CN214067230U - Fixing device for gas relay calibrator - Google Patents

Fixing device for gas relay calibrator Download PDF

Info

Publication number
CN214067230U
CN214067230U CN202120100175.5U CN202120100175U CN214067230U CN 214067230 U CN214067230 U CN 214067230U CN 202120100175 U CN202120100175 U CN 202120100175U CN 214067230 U CN214067230 U CN 214067230U
Authority
CN
China
Prior art keywords
unit
gas relay
fixed
fixing device
check
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120100175.5U
Other languages
Chinese (zh)
Inventor
王学鹏
王学彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Yacan Electric Co ltd
Original Assignee
Xi'an Yacan Electric Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Yacan Electric Co ltd filed Critical Xi'an Yacan Electric Co ltd
Priority to CN202120100175.5U priority Critical patent/CN214067230U/en
Application granted granted Critical
Publication of CN214067230U publication Critical patent/CN214067230U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The utility model discloses a fixing device for a gas relay calibrator, which comprises a supporting unit and a fixing unit, wherein the fixing unit is fixed above the supporting unit; the movable unit moves along the upper part of the supporting unit, a fixed cavity with variable width is formed between the movable unit and the fixed unit, and a fixed area for gas relay calibration is formed between the fixed cavity with variable width and the supporting unit and is used for fixing a gas relay to be calibrated; during the check-up, treat that the check-up buchholz relay arranges the support element top in, the mobile unit passes through the power pack and provides power and removes along the support element for the width adjustment of fixed chamber is to and treats the check-up buchholz relay matching back, realizes treating the fixed of check-up buchholz relay. In this embodiment, utilize power pack, realized controllable automatic centre gripping, use manpower sparingly, raise the efficiency.

Description

Fixing device for gas relay calibrator
Technical Field
The utility model relates to an electrical equipment check-up detects appurtenance technical field, concretely relates to fixing device for buchholz relay check gauge.
Background
The gas relay is applied to transformer protection, can send out a fault alarm when the oil immersed power transformer is abnormal, and can quickly remove fault equipment from a power grid, thereby reducing the occurrence of power accidents and improving the safety and reliability of power social security operation. The gas relay calibrator is used for testing the heavy gas protection action flow rate, the light gas protection action volume and the gas relay sealing test of a transformer in a power system, testing the opening and closing pressure of a pressure relief valve, and automatically printing by a pressure difference method for simulating faults in the transformer and measuring instantaneous pulse flow rate values, microcomputer measurement and control, digital display and automatic printing. In the buchholz relay check gauge, it is always more time-consuming and energy-consuming to buchholz relay's fixed, mainly be among the prior art, buchholz relay's fixed, promote through manpower manual, in promoting, mobile unit's structure is heavier, if female operative employee, can't directly realize whole fixed centre gripping process, and simultaneously, manpower promotes, whole mobile unit's displacement is difficult to hold, the precision is poor, produce the centre gripping easily and do not fasten, clamping device and waiting to check up buchholz relay have the clearance, influence check up effect scheduling problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that not enough among the above-mentioned prior art is directed against, provide a fixing device for buchholz relay check gauge, it passes through power pack, and cooperation mobile unit has realized treating check-up buchholz relay's fixed centre gripping to different widths, has realized automatic fixed and centre gripping, has improved the precision and the degree of accuracy of whole check-up.
The utility model provides a technical scheme that its technical problem adopted is:
a fixing device for a gas relay calibrator comprises,
a support unit for supporting the support unit,
a fixing unit fixed above the supporting unit;
the movable unit moves along the upper part of the supporting unit, a fixed cavity with variable width is formed between the movable unit and the fixed unit, and a fixed area for gas relay calibration is formed between the fixed cavity with variable width and the supporting unit and is used for fixing a gas relay to be calibrated;
during the check-up, treat that the check-up buchholz relay arranges the support element top in, the mobile unit passes through the power pack and provides power and removes along the support element for the width adjustment of fixed chamber is to and treats the check-up buchholz relay matching back, realizes treating the fixed of check-up buchholz relay.
As a further improvement of the utility model, the supporting unit comprises a workbench, a supporting workbench and a base arranged below the supporting rod.
As a further improvement of the utility model, the bracing piece passes the workstation sets up, the workstation below is provided with adjusting bolt, be provided with on the bracing piece with the screw thread that adjusting bolt matches.
As a further improvement of the utility model, a sleeve unit is arranged on the base, and the supporting rod sleeve is arranged in the sleeve unit.
As a further improvement, the utility model discloses a still include the frock board, treat between check-up buchholz relay and the fixed unit to and treat that check-up buchholz relay is close to mobile unit one side, be provided with respectively the frock board, treat check-up buchholz relay with fix a position through first locating pin between the frock board.
As a further improvement of the present invention, the fixing unit is connected to the tool plate through a second positioning pin.
As the utility model discloses a further improvement still includes the sealing strip, the frock board with treat to realize sealing through the sealing strip between the check-up buchholz relay.
As the utility model discloses a further improvement still includes the brace table that sets up on the support element, the brace table includes that a plurality of stacks puts the thing platform, and every upper and lower both ends of putting the thing platform all are provided with the jack, and adjacent putting is realized stacking the support through the screw rod in the jack between the thing platform.
As a further improvement, the supporting unit is provided with a slide rail, the bottom of the moving unit is provided with a slide block, and under the action of the power unit, the slide block is arranged on the slide rail.
As a further improvement, the fixing unit and the moving unit are respectively provided with a first through hole and a second through hole, and during the calibration, the first through hole and the second through hole are positioned on the shaft hole of the same horizontal line.
The utility model has the advantages as follows:
the utility model discloses in, through three unit, form fixed area, compare in the both sides centre gripping of simple, the centre gripping and the support of three direction can ensure whole check-up, treat check-up buchholz relay's stability, have promoted the security of whole check-up process, have improved efficiency.
The utility model discloses in, utilize the mobile unit, adjust whole fixed area territory, can match different widths, the buchholz relay of different models has enlarged whole application scope, more is suitable for the industrialization and popularizes and applies.
The utility model discloses in, adopt power pack, promote the mobile unit and remove along the support element, whole removal is automatic, uses manpower sparingly, can improve the precision, has improved fixed centre gripping efficiency in the whole check-up, has greatly saved the cost. Specifically, the air cylinder unit can be used as a power unit, and compared with a screw rod and the like, the air cylinder has the advantages that pushing thrust controllability is higher, pneumatic thrust is constant, moving precision is convenient to adjust, and the whole fixing precision is higher; the cylinder unit is more laborsaving, if adopt the manpower to press from both sides tightly, not only hard, the leakproofness is poor moreover.
Drawings
Fig. 1 is a schematic structural view of a fixing device for a buchholz relay calibrator provided by the present invention;
fig. 2 is a front view of a fixing device for a buchholz relay calibrator provided by the present invention;
fig. 3 is a schematic structural diagram of a power unit provided by the present invention;
fig. 4 is a schematic structural diagram of a mobile unit provided by the present invention;
fig. 5 is a schematic structural diagram of a fixing unit provided by the present invention;
description of reference numerals:
100. a support unit; 110. a work table; 120. a support bar; 130. a base; 140. adjusting the bolt; 150. a sleeve unit; 160. a slide rail; 200. a fixing unit; 210. a first through hole; 300. a mobile unit; 310. a slider; 320. a second through hole; 400. a fixed cavity; 500. a power unit; 600. assembling a plate; 610. a first mounting hole; 620. a second mounting hole; 700. a first positioning pin; 800. a second positioning pin; 900. a support table; 910. a placing table; 1. a sealing strip.
Detailed Description
The present invention is described in detail with reference to the embodiments shown in the drawings, but it should be understood that these embodiments are not intended to limit the present invention, and those skilled in the art should understand that the functions, methods, or structural equivalents or substitutions made by these embodiments are within the scope of the present invention.
Example 1
This embodiment, referring to fig. 1-2, mainly describes a core assembly of a fixing device for a buchholz relay calibrator, including,
the support unit 100 is provided with a support member,
a fixing unit 200, wherein the fixing unit 200 is fixed above the supporting unit 100;
the movable unit 300 moves above the supporting unit 100, a fixed cavity 400 with variable width is formed between the movable unit 300 and the fixed unit 200, and a fixed area for the buchholz relay to be verified is formed between the fixed cavity 400 with variable width and the supporting unit 100 and is used for fixing the buchholz relay to be verified;
during the calibration, the buchholz relay to be calibrated is arranged above the supporting unit 100, the moving unit 300 provides power through the power unit 500 to move along the supporting unit 100, so that the width of the fixed cavity 400 is adjusted to be matched with the buchholz relay to be calibrated, and the buchholz relay to be calibrated is fixed.
In this embodiment, through three unit, form fixed area, compare in simple both sides centre gripping, the centre gripping and the support of three direction can ensure whole check-up, treat the stability of check-up buchholz relay, have promoted the security of whole check-up process, have improved efficiency.
In the embodiment, the whole fixed area is adjusted by the mobile unit, so that the gas relays with different widths and different types can be matched, the whole application range is expanded, and the gas relay fixing device is more suitable for industrial popularization and application.
In this embodiment, adopt power pack, promote the mobile unit and remove along the support element, whole removal is automatic, uses manpower sparingly, can improve the precision, has improved fixed centre gripping efficiency in the whole check-up, has greatly saved the cost. Specifically, the air cylinder unit can be used as a power unit, and compared with a screw rod and the like, the air cylinder has the advantages that pushing thrust controllability is higher, pneumatic thrust is constant, moving precision is convenient to adjust, and the whole fixing precision is higher; the cylinder unit is more laborsaving, if adopt the manpower to press from both sides tightly, not only hard, the leakproofness is poor moreover.
When using this embodiment, at first, will wait to check that buchholz relay arranges in supporting element 100, and supporting element 100 adjusts to suitable height, and at this moment, wait to check that buchholz relay one side is fixed in on fixed unit 200 through pin etc. control power unit 500 specifically, adopts the cylinder, promotes mobile unit 300, slowly is close to from a distance and waits to check that buchholz relay to laminating completely, realizes fixedly.
In this embodiment, utilize the easy principle of controlling of cylinder, drive whole mobile unit 300 and remove to realize final whole fixed, treat the check gas relay promptly, one side is fixed, and the opposite side is through automatic the control unit control mobile unit, in order to realize that mobile unit and fixed unit form fixed chamber, the function of check gas relay is treated in the centre gripping.
Example 2
In this embodiment, the support unit is mainly used for description.
Referring to fig. 1, in the present embodiment, the supporting unit 100 includes a table 110, a supporting rod 120 supporting the table 110, and a base 130 disposed below the supporting rod 120. Set up solitary workstation 110, be convenient for place and treat the check-up buchholz relay, and bracing piece 120 for follow-up whole support element's altitude mixture control, provides probably, base 130 can protect bracing piece 120, if do not have base 130, directly arranges ground etc. in, the bracing piece that easily wears and teares, leads to part bracing piece bottom unstable, reduces stability.
Specifically, the support rod 120 penetrates through the workbench 110, an adjusting bolt 140 is arranged below the workbench 110, and a thread matched with the adjusting bolt 140 is arranged on the support rod 120. Compared with an expansion link and the like, the adjusting bolt 140 is convenient to adjust, the height of the workbench 110 can be adjusted by rotating the bolt, the adjustment is easy to realize, time and labor are saved, and the efficiency is higher. And the screw thread adjustment can finely tune, compares in the telescopic link, and the adjustment is more accurate.
Specifically, the base 130 is provided with a sleeve unit 150, and the supporting rod 120 is sleeved in the sleeve unit 150.
Compared with the mode of bolts and the like, the sleeve unit 150 is easy to disassemble and assemble and can be directly inserted, the bottom of the supporting rod 120 is directly inserted and is directly pulled out after use, the disassembling and assembling are convenient, and the assembling and disassembling speed is improved.
Example 3
In this embodiment, the description is made with reference to a tooling plate.
Referring to fig. 1-2, still be provided with the frock board 600 that is used for the frock, wait to check between buchholz relay and the fixed unit 200, and wait to check buchholz relay and be close to mobile unit 300 one side, be provided with respectively frock board 600, wait to check buchholz relay with through first locating pin 700 location between frock board 600. Specifically, the tooling plate 600 can be provided with a plurality of models, and then match different buchholz relays to be verified, and is connected with the fixing unit 200 the tooling plate 600 is provided with a plurality of first mounting holes 610 for matching the first positioning pin 700.
Further, referring to fig. 1, the fixing unit 200 is connected to the tooling plate 600 by a second positioning pin 800. Further, a second mounting hole 620 may be provided on the tooling plate 600 to facilitate mounting of the second positioning pin 800.
The installation mode of the positioning pin is adopted, so that the installation and the positioning can be ensured, the assembly is simple, and the efficiency is high.
Referring to the attached drawing 1, in order to realize a sealed environment, the gas relay testing fixture further comprises a sealing strip 1, and the tooling plate 600 is sealed with the gas relay to be verified through the sealing strip 1.
Set up sealing strip 1, mainly be in order to ensure the sealed in the installation, of course, can also set up the sealing strip between frock board and fixed unit, in this embodiment, the sealing strip adopts the rubber pad of circle structure, and is with low costs, acquires easily.
Referring to fig. 1 to 5, the supporting table 900 is disposed on the supporting unit 100, the supporting table 900 includes a plurality of stacked object placing tables 910, the upper and lower ends of each object placing table 910 are provided with insertion holes (not shown), and the adjacent object placing tables 910 are stacked and supported by screws in the insertion holes. Referring to fig. 4 to 5, in the present embodiment, in order to realize sliding, a sliding rail 160 is disposed on the supporting unit 100, and a sliding block 310 is disposed at the bottom of the moving unit 300, and under the action of the power unit 500, the sliding block 310 moves along the sliding rail 160.
In order to ensure the communication of air passages during installation, the fixing unit 200 and the moving unit 300 are respectively provided with a first through hole 210 and a second through hole 320, and during verification, the first through hole 210 and the second through hole 320 are located on the shaft holes of the same horizontal line. In actual use, the first through hole and the second through hole are respectively communicated with an air hole or an oil hole of a gas relay to be checked and are arranged on the same horizontal line, so that the whole air path or oil path can be ensured to be on the same horizontal line, and the checking efficiency is improved.
Example 4
In the present embodiment, description will be given with specific use.
Referring to fig. 1 to 5, in the present embodiment, the fixing unit 200 is a fixing plate, and the supporting unit 100 includes a table 110 formed in a plate-shaped structure, a supporting rod 120, an adjusting bolt 140, a sleeve unit 150, and a base 130, the supporting rod 120 is mounted on the base 130 through the sleeve unit 150 on the base 130, a mounting hole is formed in the table 110, the supporting rod 120 is disposed through the mounting hole, and then the height of the table 110 is controlled by adjusting the adjusting bolt 140 on the supporting rod 120 and under the table 110.
During the use, adjust whole workstation 110 to suitable height through adjusting bolt 140, then through the stack between the thing platform 910 of putting of different quantity, realize the adjustment of a supporting bench 900 height, specifically, set up the poroid cell body respectively at every two sides of putting the thing platform 910, on adjacent putting the thing platform 910, the poroid cell body of different faces corresponds, utilizes the screw rod of putting into, realizes the location after stacking fixedly.
Can set up the recess at the upper surface of brace table 900 for place and treat the check-up buchholz relay, adopt the second locating pin to realize fixture plate and fixed unit's fixed in advance, then utilize first locating pin, realize treating the fixed of check-up buchholz relay and fixture plate. Through the cylinder assembly, the mobile unit 300 is controlled to a proper position, and then the gas relay to be checked in the fixed cavity is fixedly clamped.
The above list of details is only for the practical implementation of the present invention, and they are not intended to limit the scope of the present invention, and all equivalent implementations or modifications that do not depart from the technical spirit of the present invention should be included in the scope of the present invention.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (10)

1. A fixing device for a gas relay calibrator is characterized by comprising,
a support unit for supporting the support unit,
a fixing unit fixed above the supporting unit;
the movable unit moves along the upper part of the supporting unit, a fixed cavity with variable width is formed between the movable unit and the fixed unit, and a fixed area for gas relay calibration is formed between the fixed cavity with variable width and the supporting unit and is used for fixing a gas relay to be calibrated;
during the check-up, treat that the check-up buchholz relay arranges the support element top in, the mobile unit passes through the power pack and provides power and removes along the support element for the width adjustment of fixed chamber is to and treats the check-up buchholz relay matching back, realizes treating the fixed of check-up buchholz relay.
2. The fixing device for the gas relay calibration instrument according to claim 1, wherein the supporting unit comprises a workbench, a supporting rod for supporting the workbench, and a base arranged below the supporting rod.
3. The fixing device for the gas relay calibrator according to claim 2, wherein the support rod penetrates through the workbench, an adjusting bolt is arranged below the workbench, and threads matched with the adjusting bolt are arranged on the support rod.
4. The fixing device for the gas relay calibration instrument according to claim 3, wherein a sleeve unit is arranged on the base, and the support rod is sleeved in the sleeve unit.
5. The fixing device for the gas relay calibrator according to claim 2, further comprising a tooling plate, wherein the tooling plate is respectively arranged between the gas relay to be calibrated and the fixing unit and on one side of the gas relay to be calibrated close to the moving unit, and the gas relay to be calibrated and the tooling plate are positioned through a first positioning pin.
6. The fixing device for the gas relay calibration instrument according to claim 5, wherein the fixing unit is connected with the tool plate through a second positioning pin.
7. The fixing device for the gas relay calibrator according to claim 5, further comprising a sealing strip, wherein the tool plate and the gas relay to be calibrated are sealed through the sealing strip.
8. The fixing device for the gas relay calibration instrument according to any one of claims 1 to 7, further comprising a support platform arranged on the support unit, wherein the support platform comprises a plurality of stacked object placing platforms, the upper end and the lower end of each object placing platform are provided with insertion holes, and the adjacent object placing platforms are stacked and supported through screws in the insertion holes.
9. The fixing device for the gas relay calibration instrument as claimed in any one of claims 1 to 7, wherein a slide rail is arranged on the supporting unit, a slide block is arranged at the bottom of the moving unit, and the slide block moves along the slide rail under the action of the power unit.
10. The fixing device for the gas relay calibration instrument according to any one of claims 1 to 7, wherein the fixing unit and the moving unit are respectively provided with a first through hole and a second through hole, and the first through hole and the second through hole are positioned on the shaft holes on the same horizontal line during calibration.
CN202120100175.5U 2021-01-15 2021-01-15 Fixing device for gas relay calibrator Active CN214067230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120100175.5U CN214067230U (en) 2021-01-15 2021-01-15 Fixing device for gas relay calibrator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120100175.5U CN214067230U (en) 2021-01-15 2021-01-15 Fixing device for gas relay calibrator

Publications (1)

Publication Number Publication Date
CN214067230U true CN214067230U (en) 2021-08-27

Family

ID=77393991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120100175.5U Active CN214067230U (en) 2021-01-15 2021-01-15 Fixing device for gas relay calibrator

Country Status (1)

Country Link
CN (1) CN214067230U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114719908A (en) * 2022-04-08 2022-07-08 中煤科工集团重庆研究院有限公司 Coal petrography dynamic disaster auxiliary measuring device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114719908A (en) * 2022-04-08 2022-07-08 中煤科工集团重庆研究院有限公司 Coal petrography dynamic disaster auxiliary measuring device
CN114719908B (en) * 2022-04-08 2024-02-06 中煤科工集团重庆研究院有限公司 Auxiliary measuring device for dynamic disaster of coal rock

Similar Documents

Publication Publication Date Title
CN106803566B (en) Cutting device for battery core tab
CN201903626U (en) Pneumatic testing device
CN214067230U (en) Fixing device for gas relay calibrator
CN112666371A (en) Fixing device for gas relay calibrator
CN208751786U (en) A kind of full-automatic testing device for the detection calibration of circuit board pressure sensor
CN104227302A (en) Overall welding and detection device for bracket
KR20150001317A (en) A Moving Apparatus for Support of Ship Block
CN106876649B (en) Battery core tab cutting device
CN203629814U (en) Force application test experiment table for vertical type tool rest
CN113602523B (en) Loading system for wing load calibration test and application method thereof
CN104191194A (en) Device for refrigerator compressor core to be automatically placed in shell
CN203894061U (en) Wheel transverse fixing clamp
CN103954457A (en) Horizontal vehicle wheel fixing clamp
CN105312937A (en) Device for automatically matching clamping device and workpiece contour and method for using device
CN203324406U (en) Detector for automatically clamping lightning arresters
CN203287481U (en) Insulating ladder withstand voltage test device
CN108972709B (en) Decorative board installation perforating device
CN205363813U (en) Albedometer rapid survey auxiliary positioning device
CN204085801U (en) A kind of leakage tester
CN209296257U (en) A kind of modularization vehicle rear axle assembly air-leakage test platform
CN109238827B (en) Box resistance to compression detects tool
CN208802551U (en) Lithium ion square power battery full-automatic transplantation tests leakage equipment
CN206583393U (en) A kind of stamping parts of automobile detection means
CN209465992U (en) A kind of automatic pre-positioning system
CN219192565U (en) Aircraft component assembly type frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant