CN214052710U CN202023292640.4U CN202023292640U CN214052710U CN 214052710 U CN214052710 U CN 214052710U CN 202023292640 U CN202023292640 U CN 202023292640U CN 214052710 U CN214052710 U CN 214052710U
Authority
CN
China
Prior art keywords
early warning
groove
warning device
insert
cleaning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023292640.4U
Other languages
Chinese (zh)
Inventor
刘大宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202023292640.4U priority Critical patent/CN214052710U/en
Application granted granted Critical
Publication of CN214052710U publication Critical patent/CN214052710U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

The utility model relates to a construction engineering quality control technical field specifically is a construction engineering early warning device for quality control, including the device main part, the device main part includes the device casing, the front of device casing is provided with the display screen body, the front of device casing is provided with control module, the top of device casing is provided with detects the head, and the quantity that detects the head is two, the top of device casing is provided with the siren, the front of device casing is provided with clean mechanism. The utility model discloses a be provided with clean mounting base, sliding tray, sliding block, insert the mounting groove, insert installation piece and clean pole, solved current construction engineering early warning device for quality control and did not have clean structure, this has not only reduced staff's work efficiency, still makes the staff appear observing unsafe problem easily, and further through being provided with protection casing, magnet and iron sheet, can play the guard action to control module, increased the practicality.

Description

Early warning device for construction engineering quality management
Technical Field
The utility model relates to a construction engineering quality control technical field specifically is a construction engineering early warning device for quality control.
Background
Engineering quality management refers to a system management activity performed by using a whole set of quality management system, means and method to ensure and improve engineering quality. The good and bad engineering quality is a fundamental problem. The construction of engineering projects has large investment and long construction and use period, can be put into production and delivered for use only when meeting the quality standard, exerts the investment benefit, combines professional technology, operation management and mathematical statistics, and meets the social needs. The requirements of many countries in the world on engineering quality have a set of strict supervision and inspection methods.
At present, before the construction project is delivered, quality inspection work needs to be carried out on the quality in the construction project, along with the improvement of environmental awareness of customers, the formaldehyde pollution is the most important thing in the engineering quality management, the construction project quality management in the prior art needs to use an early warning device, and when detecting that the formaldehyde exceeds the standard, the early warning device can be sent out through an alarm, so that the effect of detecting the early warning can be played.
At present, early warning device for construction engineering quality control is at the in-process that uses, often need clean the dust removal to early warning device's display module, prevents that the staff from appearing observing unsafe problem, but current early warning device for construction engineering quality control does not have clean structure, and this has not only reduced staff's work efficiency, still makes the staff appear easily and observes inaccurately.
Therefore, it is necessary to design an early warning device for quality management of construction engineering to solve the above problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an early warning device for construction engineering quality control to the current early warning device for construction engineering quality control who proposes in solving above-mentioned background does not have clean structure, and this has not only reduced staff's work efficiency, still makes the staff appear observing unsafe problem easily.
In order to achieve the above object, the utility model provides a following technical scheme: an early warning device for construction engineering quality management comprises a device main body, wherein the device main body comprises a device shell, the front of the device shell is provided with a display screen body, the front of the device shell is provided with a control module, the top end of the device shell is provided with two detection heads, the top end of the device shell is provided with an alarm, the front of the device shell is provided with a cleaning mechanism, the cleaning mechanism comprises two cleaning installation bases, the front of the device shell is fixedly provided with the cleaning installation bases, the number of the cleaning installation bases is two, one sides of the cleaning installation bases, which are close to each other, are provided with sliding grooves, the sliding blocks are slidably installed inside the sliding grooves, one sides of the sliding blocks, which are close to each other, are provided with insertion installation grooves, insert the inside of mounting groove and all insert and install and insert the installation piece, the middle fixed mounting who inserts the installation piece has clean pole.
Preferably, the protection casing is installed through articulated the installing of articulated shaft in one side of device casing, fixed mounting has the magnet on the protection casing, the positive fixed mounting of device casing has the iron sheet.
Preferably, the front surface of the protective cover is provided with a transparent soft sleeve.
Preferably, the ball groove bodies are all opened to one side that the sliding block is kept away from each other, and the quantity of ball groove bodies is four, the ball body is all roll-mounted to the inside of ball groove body.
Preferably, the draw-in groove has all been seted up to the both sides of inserting the installation piece, the spring recess has all been seted up to the inside both sides of inserting the installation groove, the inside all fixed mounting of spring recess has reset spring, the all fixed mounting in one side that reset spring is close to each other has the card ball, the shape that the card ball is close to one side each other all is the arc, and the card ball all inserts the inside to the draw-in groove.
Preferably, the front surface of the cleaning rod is sleeved with an anti-slip sleeve gasket, and anti-slip lines are uniformly arranged on the outer surface of the anti-slip sleeve gasket.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through being provided with clean mounting base, sliding tray, sliding block, insert the mounting groove, insert installation piece and clean pole to effectual having solved current early warning device for construction engineering quality control does not have clean structure, and this has not only reduced staff's work efficiency, still makes the staff appear observing unsafe problem easily, and further through being provided with protection casing, magnet and iron sheet, can play the guard action to control module, has increased the practicality of this device.
2. Through being provided with transparent soft cover, make the staff when not opening the protection casing, also can operate control module, the practicality of this device has been increased, further through being provided with ball cell body and ball body, make the frictional force between sliding tray and the sliding block reduce, thereby the effectual life who prolongs sliding tray and sliding block, further through being provided with the draw-in groove, the card ball, spring groove and reset spring, not only play spacing fixed effect to the cleaning rod, still made things convenient for the dismantlement maintenance work of staff later stage to the cleaning rod, further through being provided with anti-skidding sleeve pad, play the antiskid.
Drawings
FIG. 1 is a schematic view of a front view of a partial section of the structure of the present invention;
FIG. 2 is a schematic sectional view of the cleaning mechanism according to the present invention;
FIG. 3 is a schematic side view of the structure of the cleaning rod of the present invention;
fig. 4 is a partially enlarged schematic view of the structure at a in fig. 2 according to the present invention;
fig. 5 is a schematic enlarged view of a part of the structure at B in fig. 4 according to the present invention.
In the figure: 100. a device main body; 110. a device housing; 111. a display screen body; 112. a control module; 113. a protective cover; 114. a magnet; 115. iron sheets; 116. a transparent soft sleeve; 117. a detection head; 118. an alarm; 200. a cleaning mechanism; 210. cleaning the mounting base; 211. a sliding groove; 212. a slider; 213. inserting into the mounting groove; 214. inserting the mounting block; 215. a cleaning rod; 216. an anti-slip sleeve pad; 217. a ball groove body; 218. a ball body; 219. a card slot; 220. blocking the ball; 221. a spring groove; 222. a return spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides an embodiment:
an early warning device for quality management of construction engineering comprises a device main body 100, wherein the device main body 100 comprises a device shell 110, a display screen body 111 is arranged on the front surface of the device shell 110, a control module 112 is arranged on the front surface of the device shell 110, two detection heads 117 are arranged at the top end of the device shell 110, an alarm 118 is arranged at the top end of the device shell 110, a cleaning mechanism 200 is arranged on the front surface of the device shell 110, the cleaning mechanism 200 comprises a cleaning installation base 210, two cleaning installation bases 210 are arranged at the top end of the device shell 110, two cleaning installation bases 210 are fixedly arranged at the front surface of the device shell 110, sliding grooves 211 are arranged at one sides of the cleaning installation bases 210 close to each other, sliding blocks 212 are arranged inside the sliding grooves 211 in a sliding mode, insertion installation grooves 213 are arranged at one sides of the sliding blocks 212 close to each other, insert the inside of mounting groove 213 and all insert installation piece 214, insert the middle fixed mounting of installation piece 214 and have clean pole 215 to effectual for the construction engineering quality control of having solved current early warning device do not have clean structure, this not only has reduced staff's work efficiency, still makes the staff appear observing inaccurate problem easily.
Furthermore, one side of the device shell 110 is hinged with a protective cover 113 through a hinged shaft, a magnet 114 is fixedly mounted on the protective cover 113, and an iron sheet 115 is fixedly mounted on the front side of the device shell 110, so that the protection effect on the control module 112 can be achieved, and the practicability of the device is improved.
Furthermore, the front of the protection cover 113 is provided with a transparent soft sleeve 116, so that the worker can operate the control module 112 without opening the protection cover 113, and the practicability of the device is improved.
Further, ball groove bodies 217 are arranged on one side, away from each other, of the sliding block 212, the number of the ball groove bodies 217 is four, and the ball body 218 is installed inside the ball groove bodies 217 in a rolling mode, so that the friction force between the sliding groove 211 and the sliding block 212 is reduced, and the service lives of the sliding groove 211 and the sliding block 212 are effectively prolonged.
Further, draw-in groove 219 has all been seted up to the both sides of inserting installation piece 214, spring groove 221 has all been seted up to the inside both sides of inserting mounting groove 213, the inside all fixed mounting of spring groove 221 has reset spring 222, the mutual all fixed mounting in one side that is close to of reset spring 222 has card ball 220, the shape that card ball 220 is close to one side each other all is the arc, and card ball 220 all inserts the inside to draw-in groove 219, not only play spacing fixed effect to cleaning rod 215, still made things convenient for staff's later stage to the dismantlement maintenance work of cleaning rod 215.
Furthermore, the front surface of the cleaning rod 215 is sleeved with an anti-slip sleeve pad 216, and the outer surface of the anti-slip sleeve pad 216 is uniformly provided with anti-slip lines to play an anti-slip role.
The working principle is as follows: when the device is used, when dust is attached to the outer surface of the display screen body 111 and the display screen body 111 needs to be cleaned, a worker can hold the anti-slip sleeve pad 216 by hands and apply a leftward or rightward force to the anti-slip sleeve pad 216, and because the anti-slip sleeve pad 216 is tightly attached to the outer surface of the display screen body 111, when the anti-slip sleeve pad 216 moves leftwards and rightwards, the anti-slip sleeve pad 216 can clean the outer surface of the display screen body 111.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a construction engineering early warning device for quality control, includes device main part (100), its characterized in that: the device main body (100) comprises a device shell (110), a display screen body (111) is arranged on the front face of the device shell (110), a control module (112) is arranged on the front face of the device shell (110), a detection head (117) is arranged on the top end of the device shell (110), the number of the detection heads (117) is two, an alarm (118) is arranged on the top end of the device shell (110), a cleaning mechanism (200) is arranged on the front face of the device shell (110), the cleaning mechanism (200) comprises a cleaning installation base (210), the number of the cleaning installation bases (210) is two, the cleaning installation bases (210) are fixedly installed on the front face of the device shell (110), the number of the cleaning installation bases (210) is two, and a sliding groove (211) is formed in one side, close to each other, of the cleaning installation bases (210), all slidable mounting have sliding block (212) in the inside of sliding tray (211), insert mounting groove (213) have all been seted up to one side that sliding block (212) are close to each other, insert the inside of mounting groove (213) and all insert and install and insert installation piece (214), the middle fixed mounting that inserts installation piece (214) has clean pole (215).
2. The construction project quality management early warning device according to claim 1, wherein: one side of device casing (110) is passed through the articulated protection casing (113) of installing of hinge shaft, fixed mounting has magnet (114) on protection casing (113), the positive fixed mounting of device casing (110) has iron sheet (115).
3. The construction project quality management early warning device according to claim 2, wherein: the front surface of the protective cover (113) is provided with a transparent soft sleeve (116).
4. The construction project quality management early warning device according to claim 1, wherein: ball groove bodies (217) have all been seted up to one side that sliding block (212) kept away from each other, and the quantity of ball groove bodies (217) is four, ball body (218) all have rolled to be installed in the inside of ball groove body (217).
5. The construction project quality management early warning device according to claim 1, wherein: draw-in groove (219) have all been seted up to the both sides of inserting installation piece (214), spring recess (221) have all been seted up to the inside both sides of inserting mounting groove (213), the inside fixed mounting that all has reset spring (222) of spring recess (221), the equal fixed mounting in one side that reset spring (222) are close to each other has card ball (220), the shape that card ball (220) are close to one side each other all is the arc, and card ball (220) all insert to the inside of draw-in groove (219).
6. The construction project quality management early warning device according to claim 1, wherein: the front surface of the cleaning rod (215) is sleeved with an anti-slip sleeve pad (216), and anti-slip lines are uniformly arranged on the outer surface of the anti-slip sleeve pad (216).
CN202023292640.4U 2020-12-30 2020-12-30 Early warning device for construction engineering quality management Expired - Fee Related CN214052710U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023292640.4U CN214052710U (en) 2020-12-30 2020-12-30 Early warning device for construction engineering quality management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023292640.4U CN214052710U (en) 2020-12-30 2020-12-30 Early warning device for construction engineering quality management

Publications (1)

Publication Number Publication Date
CN214052710U true CN214052710U (en) 2021-08-27

Family

ID=77368118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023292640.4U Expired - Fee Related CN214052710U (en) 2020-12-30 2020-12-30 Early warning device for construction engineering quality management

Country Status (1)

Country Link
CN (1) CN214052710U (en)

Similar Documents

Publication Publication Date Title
CN214052710U (en) Early warning device for construction engineering quality management
CN219064330U (en) Engineering supervision tape protection port
CN209571628U (en) A kind of USB interface protective device
CN210899901U (en) Front-end acquisition terminal for industrial automatic control instrument system
CN210924433U (en) Hard disk mounting structure for computer
CN211697926U (en) Electric energy meter with dustproof function
CN207409034U (en) A kind of conference system Wireless voting device
CN212160791U (en) Person recognition device for higher education management
CN220934608U (en) Wire inlet and outlet protection structure of power distribution cabinet
CN221201868U (en) Ammeter case shell structure convenient to equipment
CN220397786U (en) Air conditioner display panel convenient to installation
CN206311840U (en) A kind of virtual implementing helmet with dust reduction capability
CN216262154U (en) Circulating water temperature adjusting and cooling device
CN216598485U (en) Working state indicating device of non-negative pressure water supply equipment
CN214962975U (en) Motorcycle helmet
CN212628852U (en) Equipment management system based on cloud service and intelligent terminal
CN209356955U (en) A kind of data analysis set-up based on artificial intelligence
CN213024746U (en) Online alarm monitoring system device for preventing C0 leakage
CN212656731U (en) Anti-theft door and window with alarm device
CN213364889U (en) 5G mobile communication base station electromagnetic radiation environment monitor
CN220436255U (en) Safety protection type gas pressure regulating equipment
CN214700960U (en) Green's heater
CN212458456U (en) Anti-vibration and dustproof indoor environment detection device
CN213748389U (en) Wireless dynamic strain collector convenient for protecting wiring hole
CN219564985U (en) Automobile chassis with protection function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210827