 is pressed to drive a clamping block 25 to be clamped into a first clamping groove 23, at the moment, the clamping block 25 is rotated to drive the bar body 4 to rotate in the cavity loop bar 1, so that an agnail 19 is popped out from a groove 17 under the action of a first spring 20 and popped out of the cavity loop bar 1 through a through hole 18, increase the resistance to plucking of the body of rod 4 through 19 effects of barb, make the fixed effect of the body of rod 4 better, simultaneously through the setting of first arc 3 and second arc 13, be convenient for adjust fixing bolt 14 and change the body of rod 4, increase the practicality.
The utility model discloses an useful part lies in:
1. in order to stabilize the subsequent grouting after the rod body is drilled into the ground, the connecting rod is pressed to drive the clamping block to be clamped into the first clamping groove, at the moment, the clamping block is rotated to drive the rod body to rotate in the cavity sleeve rod, the barb is popped out of the groove under the action of the first spring and is popped out of the cavity sleeve rod through the through hole, the anti-pulling force of the rod body is increased through the action of the barb, and the rod body fixing effect is better;
2. the utility model discloses rational in infrastructure, at the body of rod to the subaerial in-process that bores, first arc cooperation second arc is the lapse on the slide bar, and the decline of the first arc of slide bar cooperation and second arc is the lapse on the spout simultaneously, effectively avoids the body of rod to bore ground in-process and takes place the skew, through the setting of first arc and second arc, is convenient for adjust fixing bolt and changes the body of rod, increases the practicality.
It is well within the skill of those in the art to implement, without undue experimentation, the present invention does not relate to software and process improvements, as related to circuits and electronic components and modules.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. Stock construction equipment that building engineering used, its characterized in that: including cavity loop bar (1), sliding sleeve connects footstock (12) center department above cavity loop bar (1) outer wall, cavity loop bar (1) top fixed connection connecting block (22) bottom center department, connecting block (22) top center department fixed connection protective sheath (21) outer wall bottom, cavity loop bar (1) inner chamber rotates and cup joints the body of rod (4), cavity loop bar (1) bottom fixed connection anchor head (5), sliding sleeve connects base (7) center department below cavity loop bar (1) outer wall, base (7) top left and right sides is fixed connection backup pad (11) bottom respectively, two backup pad (11) top is fixed connection footstock (12) bottom left and right sides respectively, base (7) left and right sides is threaded connection fixed spike (6) respectively.
2. The anchor rod constructing device for construction engineering according to claim 1, wherein: two supporting plates (11) are provided with sliding grooves (8) in the vertical direction at one side close to each other, the sliding grooves (8) are respectively connected with sliding rods (10) in a sliding manner, and through grooves (2) are respectively formed in the centers of the sliding rods (10).
3. The anchor rod constructing device for construction engineering according to claim 1, wherein: the left side and the right side of the bottom end of the top seat (12) are fixedly connected with the top ends of the fixing rods (9) respectively, the left side and the right side of the top end of the fixing rod (9) are fixedly connected with the left side and the right side of the top end of the base (7) respectively, and the outer walls of the fixing rods (9) are sleeved with the through grooves (2) in a sliding mode respectively.
4. The anchor rod constructing device for construction engineering according to claim 1, wherein: fixed first arc (3) inner chamber of cup jointing in cavity loop bar (1) outer wall left side, fixed second arc (13) inner chamber of cup jointing in cavity loop bar (1) outer wall right side, the one end of fixed connection slide bar (10) is located at first arc (3) left side center, the one end of fixed connection slide bar (10) is located at second arc (13) right side center, first fixed block (15) of both sides fixed connection respectively around first arc (3) outer wall, both sides are fixed connection second fixed block (16) respectively around first arc (3) outer wall, two first fixed block (15) are respectively through fixing bolt (14) fixed connection second fixed block (16).
5. The anchor rod constructing device for construction engineering according to claim 1, wherein: second draw-in groove (26) have been seted up at connecting block (22) bottom center department, second draw-in groove (26) joint fixture block (25), fixture block (25) top center department fixed connection connecting rod (27) bottom, connecting rod (27) slip socket joint connecting block (22) center department, the one end of fixture block (25) bottom fixed connection second spring (24), the first draw-in groove of other end fixed connection (23) inner chamber bottom of second spring (24), first draw-in groove (23) joint fixture block (25), first draw-in groove (23) inlay on the body of rod (4) top, connecting block (22) top fixed connection protective sheath (21), be equipped with connecting rod (27) in protective sheath (21).
6. The anchor rod constructing device for construction engineering according to claim 1, wherein: a plurality of recesses (17) have been seted up respectively to the body of rod (4) outer wall, the one end of the first spring of fixed connection (20) respectively in recess (17), the one end of the other end fixed connection barb (19) of first spring (20), barb (19) slide and cup joint in recess (17), just barb (19) slide and cup joint through-hole (18), establish at cavity loop bar (1) outer wall through-hole (18).
CN202022989351.3U 2020-12-11 2020-12-11 Anchor rod construction device for constructional engineering Active CN214089849U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022989351.3U CN214089849U (en) 2020-12-11 2020-12-11 Anchor rod construction device for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022989351.3U CN214089849U (en) 2020-12-11 2020-12-11 Anchor rod construction device for constructional engineering

Publications (1)

Publication Number Publication Date
CN214089849U true CN214089849U (en) 2021-08-31

Family

ID=77428726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022989351.3U Active CN214089849U (en) 2020-12-11 2020-12-11 Anchor rod construction device for constructional engineering

Country Status (1)

Country Link
CN (1) CN214089849U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114086552A (en) * 2021-11-05 2022-02-25 常州工学院 Anchor bolt supporting device suitable for sandy soil field

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114086552A (en) * 2021-11-05 2022-02-25 常州工学院 Anchor bolt supporting device suitable for sandy soil field

Similar Documents

Publication Publication Date Title
US10233755B2 (en) Drilling and bursting heading machine
CN214089849U (en) Anchor rod construction device for constructional engineering
CN104234632B (en) A kind of bottom expanding drill
CN205870757U (en) Upright drill's accurate location structure of drill bit
CN1637229B (en) Boring device and method for introducing a boring element into the ground
CN209741761U (en) water conservancy bank protection component
CN207660547U (en) Speed-raising increases longevity two-stage PDC bit and twin-stage PDC reamers
CN214994169U (en) Building foundation fixing support
CN213145964U (en) Gas detection equipment for coal mining
CN210668711U (en) Earthing device for rock stratum
CN211692338U (en) Tunnel safety blasting construction device
CN210509037U (en) High-pressure rotary jet jumbolter
CN214221062U (en) Subway open cut station engineering cat ladder
CN219953262U (en) Drill bit coupling mechanism
CN216515628U (en) Foundation pit supporting structure
CN206144470U (en) Accurate efficient excavating drill of precision
CN210919113U (en) Reversible drilling box for anchor rod drilling machine
CN213143042U (en) Reinforcing apparatus of building engineering pile foundation
CN220980520U (en) Pretension hydraulic oil pipe anchor
CN206957585U (en) A kind of all-hydraulic tunnel horizontal drill device
CN215977253U (en) Recoverable prestressed anchor
CN215256089U (en) Coal side drill with thrust auxiliary device
CN204024478U (en) A kind of bottom expanding drill
CN219034632U (en) Drilling machine support convenient to installation for drilling engineering
CN216922031U (en) PDC drill bit convenient for tooth replacement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant