CN214079052U - Gas supply system of forging press of oil exploitation equipment - Google Patents

Gas supply system of forging press of oil exploitation equipment Download PDF

Info

Publication number
CN214079052U
CN214079052U CN202022468045.5U CN202022468045U CN214079052U CN 214079052 U CN214079052 U CN 214079052U CN 202022468045 U CN202022468045 U CN 202022468045U CN 214079052 U CN214079052 U CN 214079052U
Authority
CN
China
Prior art keywords
pressure
pressurize
forging press
compressor
links
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022468045.5U
Other languages
Chinese (zh)
Inventor
周现杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Puyang Chengyu Machinery Accessories Manufacturing Co ltd
Original Assignee
Puyang Chengyu Machinery Accessories Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Puyang Chengyu Machinery Accessories Manufacturing Co ltd filed Critical Puyang Chengyu Machinery Accessories Manufacturing Co ltd
Priority to CN202022468045.5U priority Critical patent/CN214079052U/en
Application granted granted Critical
Publication of CN214079052U publication Critical patent/CN214079052U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fluid-Pressure Circuits (AREA)

Abstract

The utility model discloses an air supply system of oil development equipment forging press has solved the poor technical problem of pneumatic pipeline reliability of current forging press. The utility model discloses a pneumatic line that links to each other with the forging press, pneumatic line links to each other with the compressor, is provided with the pressurize unit between compressor and the pneumatic line, and the pressurize unit includes the pressurize storehouse, and the compressor links to each other with the pressurize storehouse through the intake pipe that has the check valve that admits air, and the pressurize storehouse links to each other with pneumatic line, and the pressurize storehouse is connected with reserve atmospheric pressure jar through the benefit check valve that presses, is provided with vice manometer between benefit check valve and the reserve atmospheric pressure jar. The utility model discloses set up the pressurize unit between compressor and pneumatic pipeline, both can make the pressure in the pneumatic pipeline stable, can supply the pressure by reserve atmospheric pressure jar when the compressor is unusual again. The utility model discloses can real-time supervision pressurize the interior pressure of storehouse, in time adjust when the pressure fluctuation is great or not enough in the pressurize storehouse, can also the pressure in each reserve atmospheric pressure jar of real-time supervision.

Description

Gas supply system of forging press of oil exploitation equipment
Technical Field
The utility model relates to a forging press air pressure system technical field especially indicates an air supply system of oil development equipment forging press.
Background
A forging press is a machine that changes the physical properties of a metal material in a plastic state into a workpiece having a certain shape and size by hammering or the like. The forging press is internally provided with a pneumatic pipeline for control, the pneumatic pipeline is also called a gas source pipe or a pneumatic signal pipeline, the common medium of the pneumatic pipeline is compressed air, the compressed air is processed to be dry, oil-free and mechanical impurity-free clean compressed air (sometimes nitrogen is used), and the working pressure of the pneumatic pipeline is 0.7-0.8 MPa. As the forging press belongs to a heavy manufacturing apparatus, and the forged workpiece is in a high-temperature state, safe construction is very important, and the safety and reliability of a pneumatic pipeline are very important. The pneumatic pipeline of the existing forging press is directly connected with the air compressor, so that the dependence on the air compressor is overlarge, and serious production problems can be caused when the air compressor is unstable in operation or breaks down.
Disclosure of Invention
Not enough to among the above-mentioned background art, the utility model provides an oil development equipment forging press's air supply system has solved the poor technical problem of pneumatic pipeline reliability of current forging press.
The technical scheme of the utility model is realized like this: the utility model provides an air feed system of oil development equipment forging press, includes the pneumatic pipeline that links to each other with the forging press, and pneumatic pipeline links to each other with the compressor, be provided with the pressurize unit between compressor and the pneumatic pipeline, the pressurize unit includes the pressurize storehouse, and the compressor links to each other with the pressurize storehouse through the intake pipe that has the check valve that admits air, and the pressurize storehouse links to each other with pneumatic pipeline, and the pressurize storehouse is connected with reserve air pressure jar through mending the check valve, mends to be provided with vice manometer between pressure check valve and the reserve air pressure jar.
Further, the pressure maintaining bin is connected with a main pressure gauge.
Furthermore, spare air pressure tank is provided with a plurality of, and each spare air pressure tank all links to each other with the pressurize storehouse through the benefit pressure check valve.
Further, the pressure maintaining cabin is connected with a pneumatic pipeline through an exhaust pipe with an exhaust one-way valve.
Further, the pressure maintaining bin is a hollow cylinder, the air inlet pipe and the exhaust pipe are correspondingly arranged at the upper end and the lower end of the cylinder, and the standby air pressure tank is connected to the outer peripheral surface of the cylinder.
The utility model discloses set up the pressurize unit between compressor and pneumatic pipeline, both can make the pressure in the pneumatic pipeline stable, can supply the pressure by reserve atmospheric pressure jar when the compressor is unusual again. Additionally, the utility model discloses can the pressure in the real-time supervision pressurize storehouse, in time adjust when the pressure fluctuation is great or not enough in the pressurize storehouse, can also the pressure in each reserve atmospheric pressure jar of real-time supervision, be convenient for in time change.
Drawings
In order to illustrate the embodiments of the present invention more clearly, the drawings that are needed in the description of the embodiments will be briefly described below, and it is obvious that the drawings in the description below are only some embodiments of the present invention, and that other drawings can be obtained by those skilled in the art without inventive work.
Fig. 1 is a schematic structural diagram of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
The utility model provides an oil development equipment forging press's gas supply system, as shown in figure 1, includes the pneumatic pipeline that links to each other with the forging press, and the pneumatic pipeline links to each other with the compressor, be provided with the pressurize unit between compressor and the pneumatic pipeline, maintain the stability to pressure through the pressurize unit, not shown in pneumatic pipeline and the compressor figure. The pressurize unit includes pressurize storehouse 1, and the compressor links to each other with pressurize storehouse 1 through the intake pipe 3 that has the check valve 2 that admits air, and pressurize storehouse 1 links to each other with pneumatic pipeline through the blast pipe 5 that has exhaust check valve 4. The air inlet one-way valve 2 ensures that the gas in the pressure maintaining bin 1 cannot return, and the air outlet one-way valve 4 ensures that the gas in the pneumatic pipeline cannot return, so that the pressure in the starting pipeline is kept stable.
Further, the pressure maintaining cabin 1 is connected with a standby air pressure tank 6 through a pressure supplementing one-way valve 7, the standby air pressure tank 6 can assist the compressor to supply pressure to the pressure maintaining cabin 1, and the standby air pressure tank 6 can supply pressure when the compressor is abnormal. The spare air pressure tank 6 is provided with a plurality of, and each spare air pressure tank 6 is connected with the pressure maintaining bin 1 through the pressure supplementing check valve 7.
Further, the pressure maintaining bin 1 is connected with a main pressure gauge 8, and an auxiliary pressure gauge 9 is arranged between the pressure supplementing check valve 7 and the standby air pressure tank 6. The pressure in the pressure maintaining bin 1 can be monitored in real time by the main pressure gauge 8, the pressure fluctuation in the pressure maintaining bin 1 is large or insufficient, the pressure in each standby air pressure tank 6 can be monitored in real time by the auxiliary pressure gauge 9, and the replacement is convenient in time.
Further, pressurize storehouse 1 is hollow cylinder, and intake pipe 3 and blast pipe 5 correspond the upper and lower both ends that set up at the cylinder, reserve atmospheric pressure jar 6 is connected on the outer peripheral face of cylinder.
The present invention is not exhaustive and is well known to those skilled in the art.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides an oil development equipment forging press's gas supply system, includes the pneumatic line that links to each other with the forging press, and pneumatic line links to each other its characterized in that with the compressor: be provided with the pressurize unit between compressor and the pneumatic pipeline, the pressurize unit includes pressurize storehouse (1), and the compressor links to each other with pressurize storehouse (1) through intake pipe (3) that have air inlet check valve (2), and pressurize storehouse (1) links to each other with the pneumatic pipeline, and pressurize storehouse (1) is connected with reserve atmospheric pressure jar (6) through mending pressure check valve (7), mends to be provided with between pressure check valve (7) and reserve atmospheric pressure jar (6) vice manometer (9).
2. The gas supply system for the forging press of oil extraction equipment according to claim 1, wherein: and the pressure maintaining bin (1) is connected with a main pressure gauge (8).
3. The gas supply system of the oil extraction equipment forging press according to claim 1 or 2, characterized in that: the standby air pressure tanks (6) are provided with a plurality of air pressure tanks, and each standby air pressure tank (6) is connected with the pressure maintaining bin (1) through a pressure supplementing one-way valve (7).
4. The gas supply system for the forging press of oil extraction facilities of claim 3, wherein: the pressure maintaining cabin (1) is connected with a pneumatic pipeline through an exhaust pipe (5) with an exhaust one-way valve (4).
5. The gas supply system of the oil extraction equipment forging press according to any one of claims 1, 2, 4, characterized in that: the pressure maintaining bin (1) is a hollow cylinder, the air inlet pipe (3) and the exhaust pipe (5) are correspondingly arranged at the upper end and the lower end of the cylinder, and the standby air pressure tank (6) is connected to the outer peripheral surface of the cylinder.
CN202022468045.5U 2020-10-30 2020-10-30 Gas supply system of forging press of oil exploitation equipment Active CN214079052U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022468045.5U CN214079052U (en) 2020-10-30 2020-10-30 Gas supply system of forging press of oil exploitation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022468045.5U CN214079052U (en) 2020-10-30 2020-10-30 Gas supply system of forging press of oil exploitation equipment

Publications (1)

Publication Number Publication Date
CN214079052U true CN214079052U (en) 2021-08-31

Family

ID=77447163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022468045.5U Active CN214079052U (en) 2020-10-30 2020-10-30 Gas supply system of forging press of oil exploitation equipment

Country Status (1)

Country Link
CN (1) CN214079052U (en)

Similar Documents

Publication Publication Date Title
CN212080875U (en) Medical gas bus bar device with residual prediction function
CN101781692B (en) Blast-furnace coal powder injection method and system thereof
CN201461616U (en) Pneumatic high-pressure supercharger control system
CN214079052U (en) Gas supply system of forging press of oil exploitation equipment
CN204646817U (en) A kind of accumulator pressurizing device
CN204387679U (en) Four-wire system refueling system
CN209165028U (en) A kind of supercritical carbon dioxide system of multi-stage booster
CN202302744U (en) Compressed air supply system for chemical fiber production
CN105298949B (en) A kind of portable gas supercharging device
CN212759095U (en) Compressed gas continuous supply device of coal grinding system
CN211423042U (en) Intelligent gas pressurization system
CN202955472U (en) High pressure gasholder of pneumatic dredge pump
CN220505261U (en) High poplar tailing conveying slurry pump device
CN207390485U (en) A kind of powdered coal pressuring gasified conveying device
CN202901833U (en) Compressed air system used for producing chemical fibers
CN206723019U (en) A kind of energy supplying system of low-pressure compressed air supercharging supply
CN101566181B (en) Control system for pneumatic high-voltage booster
CN210212344U (en) Tire inflation tool
CN205815317U (en) Gas-liquid separation device in the pneumatic operated valve supply air line of gas incinerator
CN216896790U (en) Gas recycling device
CN201335606Y (en) Air supply protective device
CN212987772U (en) Supercharging device for liquefied carbon dioxide
CN205716433U (en) Multi-stage booster gas recovery system
CN110593786B (en) Wet dust removal system for down-the-hole drill
CN208829264U (en) A kind of hydrogen pressure system producing hydrogen peroxide

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant